B.08.02.01_Attachment 1 - Past Performance Assessment Worksheet.pdf
PDF 95 KB Posted
- Attached to
- RLZ Troop Housing Federal contract opportunity
- Solicitation number
- W5J9J23R0013
About this file
This document contains an attachment for evaluating past performance on federal construction projects. The attachment requests details on a previously completed construction project such as the owner and point of contact, awarded and final construction costs, original and revised completion dates, scope of work, and self-performed versus subcontracted tasks. Relevancy to the current solicitation is assessed based on including criteria such as civil site work, electrical work, and plumbing. The related federal contract opportunity is solicitation number W5J9JE23R0013 for RLZ Troop Housing from the Department of the Army Corps of Engineers. Offerors are required to provide past performance evaluations using this attachment to be considered for the housing construction work being solicited.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W5J9JE23R0013_0001.pdf | ||
| B.08.02_Solicitation W5J9JE23R0013.pdf | ||
| B.08.02.03_Attachment 3 - Final Package (Statement of Work).pdf | ||
| B.08.02.02_Attachment 2 - Past Performance Questionare and Rating.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 –
PAST PERFORMANCE ASSESSMENT WORKSHEET
(To be completed for each project submitted)
CONSTRUCTION OR PRIME CONTRACTOR PROJECT
Offeror:
Project and Location:
Was this project performed by the division or unit of the company submitting the offer for
W5J9JE23R0013
Owner:
Owner’s Point of Contact for Reference: Telephone:
Awarded Construction Cost: Final Construction Cost:
Explain Cost Growth, if any:
Date of Award: Original Completion Date:
Revised Completion Date:
Percent Complete:
Explain Time Growth, if any:
General Scope of Construction and Offeror’s Role:
Work Your Company Self-Performed: Extent and Type of Work You Subcontracted Out:
Describe extent of relevancy and complexity of the project by checking all applicable boxes below. RELEVANCY:
Criteria 1: Civil Site Work (excavation, leveling, trenching, etc.)
Criteria 2: Electrical work Criteria 3: Plumbing Work
Provide any additional narrative to support relevancy assessment (in terms of scope, magnitude and complexity as compared to the scope of the RFP).
Your Performance Evaluation by Owner, if known :
File details come from the government source that posted it. Updated .