B.08.02 Phase 1 Solicitation 2021 05 18.pdf
PDF 1 MB Posted
- Attached to
- Phase 1 of 2-Phase Design-Build Construction Contract for Access Control Points located at Arnold, Missouri
- Solicitation number
- W912DQ21R7000
About this file
This document is a solicitation for a two-phase design-build construction contract to replace existing access control points at an NGA facility located in Arnold, Missouri. The U.S. Army Corps of Engineers, Kansas City District intends to award a single firm fixed-price contract valued between $5 million to $10 million to a small business. The scope includes demolishing existing structures, constructing new guard houses, vehicle inspection facilities, and perimeter security improvements. A maximum of five offerors will be selected during phase one to progress to phase two, where they will submit technical solutions and pricing proposals. The contract will be awarded based on best value. The estimated performance period for construction completion is 900 calendar days from notice to proceed. The North American Industry Classification System code is 236220 for commercial and institutional building construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912DQ21R7000 Public Award Notice.pdf | ||
| Special Notice List of Selected Contractors 2021 07 20.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DQ-21-R-7000
US Army Corps of Engineers Kansas City District Building Strong
NGA Arnold Access Control Point’s Renovation (Main & Rear) Arnold, Missouri
PHASE 1 of 2 – Request for Proposal
Solicitation W912DQ-21-R-7000
May 2021
This page was intentionally left blank for duplex printing.
W912DQ-21-R-7000
TC-1
DEPARTMENT OF THE ARMY
Kansas City District, Corps of Engineers
647 Federal Building Kansas City, Missouri 64106
SPECIFICATIONS FOR CONSTRUCTION OF
NGA ARNOLD ACCESS CONTROL POINT’S RENOVATION (MAIN & REAR)
PHASE 1 OF 2
ARNOLD, MISSOURI
TABLE OF CONTENTS
VOLUME I
COVER
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION TITLE
00 10 00 SOLICITATION
00 20 00 INSTRUCTIONS FOR PROCUREMENT
00 21 00 INSTRUCTIONS
00 21 16 INSTRUCTIONS TO PROPOSERS
00 22 16 PHASE 2 SELECTION PROCEDURES AND BASIS OF AWARD
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTARY CONDITIONS
--End of Table of Contents--
This page was intentionally left blank for duplex printing.
494785 NGA Arnold Main ACP and 494786 Rear ACP Renovation
PROJECT DESCRIPTION: The general scope of the requirements will be furnishing all labor, equipment, materials, and transportation and performing all required work in accordance with the plans and specifications for the renovation of the NGA Arnold Access Control Points (ACP) in Arnold, Missouri. The Scope of the Design and Construction projects is for whole building renovation.
The requirement is for a 100% Small Business Set-Aside acquisition; This solicitation will use a 2-Phase Design-Build procurement methodology as described in FAR Part 36.3 and will result in a Firm Fixed-Price award. NAICS 236220 (Size Standard $36.5M) In accordance with FAR Part 36.204 and DFARS 236.204, the estimated magnitude of this project is between $5,000,000.00 and $10,000,000.00.
KRIS A HUBER 816-389-3766
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
30-Apr-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ 10 calendar days and complete it within ________ 900 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 0 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 18 Jun 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE, KANSAS CITY +
CONTRACTING DIVISION FEDERAL BLDG CT 601 E 12
KANSAS CITY MO 64106-2896
W912DQ
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
1:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
816-389-3029 FAX: TEL: 816-389-3812 TEL: FAX:
W912DQ21R7000 107
20B. SIGNATURE
(REV. 4-85) STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 27. PAYMENT WILL BE MADE BY: 26. ADMINISTERED BY
(Include ZIP Code) 14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14) 16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this 28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror) OFFER
Section 00 10 00 - Solicitation
THIS IS A DRAFT CLIN SCHEDULE
Draft CLIN Schedule Only - Preliminary For Information Only – Final CLIN Schedule to be Provided in Phase 2.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Job
ACCESS CONTROL POINT (ACP)
FFP
Upgrade Security at Main Entry
FOB: Destination
PSC CD: Y1EZ
NET AMT
0002 Job
ACCESS CONTROL POINT (ACP)
Upgrade Security at Main Entry
0003 Job OPTION Option #1
FFP
Cut off and remove all access entries from driveway to parking and roadways between the gatehouse and new pop-up barricades.
0004 Job OPTION Option #2
FFP
Construct new handicapped ramp and part of visitor parking.
0005 Job OPTION Option #3
Construct remainder of visitor parking.
0006 Job OPTION Option #4
Provide additional employee parking in the west side area where the existing dual entry drive occurred.
STATEMENT OF WORK
Note a full and final Statement of Work and SPECS package will be provided to Phase 2 participants.
Description of Construction Requirement: The purpose of this project is to design and construct two (2) Access Control Point’s (ACP) (the main and rear gates) for NGA’s location in Arnold, MO.
a. The proposed work for the Main ACP is to replace existing facility and provides an access control facility, large vehicle inspection facility, and an overwatch position. Access control facility includes a consolidated guard house, visitor control center, and a K-9 shelter. Vehicle inspection facility provides the ability to inspect large delivery vehicles, up to tractor trailer size, in an enclosed environment. The overwatch position provides a protected position where police officers can watch over entry operations, activate barriers, and react to threats.
Supporting facilities include site preparation and improvements, and a temporary visitor control center located at the Rear ACP. Site preparation includes demolition of existing facility and features, grading, and site communication/utility lines. Site improvements include active and passive barriers, ingress area canopy, visitor parking lot expansion, walkways, pavements, drainage and storm water control, landscaping, and all necessary support.
Currently the existing structure serves as both a guard house and a visitor control center and was built in 2003, but no longer meets the most current AT/FP standards, and experiences frequent water intrusion, electrical, and HVAC issues. The visitor portion is inadequate for processing the number of visitors received, compromises NGA Police security operations, and does not meet ABAAG guidelines for government facilities. No resting space exists for K-9 working animals, and there are no storm shelters for the current facility. In the event of a tornado, for example, police officers close the ACP and retreat to the main building, about 500 feet away, and leave personnel in their vehicles as they queue up waiting for the gate to reopen. The current active and passive barrier system does not meet current AT/FP standards. Vehicle inspections are done without any cover from the elements or concealment from external observation. Inadequate visitor parking capacity has resulted in inappropriate use of nearby parking lots that serve nearby private properties. Vulnerabilities and deficiencies have been identified by local and higher headquarters.
b. The proposed work for the Rear ACP is to construct an ACP that provides a guard house, large vehicle inspection area, an overwatch position, and all necessary roads and pavements. The vehicle inspection area provides the ability to inspect large delivery vehicles, up to tractor trailer size, similar to the current Main ACP configuration. The overwatch position provides a protected position where police officers can watch over entry operations, activate barriers, and react to threats.
Supporting facilities include site preparation and improvements. Site preparation includes demolition, excavation, backfill, and grading. Site improvements include active and passive barriers, ID check canopy, visitor parking lot, pad/utilities for temporary office facility, communication/utility lines, drainage and storm water control, landscaping, and all necessary support.
Currently, the site does not have an alternate ACP. The existing rear entrance only has active and passive barriers but does not provide any other structures or facilities to control access to the site. There is currently no provision for AT/FP of police officers, and no protection from the elements. The road configuration is inadequate for effective traffic control and has no provision for vehicles that are rejected to turn around without passing the final denial barriers. There is no provision for temporary visitor parking or visitor control. There are no pedestrian walkways.
Section 00 20 00 - Instructions for Procurement
CLAUSES INCORPORATED BY FULL TEXT
SCR_CT_007 MAGNITUDE OF PROJECT—CONSTRUCTION (Jul 2002)
The magnitude of this project is represented by the following estimated price range (contracting officer mark as appropriate):
_____Less than $25,000
_____Between $25,000 and $100,000
_____Between $100,000 and $250,000
_____Between $250,000 and $500,000
_____Between $500,000 and $1,000,000
_____Between $1,000,000 and $5,000,000
_X___Between $5,000,000 and $10,000,000
_____Between $10,000,000 and $25,000,000
_____Between $25,000,000 and $100,000,000
_____Between $100,000,000 and $250,000,000
_____Between $250,000,000 and $500,000,000
_____Over $500,000,000
(End)
TPL_NWK_001 Points of Contact
CONTRACT
SPECIALIST:
Kris Ann Huber PHONE: 816-389-3766 E-MAIL: Kris.A.Huber@usace.army.mil
PROJECT
MANAGER:
Mario Guerrero
PHONE: 816-389-3052 E-MAIL: Mario.Guerrero@usace.army.mil
TPL_NWK_002 PROPOSALS TO BECOME PART OF THE CONTRACT
1. When an offeror submits its proposal in response to a Request For Proposals, and a staffing plan including the names and qualifications of key personnel who are proposed to work on the project is required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.
2. When an offeror submits its proposal in response to a Request For Proposals, and the name of a specific subcontractor is a required submittal, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.
3. When an offeror submits its proposal in response to a Request For Proposals, and a schedule for the performance of the work on the project is a required submittal, the terms of the proposed schedule will become the schedule that will be utilized for completion of the project, adjusted as necessary to reflect the actual issue date of the Notice to Proceed
4. When an offeror submits its proposal in response to a Request For Proposals and that proposal contains any work, materials, methods or other type of betterment that provides an advantage to the Government that is above the minimum requirements contained in the RFP, the terms of the proposal will be the basis for evaluation and, if successful, will become the terms of the contract upon award. If a change in one of those terms is made to one that is less favorable to the Government than the one on which the award of the contract was based, a credit to the Government will be negotiated by the contractor. Only the Contracting Officer has the authority to negotiate a waiver of the terms of the contract.
(End)
Section 00 21 00 - Instructions
NOTICE
Additional Information Regarding Offer Standard Form 1442, Block 13.D.
Offers providing less than 120 calendar days for Government acceptance of their Phase 1 proposal after the date offers are due will not be considered and will be rejected.
The 120 calendar days for the Government acceptance period starts over in Phase 2. Offers providing less than 120 calendar days for Government acceptance of their Phase 2 proposal after the date Phase 2 offers are due will not be considered and will be rejected.
During Phase 2 discussions, the 120 calendar days for the Government acceptance period starts over for each proposal revision. Offers providing less than 120 calendar days for Government acceptance of their Phase 2 proposal revisions after established cut-off date will not be considered and will be rejected.
OVERVIEW
This Request for Proposal (RFP) solicits for the design and construction of the access control points at the NGA’s Arnold Facility located in Arnold, Missouri
In Phase 1, the Government intends to select up to five (5) of the most highly rated offerors to compete in Phase 2.
CLAUSES INCORPORATED BY REFERENCE
52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.232-15 Progress Payments Not Included APR 1984 52.236-26 Preconstruction Conference FEB 1995 52.236-28 Preparation of Proposals--Construction OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)
(a) Definitions. As used in this clause--
Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
Covered foreign country means The People's Republic of China.
Covered telecommunications equipment or services means--
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
Critical technology means--
(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled--
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).
Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.
(c) Exceptions. This clause does not prohibit contractors from providing--
(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(d) Reporting requirement.
(1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause:
(i) Within one business day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known); supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.
https://dibnet.dod.mil/ https://dibnet.dod.mil/
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items.
(End of clause)
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (DEC
2019)
(a) Definitions. As used in this provision, “covered telecommunications equipment or services” has the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.
(c) Representation. The Offeror represents that it [ ___ ] does, [ ___ ] does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
https://www.sam.gov/
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
6.5% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Jefferson County, Arnold, Missouri
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be Twenty (20%) percent (Phase 2 Only) of the bid price or or $3 Million (Phase 2 Only), whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers Kansas City District 601 E. 12th St, Suite 635 Kansas City, MO 64106-2824
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
To be determined at Phase 2
(c) Participants will meet at--
To be determined at Phase 2
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
FAR:
https://www.acquisition.gov/browse/index/far
DFARS:
https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
AFARS:
https://www.acquisition.gov/afars
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any DFARS (48 CFR Chapter Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 21 16 - Instructions to Proposers
PHASE 1 OF TWO PHASE
RFP SECTION 00 22 16: PHASE 1 OF Two-Phase SELECTION PROCEDURES
1. OVERVIEW
a. This Request for Proposal (RFP) seeks proposals from Offerors interested in being selected for the design and construction of the Access Control Point (ACP) W912DQ-21-R-7000.
The construction contract for the Access Control Points will utilize a FARS 36.301 Two-Phase Design-Build Selection Procedures and delivery method. The selected construction contractor must have the demonstrated capability to manage a complex construction effort; plan and execute a secure work site. The general scope of the requirements will be furnishing all labor, equipment, materials, and transportation and performing all required work in accordance with the plans and specifications.
The proposed work for the Access Control Points is to replace existing facility and provides an access control facility, large vehicle inspection facility, and an overwatch position. Access control facility includes a consolidated guard house, visitor control center, and a K-9 shelter. Vehicle inspection facility provides the ability to inspect large delivery vehicles, up to tractor trailer size, in an enclosed environment. The overwatch position provides a protected position where police officers can watch over entry operations, activate barriers, and react to threats.
Supporting facilities include site preparation and improvements, and a temporary visitor control center located at the Rear ACP. Site preparation includes demolition of existing facility and features, grading, and site communication/utility lines. Site improvements include active and passive barriers, ingress area canopy, visitor parking lot expansion, walkways, pavements, drainage and storm water control, landscaping, and all necessary support.
b. Firms formally organized as construction contractors that have associated specifically for this project, consortia of firms, or any other interested parties may submit proposals. A construction contractor may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized offeror may submit a proposal.
c. Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement.
d. Any Offeror submitting an offer in the name of a joint venture, shall include a fully executed copy of the joint venture agreement with the offer. Joint venture agreements which require SBA approval may be submitted absent the requisite SBA Servicing Agency approving authorities’ signature; however, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel.
e. In Phase 1 of the two-phase selection procedure, Offerors will submit certain specified performance capability proposals, demonstrating their capability to successfully execute design build construction work under the contract resulting from this solicitation. The Government will evaluate the proposal and intends to invite a target of three, maximum of five most highly rated Phase 1 offerors who submitted proposals to compete for the design build construction of the Access Control Points for NGA.
f. Offerors must submit a complete Phase 1 proposal to be considered for Phase 2.
PHASE 1 DOES NOT REQUEST OR REQUIRE A PRICING SUBMISSION.
g. At the beginning of Phase 2, an amendment will be issued to only the selected offerors from Phase 1 inviting them to submit a technical approach, and price proposals for consideration.
In addition, Past Performance and Management Approach from Phase 1 will be brought forward to Phase 2. The amendment will request additional information needed to complete the submission of Phase 2 proposals. In Phase 2, the Contracting Officer will award a single firm fixed price contract for the Access Control Points to the offeror whose proposal offers the Best Value- to the Government using a Trade-Off process considering the price and non-price factors described in Phase 2. The Government intends to announce the names of Offerors selected for Phase 2 on the beta.SAM.gov website.
h. Offerors must submit a complete Phase 2 proposal to be considered for award. Failure to submit a complete proposal may result in the entire proposal being rejected.
2. GENERAL PROPOSAL SUBMISSION INSTRUCTIONS
INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPOSALS:
DoD SAFE (Secure Access File Exchange) is a web-based tool that provides authenticated DoD CAC users and guests (unauthenticated users) the capability to securely send and receive large files, including files that are too large to be transmitted via email. Guests can receive files from CAC users and (only if CAC users requested files) send files to CAC users. Notification is achieved via email.
In effort to reduce paperwork and cost, all proposals shall be submitted electronically through the SAFE site. Submission shall be in Adobe PDF format. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
SAFE INSTRUCTIONS
The Offeror’s proposal shall be submitted electronically, as described below. The Offeror’s proposal shall not contain classified data. The use of hyperlinks within a proposal is prohibited.
NOTE: The only authorized transmission method for proposals in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
The Offeror’s proposal must be received by the Government by the date/time specified in the solicitation.
Offerors shall electronically submit their proposals using the following link:
https://safe.apps.mil/
Failure to properly submit a proposal by the due date and time specified in the solicitation will render it late, and late proposals will be rejected. As this is an electronic submission subject to internet connectivity and other potential network traffic issues, offerors are cautioned to plan accordingly.
REQUEST FOR UPLOAD CODE: In order to electronically submit a proposal through DoD SAFE, offerors must email Contract Specialist Kris Ann Huber at Kris.A.Huber@usace.army.mil and Contracting Officer Jay Denker at Jay.B.Denker@usace.army.mil no later than five (5) working days prior to the proposal due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email for request a code five (5) working days before proposal submission date may not mailto:Kris.A.Huber@usace.army.mil mailto:%20Jay.B.Denker@usace.army.mil mailto:%20Jay.B.Denker@usace.army.mil receive a request code in time to upload their submission. For larger submissions that require multiple sessions to upload, multiple codes may need to be requested. Please plan accordingly when requesting a code(s) for uploads in order to have sufficient time to upload prior to the proposal due date.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). Title the files(s):
Solicitation#_COMPANY NAME_Cover letter and TABs A-C Solicitation#_COMPANY NAME_TAB D-E
NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.) Submission shall be in Adobe PDF format.
INSTRUCTIONS FOR USING THE SAFE WEBSITE:
Once at the SAFE website select the “Drop-off” icon. This allows users without a Common Access Card (CAC) or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.
After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.
When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer.
The email address for the Contract Specialist for this solicitation is Kris.A.Huber@usace.army.mil AND the Contracting Officer is Jay.B.Denker@usace.army.mil.
The email address of the Government Employee who initiated the request code will be automatically populated. The Offeror must enter the email address for both the Contracting Officer and Specialist. The Offeror can enter an additional email address if desired. After entering an email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.
NOTE: Do NOT send the SAFE site packages to group email accounts.
Even if you successfully upload your proposal to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. Successful file submission will be confirmed by the ‘Drop-Off Completed” screen which generates once a file is uploaded.
NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using the Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.
RECEIPT OF SUBMISSIONS:
For the purposes of determining whether a proposal submission is timely, the government shall utilize the date and time the submission is completely uploaded into the SAFE website as indicated by the SAFE system time stamp. For proposals larger than the 2GB capacity of the SAFE website and require multiple submissions will require multiple requests for codes, the Government will utilize the system generated date and time stamp of the last submission. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.
mailto:Kris.A.Huber@usace.army.mil mailto:Jay.B.Denker@usace.army.mil
The government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals.
Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
Because uploaded documents expire in DoD SAFE, the submission of proposals should only occur during a limited window of time proposals should be submitted no earlier than 5 days before the proposal due date, in order to ensure that the submitted proposals doesn’t expire before the proposal due date.
Offerors are responsible for ensuring that the submitted proposal does not expire prior to proposal due date.
There is a SAFE User Guide available at https://dl.dod.cyber.mil/wp-content/uploads/dcs/pdf/unclass-DOD_SAFE_User_Guidev0_2d1.pdf
If an Offeror needs help, the SAFE helpdesk will not be able to help you.