B.01.01. Combined Synopsis and Solicitation - W912DQ23Q1064 - Released.pdf
PDF 1017 KB Posted
- Solicitation number
- W912DQ23Q1064
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912DQ23Q1064 02-Jun-2023
b. TELEPHONE NUMBER
816-389-3812
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 14 Jun 2023
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DQ9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ANGELLA CURRAN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C +
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
816-389-2029/2030FAX:
TEL: 816-389-3812 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$22,000,000
NAICS:
561720
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF41
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section A - Solicitation/Contract Form
SYNOPSIS / SOLICITATION:
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart
12.603 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, proposals are being requested and a written solicitation will not be issued.
The solicitation number for this acquisition is W912DQ23Q1064 and it is being issued as a Request for Quotes
(RFQ).
Offers are due at the date and time specified in box 8 on page 1. Offers shall be submitted in PDF via e-mail to angella.curran@usace.army.mil. All offers must be good for at least 90 days from offer due date.
If you have any questions please contact Ms. Angella Curran, angella.curran@usace.army.mil 816-389-3839.
The solicitation documents and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2023-04.
This synopsis/solicitation will be awarded as a 100% Small Business Set-aside and the associated North American Industry Classification system (NAICS) code is 561720 for “Janitorial Services”
Manufacturing and the business size standard is: $22,00,000.00.
Product/Service Code: ZIFB
Description of Services Required: The U.S. Army Corps of Engineers Kansas City District has a need for Custodian, and Janitor services to support several lakes in the Operations Division of the Kansas City District during the visiting season each year. The contractors shall perform all services in accordance with the Performance Work Statements. The Contractor shall comply with all Federal, state, and local laws, ordinances, statutes, and regulations pertaining to the provided services.
Place of Contract Performance: Warsaw, Missouri.
Far 52.212-1, Instructions to Offerors- Commercial does apply to this acquisition with no addenda to the provision and is located in Section L of this combined synopsis/solicitation.
Far 52.212-2, Evaluation - Commercial Edited does apply to this acquisition with no addenda to the provision and is located in Section M of this combined synopsis/solicitation.
FAR 52.212-3, Offeror Representations and Certifications -- Commercial Items, does apply to this acquisition with no addenda to the provision, and is located in Section K of this combined synopsis/solicitation.
FAR 52.212-4, Contract Terms and Conditions - Commercial Items, does apply to this acquisition with no addenda to the provision. These specific clauses required are located in Section I of this combined synopsis/solicitation.
FAR 52.212-5, Contract Terms and Conditions - Required to Implement Statutes or Executive Orders- Commercial Items, applies to this acquisition. These specific clauses required are located in Section I of this combined synopsis/solicitation.
Additional contract requirement(s) or terms and conditions are located in Section J of this combined synopsis/ solicitation.
In accordance with FAR 52.212-1(k) the prospective awardee shall be registered and active in https://beta.sam.gov/ for their System Award Management (SAM).
PLEASE NOTE: SAM.GOV procedures have been changed as of 8 November 2019. Interested vendors must go to beta.SAM.gov to register in SAM and to review current notices or announcements.
Contractors may obtain information on registration and annual confirmation requirements via the Internet at https://beta.sam.gov/ or by calling (866) 606-8220.
The beta System for Award Management (SAM) is a Federal Government owned and operated free web site. If you are a small business needing assistance with registering or help with navigating through the website you may contact the Association for Procurement Technical Assistance Centers for help with actions such as beta.SAM.gov registration.
If you have questions about Government procurements in general or need assistance in the preparation of your proposal, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org/sam-registration/
(End)
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Thibaut Point Base Period
FFP
The Contractor shall furnish all park custodian supplies, services and equipment for Thibaut Point as defined in the Performance Work Statement (PWS).
FOB: Destination
PSC CD: Z1FB
NET AMT
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK
STATEMENT FOR
FACILITIES CLEANUP
SERVICES
Public Use Areas
HARRY S. TRUMAN LAKE
Thibaut Point 5 Apr 2023
1. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, tools, supervision, and other items and services necessary to ensure that facilities cleanup services as defined in this performance work statement (PWS) are completed in a manner that will maintain all buildings and facilities in a clean, sanitary condition, and grounds free of litter and debris.
MAINTAIN GROUNDS:
1.1. Performance Requirements:
MAINTAIN IMPROVED GROUNDS. Cleanup for Service Facilities/Areas: The Contractor shall be responsible for maintaining the facilities listed below in a clean and sanitary condition, defined as being free of all particulate matter, film, spots, streaks, or removable stains. Glossy surfaces shall present a polished look free of water spots. Grounds shall be free of litter. All facilities cleanup services shall be completed in an area prior to moving to another area.
1.1.2 Service Facilities/Areas:
The Contractor shall maintain the facilities identified below in a clean and sanitary condition in accordance with the identified performance standards. The attached Specific Park Sheets (SPS) provide an estimate of the quantity of supplies and materials necessary for servicing the parks. The estimate is for bidding purposes only. Actual quantities will be maintained by the Contractor and submitted monthly for each park. The SPS for each park also includes a breakdown of facilities and areas to be serviced though not all items listed here in the Performance Work Statement are reflected in the SPS.
1.1.2.1 Shower/Latrine facilities w/Appliances and flush-type toilets:
1.1.2.1.1 Ceilings - Clean ceilings on inside and overhang on outside of buildings to remove spider webs, dust, bird and insect nests, dirt, and insect spots. Due to the height of the ceilings a specialized tool such as an extension handle for the duster and/or ladder will be necessary.
1.1.2.1.2 Walls, shower stalls, benches, partitions, stools (flush-type), wash basins, doors and refuse containers: Clean and disinfect to ensure a sanitary condition free of all dirt, oil, lotions, soap residue, rust, calcium deposits or other foreign matter. Extreme care shall be taken to keep strong abrasive, cleaners off chrome fixtures and bathroom mirror frames. All surfaces including soap trays, faucets, stool lids, handicap bars, plumbing fixtures, etc subject to wet or damp conditions will be kept free of mildew, mold, fungi, lime deposits, scale, rust and biological formulations by application of appropriate chemical agents and shall present a dried polished appearance free of dirt, cleaning solution, disinfectant, and water spots. All existing deposits shall be removed and an acceptable level of cleanliness shall be established by the COR and the Contractor prior to first payment being processed. The Contractor will be expected to provide the quality of service as established during this meeting for the duration of the contract. Interior of the exterior walls shall be free of foreign matter.
1.1.2.1.3 Floors and floor drain plates – Shall be disinfected and free of all dirt, sand, foreign matter, trash, and excess water. This shall include the floors surrounding the washers and dryers. The floors shall be cleaned using a cleaning agent and disinfectant a minimum of once a week.
1.1.2.1.4 Mirrors – Shall be free of dirt, dust, smudges, water spots and streaks.
1.1.2.1.5 Washer and dryers – Both the inside and outside shall be maintained in a clean condition free of dirt, bugs and/or detergent residue. Lint screens of dryers shall be cleaned during each cleanup to include crevice around lint tray. Behind the appliances shall be kept free of dirt and debris.
1.1.2.1.6 Inside and Outside Light Fixtures – All exterior surfaces of light fixtures attached to the interior and exterior surfaces of facilities shall be dusted and kept free of cobwebs, dirt and debris.
1.1.2.1.7 Metal louvers and Doors – Maintain a clean appearance free of spider webs, bird and insect nests, bird droppings, dirt, dust, or other foreign matter.
1.1.2.2 Vault Toilets - Floors, walls, risers and inside of risers and vault – The Contractor-furnished enzyme/deodorant shall be mixed at the rate described in the manufacturer’s instructions listed on the product and be used to promote biological growth. The pit of the vault toilet area may require additional treatments. No disinfectant shall be applied to the pit. A chemical agent and disinfectant shall be used to scrub the floor once a week. Excess water/cleanser shall be removed.
1.1.3.1 Picnic Shelter: Ceiling, beams, trusses, and overhang shall be clean and free of all dirt, spider webs, dust, bird and insect nests, and foreign matter. Due to the height of the ceilings a specialized tool such as an extension handle for the duster and/or ladder will be necessary.
1.1.3.2 Table tops, seats, and floor slabs shall be cleaned and disinfected to ensure a sanitary condition free of all dirt, food particles, foreign matter, and excess water.
1.1.4 Park benches, Playground Equipment, Bulletin Boards and Courtesy Docks - Shall be kept clean and free from cobwebs, bird droppings, insect nests foreign matter, and debris.
1.1.5 Water fountains: Shall be cleaned and disinfected to remove all residue and stains and maintain a sanitary condition.
1.1.6 Water hydrants: Shall be cleaned to remove all cobwebs, litter, and debris from the fixtures and from the immediate vicinity.
1.1.7 Charcoal grills, fire pits/rings, and picnic tables:
1.1.7.1 Grills, fire rings, and cooking surfaces shall be kept free of debris, ashes, food particles, and other foreign matter. Fire rings shall be left in the UP position after cleaning. All debris, litter, cold ashes and coals on the ground in the immediate vicinity of grills and fire rings shall be removed and disposed of properly. Trash may be put in the Government furnished dumpster. Ashes and coals shall not be placed in a refuse container or dumpster.
Ensure that all trash (glass, tin, etc) is removed from the ashes. Dry, cold ashes may be disposed of by spreading them evenly a minimum of 10’ past the mow line.
1.1.7.2 Grills, and fire rings containing live (hot) ashes or warm coals shall be left undisturbed and shall be cleaned at the next regularly scheduled cleaning.
1.1.7.3 Unoccupied picnic tables in visitor areas shall be checked each day services are performed. If unsanitary conditions exist, tables shall be cleaned by removing all foreign matter to include cleaning solution residue.
1.1.8 Park benches, playground equipment and bulletin boards: Each item listed above shall be kept clean and free from cobwebs, bird droppings, insect nests foreign matter, rocks and debris. The outside glass of visitor bulletin boards shall be cleaned to provide a surface free of smudges and streaks.
1.1.9 Sidewalks, concrete campsites and Sanitary Dump Stations:
1.1.9.1 Concrete areas shall be free of debris, stains, and residue. Excess (pooled) water shall be removed.
1.1.10 Refuse and litter handling (facilities):
1.1.10.1 All trash, litter, debris or residue (including but not limited to cigarette butts, match books, bottle caps, snap tabs and paper) within or immediately adjacent to the facility being services shall be removed. At no time shall trash or debris be swept or washed out of a facility and left unattended and shall be promptly removed and deposited into a refuse container/dumpster.
1.1.10.2 Refuse containers located within the facility being serviced shall have all trash, litter, debris or residue removed. The containers shall present a clean and odor free condition. Plastic liners shall be replaced.
1.1.10.3 Exterior refuse containers (excluding dumpsters) placed at various locations throughout the park area shall be cleaned and emptied, with refuse placed in centrally located dumpsters. A new plastic liner shall be installed in containers and the lids reinstalled on the containers. Exterior refuse containers and holders shall present a clean order free condition.
1.1.11 Refuse and litter handling (park areas, roadways, beaches, playgrounds, boat ramps, volleyball courts, horseshoe pits and parking areas):
1.1.11.1 All mowed park areas, including 10 feet into non-mowed area, on and adjacent to roadways, and parking areas, and on and adjacent to the beach area, playgrounds, volleyball courts, horseshoe pits, and boat ramp areas (including boat ramp riprap areas) shall be kept free of litter and debris. Litter and debris shall be pickup and placed, as directed by the Contracting Officer’s Representative, (COR) into a Government furnished dumpster.
Any large items that will require additional staff or equipment to move, may be left, but shall be reported to the Contracting Officer’s Representative as soon as possible.
1.1.12 MISCELLANEOUS DUTIES: The Contractor shall perform the following duties at each cleanup:
1.1.12.1 All paper shall be protected to prevent wetting during cleaning operations. Care shall be taken to avoid wetting of hand dryers, and electrical fixtures during cleaning.
1.1.12.2 All toilet paper dispensers on structures serviced under this contract shall be kept fully supplied.
1.1.12.3 Water fountains at or near facilities being serviced shall be cleaned each time the facility is serviced.
1.1.12.4 If temperatures are below freezing, sidewalks, and concrete floors shall not be hosed off, and water usage shall be kept to the minimum necessary to clean facilities.
1.2 DATES OF PERFORMANCE
1.2.1 The base year contract period shall be date of award through 31 March 2023.
1.2.2 The contract period of performance shall begin 15 May 2023 or date of award if later and continue through date as stated in the Specific Park Sheet (SPS).
1.3 SCHEDULED SERVICES
1.3.1 Time of Performance
All gates (with the exception of the beach gate) and doors to facilities shall be unlocked for public use by 9:00
am. Services shall begin in the morning hours starting no later than 7:00 a.m. being performed continuously until the work is completed no later than 4:00 p.m. in accordance with the following schedules. The additional Holiday service will be performed after 4:00 pm. The beach area shall be opened prior to 8:00 a.m. during the service period 15 May through 15 September. On the last day of cleaning ensure all doors and gates are locked after cleaning is complete.
1.3.2 Facilities / Days of Service: The Contractor shall establish a work schedule within the times set forth below, indicating the hours during which services will be performed on a regular basis. The schedule shall be submitted in writing to the Contracting Officer or his authorized representative for approval no later than the first week of work. Changes in the approved schedule shall be submitted for approval prior to implementing the change.
1.3.4 Daily
The Contractor shall perform custodial duties a minimum of one (1) time per day on Sunday, Monday, Wednesday, Friday and Saturday to include all facilities, litter pick up and areas identified in this contract with the exception of the weekly, monthly and holiday services as stated below. Tuesdays and Thursdays are the designated days off. If the first or last day of the period of performance falls on the contractor’s normal day off, the contractor will work that day.
1.3.5 Weekly
Provide services once a week to scrub the floors of the vault toilets and shower/restroom facilities using a cleaning agent and disinfectant. Excess water shall be removed.
1.3.6 Monthly
Provide services once monthly to remove mold or particulates from the exterior of the facilities.
1.3.5 Holiday Services
An additional complete cleaning to include all facilities and litter pickup shall be performed on Saturday and Sunday of a Holiday weekend. The Holiday cleaning shall be performed in the late afternoon no earlier than 4:00 p.m. In the instance that the holiday falls in the middle of the week, the additional cleaning shall be on the weekend following the holiday. If the Holiday falls on a scheduled day off, services shall be provided on that day.
1.3.8 Emergency Services
The contractor shall be on-call after hours on scheduled workdays in cases that emergency services are needed in the facilities.
2 ANNUAL COORDINATION MEETING. The Contractor shall meet with the COR annually during the first week of April to coordinate services.
3 SERVICE DELIVERY SUMMARY. The Contractor service requirements are summarized below.
Item Performance Standard Surveillance Method
Maintain Cleanlines s of Facilities
Maintain facilities in a clean and sanitary condition free of particulate matter, film, spots, streaks or removable stains. No more than 10% error per servicing.
100% Inspection or Random
Inspection
Maintain improved grounds
Grounds shall be free of litter. No more than 10% error per servicing.
100% Inspection or Random Inspection
Annual Coordination
Meeting
The Contractor’s Quality Control Manager/onsite personnel are in attendance
Complete prior to first Cleaning, after contract award and at the beginning each exercise option period.
Quality Control Plan
Submitted with all required information and Quality Control procedures identified
Complete prior to first Cleaning, after contract award .
Insurance
Submitted in accordance with contract requirements prior to start of work
Obtain prior to first Cleaning.
Maintain through contract period of performance.
4. GOVERNMENT FURNISHED PROPERTY AND SERVICES: The following consumable items shall be furnished to the Contractor by the Government from stock. The Government shall retain control of expendables to be dispensed on an as needed basis for use in performance of the contract.
1. Water for cleaning
2. Contractor Quality Control Worksheets (once approved in Q. C. Plan)
3. Closed for Cleaning Sign (Shall be displayed at the entrances of facilities while cleaning services are being performed.)
4. Magnetic Park Custodian Signs
4.1 The Government will provide a campsite for the Contractor’s trailer, and utility hookups, during the s ervice period, consisting of water, electricity, and sewer. In addition, the campsite will include a storage building, picnic table and refuse container. The site will be provided free of charge for a period of 14 days prior and 14 days after the period of performance. If temperatures are below freezing, water may not be available at the Park Custodian pad until temperatures warm up. The Contractor shall maintain these facilities in accordance with Park rules. The campsite will include the following:
• ELECTRIC, WATER AND SEWER: The Government will furnish electricity, water and sewer hookup to designated Contractor campsite at no charge.
• TRASH PICKUP: The Government will provide refuse collections services from dumpsters within the park. Contractors shall deposit trash in the nearest dumpster.
5. CONTRACTOR FURNISHED EQUIPMENT AND SUPPLIES.: The Contractor must provide all equipment/tools and supplies necessary to perform all duties as described in the Performance Work Statement including, but not limited to: broom, dust pan, mop, mop bucket, rakes, yard tools, water hoses, ladder, squeegee, brushes, cleansers and disinfectants, 2-gallon sprayer for liquid enzyme/deodorant and all other equipment and supplies necessary to accomplish the required work. All Contractor-furnished equipment and supplies must be approved by the Contracting Officer’s Representative prior to initial use.
5.1 For bidding purposes only, a breakdown of the following supplies necessary to maintain the parks in a clean and sanitary condition is provided in each Specific Park Sheet. The Contractor will supply all toilet paper, trash bags, cleaning agents and materials. An estimate of needed quantities is in each SPS (Specific Park Sheet). The Contractor is required to keep a record of all quantities used for the contract year. The actual quantities are to be reported to the Contracting Officer Representative each month.
1. Paper towels (not needed at all parks)
2. Toilet tissue (2-ply)
3. Plastic trash bags (42-gallon heavy duty bags for 32 gallon cans and 10 gallon small trash bags)
4. Liquid Enzyme and deodorant to be used in vault toilet cleaning
5. Liquid Take Down to be used in vault toilets
6. Air fresheners to be used in vault toilets (to be changed as needed)
7. Wasp spray
5.2 A mobile travel trailer, motor home or approved equal, containing sanitary facilities and all equipment necessary for habitation. Tents or ‘pop-up’ style type campers are not permitted. If self-propelled units are used, they shall remain on jacks or be blocked up for the duration of the contract and not be used for transportation.
5.3 Transportation vehicle(s) for use in performing the requirements of this contract.
5.4 A telephone and installation of telephone service at the Government provided hookup at the campsite.
5.3 If one is necessary, the pressure water pump and tank for water supply that is approved by the Contracting Officer Representative will be supplied by the contractor. The pump shall be capable of delivering an adequate stream of water at 150 psi to flush/rinse facilities being serviced. NOTE: The use of a pressure water pump is not mandatory if the Contractor is able to obtain satisfactory results by hand. The Government reserves the right to require the use of a pressure water pump, at any time, if it becomes apparent that satisfactory results are not being maintained.
5.4 NOTE: Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. It shall be the responsibility of the Contractor to assure that he/she has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment.
6. SPECIAL REQUIREMENTS.
6.1 QUALITY CONTROL. The Contractor shall develop and submit their Quality Control Plan (QCP) for COR approval at the time of the Post Award Meeting, prior to the start of work that identifies the on-site Quality Control Manager/Custodian. The Contractor shall maintain a quality program to ensure facilities cleanup services are performed in accordance with established Best Commercial Practices and the PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. At a minimum the Contractor shall develop quality control procedures addressing the areas identified in the Performance Work Statement. As each area is serviced, the Contractor’s representative shall complete that portion of the Contractor’s Quality Control Report indicating the time services were completed and number of employees working the serviced area. Completed Quality Control Reports shall be signed and delivered, as directed by the COR. The information identified in the following subparagraphs shall be included in the QCP. A sample template will be provided at the Annual Coordination Meeting for use if so chosen.
6.1.1 The Contractor shall designate, in writing, a responsible on-site representative of each work crew who shall serve as a contact for matters involving quality, performance or non-performance of the required work assigned to that crew. The representative shall have the authority to correct non-performance.
6.1.2 The Contractor shall furnish to the Contracting Officer’s Representative a telephone number for use during normal business hours (8:00 a.m. – 4:00 p.m., CST). A contact number shall also be provided for after-hours emergency services. For the purpose of time and date, a message will be deemed delivered to the Contractor at such time as it is delivered to the number provided by the Contractor.
6.1.3 Post Award Documents: The Contractor shall be responsible for maintaining and submitting Daily Quality Control Reports, updated schedules as necessary, Monthly Contractor Work Records (see attached template), Monthly Park Specific Supply Quantity Reports; Work Orders (see attached template) as items are identified in the parks that need maintenance, as well as signed pay request invoices. Any insurance or documents that may require renewal or updating during the contract performance period is the responsibility of the Contractor.
6.2 QUALITY ASSURANCE. The Government will periodically evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan.
6.3 GOVERNMENT REMEDIES. The contracting officer shall follow FAR 52.212.4, Contract Terms and Conditions-Commercial Items, for Contractor’s failure to perform satisfactory services or failure to correct non-conforming services. The Contractor shall be on-site and provide services on the days as specified for each park.
If services cannot be provided by the designated Quality Control Representative then the invoiced amount shall be reduced by the daily amount identified in the bid sheet for that park.
6.4 SECURITY REQUIREMENTS. The Contractor shall safeguard keys issued to perform the services required by this contract. All keys shall be returned to the Government upon request and/or completion of the contract. Failure to return keys shall result in withholding of payment. The Contractor shall open and close gates within the contract boundary areas. The Contractor shall securely lock any gate that is opened by him/her, upon completion of the required work, or upon completion of the workday.
7. SAFETY. Some of the areas to be serviced receive heavy use. Campers and day-users will be present. It will be necessary for the Contractor to perform the work in close proximity to camping vehicles and camping units, sewer lines, electrical cords, water hook-ups, fishing equipment, and/or camping equipment.
7.1 The Contractor shall immediately report any situation that could affect the health or safety of visitors, including maintenance needs, utility problems, accidents, or violations of laws and regulations.
7.2 The Contractor shall display a sign reading "CLOSED FOR CLEANING" at the entrance of all facilities during cleaning operations.
7.3 The Contractor shall prepare an Activity Hazard Analysis (AHA) for each work activity. The AHA will define the activities being performed and identify the sequences of work, the specific hazards anticipated and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. All AHAs shall be submitted as part of the Accident Prevention Plan.
8. COORDINATION WITH THE PROJECT OFFICE
8.1 Day to day contact with Government personnel, and telephone communication shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to insure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the Contractor shall attend meetings regarding matters affecting this contract.
8.2 To assist the visiting public in reclaiming lost articles, all property left by visitors and found during cleanup operations shall be turned in to the Project Office
8.3 Any evidence of vandalism, instances of facilities not operating properly, or are in need of repair, shall be promptly reported to project personnel.
8.4 The Contractor shall remove any dead animals within the area serviced under this contract, to the extent that the dead animal is small enough to be removed by the Contractor's daily staff. Any large animal that would require additional staff or equipment to move shall be reported to the Contracting Officer's Representative as soon as possible. Disposal of dead animals shall be as directed by the COR.
9. CONTRACTOR PERSONNEL
The Contractor shall consist of at least one (1) competent person identified as the Quality Control Manager (QCM)/Custodian who is a legal aged adult (18 years or older). The QCM shall be mentally and physically able to fulfill the terms of the contract. The Contractor shall exercise tact, diplomacy, and courtesy and present a neat and clean appearance when dealing with the public. Employees shall wear clothing suitable for the weather, however, minimum requirements for work shall be short-sleeve shirt, long pants (excessively long or baggy pants are prohibited) and leather work shoes. If analysis determines that safety-toed (or other protective) footwear is necessary (i.e., mowing, weed-eating, chainsaw use, etc), they shall be worn.
9.1 The Contractor shall not display or offer for sale, on Government property, personal property items, crafts, or like items.
9.2 The Contractor must hold all lost and found articles at the fee booth for a period of two weeks. Any article unclaimed after the two-week period must be turned over to project personnel.
9.3 Other Contractors: The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other Contractors and Government employees. All work must be carefully planned not to interfere with such other work. The Contractor shall not commit or permit any act that will interfere with the performance of work by other Contractors or by Government employees.
10. INSURANCE
In accordance with the clause FAR 52.228-5 Insurance-Work on a Government Installation, the Contractor shall procure and maintain during the entire period of performance under this contract the following kinds and minimum amounts of insurance:*
REQUIRED INSURANCE SCHEDULE
TYPE AMOUNT
Worker's Compensation Coverage complying with applicable State Statute Employer's Liability Minimum amount of $100,000 per occurrence.
Commercial General Liability Minimum amount of $300,000 per occurrence.
For bodily injury & $20,000 per accident for property damage.
NOTE: Coverage required (above) is minimums. If higher limits of coverage are required by State Statute, the
Contractor shall be responsible for obtaining such additional coverage. Information regarding State requirements may be obtained by contacting:
MISSOURI: Division of Insurance, 314-751-3365
11. FLOOD CONTROL
Occasional retention of floodwater may inundate portions of the public use areas, or access roads thereto, being serviced by this contract. In the event that inundation affects the Contractor’s ability to accomplish all work in accordance with this PWS, the Contractor shall promptly notify the COR. The Government may request the Contractor submit a pricing proposal covering the unserviceable or affected portion of work in order that an equitable adjustment to contract price can be negotiated.
12. ANTITERRORISM/OPERATIONAL SECURITY REQUIREMENTS
12.1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The
Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
12.2 Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
12.3 Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
12.4 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
(End of Performance Work Statement)
2018 Park Custodian Specific Park Sheets (SPS)
Harry S. Truman Dam & Reservoir
Prospective contractors are urged to visit the areas they are interested in bidding on before they submit a bid in order to become familiar with the size and scope of the area.
Thibaut Point
Period of Performance Base Year: 15 May2023 – 30 September 2023 Total Number of Working Days 15 May-30 September: 102 (Tues/Thurs Off)
Contract Period: Date of Award thru 31 March of following year
The contractor shall be a minimum of one (1) person adult team that will serve as the Quality Control Manager/Custodian. All cleaning contractors are required to attend an Annual Coordination Meeting to discuss all contract requirements.
PARK (TOTALS)
Facilities/Areas Thibaut Point Shower w/ Latrines and Laundry Appliances 1
Picnic Shelters w/ Grills and Tables
Shower/Latrine
Vault Toilets 8 Change House 1 Sanitary Dump Station 1 Campsites with Fire Rings/Attached Grills
Exterior Refuse Containers (32 gallons)**
Bulletin Boards*** 3 Picnic Tables (not at shelters) 64 Water Fountains 1 Water Hydrants 15 Volleyball Courts 1 Horseshoe Pits 2 Beach Area 1 Park Benches 1 Handicap Walkway
*Total number of fire rings and picnic tables shall be subject to a variation of (+/-) 6 at Thibaut Point at no change in the contract price.
**Total number of exterior refuse containers shall be subject to a variation of (+/-) 2 containers at each park, Thibaut and Osage Bluff, at no change in contract price.
***The number of bulletin boards shall be subject to a variation of (+/-) 1 at Thibaut Pointat no change in contract price.
NOTE: Park Custodians are to provide all equipment and supplies necessary to meet the requirements of the contract specifications. The estimated quantities listed are for bidding purposes only.
Estimated quantities for Thibaut:
42 Gallon Trash Bags (50/Case): 10 Cases 10 Gallon Trash Bags (250/Case): 8 Cases 2-Ply Toilet Paper (80 Rolls/Case): 12 Cases Liquid Enzymes, Hillyard Liquid Enzyme II or equivalent (4/Case): 8 Cases Liquid Take-Down, Hillyard Liquid Take-Down Cherry or equivalent (4/Case): 6 Cases Wasp Spray: 28 Cans
Contractor is required to keep a record of all quantities used for the contract year. The quantities will be reported to the Contracting Officer’s Representative (COR) each month with the Contractor’s Work Record.
The contractor will work five (5) days a week from date of award through 30 September. The normal days off will be Tuesday and Thursdays. If the first or last day of the period of performance falls on the contractor’s normal day off, the contractor will work that day.
The Contractor will clean a minimum of once per day, each scheduled workday, during the entire contract period with the exception of Holidays. An additional cleaning shall be performed on Saturday and Sunday after 4:00 pm on Holiday Weekends. Holidays include Memorial Day, Independence Day and Labor Day. In the instance that the holiday falls in the middle of the week, the additional cleaning shall be on the weekend following the holiday.
Days Unit Price/Day Total Price Thibaut Point– Base Year 15 May 2023 – 30 September 2023 102 _____ ________
WORK ORDER
Number
Date:
Description of Work:
Women side 2nd Stool Overflows when flushed.
Location:
Berry Bend C-Loop Shower Building #3
Requestor:
Supervisor:
Cost Code:
Work Assigned to:
Date Completed:
Comments:
Truman Project Office Contractor Employee Work Record
Contractor Name:
Contract Number:
For Govt Use Only
Submitted to SO
W912DQ23Q1064
Employee Name Date Hours worked
MONTH/YEAR:
TOTAL HOURS: __________________________
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
CLAUSES INCORPORATED BY REFERENCE
52.247-34 F.O.B. Destination NOV 1991
Section G - Contract Administration Data
252.232-7006 Wide Area WorkFlow Payment Instructions JAN 2023
Section H - Special Contract Requirements
WAGE RATES
The inclusion of the Davis-Bacon Act General Wage Decision or the Service Contract Act Wage Determination in the solicitation is a statutory requirement. It is not a representation by the U.S. Army Corps of Engineers that any specific work task can be performed by any specific trade. Which work tasks can be performed by what trades depends on and is determined by the prevailing area practice for the local area where the contract is being performed. It is the sole responsibility of the contractor to determine and comply with the prevailing area practice.
Inquiries regarding a prevailing area practice should be directed to the Corps of Engineers, Contractor Industrial Relations Specialist (telephone number 816-389-2247) or to the U. S. Department of Labor Regional Wage and Hour Division. Application of wage rates and fringe benefits: For the application of the wage rates and fringe benefits contained in the Decisions of the U. S. Secretary of Labor, attached to and a part of this contract, all work is considered to be performed in Benton County, MO.
https://sam.gov/wage-determination/2015-5093/21
252.225-7048 Export-Controlled Items JUN 2013
Section I - Contract Clauses
52.202-1 Definitions JUN 2020 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
NOV 2021
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
DEC 2022
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-4 Recovered Material Certification MAY 2008 52.223-15 Energy Efficiency in Energy-Consuming Products MAY 2020 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
MAR 2023
252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7007 Alternate A, Annual Representations and Certifications MAY 2021 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information
JAN 2023
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.225-7028 Exclusionary Policies And Practices Of Foreign Government APR 2003 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel
JAN 2023
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Products or Commercial
Services
JAN 2023
252.247-7023 Transportation of Supplies by Sea JAN 2023
CLAUSES INCORPORATED BY FULL TEXT
52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (DEC 2022)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .