SEE ADDENDUM

(No Collect Calls)

W9126G21Q0001 27-Oct-2020

b. TELEPHONE NUMBER

(817) 886-1289

8. OFFER DUE DATE/LOCAL TIME

11:59 PM 26 Nov 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9126G9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

KAREN M HARKINS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 967454 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

SOMERVILLE PROJECT OFC

RUSSELL J. MEIER

1560 THORNBERRY DRIVE

SOMERVILLE TX 77879

TEL: 979-596-1624 FAX: 979-596-1624

(817) 886-6403FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$16,500,000

NAICS:

541380

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF100

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9126G21Q0001

Section SF 1449 - CONTINUATION SHEET

KO STATEMENT

Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 12 Months

Water and Sewer Testing Services SO Lake

FFP

Water and Sewer Testing Services Somerville Lake Base Year 01 FEB 2021- 31 JAN 2022 The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform water and sewer testing services at Somerville Lake as defined in this Performance Work Statement (PWS), except for those items specified as Government-furnished property and services. The Contractor shall perform to the standards in this contract.

FOB: Destination

PSC CD: F103

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1001 12 Months OPTION Water and Sewer Testing Services SO Lake

FFP

Water and Sewer Testing Services Somerville Lake Option Year 1: 01 FEB 2022- 31 JAN 2023 The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform water and sewer testing services at Somerville Lake as defined in this Performance Work Statement (PWS), except for those items specified as Government-furnished property and services. The Contractor shall perform to the standards in this contract.

FOB: Destination

2001 12 Months OPTION Water and Sewer Testing Services SO Lake

FFP

Water and Sewer Testing Services Somerville Lake Option Year 2: 01 FEB 2023- 31 JAN 2024 The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform water and sewer testing services at Somerville Lake as defined in this Performance Work Statement (PWS), except for those items specified as Government-furnished property and services. The Contractor shall perform to the standards in this contract.

3001 12 Months OPTION Water and Sewer Testing Services SO Lake

FFP

Water and Sewer Testing Services Somerville Lake Option Year 3: 01 FEB 2024- 31 JAN 2025 The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform water and sewer testing services at Somerville Lake as defined in this Performance Work Statement (PWS), except for those items specified as Government-furnished property and services. The Contractor shall perform to the standards in this contract.

4001 12 Months OPTION Water and Sewer Testing Services SO Lake

FFP

Water and Sewer Testing Services Somerville Lake Option Year 4: 01 FEB 2025- 31 JAN 2026 The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform water and sewer testing services at Somerville Lake as defined in this Performance Work Statement (PWS), except for those items specified as Government-furnished property and services. The Contractor shall perform to the standards in this contract.

5001 6 Months OPTION Water and Sewer Testing Services SO Lake

FFP

Water and Sewer Testing Services Somerville Lake Option Year 5: 01 FEB 2026- 31 JUL 2026 The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform water and sewer testing services at Somerville Lake as defined in this Performance Work Statement (PWS), except for those items specified as Government-furnished property and services. The Contractor shall perform to the standards in this contract.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government 5001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-FEB-2021 TO

31-JAN-2022

N/A SOMERVILLE PROJECT OFC

RUSSELL J. MEIER

1560 THORNBERRY DRIVE

SOMERVILLE TX 77879

979-596-1624

967454

1001 POP 01-FEB-2022 TO

31-JAN-2023

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-FEB-2023 TO

31-JAN-2024

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 01-FEB-2024 TO

31-JAN-2025

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 01-FEB-2025 TO

31-JAN-2026

N/A (SAME AS PREVIOUS LOCATION)

5001 POP 01-FEB-2026 TO

31-JUL-2026

N/A (SAME AS PREVIOUS LOCATION)

SITE VISIT

52.237-1 SITE VIST

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

Prospective offerors/quoters are required to contact the Contract Specialist via email to express their interests by 3:00 PM (CST) two business days prior to attending the site visit. At that time, the Contract Specialist will assign an appointment time for the day of the Site Visit. Each appointment will allow a total of 10 people and will be limited to two (2) hours each. Site visit attendees must provide the following information: Solicitation Number, Project Title, Name(s) of Individual(s) who will attend the site visit, Name of Company Represented, Phone Number of Company being represented. All attendees will be required to sign the attendance sheet. Due to COVID-19 restrictions, space availability will be limited to two (2) participants per company.

All personnel are required to wear masks during site visits, and maintain a distance of six (6) feet between individuals, where able. Contractors must provide their own masks.

Address: U.S. Army Corps of Engineers

Somerville Lake Office 1560 Thornberry Dr.

Somerville, Texas 77879

POC: Michael (Todd) McCord

CT POC: Karen Harkins Contact Info: 817-886-1289 Email: karen.harkins@usace.army.mil

Date/Time: Wednesday, 11/04/2020 @ 10:00 am CST

VIRTUAL SITE VISIT INFORMATION

52.237-1 SITE VISIT

There will be a Virtual Site Visit performed in order to clarify expectations and answer any questions concerning the requirements of the specified work. Prospective offerors are required to contact the Contract Specialist via email to express their interests by 3:00 PM (CST) two business days prior to attending the virtual site visit. At a minimum, the email should reference the Solicitation Number, Project Title, Name(s) of Individual(s) who will attend the site visit, Name of Company Represented, Phone Number of Company being represented. An e-mail containing the dial-in information will be sent to all prospective attendees who have expressed interest.

CT POC: Karen Harkins Contact Info: 817-886-1289 Email: karen.harkins@usace.army.mil

Conference: Wednesday, 11/04/2020 @ 09:00 am CST

INSTRUCTIONS TO OFFERERS

INSTRUCTIONS TO OFFERORS

OFFEROR DUE DATE/LOCAL TIME: _ SEE SF1449 BLOCK 8

POINT OF CONTACT: _Karen Harkins_ Phone: (817)886-1289 Email address: CIV-OPS.Proposals@usace.army.mil Furnish Copy To: Karen Harkins@usace.army.mil

Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil Subject line of email must include the solicitation number and your Company Name

For additional help contact your local Procurement Technical Assistance Centers (PTAC). Centers were created by Congress to assist businesses seeking to compete on federal contracts. Services are generally free; however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.

SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: www.sam.gov.

DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business. DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).

Click here to request your D-U-N-S Number via the Web. The website to obtain your DUNS number:

http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA) allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM.

WAGE RATES: The Service Contract Act applies (see attached wage rates in Section J). Note: Does not apply to Contractors registered in System for Award Management (SAM) as Sole Proprietorships.

Contractor Information Sheet

IN THE EVENT OF AWARD, ISSUE CONTRACT TO:

NAME

(Last, First Middle)

ADDRESS

(Number & Street) (City, State and Zip)

HOME PHONE NUMBER MOBILE

(Area code and number) (Area code and number)

EMAIL ADDRESS________________________________________________________________

DUNS NUMBER CAGE CODE NUMBER

SSN/TIN NUMBER ______________________________

NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm name: CAGE Code:

Address: DUNS Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy) Explain Differences:

Original Contract Price (Award Amount):

Final contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND

SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED

QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS

QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY

ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER,

QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE

OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO

VERIFY ANY AND ALL INFORMATION ON THIS FORM.

AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil Ensure the former employer references the solicitation number in the email subject line.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract

Rating will be neither positive or negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY

a) Quality of technical data/report preparation efforts E VG S M U

N

b) Ability to meet quality standards for technical performance E VG S M U

N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

E VG S M U

N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U

N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U

N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U

N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?

E VG S M U

N

b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U

N

g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agree price(s)?

E VG S M U

N

b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.

Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

YES NO

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

YES

NO

f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.

YES NO

6. SAFETY/SECURITY

a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U

N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U

N

c) Would you hire or work with this firm again? (If no, please explain below)

YES NO

d) In Summary, provide an overall rating for the work performed by this contractor. E VG S M U

N AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):

INSURANCE

Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CESWF-CT-S, P.O.

Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:

Submit a copy of Insurance Certificate directly to:

US Army Corp of Engineers Somerville Lake Office ATTN: Russell Meier 1560 Thornberry Drive Somerville, Texas 77879

Or email to: Karen Harkins@usace.army.mil Phone: (817) 886-1289 Fax: (817)886-6403

(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.

(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $100,000 per accident for bodily injury and $20,000 per accident for property damage.

(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00 or in compliance with applicable State statutes.

(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.

NOTE:

(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

WATER & SEWER TESTING SERVICES

SOMERVILLE LAKE

1. GENERAL: This is a non-personal services contract to provide water and sewer testing services for Rocky Creek Park and Yegua Creek Park at Somerville Lake in accordance to applicable Texas Commission of Environmental Quality (TCEQ) permits, rules and regulations and Federal, State, county, and local laws, codes, regulations and rules in connection with the performance of the work specified under this contract. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.

Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform water and sewer testing services at Somerville Lake as defined in this Performance Work Statement (PWS), except for those items specified as Government-furnished property and services. The Contractor shall perform to the standards in this contract. Site visits are highly recommended prior to bidding. See instructions to offerors for specific date, time and location.

1.1.1 Definitions:

a) Contractor: Company structure, including all partners, officers and employees with interest in this contract.

b) Government: Government of the United States of America.

c) Contracting Officer (KO): Person executing this contract on behalf of the Government.

d) Contracting Officer’s Representative (COR): If applicable, the COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: performs inspections necessary in connection with contract performance: maintains written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements; including Government drawings, designs, specifications: monitors Contractor’s performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinates availability of Government-furnished property, and provides site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.

e) Safety Manual: EM 385-1-1, Corps of Engineers Safety and Health Requirements Manual, current at time of award, and any subsequent revisions. This Safety Manual can be found on-line at: https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/.

f) Performance Standard: Describes the desired results that are to be achieved.

g) Quality Control (QC): Action taken by the Contractor and/or Contractor’s personnel to document, inspect and control performance of services to ensure specifications and requirements of this PWS are met.

h) Quality Assurance (QA): Action taken by the Government to ensure the Contractor's quality control system is functioning and effective and that the Contractor is providing services which are in accordance with this PWS.

i) Quality Assurance Representative (QAR): Person designated by the Lake Manager to perform

Quality Assurance Inspections, review invoices, and perform strict contract oversight. The QAR does not have authority to change any terms of the contract.

j) Quality Assurance Surveillance Plan (QASP): Plan developed by the Government depicting means Quality Assurance will be controlled.

k) Contract Discrepancy Report (CDR): Written record of unsatisfactory performance by the Contractor as observed by the Quality Assurance Representative, issued to the Contractor when the performance threshold does not meet the minimum requirements.

1.1.2 Basic Requirements: The following requirements for submitting a quote and receiving an award are now mandatory for conducting business with the DOD Government.

1.1.3 All offerors are required to obtain a Data Universal Numbering System (DUNS) number by visiting www.dnb.com.

1.1.4 All prospective Contractors must be registered in System for Award Management (SAM) database prior to any award resulting from this solicitation. If at time of award, Contractor is not registered, award will be made to the next successful “registered” offer. Registration may be accomplished via the internet at www.sam.gov.

1.1.5 All payments shall be made by Electronic Funds Transfer (EFT) or “direct deposit”.

1.1.6 E-Verify Verification of Eligibility: The Contractor must use the U.S. Department of Homeland Security E-Verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor must provide to the Government two valid forms of Government-issued identification prior to beginning work to ensure the correct information is entered into the E-Verify system.

1.1.7 Permits: The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

1.1.8 Veterans Employment Emphasis: In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) Contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE Contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE Contractors in their outreach efforts:

U.S. Department of Labor Veterans employment, www.vets.gov/ Federal veteran employment information, www.fedshirevets.gov/index.aspx Veterans’ Employment and Training Service (VETS), http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program, http://benefits.va.gov/vow/

U.S. Army Warrior Transition Command Employment Index, wtc.army.mil/modules/employers/index.html Hiring Our Heroes initiative www.uschamberfoundation.org/hiring-our-heroes Guide to Hiring Veterans, www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf.

1.2 Scope: The Contractor is to provide all contract work force and equipment required to perform water and sewer testing services at Somerville Lake. The Contractor's work and responsibility shall include, but not be limited to; all job planning, programming, scheduling, administration, permits and licenses, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, management, and quality control necessary to perform the various services required herein (reference Attachment 3- Supportive Documentation for Bid Schedule). The Contractor shall possess at least a Class C Drinking-Water Operator license and Class D Waste Water Operator License or higher without additional expense to the Government, and be responsible for renewal upon expiration and obtaining any other necessary licenses, permits and letters of certification. The Contractor shall comply with TCEQ permits, rules and regulations and Federal, State, county, and local laws, codes, regulations and rules in connection with the performance of the work specified under this contract.

Services include furnishing all labor, materials and equipment necessary to perform specified testing services.

1.2.1 Sustainability Requirements: The Contractor shall meet the following sustainability requirements.

1.2.1.1 The Contractor shall meet the recycled content requirements set forth by the Environmental Protection Agency (EPA) and shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired;

(1) Competitively within a timeframe providing for compliance with the contract performance schedule;

(2) Meeting contract performance requirements; or

(3) At a reasonable price.

Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program. The list of EPA-designated items is available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products. Items may include, but are not limited to the following products used on-site in execution of this contract. All deliverables shall be printed double sided on paper that contains post-consumer fiber.

1.2.1.2 The Contractor shall meet the BioPrefered Program requirements set forth by the USDA at https://www.biopreferred.gov/BioPreferred/faces/Welcome.xhtml. The list of USDA-designated product categories may be found at https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml#.

1.2.1.3 As required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C.

6962(c)(3)(A)(i)), the offeror certifies, by signing this offer, that the percentage of recovered materials content for EPA-designated items to be delivered or used in the performance of the contract will be at least the amount required by the applicable contract specifications or other contractual requirements.

1.2.1.4 References: FAR Provision 52.223-1 – Biobased Product Certification, FAR Clause 52.223-2 – Affirmative Procurement of Biobased Products Under Service and Construction Contracts, FAR Provision 52.223-4 – Recovered Material Certification, FAR Clause 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA-Designated Items, and FAR Clause 52.223-17 – Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts.

1.2.2 Water System Testing and Monitoring: The Contractor shall furnish all labor, tools, equipment, and materials to test and monitor all water systems in Rocky Creek Park and Yegua Creek Park. All work shall be in accordance with applicable TCEQ permits, rules and regulations and Federal, State, county, and local laws, codes, regulations and rules. Water system testing and monitoring shall be conducted weekly on

Wednesdays, including chlorine residual testing each week and coliform bacteria testing every first and third Wednesday of the month.

1.2.2.1 Water Meters, Chlorine Residual Testing and Total Coliform Testing: The Contractor shall inspect water system and associated water meters, two water meters for Yegua Creek Park and one water meter for Rocky Creek Park (see Attachment 4). The Contractor shall maintain a record of water meter readings and weekly pumpage for each system. As per approved Monitoring Plan and in accordance with applicable TCEQ permits, rules and regulations and Federal, State, county, and local laws, codes, regulations and rules, the Contractor shall conduct sampling for chlorine residual weekly each Wednesday and total coliform bacteria on the first and third Wednesday of the month. In the event total coliform-positive results are received, the Contractor shall re-sample and re-test a second time as per TCEQ requirements. In the event total coliform-positive results are received the second time, additional required samples and testing will be the responsibility of the Government. Daily Activity Reports will be completed, including any major repairs, observations and notes.

1.2.2.1.1 Laboratories: The total coliform bacteria test and analysis of potable water systems shall be performed only by laboratories approved by the TCEQ’s Drinking Water Standards Division.

1.2.2.1.2 Plans/Reports: The Contractor shall follow requirements below for completing, processing and submitting plans and reports, as well as development of specified plans and reports by the Contractor at Contractor’s expense.

1.2.2.1.2.1 The Contractor shall develop all required monitoring and sampling plans for each Public Water Systems in accordance to applicable TCEQ permits, rules and regulations, and submit to TCEQ as required. Public Water Systems are Purchase Water Transient Non-community Public Water Systems serving population of 1,001 to 2,500 for each park. The Contractor shall develop monitoring plan for each Public Water System following template available at: http://www.tceq.texas.gov/assets/public/permitting/watersupply/pdw/Monitoring Plan Template.pdf and develop Revised Total Coliform Rule Sample Siting Plan for each Public Water System following template available at:

https://www.tceq.texas.gov/drinkingwater/revised-total-coliform-rule. All plans shall be submitted to Lake Manager or QAR within five business days after Pre-work Conference for review and approval. Approved Revised Total Coliform Rule Sample Siting Plan shall be submitted to TCEQ as required within two business days of Lake Manager approval. Any required revisions or corrections to plans shall be the responsibility of the Contractor and at Contractor’s expense.

1.2.2.1.2.2 Daily Activity Report: The Contractor shall develop Daily Activity Report to include, at minimum, the following information: date, park name, Water System ID, time in, time out, weather, Contractor personnel, work performed, current water meter readings, previous water meter readings, total gallons since last reading, sampling information (sampling station, chlorine residual level, name of laboratory, identity of individual who collected the sample, time begin, time end, type, specific test results and indication of whether TCEQ requirement met), and noted observations, deficiencies, defects and damages. Proposed Daily Activity Report shall be submitted to Lake Manager at Pre-work Conference for approval. Daily Activity Report shall be completed each day work is performed on-site and submit to Lake Manager or QAR by the following business day after work is completed.

1.2.2.1.2.3 TCEQ Microbial Monitoring Form: The Contractor shall use the most current TCEQ Microbial Monitoring Form and complete and process form for each Public Water System in accordance with Paragraph 1.2.2 of this PWS, TCEQ permits, rules and regulations. In the event total coliform-positive results are received, the Contractor shall follow Paragraph 1.2.2.1 of this PWS. TCEQ Microbial Monitoring Forms with laboratory results shall be submitted to Lake Manager or QAR by the first Wednesday of the following month.

1.2.2.1.2.4 Table 1 below provides a summary list of required reports and plans to be completed by the Contractor and delivered as described.

Table 1: Water System Reports and Plans Summary

WATER SYSTEM REPORTS AND PLANS SUMMARY

Report/Plan Frequency

Delivery Lake

Manager/ Quality

Assurance Represent ative

Delivery Date

TCEQ

Delivery

Date

Monitoring Plan per System

Once X Pre-work

Conference

NA NA

Lake Manager Approved

Monitoring Plan Once NA NA X

Following Day of Receipt

Revised Total Coliform Rule

Sample Siting Plan per System

Once X Pre-work

Conference

NA NA

Lake Manager Approved Coliform

Siting Plan per System

Once NA NA X Following

Day of Receipt

Daily Activity Report

Daily Each Work Day

X Following Business

Day

NA NA

TCEQ Microbial Monitoring Forms

(Returned from Laboratory)

Monthly X

First Wednesday of Following

Month

NA NA

1.2.2.1.3 Failures/Violations/Concerns: If unusual water meter readings or conditions/samples not meeting TCEQ requirements are discovered, the Contractor shall promptly notify the Lake Manager or QAR within an hour of observation and record on Daily Activity Report and follow the applicable TCEQ requirements, including re-sampling and re-testing, at no additional expense to the Government. All testing required after the second re-test for total coliform-positive results, and until the system meets the State’s requirements, shall be the responsibility of the Government.

If correspondence is received from TCEQ or laboratories for failures or violations, the Contractor shall furnish all related documents to Lake Manager or QAR within 24 hours of receipt or notification.

1.2.2.1.4 Yegua Creek Park Water Pump Station: Currently the water pump station at Yegua Creek Park is off-line and purchased water is not being diverted through water treatment. The Government has no intent to utilize the water pump station; however, in the event TCEQ requires diverting water through treatment plant and/or maintaining and testing water pump station, the Contractor shall perform required work in accordance to Paragraph 1.2.2 and applicable sub-paragraphs of this PWS. In addition, the Contractor shall maintain and test chlorine residual levels as required in accordance with applicable TCEQ permits, rules and regulations and Federal, State, county, and local laws, codes, regulations and rules. In the event residual levels do not meet requirements, the Contractor shall take measures to increase chlorine residual level to meet TCEQ requirements and follow TCEQ requirements at no additional expense to the Government. The Contractor shall furnish all additional chlorine as needed.

1.2.3 Sewer System Testing and Monitoring: The work shall consist of furnishing all labor, equipment, and materials necessary to maintain and monitor sewer systems in Rocky Creek Park and Yegua Creek Park, including sewer lift stations, sewage oxidation ponds w/aeration fields and electric panels associated equipment, in accordance with this PWS, TCEQ Permit to Discharge Wastes (see Attachment 6) and applicable TCEQ permits, rules and regulations and Federal, State, county, and local laws, codes, regulations and rules. Rocky Creek Park contains three sewer lift stations, five septic tanks, one flow meter and two sewage oxidation ponds with aeration field (see Attachment 4). Yegua Creek Park contains 2 sewer lift stations, one septic tank, one flow meter and two sewage oxidation ponds with aeration field (see Attachment 4). All work shall be performed as set forth in the following specifications. The Contractor services for all sewer system maintenance must result in all sewer systems being left in proper working condition and properly maintained.

1.2.3.1 Sewer Lift Stations: The Contractor shall check the operation of each sewer lift station weekly to ensure proper functioning of the system. Each lift pump shall be run on manual to check proper operation. While being run on manual, electric feed lines shall be checked with amperage probes to ensure that pumps are pulling proper amperage. Warning lights shall be checked to ensure properly functioning. The Contractor shall maintain a record of all lift station meter readings and complete weekly pumpage for each sewer lift station equipped with flow/time meters, in accordance to TCEQ Permit to Discharge Wastes. The Contractor shall make minor repairs to sewer lift stations and associated equipment to ensure proper operations. Minor repairs shall include, but not be limited to;

replacing inoperative warning light bulbs and cleaning panel interiors and exteriors, light fixtures and control panel supports to remove dead ants and insects or other foreign debris or matter. Any major repairs shall be referred to the Lake Manager or QAR. The Contractor shall monitor accumulation of solids in septic tanks during months of February and August and provide to Lake Manager or QAR the first Wednesday of the following month. Any major repairs, observations and notes shall be recorded on Daily Activity Report.

1.2.3.2 Sewage Oxidation Ponds and Aeration Fields: The Contractor shall check the operation of the sewage oxidation ponds and aeration fields weekly to ensure proper operation. When sufficient oxidation pond levels are present, aeration field pump shall be run on manual to check pump operation and operation of sprinkler system heads. The Contractor shall maintain a record of aeration field meter readings and determine weekly submittals pumpage if equipment allows. The Contractor shall make minor repairs to sewage oxidation ponds and aeration field equipment to ensure proper operation.

Minor repairs shall include, but not be limited to; cleaning sprinkler heads, panel interiors and exteriors and control panel supports to remove dead ants and insects or other foreign debris and matter. “DO NOT DRINK THE WATER” signs shall also be inspected ensuring signs are properly displayed. Any major repairs, observations and notes shall be recorded on Daily Activity Report.

1.2.3.3 Biochemical Oxygen Demand and Potential of Hydrogen Testing: The Contractor shall perform monthly Biochemical Oxygen Demand 5-day (BOD) and Potential of Hydrogen (pH) testing, in accordance to TCEQ Permit to Discharge Wastes, on the first Wednesday of each month and provide to the Lake Manager or QAR by the first Wednesday of the following month. Sampling information and results submitted on Daily Activity Report.

1.2.3.4. Annual Soil Sample Analyses: The Contractor shall complete Annual Soil Sample Analyses, in accordance to special provision requirement of each TCEQ Permit to Discharge Wastes for each aeration field annually the first Wednesday in March, with no less than 10 to 15 subsamples representing each composite sample, and submit copies of the laboratory reports and maps to the Lake Manager or QAR and TCEQ Regional Office (MC Region 9) and the Enforcement Division (MC 224) by first Wednesday of April.

1.2.3.5 Flow Meters Calibration: All automatic flow meters shall be accurately calibrated by a trained person annually, in accordance to TCEQ Permit to Discharge Wastes, during the month of March and verification documentation shall be provided to Lake Manager or QAR the first Wednesday of April.

Verification documentation shall verify each flow meter is operating properly and giving accurate results.

1.2.3.4.6 Septic Tanks: The Contractor shall inspect level of solids within all septic tanks (see Attachment 4) on the first Wednesday in February and August and complete Septic Tank Solids Monitoring Report. Septic Tank Solids Monitoring Report shall be submitted to Lake Manager or QAR by the first Wednesday of March and September.

1.2.3.7 Laboratories: All testing shall be through laboratories meeting latest TCEQ requirements.

1.2.3.8 Reports: The Contractor shall follow requirements below for completing, processing and submitting reports, as well as development of specified reports by the Contractor at Contractor’s expense

1.2.3.8.1 Daily Activity Report: The Contractor shall develop Daily Activity Report to include, at minimum, the following information: date, park name, permit ID, time in, time out, weather, Contractor personnel, work performed, current flow meter readings, previous flow meter readings, total gallons since last reading, sampling information (location, BOD 5-day, pH, name of laboratory, identity of individual who collected the sample, time begin, time end, type, specific test results and indication of whether TCEQ requirement met), and noted observations, deficiencies, defects and damages. Proposed Daily Activity Report shall be submitted to Lake Manager at Pre-work Conference for approval. Daily Activity Report shall be completed each day work is performed on-site and submit to Lake Manager or QAR by the following business day after work is completed.

1.2.3.8.2 Monthly Flow Report: The Contractor shall develop Monthly Flow Report (summarizing flow from last Wednesday of month to last Wednesday of following month) to include at minimum the following information: month, park name, permit ID, individual flow meter readings per week, weekly total gallons for each flow meter, monthly total gallons for each flow meter and Monthly Daily Average Flow to sewage oxidation ponds.