B.08.02 Solicitation (W912EF22Q0012).pdf
PDF 1 MB Posted
- Solicitation number
- W912EF22Q0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.04.30 SCA Wage Determination (Umatilla).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912EF22Q0012 13-Dec-2021
b. TELEPHONE NUMBER
509.527.7232
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 04 Jan 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912EF9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ANDREW J SPRYS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USAED, WALLA WALLA - CONTRACTING DIV.
ANDREW J SPRYS
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 960401 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
ARMY CORPS OF ENGINEERS
PERFORMANCE SPECIALIST
MCNARY PROJECT WHSE
82790 DEVORE ROAD
UMATILLA OR 97882-1230
TEL: 541-922-1355 FAX: 541-922-2221
FAX:
TEL: 509-527-7232 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF44
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912EF22Q0012
Section SF 1449 - CONTINUATION SHEET
INSTRUCTIONS TO OFFERORS
This is a request for quote for a Supply with Service Installation of Seismic Anchors in accordance with the Scope of Work for the U.S. Army Corps of Engineers, Walla Walla District at McNary Dam, Umatilla, Oregon..
Registration at www.sam.gov is required. Failure to register in the SAM database will make an offeror ineligible for award. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required in order for the GSA Federal Service Desk (FSD) to activate the entity's registration. Both Federal Assistance entities and all non-Federal entities must mail the original, signed copy of the notarized letter to the Federal Service Desk.
Failure to do so within 30 days of activation may result in the registration no longer being active. Mail the completed, signed, notarized letter to:
FEDERAL SERVICE DESK
ATTN: SAM.GOV REGISTRATION PROCESSING
460 INDUSTRIAL BLVD
LONDON, KY 40741-7285
UNITED STATES OF AMERICA
TO ENSURE RECEIPT OF YOUR QUOTE, PLEASE SEND TO THE ATTENTION OF ANDREW
SPRYS AT andrew.j.sprys@usace.army.mil
If you have any questions or concerns regarding the Request for Quote, please contact Andrew Sprys by Telephone 509-527-7232; or send an email to andrew.j.sprys@usace.army.mil
Name: _____________________________________________________________
Contact Telephone Number: ____________________________________________
Email Address: __________________________________________________________________
Company’s Federal Tax Identification Number: ____________________________________________
CAGE CODE: _________________________ DUNS Number ________________________________
The System for Award Management (SAM) is online. SAM replaces CCR/FedReg, ORCA, and EPLS.
If you have been using those systems, you should now go to www.sam.gov to find your information.
In accordance with FAR Part 29.3 – State and Local Taxes, and per Title 4 of US Code 104-107, the Government is exempt from paying state and local taxes. Exempt tax identification number 91-8028090.
Submission of Price Quote – Offeror shall submit 1 copy of the following:
1. Signed and dated Standard Form 1449 (Solicitation/Request for Quote)
2. Signed and dated Standard Form 30, if applicable, for any Amendments to the Solicitation
3. Completed schedule (pricing information) for all contract line item numbers
PRICES QUOTED MUST BE VALID FOR 60 DAYS. Solicitation shall result in a firm-fixed-price contract.
All pricing shall include shipping FOB destination (include shipping cost in price).
BUSINESS HOURS: The standard business hours for the Walla Walla District, Corps of Engineers are Monday through Friday from 8:00 a.m. to 4:00 p.m., excluding federal holidays.
BASIS FOR AWARD
The Government will award one contract resulting from this solicitation in accordance with FAR 13.106 to the responsible offeror meeting or exceeding all solicitation requirements based on price. The government does not intend to have discussions with offerors so please ensure that all information required in this solicitation is provided with your quote.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Supply List
FFP
BOM in the Performance Work Statement FOB: Destination
PSC CD: N099
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job Service Installation
FFP
IAW the Performance Work Statement
PSC CD: N099
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 5 mths. ADC 1 ARMY CORPS OF ENGINEERS
PERFORMANCE SPECIALIST
MCNARY PROJECT WHSE
82790 DEVORE ROAD
UMATILLA OR 97882-1230
541-922-1355
960401
0002 5 mths. ADC 1 (SAME AS PREVIOUS LOCATION)
960401
BIDDER INQUIRY
Bidder Inquiry
All inquiries regarding this solicitation are to be submitted via Bidder Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a web-site that allows bidders to post questions regarding the solicitation and view all questions by other bidders and responses by USACE. Bidder Inquiry can be accessed through ProjNet at (https://www.projnet.org)
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.
The Bidder Inquiry Key is: EJV2ES-B5E2VF
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for Entering Questions:
1. After you are logged in click on the "post new inquiry", it is on the left side of the window under the Word
"Submit" a.) This is the window where you will enter your questions b.) Comment Classification: Click on the down arrow to the right of the words “Please select from below”, select “Public” c.) Discipline: This is where you select who this question should be directed to. Example; if the question is about an electrical drawing or specification select: “Electrical” from the pull down list.
d.) Sheet. Enter the sheet number of the drawing you are asking about.
e.) Detail. Enter the detail name of the detail shown on the drawing that you are asking about.
f.) Specification. Enter the Specification number and paragraph number.
g.) File. Use this if you are going to attach a pdf file.
h.) Question. Enter your question here.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret
Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
For questions about the ProjNet Bidder Inquiry, please contact the Call Center help desk toll free at 1-800-428-
HELP, which operates from 8AM to 5PM (Central US time zone). Bidder inquiry help questions can also be emailed to the helpdesk at staff@projnet.info
PERFORMANCE WORK STATEMENT
Performance Work Statement Seismic Anchoring
McNary Lock & Dam
PART 1 GENERAL INFORMATION
1.1. SCOPE OF WORK
The Contractor shall provide personnel, materials, supplies, equipment and other items and services necessary to perform Seismic Anchoring installation of the 230kV Spare Transformer at McNary Lock and Dam as outlined in this Performance Work Statement (PWS). This contract is a fixed-price, performance-based service contract where desired outcomes are defined and measured while contractor methods are generally not constrained or directed.
The scope includes fabrication and installation of the seismic anchors for the existing 230kV Spare Transformer that are required to secure the transformer to the intake deck as required to comply with the structural seismic codes and drawing. Supply new materials per the BOM in Attachment 1. The steel fabrications must be welded with qualified welders per AWS D1.1, inspected by a Certified Weld Inspector, and galvanized per ASTM A123. Unbolt and remove the existing anchor tabs. Remove existing grout to structural concrete using minor chipping hammers.
Ensure not to damage existing structural concrete. Cut existing 5/8” threaded rod flush with the existing structural concrete and provide cold galvanizing to the ends. GPR scan to determine existing reinforcing location. Existing reinforcement will not be permitted to be damaged. After finalization of new anchor tab location, roughen existing concrete to grout interface to a ¼” amplitude with a light chipping hammer or high-pressure water jetting. Drill new 3/4” core holes for new 5/8” anchors. (4) 3/4” core drills are needed per anchor location. Total of (16) new core holes are required. Tape threaded rod length within grout. Install threaded rod, anchor tab assembly, and anchor plate into position. Note: the use of secondary nuts within the grout is not permissible as the threaded rod must compress the grout to the existing concrete. Verify the anchor hardware can be installed within 5 degrees of vertical in all directions. After confirmation of position, form the anchor assemblies and grout anchor tabs in position. After form removal, provide curing compound to new grout per manufacturer’s instructions. Final anchor tab threaded rod torquing performed 14 days after grout installation. Install anchorage from anchor tab location to the transformer after threaded rod final torque is completed. Install new 1 3/16” holes in rail for new rail stop brackets and Install rail stop brackets per detail J.
1.2. CONTRACTOR PERSONNEL
1.2.1. The Contractor shall designate an experienced on-site supervisor with written authority to act on behalf of the Contractor in dealing with the Government. The primary duties of the supervisor will be to supervise employees and to serve as QC person, with full responsibility described in 1.3. Quality Control (QC). This individual will have a thorough knowledge of the contract requirements and the work to be performed under this contract as well as a minimum of two years QC experience in an industrial arena. The name, phone number, fax number and email address of this person shall be designated in writing to the Contracting Officer’s Representative (COR) at the pre-work meeting.
1.2.1.1. The supervisor shall have full authority to act for the Contractor on all matters relating to daily operation of this contract.
1.2.1.2 The supervisor shall be able to fluently read, write, speak and understand English.
1.2.2. Contractor Personnel. To minimize risk, the Contractor shall not employ persons for work on this contract if the COR considers such person a risk to the health, safety, security or wellbeing of the public or Government employees or mission of the Government.
1.2.2.2. The Contractor employees shall be skilled in steel fabrication and capable of performing the work under this contract. All employees of the Contractor or subcontractors shall be 18 years of age or older.
1.2.2.3. Training. The Contractor shall ensure that all employees and subcontractors have current safety training covering safe work practices, personal protective equipment, proper housekeeping and fire protection. The Contractor shall also ensure that all employees have necessary certificates as required by local, state and Federal laws. The Contractor shall apply risk management strategies to ensure personnel safety and shall comply with safety requirements articulated in EM 385-1-1, the US Army Corps of Engineers Safety Manual. The safety manual can be accessed at:
http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm
1.2.3. Physical Security: The contractor shall be responsible for safeguarding all Government equipment, information, and property by securing all doors and access points at all times while on installation. Specific security conditions may change based on threats to National defense and based on the risk of specific facilities to these threats. The contractor shall abide by these changing conditions at all times.
1.2.4 Key Control: The Contractor must ensure all keys issued to the Contractor by the Government remain on Project site, are not lost, stolen or duplicated and are not used by unauthorized persons. Contractor must immediately report to the COR any occurrences of lost or stolen keys. In the event keys are lost or stolen, the Contractor may be required, upon written direction of the COR, to re-key or replace the affected lock or locks without cost to the Government. The Government may however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost from the monthly payment due the Contractor.
1.2.5 Anti-Terrorism (AT) Level 1 Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html
1.2.6 Access and General Protection/Security Policy and Procedures: All contractor and all associated sub-contractor employees shall comply with applicable facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.2.7 Suspicious Activity Reporting Training (e.g., IWATCH, CorpsWatch or See Something, Say Something):
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training. Provide a letter certifying who took the training and the date of the training. http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx
1.2.8 Operations Security (OPSEC) Training: All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html
1.2.9. Required Annual HECP Training. Contractor and subcontractor employees operating under the Contractor’s Lockout/Tagout procedures or under the Walla Walla District Safe Clearance Program, as described above, shall take the HECP procedure training described below. Any non-working personnel, vendors and visitors that will be entering an area under Safe Clearance shall take Awareness level training. Training and written tests for the modules below shall be completed online prior to commencing onsite work. Time estimates for training follow:
a. Awareness Level Training: Approximately 1 hour
All costs for this training shall be considered incidental to the work, and therefore, no additional payment will be made. Training is an annual requirement and will expire one year from completion date. Training is provided by Vivid Learning Systems and is available online at http://Hecp.vividlms.com. Cost for the training is displayed on the home page. Submit the training completion certification(s) to the COR
1.2.10 E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.2.11 Prohibited Items: Alcohol, firearms, or controlled substances are prohibited on Government installations. The Government retains the right to prohibit other items.
1.3. QUALITY CONTROL
1.3.1 The Contractor shall provide the COR a QC plan for acceptance at the pre-work conference. The COR will notify the Contractor of acceptance or required modifications to the plan before the contract start date. The Contractor shall make appropriate modifications and obtain acceptance of the plan by the COR before the work may begin. If the QC plan is not approved prior to the contract start date, the plan will be considered a draft and may be used for routine work pending final approval. All work permitted, prior to approval of the QC plan shall be authorized by the COR.
1.3.2. The QC plan shall minimally include:
1.3.2.1. A description of the inspection system for all services listed on the Performance Requirements Summary (PRS). The description shall specify a monitoring strategy and include both the frequency and location of inspections, and the titles and organizational placement of the inspectors.
1.3.2.2. A description of the methods to be used for identifying and preventing defects in the quality of service performed.
1.3.2.3. A description of the records to be kept to document inspections and corrective or preventive actions taken.
1.3.3 Records of QC inspections shall be kept and made available to the COR, when required by schedule or request, throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
1.4. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The Government will evaluate the Contractor’s performance under this contract for those tasks listed on the PWS, to establish acceptance of the final invoice and as the basis for payment. The COR or Quality Assurance (QA) evaluators will follow the methods of surveillance specified in the PRS; generally systematic random sampling will be employed. Government personnel will record all QA inspections, and the COR will retain such records.
1.5. MEETINGS & COMMENCEMENT
1.5.1. Pre-Work Meeting. Prior to commencement of work on this contract, the Contractor shall attend a pre-work meeting at a time and place mutually agreed to by the Contractor and the COR. At this meeting, the COR will establish lines of authority and Government procedures for contractual administrative and work issues. The schedule of required submittals and reports will also be discussed. The Government shall furnish a letter of record documenting pre-work conference discussions to attendees within one week following the meeting. The Contractor shall submit, in completed form, the following items at the pre-work conference: Certificate(s) of Insurance and Letter of Authority for the Contract Supervisor. The contractor will submit in draft form, the following items at the pre-work meeting: QC Plan; Accident Reporting Plan; Accident Prevention Plan; Activity Hazardous Analysis Plan;
Hazardous Material Communication Plan; Hazardous Waste Disposal Plan; A list of any subcontractors; and a list of names and addresses of all employees who will be working for the Contractor, and a list of all vehicles, vessels and equipment to be used by the Contractor.
1.5.2. Payment. The Contractor shall submit a final payment for COR approval within 15 days after receipt of notice of completion. The payment will reflect the work performed during contract period of performance and the method the Contractor proposes for payment to the Government. Note: The Government cannot pay for services that have not been performed; therefore, the payment schedule should reflect the work to be performed and the invoice for the contract period.
1.5.3. Commencement. The draft plans noted above shall be approved by the COR prior to commencement of work by the Contractor. Failure to complete plans approved by the COR will result in delays in notification to proceed which shall not be the basis of a Contractor claim.
1.5.4. Contract Meetings. When requested by the COR, the Contract Manager and the COR shall meet to review performance and to discuss contract issues. The meetings will be held at a time and location agreed to by the COR and the Contract Manager prior to the meeting.
1.6. PHYSICAL SECURITY
1.6.1. The Contractor shall ensure that all Government facilities, property and materials shall be appropriately secured at all times and that all doors, gates, enclosures, etc. are locked or secured as they were found. Specific security conditions may change based on threats to national defense and based on the risk of specific facilities to these threats. The Contractor shall abide by these changing conditions at all times. The Contractor shall advise the COR of any damage done to the facilities due to vandalism or other causes as soon as practicable following the discover or occurrence.
1.6.2. Project Access Policy. All Contractor employees working at the Project site shall be subject to the latest issuance of the Project Access Policy and to all access control measures listed below.
1.6.3. Employee Identification. All Contractor personnel and regular subcontractors must wear clothing marked with identifying name of the Contractor. The Contractor shall furnish photo identification for each employee. Each employee shall display this identification at all times while on the Project. At a minimum, badges shall include company name, the individual's name, and a readily identifiable photo of the employee. Badges shall be durable and in good condition.
1.6.4. Employee Background Checks. The Contractor shall perform, at a minimum, local area background checks on prospective employees who will perform work on the Project site. The Government retains the right to deny access to any prospective employee it deems may pose a security threat.
1.6.5. Contractor Employee Access. The Contractor shall request access by submitting the following to the COR for each authorized employee not later than 48 hours prior to employee's first arrival at the Project:
Employee's full name Results of employee’s local background check Copy of employee’s Contractor-provided photo ID Employee's driver's license number Employee's birth date Attestation of employee's U.S. Citizenship (see 1.12.4 below) Description of all vehicles and license plates used by the employee for the work (updated, as necessary) A digital photo of each employee (alternatively, the Government may photograph each employee)
1.6.6. Non-US Citizens. Contractor employees who are non-US citizens must request access in writing to the
USACE Walla Walla District Security Office at least four weeks in advance of the access date. The employee must submit a copy of their passport with this request.
1.6.7. Contractor Vehicles. All Contractor vehicles shall be identified with either permanent or magnetic signs that state the Company’s name. At a minimum, signs shall be placed on the driver’s side of the vehicle and be readily identifiable from not less than 25 feet from the vehicle.
1.6.8. Keys and Access Badges. The Government will issue or check out keys and access badges to Contractor employees as it deems necessary. Contractor employees shall not remove the keys/badges from the Project site without written consent. No keys/badges issued to Contractor employees shall be duplicated. The Contractor or Contractor's employees shall report the occurrence of a lost key/badge immediately to the COR. If keys are lost or duplicated by the Contractor or Contractor's employees and, in the opinion of the Government, it is necessary to replace or re-code any or all locks for reasons of security, the direct cost of such replacement or re-coding will be charged to the Contractor. All keys and access badges issued shall immediately be delivered to the COR upon the release of the employee or contract completion. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.
1.6.9. Prohibited Items. No alcohol, firearms, or controlled substances shall be allowed on the Project site. The Government retains the right to prohibit other items.
1.7. HOURS OF OPERATION
Normal Hours of Operation. Normal hours of operations are from 06:30 to 17:00 Monday through Thursday.
1.8. CONSERVATION OF RESOURCES and HAZARDOUS WASTE
1.8.1. The Contractor shall ensure employees practice utility conservation. The Contractor is responsible for operating under conditions that prevent the waste of utilities to include:
Turning off equipment when not necessary for work.
Putting tools, equipment, and materials away when done working for the day.
1.8.2. ENVIRONMENTAL and HAZARADOUS WASTE Requirements: Minimize environmental pollution and damage that may occur as the result of Service Contractor operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of this Contract. Comply with all applicable environmental Federal, State, and local laws and regulations.
Any delays resulting from failure to comply with environmental laws and regulations shall be the Contractor's responsibility.
1.8.3 Environmental and Hazardous Materials: The Contractor must establish systems and controls to minimize the use of hazardous materials and generation of hazardous wastes, maximize recycling of materials and comply with local, state and Federal guidelines for hazardous material and waste storage and disposal. The Contractor will furnish the Government with copies of all Safety Data Sheets (SDS) prior to using or storing such chemicals in Government facilities. No propane, diesel, or gas-powered equipment will be stored in the powerhouse.
Hazardous Waste Handling Plan that complies with all Federal, State, and local laws or regulations that pertain to generation, storage, and transportation of hazardous materials: 40 CFR 260-40 CFR 263, WAC 173-303-100. 49 CFR 171-178, 29 CFR 1910.120, 29 CFR 1926.65. This includes the handling of such hazardous materials as hazardous wastes (including but not limited to, aerosol cans, cleaning solvents, and used rags) if applicable. The Contractor shall prepare and submit a compliance plan detailing how the Contractor handles hazardous materials to include:
An inventory of all hazardous materials brought onto the project site accompanied by their respective Safety Data Sheets (SDS). The Contractor and the Government will jointly maintain the SDSs for all hazardous materials in accordance with 29 CFR 1910.1200. Any changes in product must have the SDSs submitted to the COR before use on project.
A hazardous material spill and cleanup plan, including tools and readily available materials on hand to facilitate containment and cleanup, 29 CFR 1910.120/29 CFR 1926.65.
A waste determination plan that includes a sample analysis plan, or process knowledge, that meets Federal and State requirements for hazardous waste designation 40 CFR 261, WAC 173-303-100. Coordination with the Project ECC to determine if testing is required. The cost of testing is the responsibility of the Contractor.
Provisions to coordinate with Project ECC for profiling and disposal of all Hazardous Waste. The Project ECC must be present to sign the Uniform Hazardous Waste Manifest for all Hazardous Waste shipped off of Corps of Engineers property.
1.8.4 Waste Disposal: The Contractor will dispose of all waste, including cleaning solutions, cleaning solvents or detergents generated that are determined to be a hazardous or dangerous waste by state and federal regulations. The Contractor will provide their own hazardous waste containers meeting all compliance regulations for Department of Transportation’s shipping and secondary containment for the potentially hazardous waste.
Contractor shall coordinate with Project ECC to determine proper container type and marking requirements in accordance with 49 CFR 178 prior to the generation of any hazardous waste. This drum will be stored in a place mutually agreed upon by the Government and the Contractor. The drums and secondary containment will be a controlled satellite accumulation area for the project. The Project EEC will perform weekly hazardous waste accumulation inspection. The Contractor will notify the COR when the hazardous waste accumulation drum reaches approximately 75% of filled volume. The Contractor must follow manufacturer’s warnings and instructions in the mixing and use of all chemicals in the execution of this contract.
Contractor shall coordinate with the Project ECC to expedite off site shipment of hazardous waste. If, for any reason, the hazardous waste cannot be shipped off-site in "less than 90-days" the COR and Project ECC shall be notified immediately. Project ECC will be required to sign all waste shipping records. The cost of disposal is the responsibility of the Contractor.
All non-hazardous waste will be the responsibility of the contractor and be properly disposed of by the contractor per state and federal regulations. The contractor will not dump these items into Government waste disposal containers. The Contractor will maintain records of disposal upon request of COR for compliance.
1.9. RECORDS
The Contractor is responsible for creating and providing reports and records that are specifically cited in the PWS or required by the provisions of a mandatory directive listed in Part 6, Applicable Publications and References. Timely communication of the following records are critically important: accident and incident reports, vandalism and property damage reports, pesticide application reports, as-built sketches and drawings, contractor personnel safety exposure hours, equipment utilization hours, security breaches, hazardous waste management and disposal and hazardous material spills. The Contractor shall comply with their approved plans.
1.10. PROTECTION OF GOVERNMENT FACILITIES
The Contractor shall report all damages to the facilities due to vandalism or any other causes to the COR on the day such damage is first noticed.
1.11. ENVIRONMENTAL PROTECTION
This paragraph prescribes actions required for the prevention of environmental pollution during and as the result of operations under this contract. For the purpose of this specification, environmental pollution is defined as the presence of chemicals, physical or biological elements, or other agents which adversely affect human health or welfare, unfavorably alter ecological balances, affect other species, or degrade the utility of the environment for aesthetic and recreational purposes. The control of environmental pollution requires consideration of air, water and land, and involves noise and solid waste management, as well as any other pollutants. In order to prevent and to provide for abatement and control of any environmental pollution arising from activities in performance of this contract, the Contractor and his/her subcontractors shall comply with all applicable federal, state and local laws and regulations.
1.11.1. Notification. The COR will notify the Contractor, in writing, of any noncompliance with the aforementioned Federal, state, or local laws or regulations. The Contractor shall, upon receipt of such notice, immediately inform the COR of proposed corrective action and take such action as approved by the COR. If the Contractor fails or refuses to comply promptly, the KO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor.
1.11.2. Implementation. At the pre-work meeting, the Contractor and the COR shall develop mutual understandings relative to compliance with this provision. The Contractor shall then prepare and submit a written environmental protection plan which shall be carried out throughout the life of this contract. This plan shall be submitted to the COR for their approval within twenty-two (22) working days after the date of award. Approval of the plan will not relieve the Contractor of his/her responsibility for adequate and continuing control of pollutants.
1.12. SAFETY REQUIREMENTS
The Contractor shall comply with all applicable federal, state, agency, local, and industry standard safety practices.
The Contractor shall comply with all applicable standards of the latest version of EM 385-1-1, USACE Safety and Health Requirements Manual, that is in effect on the date of solicitation. Prior to preparing a quote, prospective contractors should check the HQUSACE Safety and Occupational Health website (http://www.usace.army.mil/CESO/Pages/Home.aspx) for latest changes. The EM 385-1-1 standards listed below require submittals prior to and during the contract period of performance.
1.12.1. Accident Prevention Plan (APP). The Contractor shall prepare and maintain an Accident Prevention Plan in accordance with EM 385-1-1, Section 01.A.11 and Appendix A, Paragraph 11, and also covering additional topics specific to work on this Contract and shall include accident reporting procedures. The Contractor shall deliver its APP to the COR for acceptance at or prior to the Post-award Conference.
1.12.2. Activity Hazards Analysis. The Contractor shall prepare and maintain an Activity Hazards Analysis for each element of work on this contract in accordance with EM 385-1-1, Section 01.A.13. Each Contractor employee shall review and acknowledge the AHA not less than annually or upon any change. AHA templates may be downloaded at the URL listed below; the Contractor is not required to follow these formats but is welcome to do so. The Contractor shall deliver a copy of its Activity Hazards Analysis to the COR for acceptance at or prior to the Post-award Conference.
http://www.usace.army.mil/SafetyandOccupationalHealth/ActivityHazardAnalysis.aspx
1.12.3. Hazard Communication. The Contractor shall prepare and maintain a Hazard Communication Program in accordance with EM 385-1-1, Section 06.B. The Contractor shall deliver a copy of its Hazard Communication Program to the COR for acceptance at or prior to the Post-award Conference.
1.12.4. Safety & Health Bulletin Board. The Contractor shall prepare and maintain a Safety & Health Bulletin Board for its employees working onsite in accordance with EM 385-1-1, Section 01.A.06 and other applicable sections.
1.12.5. Safety Training and Meetings. The Contractor shall provide safety training and hold safety meetings in accordance with EM 385-1-1, Section 01.B. All training, meetings, and indoctrinations shall be documented in writing by date, name, content, and trainer. Contractor employee training records shall be available for inspection by the COR upon request.
1.12.6. Contractor Exposure Hours. In accordance with EM 385-1-1, Section 01.D.05.a, the Contractor shall maintain records of all exposure and work hours and a log of occupational injuries and illnesses. The Contractor shall report Contractor employee exposure hours to the COR within 10 calendar days of the end of each month of service.
1.12.7. Government-provided Orientation. The Contractor’s employees may be working in areas containing control systems vital to the operation of the Project. Prior to commencing work onsite, and annually thereafter, each Contractor employee performing work on this contract, regardless of frequency of work or duties performed, shall receive a Government-provided orientation on Project safety, security, and industrial environment precautions. This orientation is expected to take two hours, and each employee shall be required to attest in writing that it has been received.
PART 2 DEFINITIONS
2.1. Acceptable Quality Level (AQL). A percentage of acceptable defects in overall performance. Used to determine satisfactory or unsatisfactory performance based on random sampling (if used) or actual defects when work is inspected.
2.3. Contracting Officer (KO). A person with authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. The KO is the only individual who can change any terms or conditions of this contract that affect scope, delivery, or cost.
2.4. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the KO to administer the contract. The COR’s appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.5. Contractor. The term Contractor refers to the prime Contractor and all contractor employees and personnel.
The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract.
2.6. Defective Service. A service or output that does not meet the standard of performance requirement specified in the contract for that service.
2.7. Performance Requirement Summary. The point that divides acceptable and unacceptable performance of a task according to the PRS and the Inspection of Services clause. It is the number of defects or maximum percentage of defects in the lot that is acceptable.
2.8. Quality Assurance. A planned and systematic pattern of all Government actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. For purposes of this contract, QA refers to actions by the Government assurance functions for a contracted service.
2.9. Quality Assurance Representative (QAR). An individual designated to inspect the Contractor’s performance.
2.10. Quality Control. Those actions taken by a Contractor to control the production of outputs to ensure that they conform to the contract requirements.
2.11. Acronyms:
AQL Acceptable Quality Level CDR Contract Discrepancy Report COR Contracting Officer Representative CS Contract Specialist DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer MEVA Mission Essential Vulnerable Area POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QASP Quality Assurance Surveillance Plan QCP Quality Control Program TE Technical Exhibit USACE U.S. Army Corps of Engineers
PART 3 GOVERNMENT FURNISHED SERVICES
A 120VAC 15A and 480VAC 20A service is available at the work area. This electrical power will be furnished by the Government without cost to the Contractor. These utilities will be available only at existing outlets. The Contractor shall furnish all extensions and adapters. No other utilities will be provided. If the Contractor requires additional power, the Contractor will be responsible for providing a generator for the duration of the work. Gas/diesel powered generators will require temporary containment to prevent spilled fuel from reaching the river. The cost for the portable generator, fuel, and containment will be the responsibility of the Contractor. These utilities will be available only at existing outlets. The Contractor shall furnish all extensions and adapters.
PART 4 CONTRACTOR-FURNISHED ITEMS AND SERVICES
Except for those items or services specifically stated in Part 3, the Contractor shall furnish all equipment, tools, supplies/materials, consumables, facilities, transportation, personal protective equipment, and other item necessary to perform this contract according to all its terms. The Contractor shall provide all training to Contractor employees required by applicable safety, health or licensing requirements.
4.1. Equipment/Tools: The Contractor shall provide and maintain its equipment in safe and operable condition.
All equipment items shall be clearly identified as belonging to the Contractor.
4.1.1. Equipment Inventory. The Contractor shall prepare and maintain a list of equipment to be used on the Project site, whether or not the equipment is stored onsite. The Equipment Inventory shall include the equipment type/name, manufacturer/brand, intended use, and number of units by storage area or off-site. For powered equipment, the Equipment Inventory shall also include model number and serial number. The Contractor shall deliver its initial Equipment Inventory to the COR for acceptance at or prior to the Post-award Conference.
4.1.2. Equipment Manuals. The Contractor shall maintain a printed copy of the manufacturer’s operation and maintenance instructions for each piece of powered equipment used onsite. These instructions shall be stored in a location known by and easily accessible to its employees and the COR.
4.2. The Contractor shall submit for COR approval at the pre-work meeting a list of supplies, material, and equipment to be used on the job with manufacturer’s recommendations on the use of all materials. All equipment items shall be in good or better condition and be capable of efficiently accomplishing the task for which they are designed. The Contractor shall submit MSDS on all cleaning chemicals and solutions.
4.2.1. Material Safety Data Sheets (MSDS). In accordance with EM 385-1-1, Section 06.B.01.c, Safety Data Sheet (SDS) Management, the Contractor shall provide and maintain current Safety Data Sheets (SDS) for storage location.
PART 5 PERFORMANCE
The Contractor will have 5 months from the Notice of Award to complete all work.
SECTION 6. APPLICABLE PUBLICATIONS AND REFERENCES
The Contractor shall perform in accordance with the latest edition of the following individual standards and codes, manuals, and other documents:
• ER 200-2-3 – “Environmental Compliance Policies”
• EP 200-2-3 – “Environmental Compliance Guidance and Procedures”
• EM 385-1-1 - "USACE Safety and Health Requirements Manual";
http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm
• Resource Conservation and Recovery Act (RCRA)
• National Institute of Safety and Occupational Health, current provisions
• NFPA 704 Standard System for the Identification of the Hazards of Materials for Emergency
Response
PART 7 TECHNICAL EXHIBITS
7.1. Required Reports / Deliverables Schedule
The table below summarizes the deliverables required under this contract. Deliverables are generally reports, letters, plans, and data that the Contractor is required to provide to the Government for review and acceptance or to document the Contractor’s activities and progress. Other items not listed here may also be required from time to time.
Deliverable Frequency/Due Date # of
Copies Medium/Format Submit
To
Work Schedule Annually, NLT 10 calendar days prior to start of performance period.
1 Electronic or hardcopy COR
Designation of Contractor Key Personnel
NLT the Post-award Conference and anytime a change is made.
1 Hardcopy COR
Quality Control Plan Draft/proposed with Contractor’s quote.
Final at or prior to the Post-award Conference and anytime a change is made.
1 Electronic or hardcopy COR
Quality Control Reports Upon request and not less than monthly. 1 Electronic or hardcopy COR
Accident Prevention Plan NLT the Post-award Conference and anytime a change is made.
COR – Electronic or hardcopy Site - Hardcopy
COR &
Site
Activity Hazards…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .