W912DQ21Q1013
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, quotes are being requested and a written solicitation will not be issued.
The issuing office is USACE, Kansas City District, Federal Building CT-C, 601 E 12th St, RM 647, Kansas City, MO 64106-2896 (W912DQ)
The solicitation number for this acquisition is W912DQ21Q1013 and it is being issued as a Request for Quote (RFQ). The government intends to award a Firm-Fixed Price contract resulting from this solicitation.
This combined synopsis/solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2021-02 effective 11/23/2020.
This RFQ shall be full and open. Small business set-aside does not apply. The associated North American Industry Classification system (NAICS) code is 561730 and the business size standard is $8,000,000.
FAR 52 .212.1 Instructions to Offerors- Commercial does apply to this acquisition with no addenda to the provision.
The description of the service:
This contract is for herbicide application services to areas at various locations around Wilson Lake, Sylvan Grove, Kansas 67481-9172.
The contractor will provide all labor, equipment, supplies, and supervision necessary to achieve the stated outcomes. All work will be performed in accordance with the performance work statement (PWS).
Herbicide Application base and option Performance periods:
1. FY 2021 Base period 1 April 2021 – 30 September 2021
2. FY 2022 Option Year 1 1 April 2022 – 30 September 2022
3. FY 2023 Option Year 2 1 April 2023 – 30 September 2023
4. FY 2024 Option Year 3 1 April 2024 – 30 September 2024
5. FY 2025 Option Year 4 1 April 2025 – 30 September 2025
In accordance with FAR 13.106-1 the basis for award will be the offer that is determined to be the most advantageous, providing the best value after considering (1) price (2) Past Performance and (3) technical.
(1) Price
(2) Past Performance
(3) Technical –
I. Related Experience II. Equipment Listing III. Chemical Application Certificate
The base period work is to be completed 30 September 2021. Delivery is FOB. Delivery location: Wilson Lake, Sylvan Grove, Kansas 6748-91721.
Offerors must include a completed copy of FAR 52.212-3, Offeror Representation and Certifications- Commercial Items with their offer. If the offeror has up-to-date representations and certifications in the System for Award Management (SAM) website, then this completed provision is not required to be submitted with the offeror’s proposal.
FAR 52.212-4, Contract Terms and Conditions- Commercial Items, does apply to this acquisition with no addenda to the provision.
FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders- Commercial Items, applies to this acquisition. These specific clauses required are detailed in Sections C and I of this combined synopsis\solicitation.
Offerors interested in responding to this combined synopsis/solicitation must submit their quotation on the attached synopsis\solicitation. Any questions regarding this combined synopsis\solicitation must be submitted by email to the point of contact below.
Contractor must have an “Active” registration in System for Award Management (SAM) to be considered for award. To obtain information on SAM or to register with SAM visit the web site at: https://www.beta.sam.gov.
Quotations are due no later than 2:00 p.m. Central 16 February 2021. The final date to submit questions is 8 February 2021.
https://www.beta.sam.gov/
Questions of a technical nature should be addressed in writing to Nolan Fisher Nolan.d.fisher@usace.army.mil
Questions of a contractual nature should be addressed in writing to Sheila Nimrod Sheila.d.nimrod@usace.army.mil
Due to COVID-19 risk mitigation actions-NO MAIL-IN QUOTATIONS will be accepted.
All quotes/offers shall be submitted via e-mail to: Sheila.d.nimrod@usace.army.mil
The Government reserves the right to cancel this combined synopsis\solicitation. Any solicitation or contractual questions should be sent to Sheila Nimrod, Contract Specialist
(816) 389-2252 or Sheila.d.nimrod@usace.army.mil
System for Award Management (SAM)
In accordance with FAR 52.212-1(k): By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on creating a user account, registering your business entity and annual confirmation requirements via the SAM application accessed through https://www.sam.gov/SAM/pages/public/index.jsf . SAM frequently asked questions (FAQ) can be accessed via https://www.sam.gov/SAM/pages/public/loginFAQ.jsf It is highly encouraged that all prospective Offeror’s start the SAM registration process as soon as possible.
OFFEROR MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT
(SAM) WITHIN 7 DAYS OF THE CLOSE OF THE SOLICITATION OR THE
CONTRACTING OFFICER MAY PROCEED WITH AWARD TO THE NEXT SUCCESSFUL
OFFEROR.
If you have questions about Federal Government procurements in general or need assistance in the preparation of your proposal, a local Procurement Technical Assistance Center (PTAC) may be able to help.
The PTAC was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Federal Government marketplace. To locate a PTAC near you, go to https://www.aptac-us.org/contracting-assistance/ . THIS IS A FREE SERVICE BY A NON
PROFIT PAID FOR BY THE US GOVERNMENT:
mailto:Sheila.d.nimrod@usace.army.mil mailto:Sheila.d.nimrod@usace.army.mil mailto:Sheila.d.nimrod@usace.army.mil https://www.sam.gov/SAM/pages/public/index.jsf https://www.sam.gov/SAM/pages/public/loginFAQ.jsf https://www.aptac-us.org/contracting-assistance/
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 6 Months Herbicide Application - Wilson Lake
FFP
The contractor will provide all labor, equipment, supplies, and supervision necessary to achieve the stated outcomes. All work shall be performed in accordance with the performance work statement (PWS) FOB: Destination
PSC CD: S208
NET AMT
1001 6 Months OPTION Herbicide Application
FFP
The contractor will provide all labor, equipment, supplies, and supervision necessary to achieve the stated outcomes. All work shall be performed in accordance with the performance work statement (PWS)
2001 6 Months OPTION Herbicide Application
FFP
The contractor will provide all labor, equipment, supplies, and supervision necessary to achieve the stated outcomes. All work shall be performed in accordance with the performance work statement (PWS)
3001 6 Months OPTION Herbicide Application
FFP
The contractor will provide all labor, equipment, supplies, and supervision necessary to achieve the stated outcomes. All work shall be performed in accordance with the performance work statement (PWS)
4001 6 Months OPTION Herbicide Application
FFP
The contractor will provide all labor, equipment, supplies, and supervision necessary to achieve the stated outcomes. All work shall be performed in accordance with the performance work statement (PWS)
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
2021 – 2025 Herbicide Application Services
WILSON LAKE PROJECT, KS
C.1 General Information
C.1.1 Background: Wilson Lake, located on the Saline River, controls a drainage area of 1,917 square miles. The grassland drainage basin above Wilson makes it one of the clearest lakes in Kansas. With 9,000 acres of water and 100 miles of shoreline, it is a popular recreation area.
During periods of heavy rain the lake increases in size, as runoff is stored, providing downstream flood protection. Recreation, fish and wildlife enhancement, and water quality also are benefits of the lake. To get to Wilson Lake, from I-70 take exit 206 north on Highway 232 for nine miles.
C.1.1.1 Scope of Work: The contractor shall provide herbicide application services to areas at various locations at Wilson Lake as defined in this performance work statement (PWS). The Contractor shall comply with all Federal, state, and local laws, ordinances, statutes and regulations pertaining to the provided services.
C1.1.2 SITE VISITS: It is highly recommended that a site visit be made prior to submitting a offer. To schedule a site visit, contact the Wilson Project Office at (785) 658-2551.
C.1.2 Contractor Personnel
C.1.2.1 Contractor Employees. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the contracting officer as a potential threat to the health, safety, security, general well-being, or operational mission of Wilson Lake and its population.
C.1.2.2 Contractor personnel shall present a clean appearance and be easily recognized as a contractor employee.
C.1.2.3 While on duty, the contractor’s employees shall utilize proper safety equipment to include eye protection, hearing protection, head protection (to include hard hat when appropriate) and proper foot wear which is defined as work boots (sandals or open shoes are prohibited).
C.1.2.4 The contractor shall make sure that employees have valid driver licenses before starting work under this contract.
C.1.2.5 All Contractor personnel shall be fully clothed at all times while performing these services. This requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing. Clothing shall be clean and neat in appearance.
C.1.2.6 Contractor personnel shall utilize tact, diplomacy and courtesy at all times during contact with the public.
C.1.3. Post-Award Conference: After award, but prior to commencement of work, the Contractor shall contact the Contracting Officer Representative (COR) to arrange a mutually agreeable time to meet at the Project Office for the purpose of discussing and developing a mutual understanding of the requirements and details of the work.
C.1.4. DOCUMENTS AND CORRESPONDENCE: After award, all documents and related correspondence shall be addressed to the COR at the Project Office.
C.1.5 Quality Assurance
C.1.5.1 The Contractor shall submit, in writing, for approval of the COR at the project, a detailed plan of operation to include equipment and personnel.
C.1.5.2 Quality Assurance Surveillance Plan. A Quality Assurance Surveillance Plan (QASP) will be used during the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government reserves the right to alter or change the Plan at its own discretion. The Government develops the QASP and the Project Office administers the Plan through Quality Assurance Evaluators (QAE)s.
C.1.5.3 If it becomes apparent to the Government during the Contractor's performance that the required services may not be completed within the time frames required herein, the Contracting Officer may require the Contractor to submit a written plan demonstrating how the Contractor will meet the schedule. Such direction will be issued to insure that required services will be completed within the time frames specified.
C.1.6 Quality Control
C.1.6.1 The Contractor shall designate, in writing, a member of each work crew who shall serve as the contact for matters involving quality and performance or non-performance of the required work assigned to that crew. The designated employee(s) shall be qualified with full authority to act for, and on behalf of, the Contractor as necessary to ensure that the work described herein is performed in accordance with these specifications. The Contractor shall furnish the above written designation to the COR at the project no later than the first day of work. The designation shall include the name(s), address(es), and telephone number(s) of the responsible individuals(s).
The COR reserves the right to disapprove any individual whom he considers to be incompetent to perform the work required. Such disapproval will be given to the Contractor by written notice, and the COR's decision shall represent a final decision.
C.1.6.2 The Contractor shall furnish to the COR, a telephone number attended during normal business hours (7:30 a.m. – 4:00 p.m. C.S.T.) to which calls concerning performance or other contractual matters can be placed. For the purpose of time and date, a message will be deemed delivered to the Contractor, at such time as it is delivered to the number provided by the Contractor.
C.1.6.3 The contractor is responsible for any damage done to project features or facilities and will be required to repair or replace them to the satisfaction of the government.
C.1.7 In the event of unsatisfactory performance of specified work, the Contractor may be requested to re-perform the unsatisfactory services at no additional cost to the Government.
Failure of the Contractor to perform the work will result in withholding of payment for the portion(s) of the work not accomplished. Amounts to be withheld for work not performed or not performed to standard will be determined by prorating the amount of services satisfactorily performed against the amount of services required.
C.1.8 The Government reserves the right to cause the specified unsatisfactory work to be performed by a third party or Government personnel. The cost incurred thereby will be levied against the Contractor. Any time Government personnel are used because of Contractor's nonperformance, the cost levied against the Contractor will include all direct costs associated with the performance of the specified. Such inefficiencies are determined as the direct cost to the Government for substitution of the Government personnel removed from their normal duties computed on an hourly basis at the applicable wage rate. Government personnel will be used only when time is of the essence and the interests of the Government would not be served by securing a third party to perform the specified work.
C.1.9 LOST ARTICLES, VANDALISM, FACILITIES MALFUNCTION: To assist the visiting public in reclaiming lost articles, all property left by visitors and found during operations shall be turned in daily to the project office where it may be claimed by the owner.
C.1.10 The Contractor or his designated employee(s) shall meet with the COR at the Project Office before beginning work, to coordinate his work schedule in compliance with the specifications and to arrange a satisfactory operating agreement.
C.1.11 PERIOD OF REQUIRED SERVICES: Services shall be performed in accordance with the following schedule, between the hours of 7 a.m. and 8 p.m. for the service period of 1 April through 30 September.
C.1.11.1 Work will not be permitted on Saturdays, Sundays, or Holidays, and shall not begin prior to 7 a.m., nor continue after 8 p.m., unless this restriction is specifically waived in writing by the Contracting Officer or his authorized representative.
C.1.11.2 All work shall be accomplished within the timeframes specified above. Services rendered outside the time periods specified will not be compensated unless specifically approved in writing by the Contracting Officer or his authorized representative.
C.1.11.3 In the event adverse weather or ground conditions occur during scheduled services that would create unsafe working conditions or result in damage to vegetation or turf, the Contractor shall cease operations and contact project personnel. Work affected by adverse conditions shall be stopped, restarted, or rescheduled as directed by the Contracting Officer or his authorized representative. Rescheduled work shall be accomplished at a mutually agreed upon time, to the extent possible.
C1.11.5 This is a flood control project. Occasional retention of floodwaters may inundate portions of the public use areas, other areas, or access roads thereto, being serviced by this contract. In the event that inundation materially affects the scope of work, the Contractor will be requested to submit a pricing proposal covering the unserviceable or affected portion of his work in order that an equitable adjustment to contract price can be negotiated and an adjustment made in accordance with the appropriate contract clause entitled "Changes." Payment for services not performed as a result of conditions stated above will be initially withheld until execution of an equitable adjustment can be made by contract modification.
C.1.12 General Safety requirements: In order to provide safety controls for protection to the life and health of employees and other persons; for the prevention of damage to property, materials, supplies, and equipment; and for the avoidance of work interruptions in the performance of this contract, the contractor shall comply with all pertinent provisions of Federal, state, and local regulations and shall take or cause to be taken such additional measures as the Contracting Officer may determine to be reasonable and necessary for the purpose.
C.1.12.1 Contractor vehicles shall be equipped with 4-way flashers and turn signals in operating condition. Flashers shall be activated when vehicles are parked on, or traveling slowly along roadways.
C.1.12.2 Any injury, property damage, equipment malfunction or safety hazard observed by the Contractor shall be immediately reported to Project personnel.
C.1.13 INSURANCE: The types of insurance and at least the minimum amounts listed below are to be maintained during the performance period of this contract. This requirement also applies to all subcontractors. Proper proof of insurance (insurance policy, or a binder issued by the insure) shall be provided to the COR either at the post-award conference, or prior to starting work on the first day of the service period. The Contractor shall maintain a copy of all subcontractors proofs of required insurance and shall make copies available to the Contracting Officer upon request.
C.1.13.1 The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
THE FOLLOWING SCHEDULE OF INSURANCE IS APPLICABLE
TYPE AMOUNT
Worker's Compensation Coverage complying with applicable State Statute Employer's Liability Minimum amount of $100,000 Commercial General Liability Minimum amounts of $500,000 per occurrence
Commercial Automobile Liability Minimum limits of $200,000 per person, $300,000 per accident for bodily injury, and $20,000 per accident for property damage
NOTE: Coverage required above are minimums. If higher limits of coverage are required by state statute, the Contractor shall be responsible for obtaining such addition coverage. Information regarding State requirements may be obtained by contracting:
KANSAS: Insurance Commissioner, Toll Free, 1-800-432-2484
C.2 Definitions and Acronyms: The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.
Contracting Officer's Representative (COR) means an individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.
Fully-Clothed: Deemed to mean that a sleeved shirt (or T-shirt), trousers, and shoes shall be worn at all times: except that this requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate personal protective equipment as may be required for the application of various chemicals.
Performance-Based Contract: (FAR 2.101) Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.
Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable quality level (AQL) for each work requirement.
Quality Assurance Surveillance Plan (QASP): An organized written document used by Government for quality assurance surveillance. Document contains sampling/ evaluation guides, checklists, and the performance requirements summary (PRS).
Quality Control (QC): A method used by the Contractor to control the quality of goods and services provided.
Quality Assurance (QA): A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
"Service contract" means a contract that directly engages the time and effort of a contractor whose primary purpose is to perform an identifiable task rather than to furnish an end item of supply. A service contract may cover services performed by either professional or nonprofessional personnel whether on an individual or organizational basis. Some of the areas in which service contracts are found include the following:
Maintenance, overhaul, repair, servicing, rehabilitation, salvage, modernization, or modification of supplies, systems, or equipment.
(b) Routine recurring maintenance of real property.
(c) Housekeeping and base services.
(d) Operation of Government-owned equipment facilities, and systems.
"Shall" means the imperative. A task that must be complied with or performed.
C.3 Government-Furnished Supplies and Facilities:
C.3.1 The Government may designate an area for the temporary overnight storage of equipment.
All equipment must be stored off government property when not in use in the performance of the contract unless approved by the COR.
C.3.2 Maps of the areas to be sprayed.
C.4 Contractor furnished Supplies and Equipment: The Contractor shall furnish all equipment and supplies necessary to successfully perform these requirements not identified in section C.3 of this PWS as Government-Furnished supplies or facilities and as specifically identified in this section. All contractor-furnished equipment and supplies must be approved by the COR prior to initial use.
C.4.1 The Contractor shall furnish all manpower, equipment, fuel, tools, and supplies necessary to accomplish the services specified herein.
C.4.2 NOTE: Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. It shall be the responsibility of the Contractor to assure that he has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment.
C.5 Specific Tasks: The following work shall be accomplished:
C.5.1 Apply herbicide to all areas listed under Herbicide Application sites. In most cases, the result should be a clean, vegetation free area. Some areas involve the control of certain species (ie woody vegetation). In those areas, it will be the Contractor’s responsibility to ensure that the target species are all that are killed.
C.5.2 The Contractor will be responsible for selecting the appropriate chemical to be used based on site location, proximity to the public, environmental concerns, target species and best commercial practices. Information will be provided to the government regarding the chemical(s) to be used prior to application. The COR must approve all chemicals that will be used during this contract. The contractor will provide MSDS sheets (Material Safety Data Sheets) and product labels for all chemicals used on government property. Biodegradable dye will be used as a marker to insure even applications.
C.5.3 The Contractor will guarantee at least a 99% vegetation free control 100% of the time of all serviced areas during the growing season (April through September). Should the level of control fall below 99%, the contractor will be responsible for the re-treatment of the subject area(s) to achieve the desired result at no additional cost to the government. In order to maintain this level of vegetation control, the contractor will be required to make at least one Quality Control visit each month to ensure that the desired results are being achieved. Payment will not be made until this level of control is accomplished.
C.5.4 The contractor’s monthly herbicide treatment will be conducted between the 1st and 15th of each month. The monthly Quality Control visit will be conducted between the 15th and 30th of each month. The monthly Quality Control visit can occur no less than 7 days from the date of the initial monthly treatment.
C.5.4 All contractor personnel applying herbicide shall be appropriately trained and licensed.
Copies of all licenses and certifications will be submitted with the offeror’s quote. Appropriate insurance will also be in place and documentation provided prior to the start of work.
C.5.5 The serviced areas will present a neat, even kill of all target species. Spray patterns will provide an even border between treated and untreated areas. A 1 foot (approx.) vegetation free border will be left around all hard-surfaced or rocked facilities (i.e. campsites, parking lots, riprap, curbing etc.).
C.5.6 Work will not be done on days when the wind exceeds 10 mph in developed areas (15 mph in undeveloped areas) or when wet weather could affect the application.
C.5.7 The government will provide water for tank filling. The Contractor will provide hoses and backflow-preventers. Clean-out of chemical tanks and disposal of chemical containers will not be done on government property. The Contractor will have spill kits available on all vehicles used on government property adequate to the type and quantity of chemical on the vehicle.
Contractor employees will be trained in the use of these kits and are expected to aggressively implement their use in the event of a spill.
C.5.8 The Contractor will be responsible for any damage to non-target species.
C.5.9 The Contractor will complete a herbicide application report form after each chemical application whether initial or follow-up. Payment will not be made until the completed report is provided.
C.5.10 The use of aerial spraying will not be permitted in any of the areas serviced under this contract.
C.6 Payment All invoices should be submitted promptly upon completion of work. The USACE Finance Center has 30 days to make EFT payment.
Invoices are to be sent to:
Wilson Project Office U.S. Army Corps of Engineers 4860 Outlet Blvd.
Sylvan Grove, Kansas 67481
Payment by Electronic Funds Transfer.
TECHNICAL EXHIBIT #1
PERFORMANCE REQUIREMENTS SUMMARY
HERBICIDE APPLICATION SITES
AREA SITE TO BE SERVICED
Administration Area & Dam
1. Spot Treatment of Vegetation on face of dam. From water line to guardrail *
2. Face of dam: west beach and east beach.*
3. Backside of dam: all gravel wicks, extensions and collector stream ditches (concrete gutter and ditch up to the flume)*
4. Backside of dam: Weir ditch on northwest end downstream of dam *
5. Rock/gravel service road to piezometer’s on northwest end (1800’).
6. Backside of dam: Concrete gutter on far northwest end downstream of dam
7. Backside of dam: Base of Sand Rock Bluff gravel drain above the outlet *
8 Guardrail and rock berm on back slope of dam
9. Outlet Stilling Basin Guard rail. Service between road and rail. Service extending 2' beyond rail.
10. Outlet Stilling basin riprap and outlet channel riprap. This is to include the area between the riprap and the river channel on both sides of river (approx ¼ mile between outlet tube and downstream). *
11. Rock stockpiles, downstream of the dam embankment, near the storage area
12. Scrap metal & junk pile
13. Culvert and dock scrap pile.
Required Service Standard Performance Requirement ptable Level of Performance)
Method of Surveillance
QUALITY CONTROL
Refer to C.1.6
96% compliance (4% maximum defective allowed)
1) Periodic Inspections by Gov’t.
2) Public Visitor Complaint
SPECIFIC TASKS
Refer to C.5
99% compliance (1% maximum defective allowed)
SAFETY
Refer to C.1.12
96% compliance (4% maximum defective allowed)
14. Equipment and material storage area and pad including fence around storage building and sign shop (Outdoor Storage Area)
15. Wick Shed and pad around building and fuel tanks.
16. Service Road to Outdoor Storage Area and Wick Shed.
17. Administration area compound, perimeter fencing, parking lots, curbing and sidewalks
18. Weather station.
19. QSI shed south of office and access road and pad around building.
20. Driveway and parking lot to East & West Garage across the road to SE of office.
21. Volunteer Village (3 campsite pads) across the road to SE of office.
22. East dam Hwy overlook parking lot and sidewalks.
23. East dam beach parking lot.
24. Spillway boat ramp (spray 3 feet beyond concrete lane)
25. Rock jetty and rip rap rock at boat ramp*
26. Spillway boat ramp parking lot, sidewalk, and around landscape stone posts.
SYLVAN PARK
1. Two Playgrounds, (Sand Volleyball court removed)
2. Bur Oak Hiking Trail, interpretive signs (11) and parking lot
3. Tent site shelters by river (#1-#2)
4. Sylvan Group Camp Sites (8 chip sealed sites), shelter and shelter parking lot
5. Sylvan Solar Panels 200’x10’
6. Group Camp restroom parking lot and sidewalks.
7. Sylvan Park Campsites (28 chip sealed sites)
8. Campsite identification posts (6” perimeter)
6. Shower house parking lots (2) and sidewalks
7. Dumpster pads
8. Dump Station
9. All vegetation growing through cracks in asphalt roads in park will be sprayed. Approx 1 mile.
LUCAS PARK
1. West dam beach parking lot near lake.
2. West dam parking lot on dam to include gazebo, sidewalks, vault toilet
3. Scenic overlook parking lot and cracks in asphalt road (1/4 mile)
4. 9 guardrails (3 at overlook, 2 at north Lucas, 2 at Group Camp and 2 on Point Road)
5. Rock storage area on Airstrip Hill to include rock pile and hard surface area
6. Lucas Gate Attendant booth and parking lot
7. Lucas Campsites including curbs and site posts, 104 sites
8. Lucas Park Solar Panels 90’ x 10’
9 Playground (2)
10. Lagoon access road, fence and interior lagoon
11. North Lower Lucas Restroom Parking lot and sidewalks
12. Dump Station parking lot, curbing, rock gutter north of station, gravel around grass island.
13. Swim beach: beach itself, parking lot, sidewalks *
14. Lucas Point Shelter Parking Lot and vault toilet sidewalks
15. Boat ramp parking lot and curbing. (spray 3 feet beyond concrete lane)
16. Rock jetty and rip rap rock at boat ramp*
17. Group Camp campsites, 15 sites
18. Group Camp playground (sand volleyball court removed)
19. Group Camp parking lots (3)
20. Old Fishing Dock Parking Lot
21. Park Attendant/Custodian Campsites, 2 sites
22. Rocktown Trail: Gravel around trailhead sign, parking lots, 5 lots
23. Picnic shelter concrete slabs at Lucas point
24. Lucas shower house parking lot curbing and sidewalks
25. Concrete Picnic Table Pads (Lucas Point) – approx 6 pads
26. Dumpster pads (6)
27. 1 Culvert (2 culvert ends)north of the Rocktown Parking Lot on the curve**
MINOOKA PARK
1. Beach shelter, beach shelter playground, parking lot and driveway
2. Y in road between Beach Shelter and West Ramp. (around arrow signs)
3. Beach parking lot, sidewalks and sand beach
4. West boat ramp parking lot, and self pay station
5. Rock jetty and rip rap rock at 3 boat ramps* (spray 3 feet beyond concrete lane)
6. Group Camp gravel roads and campsite pads, 12 sites
7. Group Camp Shelter and restroom sidewalks
8. Group Camp playground *
9. Prairie Fire Trail West Parking Lot
10. 1 culvert (1 end) along roadway just south of Prairie Fire Trail West parking lot. **
11. 150 stone posts along entrance road, 6” perimeter
12. S-loop campsites (12 sites)
13. S-Loop shower house sidewalks, parking lot, and fish cleaning station sidewalk
14. Lagoon access road, rock piles, fence and interior lagoon *
15. All asphalt cracks in S-Loop roads (approx .75 mile)
16. Middle Boat Ramp parking lot, self pay station, and 40 stone posts in grass parking lot (6” perimeter).
17. All Campsite identification site posts (6” perimeter)
18. A- loop campsites, 10 Sites
19. B-loop campsites, 10 Sites
20. B-Loop Playground
21. Minooka Solar Panels 140’ x 10’
22. A/B camp loop Restroom parking lot and sidewalks
23. C-loop campsites, 31 Sites
24. D-loop campsites, 31 Sites
25. D-loop playground & horse shoe pits (sand volleyball court removed) *
26. E-loop campsites, 36 Sites
27. E loop vault toilet and parking lot
28. F-loop vault toilet parking lot
29. F-loop campsites, 29 Sites
30. Old beach parking lot ½ mile east of park booth.
31. East boat ramp fee vault parking lot, self pay station, and 21 stone posts
32. Boat ramp curbs, parking lots and adjacent riprap, 3 ramps *
33. Dump station and curbing (2 dump stations)
34. Park Attendant/Custodian Campsites, 2 sites
35. Main shower house parking lots, sidewalks and curbing
36. Dumpster pads (10)
37. Marshall Cove: 3 culverts (6 culvert ends). Includes rip rap around culverts.**
38. Marshall Cove vault toilet parking lot and sidewalks (2)
*Highlighted areas are considered Aquatic/Sensitive areas and may require special treatment/chemicals due to their proximity to water or potential for public contact. Pendulum may not be used in some of these areas.
* * Preemergent herbicide will not be allowed on culverts.
C.7 ANTITERRORISM/OPERATIONS SECURITY REQUIREMENTS
ANTITERRORISM/OPERATION SECURITY REQUIREMENTS
All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
All contractor and all associated sub‐contractors employees will receive a CORPS Watch information paper (provided by the authorized government representative) and provide a written acknowledgement to the COR, no later than 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract.
The Contractor must pre‐screen candidates using the E‐verify Program (http://www.dhs.gov/E‐ Verify) website to meet the established employment eligibility requirements. The vendor must ensure that the candidate has two valid forms of government issued identification to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.
Employers whose contracts are exempt from the E-Verify federal contractor rule are not required to enroll in E-Verify. A contract is considered exempt if any one of the following applies: (1) It is for fewer than 120 days. (2) It is valued at less than $250,000, the simplified acquisition threshold (Source: https://www.e-verify.gov/employers/federal-contractors/who-is-affected-by-the-e-verify-federal-contractor-rule).
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
http://www.dhs.gov/E%E2%80%90Verify http://www.dhs.gov/E%E2%80%90Verify http://www.dhs.gov/E%E2%80%90Verify https://www.e-verify.gov/employers/federal-contractors/who-is-affected-by-the-e-verify-federal-contractor-rule https://www.e-verify.gov/employers/federal-contractors/who-is-affected-by-the-e-verify-federal-contractor-rule
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-APR-2021 TO
31-MAR-2022
N/A WILSON PROJECT OFC
NOLAN FISHER
4860 OUTLET RD
SYLVAN GROVE KS 67481
816-389-3093
G5R0870
1001 POP 01-APR-2022 TO
31-MAR-2023
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-APR-2023 TO
29-MAR-2024
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-APR-2024 TO
31-MAR-2025
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-APR-2025 TO
30-SEP-2025
N/A (SAME AS PREVIOUS LOCATION)
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
TPL_NWK_001 Points of Contact
CONTRACT
SPECIALIST:
Sheila Nimrod PHONE: (816) 389-2252 E-MAIL: Sheila.d.nimrod@usace.army.mil
PROJECT
MANAGER:
Nolan Fisher PHONE: (816) 389-3034 E-MAIL: Nolan.d.fisher@usace.army.mil
Section H - Special Contract Requirements
SERVICE CONTRACT ACT WD
The following current Service Contract Act Wage Determinations are incorporated into this RFQ by reference:
Service Contract Act WD Number 2015-753, Revision Number: 14, 12/21/2020 and can be downloaded on the beta.SAM.GOV at https://beta.sam.gov/wage-determination/2015-5753/14?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_selection=date&wdType=sca&state=KS&county=15216&page=1
“A hard copy of the applicable wage decision will be provided upon request.”
https://beta.sam.gov/wage-determination/2015-5753/14?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_selection=date&wdType=sca&state=KS&county=15216&page=1 https://beta.sam.gov/wage-determination/2015-5753/14?index=wd&keywords=&is_active=true&sort=-modifiedDate&date_filter_index=0&date_rad_selection=date&wdType=sca&state=KS&county=15216&page=1
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.203-6 Alt I Restrictions On Subcontractor Sales To The Government
(JUN 2020) -- Alternate I
OCT 1995
52.204-7 System for Award Management OCT 2018 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.223-1 Biobased Product Certification MAY 2012 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-4 Recovered Material Certification MAY 2008 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-10 Waste Reduction Program MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General AUG 2019 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.225-7004 Report of Intended Performance Outside the United States and Canada--Submission after Award
OCT 2020
252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7015 Restriction on Acquisition of Hand Or Measuring Tools JUN 2005 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.244-7000 Subcontracts for Commercial Items OCT 2020 252.247-7023 Transportation of Supplies by Sea FEB 2019
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (OCT 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L.
109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (MAR 2020) (15 U.S.C. 657a).
____ (ii) Alternate I (MAR 2020) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (MAR 2020) of 52.219-4.
____ (13) [Reserved]
____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-6.
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (NOV 2016) of 52.219-9.
____ (iii) Alternate II (NOV 2016) of 52.219-9.
____ (iv) Alternate III (JUN 2020) of 52.219-9.
____ (v) Alternate IV (JUN 2020) of 52.219-9.
____ (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
____ (ii) Alternate I (MAR 2020) of 52.219-13.
____ (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15 U.S.C. 657f).
____ (22) (i) 52.219-28, Post Award Small Business Program Rerepresentation (MAY 2020) (15 U.S.C. 632(a)(2)).
____ (ii) Alternate I (MAR 2020) of 52.219-28.
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C. 637(m)).
____ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)).
____ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
____ (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).
XX (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
XX(28) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).
XX (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
XX (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
____ (ii) Alternate I (FEB 1999) of 52.222-26.
XX (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
____ (ii) Alternate I (JUL 2014) of 52.222-35.
XX (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
____ (ii) Alternate I (JUL 2014) of 52.222-36.
____ (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
____ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496).
XX (35)(i) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
(JUN 2016) (E.O. 13693).
____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-14.
____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).
____ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-16.
XX (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.
13513).
____ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
____ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
____ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (48) 52.225-1, Buy American--Supplies (MAY 2014) (41 U.S.C. chapter 83).
____ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (MAY 2014) of 52.225-3.
____ (iii) Alternate II (MAY 2014) of 52.225-3.
____ (iv) Alternate III (MAY 2014) of 52.225-3.
____ (50) 52.225-5, Trade Agreements (OCT 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
XX (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150
____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.
5150).
___…