B.01 W9126G20Q0078_Issued Solicitation.pdf
PDF 3 MB Posted
- Attached to
- Embankment Mowing Federal contract opportunity
- Solicitation number
- W9126G20Q0078
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9126G20Q0078 19-Jun-2020
b. TELEPHONE NUMBER
(817) 886-1289
8. OFFER DUE DATE/LOCAL TIME
11:59 PM 20 Jul 2020
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KAREN M HARKINS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 967422 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
X SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
CANYON PROJECT OFC ATTN CESWF-OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
TEL: 830-964-3341 FAX:
(817) 886-6403FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF105
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Embankment Mowing Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2020 - 30 SEP 2021
POC: Karen Harkins 817-886-1289 karen.harkins@usace.army.mil
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AA 4 Job
Main Dam
FFP
FOB: Destination
PSC CD: S208
NET AMT
0001AB 4 Job Spillway Dike
FFP
FOB: Destination
0001AC 4 Job Ranp 1 Dike
FFP
Embankment Fertilizer Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2020 - 30 SEP 2021
POC: Karen Harkins 817-886-1289 karen.harkins@usace.army.mil
0002AA 1 Job Main Dam
FFP
0002AB 1 Job Spillway Dike
FFP
OPTION Embankment Mowing Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2021 - 30 SEP 2022
1001AA 4 Job OPTION Main Dam
FFP
1001AB 4 Job OPTION Spillway Dike
FFP
1001AC 4 Job OPTION Ranp 1 Dike
FFP
OPTION Embankment Fertilizer Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2021 - 30 SEP 2022
1002AA 1 Job OPTION Main Dam
FFP
1002AB 1 Job OPTION Spillway Dike
FFP
OPTION Embankment Mowing Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2022 - 30 SEP 2023
2001AA 4 Job OPTION Main Dam
FFP
2001AB 4 Job OPTION Spillway Dike
FFP
2001AC 4 Job OPTION Ranp 1 Dike
FFP
OPTION Embankment Fertilizer Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2022 - 30 SEP 2023
2002AA 1 Job OPTION Main Dam
FFP
2002AB 1 Job OPTION Spillway Dike
FFP
OPTION Embankment Mowing Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2023 - 30 SEP 2024
3001AA 4 Job OPTION Main Dam
FFP
3001AB 4 Job OPTION Spillway Dike
FFP
3001AC 4 Job OPTION Ranp 1 Dike
FFP
OPTION Embankment Fertilizer Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2023 - 30 SEP 2024
3002AA 1 Job OPTION Main Dam
FFP
3002AB 1 Job OPTION Spillway Dike
FFP
OPTION Embankment Mowing Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2024 - 30 SEP 2025
4001AA 4 Job OPTION Main Dam
FFP
4001AB 4 Job OPTION Spillway Dike
FFP
4001AC 4 Job OPTION Ranp 1 Dike
FFP
OPTION Embankment Fertilizer Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2024 - 30 SEP 2025
4002AA 1 Job OPTION Main Dam
FFP
4002AB 1 Job OPTION Spillway Dike
FFP
OPTION Embankment Mowing Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2025 - 31 MAR 2026
5001AA 4 Job OPTION Main Dam
FFP
5001AB 4 Job OPTION Spillway Dike
FFP
5001AC 4 Job OPTION Ranp 1 Dike
FFP
OPTION Embankment Fertilizer Services
FFP
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
Period of Performance is: 01 OCT 2025 - 31 MAR 2026
5002AA 1 Job OPTION Main Dam
FFP
5002AB 1 Job OPTION Spillway Dike
FFP
KO STATEMENT
CONTRACTING OFFICER STATEMENT
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A N/A 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0001AC Destination Government Destination Government 0002 N/A N/A N/A N/A 0002AA Destination Government Destination Government 0002AB Destination Government Destination Government 1001 N/A N/A N/A N/A 1001AA Destination Government Destination Government 1001AB Destination Government Destination Government 1001AC Destination Government Destination Government 1002 N/A N/A N/A N/A 1002AA Destination Government Destination Government 1002AB Destination Government Destination Government 2001 N/A N/A N/A N/A 2001AA Destination Government Destination Government 2001AB Destination Government Destination Government 2001AC Destination Government Destination Government 2002 N/A N/A N/A N/A 2002AA Destination Government Destination Government 2002AB Destination Government Destination Government 3001 N/A N/A N/A N/A 3001AA Destination Government Destination Government 3001AB Destination Government Destination Government 3001AC Destination Government Destination Government 3002 N/A N/A N/A N/A 3002AA Destination Government Destination Government 3002AB Destination Government Destination Government 4001 N/A N/A N/A N/A 4001AA Destination Government Destination Government 4001AB Destination Government Destination Government 4001AC Destination Government Destination Government 4002 N/A N/A N/A N/A 4002AA Destination Government Destination Government 4002AB Destination Government Destination Government 5001 N/A N/A N/A N/A 5001AA Destination Government Destination Government 5001AB Destination Government Destination Government 5001AC Destination Government Destination Government 5002 N/A N/A N/A N/A 5002AA Destination Government Destination Government 5002AB Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0001AA POP 01-OCT-2020 TO
30-SEP-2021
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
967422
0001AB POP 01-OCT-2020 TO
30-SEP-2021
N/A (SAME AS PREVIOUS LOCATION)
0001AC POP 01-OCT-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
0002 N/A N/A N/A N/A
0002AA POP 01-OCT-2020 TO
30-SEP-2021
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
0002AB POP 01-OCT-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 N/A N/A N/A N/A
1001AA POP 01-OCT-2021 TO
30-SEP-2022
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
1001AB POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
1001AC POP 01-OCT-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
1002 N/A N/A N/A N/A
1002AA POP 01-OCT-2021 TO
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
1002AB POP 01-OCT-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 N/A N/A N/A N/A
2001AA POP 01-OCT-2022 TO
30-SEP-2023
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
2001AB POP 01-OCT-2022 TO
30-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
2001AC POP 01-OCT-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2002 N/A N/A N/A N/A
2002AA POP 01-OCT-2022 TO
30-SEP-2023
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
2002AB POP 01-OCT-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 N/A N/A N/A N/A
3001AA POP 01-OCT-2023 TO
30-SEP-2024
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
3001AB POP 01-OCT-2023 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
3001AC POP 01-OCT-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
3002 N/A N/A N/A N/A
3002AA POP 01-OCT-2023 TO
30-SEP-2024
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
3002AB POP 01-OCT-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
4001 N/A N/A N/A N/A
4001AA POP 01-OCT-2024 TO
30-SEP-2025
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
4001AB POP 01-OCT-2024 TO
30-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
4001AC POP 01-OCT-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
4002 N/A N/A N/A N/A
4002AA POP 01-OCT-2024 TO
30-SEP-2025
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
4002AB POP 01-OCT-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
5001 N/A N/A N/A N/A
5001AA POP 01-OCT-2025 TO
31-MAR-2026
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
5001AB POP 01-OCT-2025 TO
31-MAR-2026
N/A (SAME AS PREVIOUS LOCATION)
5001AC POP 01-OCT-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
5002 N/A N/A N/A N/A
5002AA POP 01-OCT-2025 TO
31-MAR-2026
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
TERRI BETH TEASCHNER
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
5002AB POP 01-OCT-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
SITE VISIT
SITE VIST
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. 52.237-1 Offerors or quoters will be required to wear PPE and maintain the CDC recommended guidance of maintaining a 6 foot distance between themselves and the lake personnel. The lake has requested that Offerors or quoters bring only those who are necessary to the visit with them.
Prospective offerors / quoters are required to contact the Contract Specialist via email to express their interests by 3:00 PM (CST) two business days prior to attending the site visit. Site visit attendees must provide the following information the Solicitation Number, Project Title, Name(s) of Individual(s) who will attend the site visit, Name of Company Represented, Phone Number of Company being represented. All attendees are required to sign an attendance sheet.
Address: U.S. Army Corps of Engineers Canyon Lake Project Office Terri Beth Teaschner- Lead Park Ranger 601 C.O.E Road Canyon Lake, TX 78133
CT POC: Karen Harkins Contact Info: (817)886-1289 Email: karen.harkins@usace.army.mil
Date of Site Visit: Tuesday 07 JUL 2020 @ 10:00 am CST
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
QUOTER DUE DATE/LOCAL TIME: 20 July 2020, 11:59 p.m. CST POINT OF CONTACT: Karen Harkins, 817-886-1289 Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil
Subject line of email MUST include the solicitation number and your Company Name.
For additional help contact your local Association Procurement Technical Assistance Centers (PTAC). Centers were created by Congress to assist businesses seeking to compete on federal contracts. Services are generally free;
however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.
SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: http://www.sam.gov.
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business. DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).
The website to obtain your DUNS number: http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com or phone 866-705-5711.
WAGE RATES: The Service Contract Act applies (see attached wage rates).
Vendor Information Sheet
IN THE EVENT OF AWARD, ISSUE CONTRACT TO:
COMPANY NAME
POC
(Last, First Middle)
ADDRESS
(Number & Street) (City, State and Zip)
PHONE NUMBER MOBILE
(Area code and number) (Area code and number)
EMAIL ADDRESS___________________________________________
DUNS NUMBER CAGE CODE NUMBER________
Vendor’s Online Representation and Certification Application (ORCA) is updated in SAM Yes No
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION.
CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM. AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil Ensure the former employer references the solicitation number in the email subject line
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract
Rating will be either positive or negative.
W9126G20Q0078
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?
E VG S M U N
b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)?
E VG S M U N
b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.
Budget variance reports, compliance with established budgets and
E VG S M U N
avoidance of significant and/or unexplained variances (under runs or overruns)
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
YES NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
YES NO
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below. YES NO
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
YES NO
d) In Summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary)
INSURANCE REQUIREMENT
I NSURANCE REQUIREMENT
Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, and one copy directly to the Lake Project Office.
Submit a copy of Insurance Certificate directly to:
U.S. Army Corps of Engineers
ATTN: CESWF-CT
P.O. Box 17300
Fort Worth, TX 76102
And
U.S. Army Corps of Engineers
Canyon Lake Office
601 C.O.E. Road
Canyon Lake, TX 78133
And email to: karen.harkins@usace.army.mil, 817-886-1289
The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:
(a) Comprehensive general liability insurance for bodily injury in the minimum limits of
$500,000 per occurrence. No property damage liability is required.
(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $500,000 per accident for bodily injury and $20,000 per accident for property damage.
(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of
$100,000.00, or in compliance with applicable State statutes.
(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.
NOTE:
(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.
PERFORMANCE WORK STATEMENT
US ARMY CORPS OF ENGINEERS
FORT WORTH DISTRICT
CAPITAL REGION
EMBANKMENT MOWING, CANYON LAKE, TEXAS
PERFORMANCE WORK STATEMENT (PWS)
1. GENERAL: This is a non-personal services contract to provide mowing and fertilization services on the embankments at Canyon Lake, Texas. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform mowing and fertilization services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.1.1. Definitions:
(a) Contractor: Company structure, including all partners, officers and employees with interest in this contract.
(b) Government: Government of the United States of America.
(c) Contracting Officer (KO): Person executing this contract on behalf of the Government.
(d) Contracting Officer’s Representative (COR): If applicable, the (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:
maintain written and oral communications with the contractor concerning technical aspects of the contract: issue written interpretations of technical requirements;
including Government drawings, designs, specifications: monitor Contractor’s performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.
(e) Designated Individual (DI): Person designated in writing by Capital Regional Office Operations Project Manager to monitor and act as liaison with the Contractor.
(f) Safety Manual: EM 385-1-1, Corps of Engineers Safety and Health Requirements Manual, current edition available at pre-work meeting.
(g) Performance Standard: Describes the desired results that are to be achieved.
(h) Quality Control: Action taken by the Contractor and/or their personnel to document, inspect and control performance of services to insure specifications and requirements of this PWS are met.
(i) Quality Assurance: Action taken by the Government to insure the Contractor's quality control system is functioning and effective and that the Contractor is providing services which are in accordance with this PWS.
(j) Quality Assurance Representative (QAR): Person designated by the Lake Manager to perform Quality Assurance Inspections, review invoices, and perform strict contract oversight. The QAR does not have authority to change any terms of the contract.
(k) Quality Assurance Surveillance Plan (QASP): Plan developed by the Government depicting means Quality Assurance will be controlled.
(l) Contract Discrepancy Report (CDR): Written record of unsatisfactory performance by the Contractor as observed by the Quality Assurance Representative, issued to the Contractor when the performance threshold does not meet the minimum requirements.
1.1.2. Basic Requirements: The following requirements for submitting a quote and receiving an award are now mandatory for conducting business with the DOD Government.
1.1.2.1. All offerors are required to obtain a Data Universal Numbering System (DUNS) number by visiting www.dnb.com.
1.1.2.2. All prospective contractors must be registered in System for Award Management (SAM) database prior to any award resulting from this solicitation. If at time of award, contractor is not registered, award will be made to the next successful “registered” offer. Registration may be accomplished via the internet at www.sam.gov.
1.1.2.3. All payments shall be made by Electronic Funds Transfer (EFT) or “direct deposit”.
1.1.2.4. E-Verify Verification of Eligibility: The Contractor must use the U.S.
Department of Homeland Security E-Verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor must provide to the Government two valid forms of Government-issued identification prior to beginning work to ensure the correct information is entered into the E-Verify system.
1.1.2.5. Permits: The Contractor will, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor will comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
1.1.2.6. Veterans Employment Emphasis: In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
U.S. Department of Labor Veterans employment, www.vets.gov/ Federal veteran employment information , www.fedshirevets.gov/index.aspx Veterans’ Employment and Training Service (VETS) , http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program , http://benefits.va.gov/vow/ U.S. Army Warrior Transition Command Employment Index , wtc.army.mil/modules/employers/index.html Hiring Our Heroes initiative , www.uschamberfoundation.org/hiring-our-heroes Guide to Hiring Veterans , www.whitehouse.gov/sites/default/files/docs/white_house_business_counc il_-_guide_to_hiring_veterans_0.pdf
1.2. Scope: The Contractor is to provide all contract work force, equipment and material/supplies required to perform mowing and fertilization services on the embankments at Canyon Lake, Texas. The Canyon Lake office will have soil testing conducted prior to fertilization. The results and recommendations will be utilized by the contractor for proposing formulation and quantity of fertilizer to be used at each site.
1.2.1. Sustainability Requirements: The Contractor shall meet the recycled content requirements set forth by the EPA. Information and list of EPA-designated products may be found at http://www.gsa.gov/portal/content/105366. In addition, the contractor shall meet the BioPrefered Program requirements set forth by the USDA. Information and list of USDA-designated product categories may be found at (http://www.biopreferred.gov/BioPreferred/faces/Welcome.xhtml).
1.2.1.1. In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired;
(1) Competitively within a timeframe providing for compliance with the contract performance schedule;
(2) Meeting contract performance requirements; or
(3) At a reasonable price.
Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program. The list of EPA-designated items is also available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products, items may include, but are not limited to the following products used on-site in execution of this contract: toilet tissue, trash can liners, and biobased content cleaners, solvents, detergents and disinfectants.
1.2.1.2. As required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C. 6962(c)(3)(A)(i)), the offeror certifies, by signing this offer, that the percentage of recovered materials content for EPA-designated items to be delivered or used in the performance of the contract will be at least the amount required by the applicable contract specifications or other contractual requirements.
1.2.1.3. References: FAR Provision 52.223-1 – Biobased Product Certification, FAR Clause 52.223-2 – Affirmative Procurement of Biobased Products Under Service and Construction Contracts, FAR Provision 52.223-4 – Recovered Material Certification, FAR Clause 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA-Designated Items, and FAR Clause 52.223-17 – Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts.
1.3. Period of Performance: This contract is for a base year and four (4) option years and one (1) six month Option. The base contract awarded as a result of this solicitation shall remain in full force and effect from October 1, 2020 or date of the award (whichever is later) through September 30, 2021. Option years, if exercised shall be for 12 months each and the option six month period, if exercised for up to six months. It is anticipated that offices will be open during the period of performance for this contract; however, Lake Offices may be closed to the public at any time for construction, floods, budget reductions, etc. and that part or all of required services may be cancelled. No such action shall be cause for a claim against the Government under this contract. Period of Performance is the three (3) weeks leading up to the date specified. The fertilizer will be applied during the month of May, weather dependent.
Mowing Schedule Fertilization Schedule December 23 May 20
March 31 June 30
September 30
1.4. General Information:
1.4.1. Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which the Contractor ensures Contractor’s work complies with the requirements of the contract. The Contractor’s Quality Control Plan shall be submitted to the Government for approval at least fifteen (15) days prior to work and must be approved before the Contractor provides any services under this contract. After acceptance of the Quality Control Plan, proposed changes to the approved plan by the Contractor must be submitted to the Lake Office POC for approval and if approved, the Contractor will receive the Contracting Officer’s acceptance in writing.
1.4.2. Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused upon the means utilized by the Government to ensure that the Contractor has performed in accordance with the performance standards.
1.4.2.1. Inspection and Contract Performance: The service performed by the Contractor under the provisions of this contract shall be subject to inspections by the Contracting Officer or Government Quality Assurance Representative (QAR) to insure strict compliance with the terms of the contract.
1.4.2.1.1. Notification of Deficiencies: The Contractor shall be notified verbally and/or in writing of any serious or recurring minor deficiency in service observed by the Contracting Officer or his/her authorized representative. Verbal notification will be recorded in a memorandum for record.
1.4.2.1.2. Documentation of Deficiencies: Written notifications and memoranda for the record shall be prepared by the Contracting Officer or Lake Manager
1.4.2.1.3. Correction of Contract Deficiencies: Upon receipt of notification of deficiency in service, Contractors will immediately correct deficiencies and /or take steps to prevent recurrence of the deficiency.
1.4.2.1.4. Deficiencies of Service: In the event a Contract Discrepancy Report (CDR) is issued, a meeting shall be scheduled within two (2) Government working days after the CDR was issued. Mutual effort will be made to resolve any and all problems identified. Written minutes of these meetings shall be prepared and signed by the QAR, Contractor and their respective employees. This contract may be terminated by the Contracting Officer upon receipt of any CDRs. Termination will be based upon the seriousness of the deficiency.
1.4.2.1.5. Evaluation of Performance: All Contractors will have their performance evaluated no less than mid-term and at the conclusion of their contract.
1.4.3. Government Holidays: The Lake Office will be closed on the following Government Holidays.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.4.4. Hours of Operation: Office hours of operation are Monday-Friday, 8:00 a.m. to 4:30 p.m.
1.4.5. Place of Performance: The work to be performed under this contract will be performed at Canyon Lake, 601 COE Road, Canyon Lake, TX.
Area Acres Main Dam 42.0
Spillway Dike 5.7 Dike Ramp 1 0.3
1.4.6. Type of Contract: The Government will award a Firm Fixed Price Service Contract.
1.4.7. Security Requirements:
1.4.7.1 General Security Requirements:
(a.) All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Lake Manager or to the contracting officer, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https://atlevel1.dtic.mil/at.
(b.) All Contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition
(FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
(c.) The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Lake Manager. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Lake Manager NLT 5 calendar days after contract award.
(d.) Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
(e.) The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the Lake Manager no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I‐9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
1.4.7.2. Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.7.3. Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .