This document contains a budget template and statement of work for a cooperative agreement between a state agency and the U.S. Army Corps of Engineers, Portland District for the management of undesirable plants on federal lands at the John Day Project in Morrow County, Oregon. The five-year agreement will provide for coordination, planning, surveying, implementation through biological or chemical control methods, and reporting on activities at sites including Willow Creek Lake, Threemile Canyon Park, Paterson Ferry Park, the Eighth Street River Access, and a firebreak between the Irrigon Fish Hatchery and Irrigon Park and Marina. The implementation section provides estimated costs for control methods such as establishing control areas and spot treating noxious weeds. The related federal grant opportunity specifies that the recipient must be a state department of agriculture or other agency responsible for state undesirable plants laws, with funding provided under the Federal Noxious Weed Act of 1974 and CFDA #12.012 for the management of undesirable plants on federal lands.

Attachment 4 Program Budgeted Proposal

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposed Program Budget

Attachment 4 - Budget Proposal Worksheet
W9127N-24-2-0007
2024-2028* Undesirable Plant Mgmt on USACE lands in Morrow County - Cooperative Agreement
INSTRUCTIONS: Fill in the anticipated costs for the given action. Formulas are built in and totals will populate vertically and laterally. Refer to the attached Statement of Work for more details of each Action Item.
BASE YEAROPTION YEAR 1OPTION YEAR 2OPTION YEAR 3OPTION YEAR 4
ITEMACTION DESCRIPTIONNumber of Personnel HoursHourly RateTotal Personnel Cost (Hours x Hourly Rate)Fringe Benefit RateTotal Fringe Benefits (Hours x Fringe Rate)TravelEquipmentSuppliesContractualOtherFY24-FY25 TOTAL for each specific actionNumber of Personnel HoursHourly RateTotal Personnel Cost (Hours x Hourly Rate)Fringe Benefit RateTotal Fringe Benefits (Hours x Fringe Rate)TravelEquipmentSuppliesContractualOtherESTIMATED FY25-FY26 TOTAL for each specific actionNumber of Personnel HoursHourly RateTotal Personnel Cost (Hours x Hourly Rate)Fringe Benefit RateTotal Fringe Benefits (Hours x Fringe Rate)TravelEquipmentSuppliesContractualOtherESTIMATED FY26-FY27 TOTAL for each specific actionNumber of Personnel HoursHourly RateTotal Personnel Cost (Hours x Hourly Rate)Fringe Benefit RateTotal Fringe Benefits (Hours x Fringe Rate)TravelEquipmentSuppliesContractualOtherESTIMATED FY27-FY28 TOTAL for each specific actionNumber of Personnel HoursHourly RateTotal Personnel Cost (Hours x Hourly Rate)
0001Coordination$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0002Planning$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0003Surveying$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004Implementation
0004a.iWillow Creek Total vegetation control on the gravel entrance road and spill wall access road starting at the Willow Creek Bridge extending to the dam. Establish a five-foot control area along perimeter of both sides of the road.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004a.iiWillow Creek Total vegetation control along security fence line around Project perimeter. Establish a three-foot control area along perimeter of both sides of the fence.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004a.iiiWillow Creek Biological or chemical control to reduce fuel and control noxious weeds on the hiking trail below Willow Creek Dam. Establish a three-foot control area along perimeter of both sides of the trail. Spot treat any state or county-listed noxious weeds.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004a.ivWillow Creek Total vegetation control on the dam office parking lot starting at the entrance road.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004a.vWillow Creek Biological or chemical control to reduce fuel and control noxious weeds on gravel fishing access road and parking lot starting at Willow Creek Road. Establish a five-foot control area along perimeter of both sides of the road. Spot treat any state or county-listed noxious weeds.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004a.viWillow Creek Biological or chemical control along on Willow Creek Wildlife Management Area entrance road starting at Willow Creek Rd. extending to the gate. Establish a five-foot control area along perimeter of both sides of the road. Spot treat any state or county-listed noxious weeds.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004a.viiWillow Creek Spot treat vegetation on upland land adjacent to Willow Creek Lake from the dam to the Willow Creek Wildlife Management Area entrance road including Balm Fork.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004a.viiiWillow Creek Biological or chemical treatment of the downstream face of the Willow Creek Dam to remove or minimize vegetative growth.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004b.iThreemile Canyon Park (near Boardman, Oregon - 3 acres maximum)
Total vegetation control establishing a five-foot control area around CXT vault toilet.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004b.iiThreemile Canyon Park
Spot treatment of noxious weeds in and adjacent to parking area.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004cPaterson Ferry Park (near Irrigon, Oregon - 12 acres maximum)
Spot treat 12-acre area from Patterson Ferry Road entrance to the fish hatchery fence line and from the Columbia River shoreline to Riverview Ln.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004dEighth Street River Access (Irrigon, Oregon - 2 acres maximum)
Spot treat two acres around parking area and to the west for Russian thistle and other noxious species.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004eFirebreak between Irrigon Fish Hatchery and Irrigon Park and Marina (Irrigon, Oregon - 25 acres)
Biological control to establish a 50-foot-wide firebreak between the Irrigon Fish Hatchery and Irrigon Park and Marina north of Riverview and Washington Lanes to reduce fuels between Corps lands and neighboring properties, a distance of 3.5 miles.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004fLake Umatilla Shoreline
EDRR for any presence of Flowering rush.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0005Reporting$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTALS0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
Grand Total of Base + 4 Option Years
* Note: All items under Implementation are expected to change from year to year. Revised annual SOWs will be developed prior to the bilateral exercising of Option Years. For the purposes of the initiation of the Cooperative Agreement, assume the specific actions under Implementation will remain the same and estimate associated costs in option years as well.