B.08 Attachment B Buoy Reference Drawing.pdf

PDF 2 MB Posted

Attached to
Mooring Buoy Installation Service
Solicitation number
W9127N23Q0030
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR R

EFERENCE O

NLY

BUOY REFERENCE DRAWINGS

Attachment B - 1

NLY

BUOY REFERENCE DRAWINGS

Attachment B - 2 g2odnml9 Rectangle

1. NUT AND BOLT ON FIND NO.S 2, 8, & 9 SECURED BY WELD.

2. FIND NO. 3 & 5 SECURED WITH LEAD PLUGS.

3. 25 FT-LB TORQUE RERQUIRED TO SECURE ZINC, FIND NO. 13 TO LINK.

4. SEE SHEETS C -1 & C-2 FOR STERN MOORING COMPONENT SUMMARY.

NOTES

5. NUT AND BOLT ON FIND NO.S 2, 9 & 11 SECURED BY COTTER PIN OR

SAFETY BOLT.

REF

NOT TO SCALE

TYPICAL TO ALL CHAIN LINKS

REF 13

DETAIL A

C-1

PLATE SHACKLE

N.T.S

S-2

ANCHOR JOINING LINK

N.T.S

C-1

S-2

SEE NOTE 2

SEE NOTE 5

S-2

C-1

2, 9

N.T.S

SEE NOTE 2

C-1 S-2

N.T.S

CHAIN JOINING LINK

ANCHOR BOLT SHACKLE

ZINC ANODE ASSEMBLY

N.T.S

C-1

S-2

SEE NOTE 3

SEE NOTE 1

SEE NOTE 1

S-1

PLATE SHACKLE FOR SINKER FAB

S-2

8 REF SHEET S-1

REF

2, 9

TAKEN FROM NFESC DWG 6425394

REF

NOTE: THIS IS A REPRESENTATIVE CONFIGURATION OF BUOY MARKINGS AND TAPE REQUIREMENTS

NOTE: THE TAPE AND STENCILING REQUIREMENTS AS THE WRITTEN PART OF IMAGE HARD TO READ

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

FY

A C

O E

P O

R

TL

A N

D S

TE

R

N M

O O

R

IN

G S

FOR R

EFERENCE O

NLY

Attachment B - 3

NLY

Attachment B - 4

File details come from the government source that posted it. Updated .