B.08.02_Att5 - Price Schedule.docx
DOCX document 36 KB Posted
- Solicitation number
- W912GB24R0046
- Issued by
-
Department of the Army European Command
About this file
This document is a Price Schedule for the Renovation of Purcivems EMS Riga Latvia. The project includes renovation of the garage floor and interior, the garage vehicle wash station, providing waterproofing and insulation for the building's exterior, and other mechanical, electrical, and plumbing changes.
The Price Schedule lists the base item for the building renovation and improvements, as well as several option items including repairing the garage floor and interior trench drains, repairing the vehicle washing area and providing an Oil Water Separator, replacing the garage interior lighting, replacing the main heating pipes, and replacing the vehicle entry door. The period of performance, liquidated damages, and award of options are also described. The project is located in Riga, Latvia and is being solicited by the Department of the Army European Command under Solicitation Number W912GB24R0046.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Renovation of Purcivems EMS Riga Latvia 13-Feb-24
PRICE SCHEDULE
Renovation of Purcivems EMS Riga Latvia 13-Feb-24
Offerors shall provide pricing for all base and option items.
The following items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Statement of Work (SOW), Request for Proposal and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.
Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Request for Proposal for the period of performance for all base and option items.
Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Request for Proposal for the liquidated damages for all base and option items.
Option Items: The Government reserves the right to award the options up to 180 calendar days from contact award. See Section 01 22 00 for additional information regarding the award of options. There will be no period of performance extension if the options are awarded if the options are awarded.
| Item No. |
| Title |
| Quantity |
| Unit |
| Unit Price |
| Amount |
BASE ITEMS
| 0001 |
| Building Renovation and Improvements |
| 1 |
| Job |
| $ |
| $ |
| Total of Base Item 0001 |
| $ |
OPTION ITEMS
| 0002 |
| Repair garage floor and interior trench drains |
| 1 |
| Job |
| $ |
| $ |
| 0003 |
| Repair vehicle washing area and provide Oil Water Separator |
| 1 |
| Job |
| $ |
| $ |
| 0004 |
| Replace garage interior lighting |
| 1 |
| Job |
| $ |
| $ |
| 0005 |
| Replace main heating pipes |
| 1 |
| Job |
| $ |
| $ |
| 0006 |
| Replace vehicle entry door |
| 1 |
| Job |
| $ |
| $ |
| Total of Option Items 0002 thru 0006 |
| $ |
| Total of all Base and Option Items |
| $ |
EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
-- END OF PRICE SCHEDULE --