SEE ADDENDUM
(No Collect Calls)
W9123720Q0098 07-Aug-2020
b. TELEPHONE NUMBER
304.399.5337
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 24 Aug 2020
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
H1P0A009. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CYNTHIA A OXLEY
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W81F8E00913462A
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, CONTRACTING DIVISION
502 EIGHTH STREET
HUNTINGTON WV 25701-2070
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF45
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9123720Q0098
Section SF 1449 - CONTINUATION SHEET
INSTRUCTIONS TO OFFERORS
The Government intends to award one firm-fixed price commercial service contract.
The award will be based on low-price. Prospective offerors must complete the information below.
Estimated Delivery Time: __________________________________
Unique Entity Identifier (formerly DUNS): ___________________________
TAX ID: ________________________
IMPORTANT NOTICE: Effective September 26, 2018 and in accordance with FAR Clause 52.204-7, “an Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.”
Vendors are highly encouraged to check their registration status and plan accordingly prior to submitting an offer.
Please direct all questions to Cynthia Oxley at (304) 399-5337 or cynthia.a.oxley@usace.army.mil. THE
SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING DOCUMENT IN ALL
CASES.
QUOTES CAN BE E-MAILED TO Cynthia Oxley at cynthia.a.oxley@usace.army.mil. Only e-mailed offers will be accepted.
CONTRACTOR FEEDBACK. Help us in BUILDING STRONG. Please provide us with your feedback, comments and recommendations for improvement by visiting our Interactive Customer Evaluation (ICE) Website at:
https://ice.disa.mil/index.cfm?fa=SiteSuggestions&site_id=856&dep=*DoD&suggestion_type=1
PERFORMANCE WORK STATEMENT
Rehabilitation of Willow Island Locks & Dam Culvert Valve Bulkheads
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
A. GENERAL INFORMATION
PROJECT LOCATION: Willow Locks and Dam 22400 State Route 7, Newport, OH 45768-5219 (740) 374-8710.
WORK SCHEDULE: Work shall be complete during normal working hours (MON-FRI, 0730-1600). The Contractor will coordinate pick up and drop off schedule with the project staff. If Contractor is planning to complete work onsite, the aforementioned schedule shall be followed unless other arrangements are made with the Government Representative. Also, if work is to be completed at Willow Island L/D, Contractor shall state that in their quote. No work shall be performed on weekends and/or federal holidays. After Notice to Proceed is given, contractor shall have 90 days to complete the requirements of this contract.
WORK AREA: Load and transport the bulkheads from landwall. An option is being given to do this work onsite at Willow Island L&D. Contractor is responsible for moving/securing bulkheads for the below mentioned work.
GOVT.PROPERTY: All instances where Government materials supplies, property, and/or equipment are damaged as a result of the contractor’s actions shall be immediately reported to the Lockmaster and/or the projects staff. Contractor is required to take necessary corrective action to replace and/or repair damages within 30 calendar days from when the incident occurred. If the contractor fails to take corrective actions as described herein, then the USACE reserves the right to take corrective action itself by using project staff, another contractor, or other means as deemed necessary at the contractors expense.
Government Representative for this Contract: Tyler Lester is the Government Representative for this Contract. Phone number is 304-563-0152 and email address is Tyler.W.Lester@usace.army.mil.
Inspections/Testing: Contractor shall notify Government Representative Tyler Lester at 304-563-0152 at least seven (7) days prior to any inspections and testing to coordinate inspections and/or testing dates.
PAYMENT: Contractor shall notify the Government Representative when the job is complete, at which time final inspection shall take place. Payment shall be initiated upon acceptance by the Government Representative.
B. PERFORMANCE WORK STATEMENT
C.1 GENERAL INFO. Contractor will provide all labor, material and equipment necessary for loading four (4) Culvert Valve Bulkheads, transporting them to offsite facility, inspecting them, rehabilitating them, and then transporting them back to Willow Locks and Dam. Each Culvert Valve Bulkhead weighs approximately 15,000 lbs.
The Contractor is given the option to do this work onsite. The Contractor is still responsible for all work listed below. It is requested that the Contractor list which site they will be performing the work at in their quote.
Non destructive weld testing (NDT) shall be performed in accordance with the latest provisions of AWS D1.1 and the following specifications.
The rehabilitation work included in this contract is for four (4)Culvert Valve Bulkheads (with components already disassembled). Rehabilitation work outlined in this SOW shall be performed at the contractor’s offsite facility.
Loading and pick up shall be coordinated with Willow Island’s staff so that access to facility and use of equipment is uninterrupted as minimally as possible.
A crane, licensed crane operator and rigging person shall be provided by contractor when picking up the Bulkheads.
C.2 DETAILED REQUIREMENTS.
Submit crane model information, boom extension required and desired positioning lot for review and approval prior to work.
Roller bracket wheels will need to be disassembled prior to being blasted. Wheels will not be rebuilt by the contractor for this contract. Contractor will inspect the wheels prior to disassembly and provide a report of their condition to the Government. If no further modifications are issued to repair/replace the rollers and or components, the Contractor will re-install the wheels and components after blasting. All hardware (nuts and bolts) shall be replaced with same types/materials as existing.
Seals will need to be removed and protected from the sandblasting and painting. Seals will be re-installed with new bolts after painting. Any damage to the paint will need to be touched up by the Contractor at no cost to the Government prior to shipping the bulkheads back to Willow Island L/D.
Rehabilitation of the Bulkheads is to include but not limited to:
a. Prepare all exposed surfaces, including weld areas, for visual inspection and NDT by removing all visible oil, grease, dirt, dust, mill scale, rust paint, oxides, corrosion products, and any other foreign matter. Coordinate with Government Representative when bulkhead is blasted for inspection by Government Representative Tyler Lester.
b. After Government inspection, Non-Destructive Testing (NDT) of welds will need to be performed.
Contractors will coordinate, schedule and provide payment for this service. Contractor shall assume 100% of welds will be tested for quoting purposes. (See below and sketches for Weld Inspection and Testing)
1. The weld inspection personnel shall meet the requirements of Section 6.1.4, “Inspector
Qualification Requirements” of AWS D1.1-2015.
2. One hundred percent (100%) of all the completed welds connecting the horizontal and vertical members to the skin plate, the lifting lugs to the top horizontal member, and the hook brackets to the top horizontal member shall be visually inspected. The appearance of the welds shall meet the acceptance criteria of Section 5.23, “Weld Profiles” and Section 6.9, “Visual Inspection” of AWS D1.1- 2015. All unacceptable weld profiles and weld discontinuities shall be noted, located and recorded by photographs. These welds are cyclically loaded.
3. One hundred percent (100%) of the completed fillet welds specified In item 2 above shall be nondestructively examined by magnetic particle testing in accordance with Part D of Section 6 of AWS D1.1- 2015. The welds shall meet the acceptance criteria of Part C of Section 6 of AWS D1.1-2015. All discontinuities shall be noted, located and recorded by photographs. These welds are cyclically loaded.
4. If any discontinuities are found to be unacceptable defects, the defects shall be corrected and the repairs subjected to one hundred percent (100%) visual and non-destructive testing by the method originally used, and the same technique and quality acceptance criteria shall be applied. All discontinuities which are found to be unacceptable defects shall be noted, located and recorded.
5. The inspector shall prepare an inspection report presenting the results of the visual and magnetic particle testing including sketches, pictures, and locations of all discontinuities and defects found.
6. Quantity of welds to be inspected:
a. Lifting Lugs – approximately 105 linear inches of 3/8” fillet weld.
b. Top Brackets for Hooks – approximately 108 linear inches of 1/4” fillet weld.
c. Vertical End Beam Web to Skin Plate – approximately 748 linear inches of 5/16” fillet welds.
d. Interior Vertical Members to Skin Plate – approximately 2,244 linear inches of 1/4” fillet weld.
e. Horizontal Members to Skin Plate – approximately 1,638 linear inches of 5/16” weld.
NDT and weld repair (if applicable) shall be complete prior to painting.
Should weld repairs be required per testing or by Government inspection, each welder assigned to placing new welds on the Bulkheads must be qualified in accordance with the applicable requirements of AWS D1.1. Welders, welding operators, and tackers who make acceptable procedure qualification test welds will be considered qualified for the welding procedure used. Contractor shall assume 10% of welds will be identified for repair. All repaired welds will need to be Non-Destructively Tested.
Defective welds in the structural steel should be defined as critical repairs or non-critical repairs and must be repaired in accordance with AWS D1.1/D1.1M, Workmanship Clause. Submit welding repair plans for welds, approved prior to making repairs. Address weld repairs within the weld as well as weld repairs for base metal defects in the welding repair plan. Weld repairs to mill defects in the base metal, repair of cracks, or a revised design to compensate for deficiencies require approval from the Government. The Contractor may prepare procedures and specifications for the repair of anticipated routine problems and submit them for approval before fabrication begins. Critical weld repairs require a WPS specific to the weld repair. Remove defective weld metal to sound metal by use of air carbon-arc gouging or by mechanical methods. Oxygen gouging for purposes of weld repair is not permitted. Thoroughly clean metal surfaces before welding. Inadequate removal of welds that damages the base metal are subject to replacement of the base metal, or compensation for the deficiency in a manner approved by the Government Representative. Retest repaired welds by the same methods used in the original inspection. Except for the repair of members cut to remove test coupons and found to have acceptable welds, costs of repairs and retesting are borne by the Contractor.
f. Before painting, the Bulkheads and already disassembled components shall be free of all visible oil, grease, dirt, dust, mill scale, rust paint, oxides, corrosion products, and other foreign matter, except for staining. Staining shall be limited to no more than 33 percent of each square inch of surface area and may consist of light shadows, slight streaks, or minor discolorations cased by stains of rust, stains of mil scale, or stains of previously applied paint. Before blast cleaning, visible deposits of oil or grease shall be removed by any of the methods specified in SSPC-SP1 or other agreed upon methods. For complete instructions, refer to Joint Surface Preparation Standard SSPC-SP10/NACE No. 2.
g. The system outlined is for a 5-E-Z paint coating system V-766E or equal. Alternative shall be provided to the Government Representative prior to award with all technical details relating how it exceeds or meets the V-766E system. Figure 1 below outlines the coating system with colors required by this contract.
h. Paint shall be spray applied to an average dry film thickness of a minimum of 175 microns 7.0 mils for the completed system, and the thickness at any point shall not be less than 140 microns 5.5 mils. The dry film thickness of the zinc-rich primer shall be approximately 63 microns 2.5 mils. The specified film thickness shall be attained in any event, and any extra coats needed to attain the specified thickness shall be applied at no additional cost to the Government. Attaining the specified film thickness by applying fewer than the prescribed number of coats or spray passes will be acceptable provided heavier applications do not cause an increase in pinholes, bubbles, blisters, or voids in the dried film and also provided that not more than 50 microns 2.0 mils (dry film thickness) per double spray coat nor more than 25 microns 1.0 mil per single spray pass of non-zinc paint shall be applied at one time.
C.3 MATERIALS AND WORKMANSHIP STANDARDS. This paragraph covers workmanship standards and procedures applicable to the items of work specified herein.
a. Workmanship. Workmanship shall be of the highest grade and in accordance with the best modern practices to conform to the specifications for the item of work being furnished.
b. Quality Control. The Contractor shall establish and maintain a quality control system to assure compliance with contract requirements and shall maintain records of all quality control operations covered by these specifications. The Contractor shall provide continuous inspection of all operations for quality control and record the results for submitting to the Government Representative to show compliance with contract requirements.
C.4 BLAST CLEANING, NDT AND PAINTING. This paragraph covers surface preparation and painting standards applicable to the items of repair work specified in paragraph C-2.
a. Surface Preparation. Surface preparation of bare metal as well as tightly adhering coating will conform to manufacture’s recommendations unless specified differently in this document. Areas that require blast cleaning in preparation for application of the paint system, for example but not limited to damaged coating, corroded metal, and bare metal, shall be performed in accordance with Steel Structures Painting Council Specification SSPC-SP-10, for “Near-White Blast Cleaning”. Surfaces shall be dry at the time of blasting. Within eight (8) hours after cleaning, but in any event prior to the deposition or formation of any detectable moisture or corrosion, all blast cleaned surfaces shall be cleaned of dust and abrasive particles by brushing, vacuum cleaning, and/or blow-down with clean, dry compressed air, and given the first coat of paint. Cleaning and painting shall be so programmed that dust or other contaminants from the cleaning process do not fall on wet, newly painted surfaces, and surfaces not intended to be painted shall be suitably protected from the effects of cleaning and painting operations. Prior to painting, abrasive particles, dust, water, and all other matter on the deck which might, in the opinion of the Government Representative, adversely affect the painting application, shall be removed to the satisfaction of the Government Representative.
b. Paint Requirements. Paint shall be delivered in sealed containers with labels to indicate manufacturer, contents, and any special instructions. Paints and painting materials shall be stored under cover and protected from extreme temperatures. Paints shall not be used if they have exceeded the closed shelf life or pot life recommended by the manufacturer. Additionally, paints shall not be applied in weather or humidity conditions not recommended by the manufacturer.
c. Qualified Painting Contractor. The Contractor will need to be a certified SSPC QP 3 Painting
Contractor.
d. Application of Coatings. Surface preparation and paint application shall be in strict compliance with the coating manufacturer’s recommendations. The Contractor shall take particular care to insure that coating system requirements are met in all areas, especially those difficult to coat, such as flange undersides, edges, cutouts and welds. All requirements outlined in this specification are additional to the manufacturer’s recommendations and does not relieve the Contractor from meeting both the manufacturer’s recommendations along with the additional requirements outlined in this specification.
e. Coating System. The system is outlined in paragraph C-2 above.
f. Inspection. NDT results shall be submitted to the Government Representative for review and approval by the Hydraulic Steel Structure Coordinator.
Surface preparation and paint application will be inspected by the Government Representative for compliance with the provisions of this section. Blast-cleaned surfaces and each applied coat of paint will be examined for imperfections by the Government Representative.
C.5 SUBMITTALS. The Government Representative may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Contractor's Quality Control (CQC) System Manager and the Designer of Record, if applicable, to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings;
descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports;
samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
All submittals shall be for Government approval and submitted to the Government Representative. The following shall be submitted in accordance with this section:
a. APP Submittal
b. Paint Submittal
c. AHA Submittal
d. Crane Model/Crane Positioning / Truck Loading Information
e. NDT Technician Certifications / Qualifications
f. NDT Report
g. Welding Procedure Specifications (WPS) – As Required
h. Procedure Qualification Record (PQR) – As Required
i. Welder Qualifications – As Required
j. Qualified Painting Contractor – The Contractor will need to submit a copy of their current SSPC QP 3
Certification.
Approved Submittals. The Government Representative’s approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory. Approval will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work. After submittals have been approved by the Government Representative, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
Disapproved Submittals. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause "Changes" shall be given promptly to the Government Representative.
General. The Contractor shall make submittals as required by the specifications. The Government Representative may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Prior to submittal, all items shall be checked and approved by the Contractor's and each item shall be stamped, signed, and dated by the CQC System Manager indicating action taken.
Proposed deviations from the contract requirements shall be clearly identified. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list);
certifications; warranties; and other such required submittals. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby. Samples remaining upon completion of the work shall be picked up and disposed of in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations. Adequate time (minimum of thirty (30) days) will be allowed for review and approval, and possible re-submittal.
Shop drawings and submittals shall be submitted as specified above to:
US Army Corps of Engineers Attn: Tyler Lester, CELRH-OR-TM 502 8th Street Huntington, WV 25701
C.6 SUGGESTED WORK SEQUENCE.
1. Pickup Bulkheads and components from Willow Island Locks Dam. (Unless performing work at Willow Island L/D)
2. Disassemble the Roller wheel from the roller brackets.
3. Clean areas to be NDT and perform NDT of welds. Perform weld repair (if needed).
4. Blast clean entire surfaces to be painted.
5. Paint all surfaces in accordance with specifications.
6.Transfer the Bulkheads and components to Willow Island Locks and Dam. (Not needed if work is performed at Willow Island L/D) Contractor Accident Prevention Plan (APP).
A. General. Contractor shall comply with all Federal, State and Local safety requirements including those specified by the Occupational Safety and Health Act (OSHA) in 29 CRF 1910 General Industry Standard, 1926 Construction Standard and the U.S. Army Corps of Engineers Safety & Health Requirements Manual EM 385-1-1 as currently revised. Where a conflict exists between safety standards/requirements the contractor shall comply with the more stringent requirement. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, any project employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.
B. Contractor Accident Prevention Plan (APP). The Contractor shall prepare a site-specific Accident Prevention Plan following the outline provided in EM 385-1-1, Appendix A as a minimum. The contractor shall address each element and sub-element in the outline in the order they appear in Appendix A. Any item from the outline that does not apply must be listed, in its assigned place and a brief explanation of the reason it is not required/provided. The APP shall address any unusual or unique aspects of the project or activity. This plan must be accepted by the Contracting Officer prior to commencement of any work. Contractors are encouraged to contact the USACE Safety & Occupational Health Office for questions or information regarding the development of contract Accident Prevention Plans. Office hours are Monday-Friday 8:30 a.m. - 4 p.m. at (304)399- 5039/5032/5326. The web address for EM 385-1-1 is:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
(1) The contractor shall have on site an employee designated as a Site Safety and Health Officer (SSHO) who has completed the OSHA 30-hour Construction Safety training or its equivalent as specified in EM 385-1-1, 01.A.17 (only authorized online outreach training providers qualify – https://www.osha.gov/dte/edcenters/map.html) and has at least five years experience relative to the work to be performed. No work will be permitted unless the SSHO is present at the work site.
(2) For task orders limited to routine mowing, cleaning and janitorial work SSHO responsibilities may be a collateral duty. Contractor may also elect to use an SSHO with either OSHA 30-hour Construction or General Industry qualifications.
(3) Work crews of two or more must have two people holding current certification in First Aid and CPR from the American Red Cross, American Heart Association or a licensed physician. Training must include a hands-on component that cannot be taken online and the contractor must maintain appropriate First Aid kit on site. Single individuals working alone must have current certification in First Aid as a minimum.
(4) All work that potentially exposes the worker to falls of six feet or more will require the contractor to submit a Site Specific Fall Protection & Prevention Plan in accordance with EM 385-1-1, Section 21.D.
(5) Cranes and hoisting equipment shall be operated only by qualified personnel (operators licensing, physical and drug testing in accordance with EM 385-1-1 Section 16.B). Note: CDL Medical Clearance is not acceptable. Please see attached medical clearance requirements.
(6) Effective November 8, 2010 all “Signalpersons” and “Riggers” shall be qualified. This is a mandatory requirement in accordance with 29 CFR 1926.1400 Regulations. Riggers must be a qualified person for the performance of specified hoisting activities such as during assembly/disassembly, in accordance with OSHA 1926.1404(r)(1) and 1926.1425(c)(3).
(7) Work orders involving potential exposure to Hazardous, Toxic or Radiological Waste shall require development of Site Specific Safety and Health Plan (SSHP) by qualified personnel as specified in EM 385-1-1 Sections 6 and 33.
C. Risk Management Process. The Contractor shall utilize risk management tools such as Activity Hazard Analysis (AHA), Job Hazard Analyses (JHAs), Job Safety Analyses (JSAs) or similar tools to identify, assess, prioritize risks and develop controls to minimize, monitor and control the probability and/or impact of unfortunate events to an acceptable level. Within each major phase, all activities, tasks or Definable Features of Work (DFOWs) shall be identified that will require an AHA/JSA/JHA. For each work activity, task or DFOW contractor shall prepare the initial AHA/JSA/JHA. A Risk Assessment Code (RAC) is assigned to each step, to the risk that remains after controls have been applied (residual risk) a final RAC (cannot be lower than the highest step RAC) shall be assigned. See EM 385-1-1 Section 01.A.14.b. for further guidance or contact the SOHO for assistance. The AHA/JSA/JHA shall be reviewed and accepted by the proper authority in order to proceed with the activity. All on-site employees shall review the accepted AHA/JSA/JHA prior to performing work and during weekly and “Tool Box” safety meetings as appropriate.
1. AHA/JSA/JHA shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. AHA/JSA/JHA should indicate compliance with EM 385-1-1 personal protective equipment requirements (safety-toed work boots, safety glasses, gloves, hard hats, etc.), work crews of two or more must have two people currently qualified in first aid and CPR and the appropriate first aid kit on site. Single individuals working alone must have current certification in First Aid only.
2. The names of the Competent Person(s) and Qualified Person(s) required for a particular activity (e.g., excavation, scaffolding, fall protection, or other activities as specified by OSHA and this manual) shall be identified and included in the AHA/JSA/JHA, as well as proof of their competency/qualification.
D. Accident/Mishap Reporting: The Contractor shall report all recordable mishaps to the GDA within 24-hours in accordance with EM 385-1-1 Section 01.D. Accidents shall be investigated to determine causal factors and corrective actions shall be implemented. Accidents resulting in: days away injuries, days away illnesses, restricted/transfer injuries, property damage of $5,000.00 or more shall be investigated and reported to the GDA using the USACE Accident Investigation Report Form ENG 3394 within 24 hours of the occurrence.
(1) Immediate notification to the GDA is required for all serious accidents:
a. Fatal Injury/illness;
b. Permanent totally disabling injury/illness;
c. Permanent partial disabling injury/illness;
d. One (1) or more persons hospitalized as inpatients as a result of a single occurrence;
e. $500,000 or greater accidental property damage;
f. Three (3) or more individuals become ill or have a medical condition suspected to be related to a site condition, or a hazardous or toxic agent on the site;
g. USACE aircraft destroyed or missing;
The Contractor shall maintain an OSHA Log of Work Related Injuries and Illnesses, OSHA Form 300 and comply with all accident reporting and recordkeeping requirements specified in 29 CFR 1904.39.
(2) In addition to the above, any mishap occurring in any of the following high hazard areas shall be reported immediately to the GDA, investigated and corrective actions implemented.
a. Electrical (includes Arc Flash, electrical shock, etc.);
b. Uncontrolled Release of Hazardous Energy (includes electrical and non-electrical);
c. Load Handling Equipment (LHE) or Rigging;
d. Fall-from-Height (any level or other than same surface);
e. Underwater Diving
SECURITY REQUIREMENTS
All Contractors and subcontractor employee(s) working on any contract who require access in and/or around any Huntington District facilities, projects, owned or leased facility/space shall receive authorization to be on site at these areas based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12).
The Huntington District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on any contract based upon the results of the background investigation provided by the Huntington District Security Management Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.
FOR ALL CONTRACTS 1-YEAR AND SUBSEQUENT OPTION YEARS:
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or on District facilities.
The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working,
(2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) Security Information Sheet on each employee working on site must be submitted directly to the Huntington District Security Management Office.
The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.
Contractors shall have background checks completed for their employees annually in the case of Contracts with option periods. For instance, if the employee was cleared in May of 2018, they shall be cleared again in May of 2019. It is the Contractor’s responsibility to ensure that each employee’s security is up to date. Failure to comply may lead to possible removal from the project/jobsite.
The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Huntington District USACE Security Management Office for background purposes.
FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC)
The documents listed below are required:
SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by Contracting Division by contacting the Huntington District Security Management Office).
Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.
Following submission of paperwork, the Huntington District Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Huntington District Security Management Office will make recommendations to the PCO or their Designated Representative. The Huntington District Security Management Office cannot give approval due to unfavorable report(s). The Huntington District Security Management Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.
FOREIGN NATIONALS
The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must be cleared 30 to 45 days in advance of any site visit, tour or work on USACE owned/leased property. All Foreign Nationals must comply with the following paragraph:
In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.
In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Huntington District Security Management Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work. A scanned copy of a valid passport must be sent to the Security Management Office in order to formally request a visit to any Huntington District facilities, projects, owned or leased facility/spaces.
Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, Engineering or Army regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.
The Contractor shall contact the Huntington District Security Management Office by phone, letter, or email at the following numbers/addresses:
CELRH-SM
502 Eighth Street Huntington, WV 25701
Scott E. Grandon, phone (304) 399-5661; email scott.e.grandon@usace.army.mil Stephen R. Curry, phone (304) 399-5695; email stephen.r.curry@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil Sandra L. Hardwick, phone (304) 399-5612; email sandra.l.hardwick@usace.army.mil
Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program(http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
WIO BULKHEAD REPAIRS
FFP
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL AND
EQUIPMENT NECESSARY FOR THE REHABILITATION OF THE CULVERT
VALVE BULKHEAD AT WILLOW ISLAND LOCKS IN ACCORDANCE
WITH THE PERFORMANCE WORK STATEMENT
FOB: Destination
MILSTRIP: W81F8E00913462
PURCHASE REQUEST NUMBER: W81F8E00913462A
NET AMT
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.212-5 Contract Terms and Conditions Required to Implement
Statutes or Executive Orders--Commercial Items
JUL 2020
52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION 2020-O0008).
MAR 2020
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.245-1 Government Property JAN 2017 52.245-9 Use And Charges APR 2012 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
DEC 2019
252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.215-7013 Supplies and Services Provided by Nontraditional Defense
Contractors.
JAN 2018
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7048 Export-Controlled Items JUN 2013 252.225-7974 (Dev) Representation Regarding Business Operations with the
Maduro Regime (DEVIATION 2020-O0005)
FEB 2020
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.232-7017 Accelerating Payments to Small Business Subcontractors--
Prohibition on Fees and Consideration
APR 2020
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished
Property
APR 2012
252.245-7002 (Dev) Reporting Loss of Government Property (DEVIATION 2020- O0004)
FEB 2020
252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal DEC 2017 252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)
(a) Definitions. As used in this clause--
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
This is the start of the file's text. The full file is on GovTribe.