B.01 EPA SATOC PWS.pdf
PDF 271 KB Posted
- Attached to
- EPA SATOC ACW Jackson
- Solicitation number
- W912HN24R1004
About this file
This document is a draft Performance Work Statement (PWS) for a $90 million Environmental Protection Agency (EPA) Single-Award Task Order Contract (SATOC) for the American Creosote Works Superfund Site in Jackson, Tennessee. The contract will be awarded to a small business under NAICS Code 562910 for Environmental Remediation Services (ERS). The services may include assessment, investigation, control, characterization, containment, removal, and/or treatment of environmental contamination from pollutants, toxic substances, and perfluorinated compounds. The contract will have a 5-year base period and a 6-month option period. The evaluation criteria will be a tradeoff between price, technical approach, and past performance. Proposals will be submitted electronically through the PIEE Solicitation Module. The draft RFP and PWS are provided for industry comment prior to the final solicitation being issued on or about July 15, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.01 PWS (seed project) ACW Jackson Enviromental Remediation.pdf | ||
| B.01 W912HN24R1004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK for EPA SATOC
American Creosote Works Superfund Site (Site) is located at 318 Meadow Street in the town of Jackson, in Madison County, Tennessee. The Site is an approximately 60-acre parcel of land located 1 mile southwest of downtown Jackson in an industrial/commercial area. It is bounded on the south by the Seaboard Railroad, on the southwest by the South Fork of the Forked Deer River (SFFDR), on the west and north by Central Creek, and on the east by an industrial yard.
The Site is a former a wood-treatment plant that operated from the early 1930s until December 1981 under American Creosote Works, Inc. (ACW). Wood preservation was performed using creosote and pentachlorophenol (PCP). Between the early 1930s and 1973, the plant discharged untreated process water on site with minimal control. In 1973, a levee was built around the facility to contain the wastewater and surface water runoff and protect the site from flooding by the SFFDR. The 5 soil borrow pits used for the levee construction subsequently became holding ponds for surface water (historically referred to as lagoons) in this document). Between 1974 and 1975, the plant installed a wastewater treatment system and oil-water separators to control environmental pollution. In 1982, ACW filed for bankruptcy and ceased operations. The United States Environmental Protection Agency (USEPA) proposed the Site for listing on the Superfund program’s National Priorities List (NPL) in October 1984. The USEPA finalized the Site’s listing on the NPL in June 1986.
EPA manages the cleanup for the Site through three operable units (OUs): OU1 addresses surface contamination; OU2 addresses site soil and groundwater; OU3 addresses the subsurface soils and groundwater and dense no-aqueous phase liquid (DNAPL). Both OU1 and OU2 have existing Records of Decision ROD) that have been implemented and their remedial actions and are not part of this requirement.
While considering several alternatives to treat the DNAPL in the subsurface for OU3 ,the Tennessee Department of Transportation (TDOT) informed the USEPA that they were going to construct a roadway through the southwest portion of the site. The treatment area for the southwest portion of the site will be impacted by the construction of a highway bypass limiting remedial action for the final Site remedy.
The EPA has prepared an Engineering Evaluation/Cost Analysis (EE/CA) to support the selection and implementation of a Non-Time Critical Removal Action (NTCRA) to address non-aqueous phase liquid (NAPL) at the Site impacted by the new roadway. The construction of the new roadway and associated right of ways would serve as a barrier and restrict access for the final remedy for OU3 for the southwest section of the site. The EE/CA and associated Action Memo were approved for a removal action for the contamination located in the southwest part of the site by in-situ soil stabilization (ISS).
1. CONTRACT PROCUREMENT OBJECTIVE AND OVERVIEW
The purpose of this contract is to provide a full range of environmental remediation services (ERS) for the American Creosote Works Superfund Site located in Jackson TN.
The environmental remediation services consist of environmental remediation for hazardous toxic and radioactive waste and wetland mitigation. This will NOT include services that are related to military munitions response and range and UXO support.
Services may include, but are not limited to, the assessment, inspection, investigation, study, control, characterization, containment, removal and/or treatment of environmental contamination from pollutants, toxic substances, perfluorinated compounds, preparing workplans, remedial design documents and reporting. The projects performed under this SATOC will be solely for the United States Environmental Protection Agency for the ACW Site under NAICS Code 562910, Environmental Remediation Services.
The contractor shall provide services related to pertinent requirements for the site following the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) in addition to and State/Local specific regulations/requirements that the USEPA may require. Remedial actions may address site specific compounds identified for removal or remediation at the ACW Site. Project specific task orders will be issued under the basic contract and any exercised option period thereto. The USACE Contracting Officer (KO) or Contracting Officer’s Representative (COR) will provide the contractor with any site-specific information upon issuance of each task order.
Information provided by the USACE on any site will be dependent on the status of the site. Each task order will define the performance requirements of the contractor. Task orders may require but will not be limited to any combination of the requirements stated in Section 3 below.
Task Orders will be Performance Based. Task orders may use performance-based work statements (PWSs). A PWS structures all aspects of an acquisition around the purpose of the work to be performed and does not dictate how the work is to be accomplished. It is written to ensure that contractors are given the freedom to determine how to meet the Government’s performance objectives and provides for payment only when the results meet or exceed these objectives. It maximizes contractor control of work processes and allows for innovation in approaching various work requirements. A PWS emphasizes performance that can be contractually defined so that the results of the contractor’s effort can be measured in terms of technical and quality achievement, schedule progress, or cost performance. The goal of Performance-Based Acquisition (PBA) is to:
• Save money by reducing contract costs from elimination of unnecessary effort, through innovation by the contractor, and by reducing Government surveillance.
• Enable Government to shift its emphasis from processes to outputs.
• Hold contractors accountable for the end results.
• Ensure that contractors are given the freedom to determine how to meet
Government’s performance objectives.
1.1 CONTRACT REQUIREMENTS
The contractor, operating as an independent contractor and not as an agent of the Government, shall provide all labor, materials, facilities, and equipment to perform all work identified in each individual task order. The contractor may be required to perform work under multiple task orders at different sites simultaneously. The contractor shall be cognizant of all appropriate laws, regulations, and guidance. The contractor shall ensure that all work activities performed by their personnel, subcontractors and suppliers are executed as required by these laws and regulations. Any incident of noncompliance noted by the contractor shall immediately be brought to the attention of the Contracting Officer (KO) and/or the Contracting Officer's Representative (COR) by written notice.
Nothing in this contract shall relieve the contractor of the responsibility to comply with these laws and regulations. Any conflicts between laws/regulations and contract/task order requirements shall be brought to the attention of the KO and/or COR immediately.
1.2 ENVIRONMENTAL REMEDIATION SERVICES (ERS) for ACW
There services could include remedial investigations, feasibility studies, proposed plans, decision documents/records of decision, and site remediation. The contractor shall provide services related to requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and other related Federal Programs in addition to State/Local specific regulations/requirements dealing with hazardous waste management/disposal. The ERS actions may address both regulated and non-regulated toxic substances. The contractor shall be familiar with, understand, and have prior experience executing projects within the regulatory process (CERCLA) and phases normally utilized to perform the above listed actions. The contactor shall be familiar with, understand and have prior experience in performing the specific tasks anticipated to be performed under this contract to include, but not limited to the following actions as stated in Section 2.
2. DESCRIPTION OF WORK
This Environmental Remediation Services (ERS) contract will support work assigned to the U.S. Army Corps of Engineers (USACE), South Atlantic Division; for the ACW site.
Services may include, but are not limited to, the assessment, inspection, investigation, study, control, characterization, containment, removal and/or treatment of environmental contamination from pollutants, toxic substances, perfluorinated compounds, radioactive materials, and hazardous materials. ERS projects include both civilian and military agencies of the Federal Government. This contract for ERS could include services related to requirements the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the Environmental Protection Agency (EPA) Emerging Contaminate Program; the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), the Clean Water Act, and other related Federal Programs in addition to State/Local specific regulations/requirements dealing with hazardous waste management/disposal, radioactive waste/mixed waste management/disposal.
The ERS activities could include remedial investigations, feasibility studies, proposed plans, decisions documents/records of decision, and site remediation including excavation/removal of contaminated soil, off-site disposal of contaminated soil, and installation of treatment systems. The ERS actions may address both regulated and non-regulated toxic substances and emerging contaminants. As part of any site remediation activities, incidental construction (i.e. treatment system assembly or placement, potable water hook-ups, temporary site stabilization, drainage modifications, etc.) may also be included in this contract; however, construction activities will be incidental to the remediation effort.
The contractor shall be responsible for acquiring the latest version of applicable regulator or agency guidance including but not limited to, the referenced documents cited in this Section C of this Solicitation and/or subsequent task orders issued after award of the Contract, unless otherwise specified.
3. PERFORMANCE-BASED TASK ORDERS
All task orders issued under this SATOC shall be performance-based task orders as in Federal Acquisition Regulations (FAR) 37.6. Performance-based task orders, with a tailored task order specific Quality Assurance Surveillance Plan (QASP), will be issued IAW FAR 37.102 against the awarded contract unless the required approval is received in accordance with AFARS 5137.170-2.
3.1 Services that may be required in a task order for this SATOC can include, but are not limited to: preparation of work plans; studies with associated reports; multiple phases of field investigations; remedial investigations (RI); feasibility studies (FS); Engineering Evaluation Cost Analysis (EECA); monitoring well installation and sampling; short and long term monitoring/long term operations (LTM/LTO); data management; data interpretation; evaluation of corrective actions; optimization studies; ground-water modeling; geophysical surveys; remediation cost estimates; management of non-hazardous and hazardous investigative derived waste (IDW); environmental and human health risk assessments; air emission issues including vapor intrusion; surface water discharge, applying for environmental permits, remedial design; well abandonment;
meetings; public meeting participation; preparation of presentation material both written and visual; hydrological, sediment and soil studies; project reports; environmental support and/or design; value engineering studies; operations and maintenance (O&M) for remediation systems, energy evaluations for remediation systems; remedial action plans;
remedial actions; removal action plans; removal actions; project oversight and support;
site closeout/decision documents.
3.1.1 Remedial Investigation/ Feasibility Studies (RI/FS) activities could include, but are not limited to Geographical information system (GIS) support for project activities; visual surveys; preparation of impact analysis, environmental impact statements, and various agency specific plans for compensatory mitigation projects; field investigations to include soil delineations, monitoring well installation and sampling; Life Cost Analysis, including evaluation of available corrective actions and recommendations for the most environmentally sound cost-effective alternatives; Environmental and human health assessments; Hydrological and soil studies; management of investigative derived waste;
Well abandonment including all associated piping and accessories; and Reconnaissance and Site Specific Feasibility Studies.
Remedial Investigations (RI) shall be in compliance with EPA guidance EPA/540/G- 89/004 that result in the collection, compilation and evaluation of data necessary to define source areas of contamination, the potential pathways of contaminant migration, and the lateral and vertical extent of contaminant plumes in all site media. The RI shall define the extent of contamination, especially source areas and the plume core, to allow estimation of the volume requiring remediation and determination of remedial costs without excessive cost risk during the RD/RA phase of the project. The RI shall result in development of a comprehensive conceptual site model which identifies migration pathways and fate and transport processes affecting each contaminant, which identifies potential receptors and complete exposure pathways to the extent necessary to determine whether a threat to human health or the environment exists, and to quantify that risk for all receptors. The RI shall include a comprehensive risk assessment for all identified contaminants of concern The RI shall include consideration of applicable general response actions and preliminary remedial alternatives to ensure collection of all pilot study, treatability, or high-resolution site characterization data necessary to develop and evaluate remedial alternatives (including the no-action alternative) in the feasibility study. A post or supplemental RI investigation and report may also be required.
Feasibility Studies will be in accordance with EPA guidance. The data needs of the feasibility study must be considered during the scoping and execution of the remedial investigation to ensure that appropriate general response actions, representative technologies, and applicable remedial alternatives for the site are identified and evaluated in coordination with the evolution of the conceptual site model as the RI progresses, and that field data needs necessary to confirm the efficacy of the technologies screened as applicable to the site (e.g. contaminant interactions, bioremediation related geochemistry, soil chemistry, high resolution site stratigraphy, injection/extraction radius of influence) are identified and collected.
3.1.2 Remedial action activities could include, but are not limited to the following: air sparging; soil vapor extraction; bioremediation; asbestos and lead-based paint remediation; radon abatement; landfill capping and collection systems; building remediation and demolition; sediment remediation; air discharge systems; ground-water extraction and injection systems; air stripping; carbon absorption; ground-water treatment systems; incineration of soils; thermal desorption; mixed water disposal; solidification of contaminated matter; soil washing; detection, recovery, and any in-situ or on-site treatment methods. Remedial actions may address both regulated and non-regulated toxic substances. If required, the contractor shall outline a complete CQC Plan in order to implement QC testing of a project's remediation goals. The contractor shall specify and perform any and all necessary engineering QC testing, at required frequencies, deemed necessary to adequately control and monitor the remediation or removal action.
3.1.3 Proposed Plans/Records of Decision (PP/RODs) activities could include but are not limited to the following: Geophysical mapping and associated activities; Alternative Analysis; and Land Use Controls (LUCs) decisions.
3.1.4 Interim Removal Actions (IRAs) activities may be required to mitigate imminent endanger to human health or the environment resulting from situations including but not limited to, exposed and readily accessible surface or near surface HTRW or munitions, from vapor intrusion, from impacts to active potable groundwater sources, from impacts to landfills or contaminated soil volumes, posed by erosion or other causes. Removal actions can be both time critical and non-time critical. and could include but are not limited to the following: perform removal and/or isolation of exposed or near surface contaminants, provide landfill cover stabilization, provide erosion control, install groundwater containment systems to prevent impact to potable water wells or surface water releases.
3.1.5 Remedial Design/ Remedial Actions (RD/RA) activities could include, but are not limited to the following: GIS support for project activities; engineering support and/or design and remediation; Landfill capping and collection systems; evaluations for remediation systems to include: air sparging; soil vapor extraction; bioremediation; air discharge systems; air stripping, carbon absorption; groundwater treatment systems;
incineration of soils; soil washing; any in-situ or site treatment method; thermal desorption, building remediation and demolition; sediment, mixed water; and contaminated matter remediation and disposal; and Remedial Design documentation and Remedial Action Plans.
3.1.6 Short- and Long-Term Operation and Maintenance of facilities under this Contract for the period specified. Short term O&M is a requirement during initial startup and shakedown of any active treatment or containment system installed by the contractor.
Other short-term O&M requirements may be identified associated with short term interim actions. contract gap filling, or other reasons. Long-Term Operations/ Long Term Monitoring (LTO/LTM) activities could include but are not limited to the following:
groundwater containment/extraction or amendment recirculation systems, soil vapor extraction systems, air sparging systems, monitoring and optimization of in-situ amendment based remedial actions, monitoring and revitalization of in-situ permeable barrier walls.
4.0 SUBMITTALS
Site work shall not commence on a project until the Government, the Project Manager (PM), COR and other appropriate management personnel, as required, have approved all of the site-specific submittals required for each specific task order to include Insurance Certificates and Payment and Performance Bonds, if applicable. Required submittals will be identified within each task order. The following are standard submittals for all task orders unless otherwise specified:
4.1 Work Plan
The contractor is responsible for preparing the appropriate planning document for each individual task order that complies with the EPA agency regulations, USACE guidance, the Department of Defense Quality Systems Manual (DOD QSM) and other EPA guidance.
4.2 Chemistry Requirements
The contractor shall be responsible for the quality of all required chemistry services performed. The contractor shall ensure that all chemistry-related tasks are conducted in accordance with the requirements within each task order.
4.3 Health and Safety
An Accident Prevention Plan (APP) will be a required sub- plan for all work plans and will be a standalone document. Site Safety and Health plans are potential sub-plans to the APP, but not required for all task orders. Site-specific health and safety submittals including an activity hazard analysis, safety monitoring, practices, procedures, and equipment are required in accordance with each task order.
4.4 Laboratory Selection
The contractor shall select a laboratory that is accredited under the DoD Environmental Laboratory Accreditation Program (ELAP) and National Environmental Laboratory Accreditation Program (NELAP) in accordance with the task order. The contractor shall ensure that the selected laboratory meets all state and federal requirements, including state certification where appropriate. The laboratory must also have analytical capabilities sufficient for the methods specified in the UFP QAPP and adequate throughput capacity to handle the project’s analytical workload during all field activities.
The contractor may establish an on-site laboratory at the project site if determined necessary by the contractor. However, on-site test laboratory(ies) must meet all Method specific requirements and DoD QSM requirements if data is to be used definitively.
Screening level data may not require as stringent control but must still meet quality assurance criteria as approved by the USACE project chemist. All on-site methods including QA/QC techniques must be documented and approved in the UFP QAPP. In addition, all definitive data will be required to meet all validation criteria specified in the
UFP QAPP.
4.5 Analytical Data Management
Data should be provided as described in each individual task order. The contractor shall ensure that all hard copy and electronic data deliverables supplied by the laboratory are complete and adequate to support the quality and usability of the data. Raw data packages shall be submitted to the COR and the EPA upon request. Data packages shall include all information required to re-create the analysis, including correspondence with the laboratory regarding exceeding quality assurance/quality control (QA/QC) measurements and documentation of corrective actions. Complete laboratory reports must be available electronically and should be supplied as an addendum to each applicable report. Data validation reports should also be attached verifying data are of sufficient quality for its intended use.
4.6 Environmental Support for Remediation and Removal Actions The contractor may be required to provide a wide variety of environmental services to support remediation/response actions. The extent of these e services will be described in detail in each individual task order and may include but are not limited to geotechnical, geological, environmental, cost engineering, and other engineering support such as value engineering following USACE policy. The successful contractor shall perform all necessary planning, fieldwork, and prepare all related design documents identified in the Task Order. All design and planning documents shall be representative of industry or Government standards for drawings and specifications. All design documents produced by the contractor shall be stamped by a licensed Professional Engineer and shall be submitted to the USACE Project Manager (PM)/COR for approval.
4.7 Record Keeping
The contractor shall create and maintain in one location written (in bound, numbered logbook) and electronic records sufficient to recreate each sampling, analytical, testing and monitoring event, and shall make these records available to the Government upon request. The contractor shall also retain written calculations using information obtained from sampling, analysis monitoring, and testing activities, to include all raw data. All information shall be provided to the government upon request.
4.8 Compliance with Federal, State, and USACE Regulations
The USACE environmental work for this SATOC falls under EPA environmental regulations covered by CERCLA. As such, each project’s lead regulatory agency must be identified, and any unique requirements accommodated. In general, all programs mandate the preparation of planning documents to assure the fieldwork and chemical data quality are supportive of the intended use of the data and final decisions being made.
4.9 Sustainable Practices
Projects executed for certain stakeholders shall use technologies and practices that are sustainable in accordance with EPA’s Consideration for Greener Cleanup Activities (current version) or other EPA green requirements as applicable.
4.10 Conference/ Meeting Notes
The contractor shall be responsible for taking notes and preparing the reports of all conferences/meetings. Conference/meeting notes shall be prepared in typed form and the original furnished to the Government in accordance with each individual task order for concurrence and distribution to all attendees. This report shall include at a minimum:
• The date and place the conference was held with a list of attendees;
• The list of attendees shall include name, organization, and telephone number;
• Comments made during the conference and decisions affecting criteria changes shall be recorded in the basic conference notes; and
• Conference notes should document any augmentation of written comments.
4.11 Technical Reports
Technical reports shall be prepared and submitted by the contractor to the PM for each project. All reports shall have a title page/header identifying the Contract and task order number; contractor name; project name; location of project; report type; and date of submittal. The task order statement of work will further specify the submittals for each project. The submittal requirements may vary with the project or site.
4.12 PROJECT SCHEDULE
The contractor shall prepare a project schedule for each individual task order. The schedule should show the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. Provide a schedule that is a forward planning, as well as a project monitoring tool. The schedule will be approved by the USACE Project Manager/COR. The status of activities in the schedule will be updated by the contractor to reflect the actual status. The schedule status will be included with contractor Progress Reports as specified in the task order(s). The Progress Report shall discuss target and actual completion dates for each element of activity including project completion and provide an explanation of any deviation from the milestones in the work plan schedule and how project execution will be adjusted so that milestone deviations do not have an adverse impact on project completion and attainment of all project objectives. The progress report should also identify any potential future risks to schedule identified during the reporting period and provide preliminary approaches to mitigate the risks. Where applicable, the contractor shall establish and prepare a payment milestone schedule for each individual task order. This milestone schedule shall be approved by the Project Manager/COR.
4.13 Partial Submittals
Partial submittals will not be accepted without prior approval from the COR as appropriate for the submittal involved.
4.14 Revisions and Addenda
Prior to Government approval, review comments shall be incorporated by revising and reissuing affected pages. If major revisions are necessary, the entire document shall be resubmitted. Addenda sheets may be used to make minor changes affecting only a few pages. The affected pages shall have the revision number and date of correction on the bottom right corner of the page. Any changes to the work plan shall be submitted under a cover sheet with a list of pages that have been revised. The revised pages the contractor issues shall cover any additions or changes to the plans or reports. The addendum for the project plan shall be issued prior to the commencement of work for that phase.
4.15 Review of Progress and Technical Adequacy
At any appropriate time, representatives of the KO may review the progress and technical adequacy of the contractor’s work. Such review shall not relieve the contractor from performing all contract requirements, except as may be waived by written instructions.
4.16 Distribution
The contractor is responsible for reproduction and distribution of all documents according to individual task order. Documents shall be mailed via regular mail, a carrier service that will provide overnight service (if necessary), or they will be faxed/email, as specified in the task order. All work products are considered to be products of the Government.
4.17 Deliverables
The contractor shall provide deliverables as described in subsequent task orders.
Deliverables shall be specified by the government. Format and delivery schedule for deliverables shall be outlined in the individual task order PWS and/or other means TBD.
5. ENVIRONMENTAL REQUIREMENTS
All ERS shall be in full compliance with applicable Federal, State and local environmental laws and regulations including but not limited to: Pertinent Occupational Safety and Health Administration and Department of Transportation requirements, National Environmental Policy Act, Clean Water Act, Clean Air Act, Endangered Species Act, Toxic Substances Control Act, Resource Conservation and Recovery Act as amended by the Hazardous and Solid Waste Act, and Comprehensive Environmental Response and Compensation and Liabilities Act as amended by Superfund Amendments and Reauthorization Act. The contractor shall assure that all activities performed by his personnel, subcontractors and suppliers are executed as required by these laws and regulations.
Any incidents of releases, spills, or regulation noncompliance noted by the contractor shall immediately (within 1 hour) be brought to the attention of the KO or his representative with written notice provided. The contractor shall also ensure that the National Response Center is notified as well. Nothing in this contract shall relieve the contractor of his responsibility to comply with these laws and regulations.
5.1 PERMITS/LICENSES
The contractor shall obtain permits and licenses necessary to conduct the work required by this contract including, but not limited to, environmental permits, building permits, discharge permits, and Department of Transportation (DOT) permits for transport of Hazardous, Toxic and Radioactive Waste (HTRW) on public highways. The contractor shall comply with all applicable Federal, State, and local laws and regulations. Rights of entry on and off Government property may be required.
5.2 REGULATORY REQUIREMENTS
As applicable, all site investigation, field activities, monitoring, operations and maintenance activities and health and safety documents required by this scope of work shall comply with all applicable local, state, federal and/or DoD guidance and regulations.
6. TRANSPORTATION, STORAGE, TREATMENT AND/OR DISPOSAL OF
HAZARDOUS WASTE
The contractor shall ensure that their personnel and all subcontractors handle, transport, store, treat and/or dispose of all hazardous wastes as required by the applicable laws and regulations. The contractor shall review all information provided and develop the necessary deliverables which contain the transportation and disposal criteria, procedures, and practices sufficient to protect personnel, the environment, and potential off-site receptors from chemical, physical, and/or biological hazards. The contractor shall utilize the services of a Regulatory Specialist experienced in hazardous waste manifesting and hazardous waste site operations. If the information that is available is insufficient to allow the contractor to develop these documents, a description of all additional information required shall be prepared and submitted to the KO, prior to the commencement of work.
7. SAFETY & HEALTH
7.1 General
This subsection describes in general terms, the minimum contractor safety health and emergency response requirements associated with this contract. The contractor shall have an ongoing Safety and Health Program meeting the requirements of the OSHA and USACE standards. Note that the requirements stated in EM 385-1-1 are often more stringent than OSHA requirements, and the contractor shall comply with all requirements as applicable. The contractor shall prepare, implement, and enforce the applicable and approved APP. The APP shall be validated by the contractor annually. Validation shall include review by the contractor's qualified personnel, necessary revision, and completion of a new signature page.
7.2 Acceptance of Safety Plan
Government acceptance of the contractor's safety plan is required prior to start of field activities. Changes to the approved plan shall not be implemented without written concurrence from the KO. The Government reserves the right to require the contractor to make changes in the safety plan and/or operations to assure the safety and health of site workers and the public.
The contractor shall develop and implement a safety plan for each individual task order in accordance with USACE EM 385-1-1, current version (Safety and Health Requirements) and applicable state, federal, and local regulations and guidance.
The overall responsibility for the development, implementation and continued enforcement of the safety plan lies with the contractor.
8.ENGINEERING REQUIREMENTS
The engineering requirements related to the ERS will be described in detail in each individual task order. The contractor shall perform all necessary field work and analyses to address the appropriate engineering requirements. Engineering work performed may be under the authority of a properly licensed engineer, as deemed necessary by the KO.
Furthermore, engineering support to be performed incidental to remediation/removal actions will depend on the requirements of the individual task order. If required, the contractor shall outline a complete CQC Plan in order to implement QC testing for construction of a project's engineering features. The contractor shall specify and perform any and all necessary engineering QC testing, at required frequencies, deemed necessary to adequately control and monitor remediation/removal progress.
9. PROJECT PERSONNEL
9.1 The contractor shall provide qualified personnel to successfully complete each individual task order. Personnel shall meet the following minimum qualifications.
Program Manager The contractor shall designate one (1) individual as the Program Manager that serves as a single point of contact for coordination of program issues with USACE. The Program Manager shall be responsible for the overall management of the contract including cost, schedule, and technical quality. The Program Manager shall be competent, experienced, and knowledgeable in the full range of ERS activities from investigations to studies, designs, remediation, short-term operations, and maintenance, and with the specific activities identified in this contract. The Program Manager shall take immediate corrective action when performance is not acceptable to USACE. The Program Manager shall oversee the development and implementation of record keeping, administrative and QC programs. The Program Manager will provide an annual report to the USACE Program Manager that shall include details on subcontracting executed under awarded delivery orders. The Program Manager shall be an employee of the prime contractor; have a college degree in engineering, construction management, geology, chemistry, or related field; and shall have a minimum of five (5) years as a Program Manager on ERS projects.
Project Manager(s) For each task order, the contractor shall designate a Project Manager (PM). The Program Manager may act as the Project Manager, with approval of USACE, if execution is sufficiently limited. The Offeror shall identify the PM before issuance of the task order and the PM qualifications, experience and performance history shall be satisfactory to the KO or COR. The Project Manager shall be the single point of contact for the task order and shall be responsible for the management and execution of the Task order in accordance with the approved performance work statement, approved work plans, and all federal, state, and local laws and regulations. The Project Manager shall ensure coordination between the Safety and Health Manager (SHM) and the Site Safety and Health Officer (SSHO) to ensure that all site activities are performed in a safe manner. The contractor shall also maintain close communication and coordination with USACE for the duration of the project, including weekly and/or monthly progress and detailed cost reporting.
Individuals proposed as Project Managers shall be employees of the Prime contractor, have a college degree in engineering, construction management, geology, chemistry, or related field, and a minimum of three (3) years of experience in Project Management of ERS projects.
Project Engineer The contractor shall designate a one person to be the project engineer for each task order (as appropriate to the task order). The Project Engineer(s) is responsible for assuring that all civil, process and geotechnical engineering support goals specified in the Task Order are attained. The Engineer shall have a college degree in engineering (soil mechanics, materials, or related specialty), geological engineering, or related field.
The individual(s) proposed should have a PE license, demonstrable education and experience in geotechnical or environmental engineering. The individual(s) proposed should also have three (3) years’ experience related to remedial investigations, feasibility studies, and design and construction of geotechnical features in ERS sites and/or process engineering at ERS facilities or sites.
Project Geologist The contractor shall designate a project geologist for each task order (as appropriate to the task order). The Geologist shall ensure activities, to include plan development, field activities, report writing, designs, etc. are of the quality to meet project objectives. The geologist shall have experience in surface and subsurface soil, groundwater, surface water, sediment, etc. sampling techniques, as well as aspects of obtaining all types of samples through various drilling and sampling techniques, along with appropriate documentation procedures. The geologist shall have a PG licensed, a minimum 4-year college degree in geology or geological engineering with a minimum of three (3) years of experience working ERS projects.
Project Chemist The contractor shall designate one (1) individual to perform the function of Project Chemist. This individual shall ensure that all chemistry related goals of the program are attained. The Project Chemist should have general knowledge of remedial process chemistry, fate and transport of organics and inorganics, knowledge of chemical quality control, experience with validation software and staged electronic data deliverables. The Project Chemist shall be experienced in the sampling and analysis of toxic/hazardous chemicals in environmental matrices. Demonstrated experience with emerging contaminants will be beneficial. The Project Chemist will be required to have advanced expertise (senior level) in chemical data quality management of environmental analytical data and demonstrate an understanding of the UFP QAPP. The Project Chemist shall be an employee of the prime contractor; have a college degree in chemistry, or related program, from an accredited four (4) year program. Shall have a minimum of three (3) years of specialized experience in ERS related work.
Site Superintendent If required by the task order, the contractor shall provide one (1) individual who is trained and experienced as a Site Superintendent on overseeing ERS projects during the Remedial Action phase. The Site Superintendent is directly responsible for all site operations and for supervision of the site foreman, craft labor, equipment, and subcontractor / vendor field activities. The Site Superintendent is responsible for leading on-site activities, managing on-site personnel and subcontractors, managing, and controlling remediation schedules, effectively and proactively resolving quality and schedule issues. The Site Superintendent shall have a minimum of 3 years working experience as a Site Superintendent and should have 3 years of experience on ERS remediation sites, experience in schedule management, and experience with the Government’s QCS for managing QC requirements and submittals.
Contractor Quality Control Supervisor (CQCS) The contractor shall designate one (1) individual who is trained within its organization to be responsible for overall management of Contractor Quality Control (CQC) Program and have the authority to act in all CQC matters. The CQCS will be responsible for ensuring contract CQC requirements are met. The CQCS shall have a Bachelor’s Degree in a related field such as engineering, chemistry, construction management, or related field and a minimum of three (3) years working experience in quality control in chemical/hazardous waste investigations and remediation. The individual proposed as the CQCS shall have experience with QA/QC in areas specific to ERS sites. These areas should include remedial investigations, remedial design, and remedial actions.
On-site CQC personnel requirements will be defined in the project specific Task Order Request for Proposal (RFP).
Safety and Health Professionals In accordance with the US Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, current version, which can be found on line at http://publications.usace.army.mil/publications/eng-manuals/), the contractor shall provide the following personnel for hazardous waste operations:
Safety and Health Manager (SHM) The contractor shall designate an SHM and the SHM shall have a minimum of three (3) years of experience managing safety and occupational health at hazardous waste site cleanup (or radioactive waste sites, if necessary) operations. The SHM shall be an employee of the prime contractor. The SHM shall possess the authority to shut down the site work if/when Health and Safety becomes an issue. The SHM shall enlist the support of safety and occupational health professionals with appropriate education and experience when working on sites with multiple (chemical, safety, ionizing radiation) hazards. The SHM shall be responsible for developing, maintaining, and overseeing implementation of the Site Health and Safety Plan, visiting the project site as needed to audit the effectiveness of the SSHP, remaining available for project emergencies, evaluating occupational exposure, and monitoring data that impacts the SSHP requirements. The SHM, dependent upon the contaminant-related hazards on the project, shall be a Certified Industrial Hygienist (CIH), Certified Safety Professional (CSP) or Certified Health Physicist (CHP). If the project involves radioactive material, any specific requirements will be identified in the task order RFP.
Site Safety and Health Officer (SSHO) The SSHO is required at cleanup operations and shall have a minimum of one (1) year of experience implementing safety and occupational health procedures at cleanup operations. The SSHO shall be on site anytime cleanup operations are being performed and shall be responsible for inspecting site activities to identify safety and occupational health deficiencies and to correct them, to coordinate changes to the SSHP with the SHM, Site Superintendent, and KO, to conduct safety training, and to ensure site monitoring for site health and safety (equipment, processes, and procedures) is conducted and enforced.
Regulatory Specialist The Regulatory Specialist is responsible for assuring regulatory compliance is achieved for all environmental related activities in the task order. The project Regulatory Specialist must have professional knowledge of and a thorough understanding of, and applied practical experience of environmental regulations with respect to CERCLA, the Hazardous Materials Conservation Act, the Superfund Amendments & Reauthorization Act (SARA), the Toxic Substances Control Act (TSCA), the Clean Air Act, the Clean Water Act, etc., and implementing federal, state and local regulations and their application to the projects. The Regulatory Specialist shall have a college degree in environmental, physical or natural sciences or in engineering, shall have professional http://publications.usace.army.mil/publications/eng-manuals/) registration in their respective field of expertise (e.g., Professional Engineer license, Certified Hazardous Materials Manager (CHMM), Registered Environmental Manager (REM), or equivalent), have a minimum of five (5) years of professional experience, and have a minimum of three (3) years of experience in the accumulation, manifesting, and shipment of wastes.
Hazardous Waste Specialist.
The offeror shall designate an individual who is responsible for the management of hazardous materials and hazardous wastes. The Hazardous Materials/Waste Specialist should have appropriate education and experience in HAZMAT and HAZWASTE management services to ensure compliance with all federal, state, and local laws and regulations. The Hazardous Materials/Waste Specialist is responsible to ensure compliance with the requirements identified in the PWS and the HAZWASTE management plan. The Hazardous Materials/Waste Specialist shall demonstrate the following qualifications to be deemed acceptable:
• As a minimum, the Hazardous Materials/Waste Specialist shall possess a bachelor’s degree in an environmental, physical or natural science or in engineering and three (3) years specialized experience in the management of hazardous materials/waste.
• To perform under a task order, he/she must possess a current Certified Hazardous Materials Manager certification and/or a Hazardous Waste Manifest/DOT certification, copies of which should be provided with the proposal.
Risk Assessor.
The project Risk Assessor should have professional knowledge of and applied practical experience in toxicological principles, concepts, regulations, and established methodologies sufficient to perform the full range of duties in hazardous and toxic waste human health and ecological risk assessments; professional knowledge of and applied practical experience in ERS hazard assessment principles, practices regulations and methodologies; knowledge of related physical and natural sciences, such as toxicology, chemistry, physics, geology, geophysics, biology, mathematics and statistics;
knowledge of standard practices in soil, air, water, and sediment quality and chemical testing procedures; knowledge of site investigative techniques for PFAS, and HTRW:
knowledge of the TPP and DQO process; knowledge of applicable Federal and State regulations and guidance related to PFAS, and HTRW, human health and ecological risk assessments and hazard assessments.
The individual proposed as the Risk Assessor shall have a four-year college degree in toxicology, biochemistry, chemistry, environmental science/engineering, or related field from an accredited institution.
The individual proposed as the Risk Assessor should have a minimum of five (5) years of professional experience related to ERS investigations, risk assessments, and mitigation/removal/remedial actions.
Geophysicist.
The geophysicist will be responsible for design, implementation, and management of all geophysical investigations required for the work effort. This individual shall be the geophysicist-of-record. This position will serve as the primary point-of-contact for technical coordination of project geophysical requirements. The geophysicist should have experience in selecting the appropriate geophysical platform, sensor and navigational technologies, geophysical data collection and geophysics quality control programs, as well as the preparation of geophysical investigation plans and reports. The individual proposed as the geophysicist shall have a college degree in geophysics, geology, geological engineering, or a closely related field. The individual proposed as the geophysicist should have professional registration, in their respective field, where applicable or available. The individual proposed as the geophysicist should have a minimum of five (5) years of directly related geophysical experience.
9.2 Multi-Disciplined Technical Staff
The KO may request the resumes of any of these personnel or other personnel identified in Section B Labor Rate Table 1 to verify that they meet the requirements before Task Order award.
10. SECURITY
The contractor shall meet the security requirements as prescribed in each individual task order for non-DoD facilities. This may include but not limited to:
10.1 General security requirements and guidance (Other Federal Agencies): The security requirements described below apply to all contract personnel (including employees of the prime contractor (“contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The contractor is responsible for compliance with all security requirements and any others promulgated by the Requiring Activity (RA). Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). In circumstances where access to a DoD installation or Facility is necessary to meet contract performance requirements, contractor personnel shall comply with that agency’s security requirements (e.g. access control procedures, etc.). Contractor personnel entering federal buildings and non-DO0D installations shall follow applicable access control procedures and are subject to search in accordance with Interagency Security Committee (ISC) regulations.
10.11 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.
Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .