This document contains a bid schedule and related federal contract opportunity for mowing services. The bid schedule lists various areas across 340 acres that will require mowing, including power plant areas, joint areas, recreation areas, and environmental stewardship areas. It provides estimated acreages of mixed grass, miscellaneous areas, and lagoon areas for each location. Pricing is solicited on a per acre unit price basis for the base year of 2022 and two option years of 2023 and 2024.
The related federal contract opportunity is solicitation number W912DQ22R1012 to provide mowing and trimming services at the Harry S. Truman Mowing contract. The contractor will be responsible for all personnel, equipment, facilities, transportation, and other items and services necessary to perform the required mowing. A site visit is scheduled for March 2nd at 9:00 am. The contracting agency is the Department of the Army Corps of Engineers Engineering District Kansas City.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Areas Estimated Mixed Grass Acres
Estimated Miscellaneous
Acres
Lagoon Acres Estimated Total Acres
Unit Price Total
CLIN 0001 Power Plant Areas Lab Yard/PowerHouse/Switch 2.2 11.0 0 13.2
CLIN 0002 Joint Areas Access Road A/ West Access Rd 8.1 12.5 0 20.6
Access Road B/East Access Rd 4.63 0.1 0 4.73 Admin Area 4.5 4.7 0 9.2
Maintenance Compound 1.8 0 0.8 2.6 Right and Left Levees 4.3 0 0 4.3
CLIN 0003 Rec Areas
Berry Bend Public Use Area 26 0 4.4 30.4 Bledsoe Ferry East 13.7 0 0 13.7
Bledsoe Ferry West 13.6 0 0 13.6 Bucksaw 43.69 0 3.5 47.19
Cooper Creek 0.79 0 0 0.79 Crowe’s Crossing 0.02 0 0 0.02
Fairfield 2.9 0 0 2.9 Long Shoal 26.20 12.58 2.3 41.08 Osage Bluff 14.6 2.3 2.6 19.5
Sac River 1.3 0 0 1.3 Shawnee Bend 12.7 12.4 0 25.1
Sparrowfoot 26.36 0 3.2 29.56 Talley Bend 2.4 0 1.1 3.5 Thibaut Point 16 0 1.9 17.9 Visitor’s Center 5.46 2.5 0 7.96 Windsor Crossing 1.61 0 0 1.61
Base Year 2022
CLIN 0004 ENS Areas
High Pond 1.47 0 0 1.47 Hilty Pond 0.69 0 0 0.69 Hoppe Pond 0.45 0 0 0.45 Tatges Pond 1.45 0 0 1.45 AA Marsh 10 0 0 10 Avery Marsh 8.3 0 0 8.3 Deep Water Marsh 4 0 0 4 Muddy Creek Marsh 1.85 0 0 1.85 Beck Cave Levee 1.45 0 0 1.45
TOTAL 262.52 58.08 19.8 340.4
Estimated Miscellaneous
Acres
Lagoon Acres Estimated Total Acres
Unit Price Total
CLIN 0001 Power Plant Areas Lab Yard/PowerHouse/Switch 2.2 11.0 0 13.2
CLIN 0002 Joint Areas Access Road A/ West Access Rd 8.1 12.5 0 20.6
Access Road B/East Access Rd 4.63 0.1 0 4.73
Admin Area 4.5 4.7 0 9.2
Maintenance Compound 1.8 0 0.8 2.6
Right and Left Levees 4.3 0 0 4.3
CLIN 0003 Rec Areas Berry Bend Public Use Area 26 0 4.4 30.4
Bledsoe Ferry East 13.7 0 0 13.7
Bledsoe Ferry West 13.6 0 0 13.6
Bucksaw 43.69 0 3.5 47.19
Cooper Creek 0.79 0 0 0.79
Crowe’s Crossing 0.02 0 0 0.02
Fairfield 2.9 0 0 2.9
Long Shoal 26.20 12.58 2.3 41.08
Osage Bluff 14.6 2.3 2.6 19.5
Sac River 1.3 0 0 1.3
Shawnee Bend 12.7 12.4 0 25.1
Sparrowfoot 26.36 0 3.2 29.56
Talley Bend 2.4 0 1.1 3.5
Thibaut Point 16 0 1.9 17.9
Visitor’s Center 5.46 2.5 0 7.96
Option Year 2023
Hilty Pond 0.69 0 0 0.69 Hoppe Pond 0.45 0 0 0.45 Tatges Pond 1.45 0 0 1.45 AA Marsh 10 0 0 10 Avery Marsh 8.3 0 0 8.3 Deep Water Marsh 4 0 0 4 Muddy Creek Marsh 1.85 0 0 1.85
Estimated Miscellaneous
Acres
Lagoon Acres Estimated Total Acres
Unit Price Total
CLIN 0001 Power Plant Areas Lab Yard/PowerHouse/Switch 2.2 11.0 0 13.2
CLIN 0002 Joint Areas Access Road A/ West Access Rd 8.1 12.5 0 20.6
Access Road B/East Access Rd 4.63 0.1 0 4.73
Admin Area 4.5 4.7 0 9.2
Maintenance Compound 1.8 0 0.8 2.6
Right and Left Levees 4.3 0 0 4.3
CLIN 0003 Rec Areas Berry Bend Public Use Area 26 0 4.4 30.4
Bledsoe Ferry East 13.7 0 0 13.7
Bledsoe Ferry West 13.6 0 0 13.6
Bucksaw 43.69 0 3.5 47.19
Cooper Creek 0.79 0 0 0.79
Crowe’s Crossing 0.02 0 0 0.02
Fairfield 2.9 0 0 2.9
Long Shoal 26.20 12.58 2.3 41.08
Osage Bluff 14.6 2.3 2.6 19.5
Sac River 1.3 0 0 1.3
Shawnee Bend 12.7 12.4 0 25.1
Sparrowfoot 26.36 0 3.2 29.56
Talley Bend 2.4 0 1.1 3.5
Thibaut Point 16 0 1.9 17.9
Visitor’s Center 5.46 2.5 0 7.96
Option Year 2024
Hilty Pond 0.69 0 0 0.69 Hoppe Pond 0.45 0 0 0.45 Tatges Pond 1.45 0 0 1.45 AA Marsh 10 0 0 10 Avery Marsh 8.3 0 0 8.3 Deep Water Marsh 4 0 0 4 Muddy Creek Marsh 1.85 0 0 1.85
| Base FY22 |
| Option Yr FY23 |
| Option Yr FY24 |
File details come from the government source that posted it. Updated .