B.01 Combined Solicitation - 26QA023 - RCM Training & Pilot Study.pdf

PDF 13 MB Posted

Attached to
Reliability Centered Maintenance (RCM3) Training & Pilot Study
Solicitation number
W912DW26QA023
Issued by

About this file

This is a Request for Quotation (RFQ) for Reliability Centered Maintenance (RCM) Training and Pilot Study services issued by the U.S. Army Corps of Engineers (USACE), Seattle District. The solicitation number is W912DW26QA023, with an issue date of 18 February 2026 and closing date of 18 March 2026 at 12:00 PM PST. This is a 100% small business set-aside with NAICS code 611430 (Professional and Management Development Training) and a size standard of $15 million. The procurement is for professional facilitation services to support USACE's RCM3 Training and Pilot Study at Chief Joseph Dam in Bridgeport, Washington. Award will be made as a firm-fixed-price purchase order to the lowest-priced compliant quote. The contract performance period runs from 15 May 2026 to 14 August 2026.

The contractor must deliver RCM3 training to USACE subject matter experts and facilitators, lead and support facilitators through RCM process and maintenance optimization at Chief Joseph Dam, develop maintenance approach and sparing strategy, provide feedback and coaching, and submit a summary report of findings and recommendations. Key deliverables include a project schedule (workplan) due within 30 days of award, training materials (presentations, handouts, exercises) prior to the on-site session, and on-site facilitation consisting of two one-week sessions. The contractor is responsible for all travel costs including transportation, lodging, and per diem, compliance with federal travel regulations, and adherence to site safety requirements. All services must be completed and invoiced prior to 10 September 2026. The government will provide meeting space, office support, site access, and required documentation. The technical point of contact is Vyacheslav (Slava) Govorushkin at Vyacheslav.V.Govorushkin@usace.army.mil.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE NWS RCM Training and Pilot Study

1. INTRODUCTION

1.1. Background

The Federal Columbia River Power System (FCRPS) is committed to delivering low-cost, reliable power to the Pacif ic Northwest through ef fective asset lifecycle maintenance. One of the core methodologies supporting this mission is Reliability Centered Maintenance (RCM), which originated in the airline industry during the 1960s and was formalized in a 1978 report to United Airlines by the U.S. Department of Defense (MSG-3). Since then, RCM has been widely adopted across industries— including nuclear energy and defense—for its systematic approach to optimizing maintenance based on equipment performance, safety, and operational risk.

Traditional maintenance practices at the U.S. Army Corps of Engineers (USACE) have historically been based on original equipment manufacturer (OEM) recommendations or inherited standards.

These of ten result in excessive or ineffective maintenance activities. By implementing RCM, USACE seeks to realign maintenance ef forts to better identify and address true failure modes, increase reliability, and reduce maintenance overhead.

1.2. Purpose

This Statement of Work (SOW) def ines the requirements for professional facilitation services to support USACE's RCM3 Training and Pilot Study at Chief Joseph Dam. The ef fort includes foundational training and guided application of RCM principles to a selected asset, with the intent of building internal capacity and informing broader programmatic adoption.

1.3. Objectives:

• Establish a service contract with a qualified RCM3 facilitator to support pilot implementation.

• Deliver training to subject matter experts (SMEs) and facilitators on RCM fundamentals and the structured RCM3 methodology.

• Pilot the application of RCM3 on a selected asset to assess feasibility, ref ine practices, and build internal capability.

• Build internal knowledge and capacity by collaborating with the facilitator throughout the pilot ef fort.

2. SCOPE OF SERVICES.

2.1. Project Overview

The project consists of two key phases: (1) RCM3 training overview for internal USACE personnel subject matter experts, and (2) Lead/support facilitators through RCM and maintenance optimization at Chief Joseph Dam. The contractor will provide instruction, help to the team for developing maintenance approach and sparing strategy, and feedback of the process.

Training and facilitation services shall occur during a one two-week on-site session, with remote coordination and deliverable development before and af ter the visit as needed.

2.2. RCM3 Training Overview

The contractor shall provide required training to accomplish the following:

• Orient subject matter experts and others on the fundamentals of RCM 3 to include providing an overview of the RCM process, and process f low.

• Further develop skills of facilitators and provide overview to subject matter experts of RCM process.

2.3. RCM3 Facilitation Services/Pilot Study Phase

The contractor shall provide comprehensive facilitation services to accomplish the following:

• Delivery of interactive workshops and training sessions

• Lead and support facilitators through the RCM process and maintenance optimization at a selected asset at Chief Joseph Dam

• Help the team develop maintenance approach and sparing strategy

• Further develop skills of facilitators and provide overview to subject matter experts of RCM process

• Observe and support facilitators in leading the RCM ef fort.

• Recommend actions to take unique to the organization to help implement the RCM program.

2.4. Contractor Responsibilities

The contractor shall be responsible for the following:

• Developing and delivering training materials

• Facilitate training and pilot workshops.

• Providing feedback and coaching to USACE facilitators

• Submitting a summary report of f indings and recommendations

• Coordinate closely with designated points of contacts.

3. CONTRACTED REQUIREMENTS

3.1. Key Personnel. The contractor shall identify key personnel assigned to this project.

4. DELIVERABLES

Deliverable Description Frequency Format Submit To Due Date

Project Schedule

Workplan outlining timeline, key milestones, and logistics

One Time E-Mail (PDF or Word)

USACE POC Within 30 days of award

Training Materials

Presentations, handouts, workshop exercises, etc.

One Time PowerPoint, PDF, etc.

Onsite Team Prior to on-site session

On-Site Facilitation

Delivery of the two-week facilitation

One two-week session

In-Person Session Consult with

USACE POC

Date coordinated with POCs

5. PERFORMANCE STANDARDS

5.1. Quality Assurance. All deliverables shall be reviewed for accuracy, completeness, and alignment with RCM3 standards. Feedback will be provided, and corrections shall be addressed promptly.

5.2. Acceptance Criteria. Deliverables will be accepted based on:

• Completeness and clarity

• Timely delivery per the agreed schedule

• Engagement and support quality during on-site facilitation

6. PERIOD OF PERFORMANCE. All services and deliverables shall occur over two one-week site visits with exact dates to be scheduled with contractor upon contract award. All services must be completed and invoiced prior to September 10, 2026.

7. PLACE OF PERFORMANCE. Primary location: Chief Joseph Dam, Highway 17 and Pearl Hill Road, Bridgeport, WA 98134-1120

Some activities within this statement of objectives may be performed at other locations rather than the primary place of performance. The contractor must seek Contracting officer approval for any location not designated as the primary location.

8. TRAVEL. Travel is required to Chief Joseph Dam. The contractor shall be responsible for all travel-related costs, including transportation, lodging, and per diem. Travel must comply with federal travel regulations.

9. SAFETY. The contractor shall abide by local safety rules when visiting Chief Joseph Dam. Project personnel will provide a safety briefing before entering the operational area. The contractor shall be responsible to provide a hard hat and safety shoes when visiting an operating project.

10. GOVERNMENT FURNISHED PROPERTY. The government will provide access to required site information, personnel, and documentation necessary for pilot execution. Additionally, the government shall provide meeting space and basic of f ice support.

11. SECURITY REQUIREMENTS.

11.1. General security requirements and guidance. The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Of f icer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those ef forts. The Department of Defense (DoD) and Army security training requirements specif ied below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract f iles and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that af fect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identif ied in local policies or procedures.

11.2. Physical security and access control requirements. All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identif ication Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verif ication requirements specif ied in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

11.3. Pre-screen candidates using E-Verify Program. Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verif ication and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days af ter the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verif ication, and submit it to the Contracting Of f icer to become part of the of f icial contract f ile.

12. POINT OF CONTACT (POC). USACE Technical Point of Contact – Vyacheslav (Slava) Govorushkin, Vyacheslav.V.Govorushkin@usace.army.mil

W912DW26QA023

Page 11 of56

Contract Clauses

FAR/RFO Clauses Incorporated by

Reference Number TiUe Effective Alternate Vartation

Date Deviation Effective

Date

52.203-19 Prohibition on Requiring Certain Internal 2017-01

Confidentiality Agreements or Statements.

52.204-10 Reporting Executive Compensation and 2026-02

First-Tier Subcontract Awards.

52.204-13 System for Award Management- 2026-02

Maintenance.

52.209-6 Protecting the Government's Interest 2026-02

When Subcontracting With Contractors

Debarred, Suspended, Proposed for

Debarment, or Voluntarily Excluded.

52.212-4 Terms and Conditions-Commercial 2026-02

Products and Commercial Services.

52.219-6 Notice of Total Small Business Set-Aside. 2026-02

52.222-50 Combating Trafficking in Persons. 2026-02

52.226-8 Encouraging Contractor Policies to Ban 2024-05

Text Messaging While Driving.

52.229-12 Tax on Certain Foreign Procurements. 2021-02

52.232-33 Payment by Electronic Funds Transfer- 2018-10

System for Award Management.

52.232-40 Providing Accelerated Payments to Small 2023-03

Business Subcontractors.

52.233-3 Protest after Award. 2026-02

52.233-4 Applicable Law for Breach of Contract 2026-02

Addendum to Contract Clauses

FAR/RFO Clauses Incorporated by

Reference Number TiUe Effective Alternate

Date Deviation

52.209-10 Prohibition on Contracting With 2026-02

Inverted Domestic Corporations.

52.223-5 Pollution Prevention and Right-to- 2024-05

Know Information.

52.240-91 Security Prohibitions and Exclusions. 2026-02

52.244-6 Subcontracts for Commercial Products 2026-02 and Commercial Services.

DFARS Clauses Incorporated by Reference

W912DW26QA023

Vartation

Effective

Date

Number Title Effective Alternate Vartation

252.237-7010 Prohibition on Interrogation of

Detainees by Contractor Personnel.

FAR Clauses Incorporated by Full Text

Number TiUe

52.252-2 Clauses Incorporated by

Reference.

Effective

Date

1998-02

Clauses Incorporated By Reference (Feb 1998)

Date Deviation Effective

2023-01

Alternate

Deviation

Date

Variation

Effective Date

Solicitation Provisions

FAR/RFO Provisions Incorporated by

Reference Number Title

52.204-7 System for Award Management

Registration.

52.212-1 Instructions to Offerors-Commercial

Products and Commercial Services.

DFARS Provisions Incorporated by Reference

Number Title

252.203-7005 Representation Relating to

Compensation of Former DoD

Officials.

252.204-7008 Compliance with Safeguarding

Covered Defense Information Controls.

252 .204-7019 Notice of NIST SP 800-171 DoD

Assessment Requirements.

252.204-7024 Notice on the Use of the Supplier

Performance Risk System.

W912DW26QA023

Effective Alternate Variation

Date Deviation Effective

Date

2026-02

2026-02

Effective Alternate Variation

Date Deviation Effective

Date

2022-09

2016-10

2023-11

2023-03

Addendum to Solicitation Provisions

FAR/RFO Provisions Incorporated by

Reference Number TiUe

52.240-90 Security Prohibitions and Exclusions

Representations and Certifications.

52.209-2

FAR/RFO Provisions Incorporated by Full

Text Number TiUe

Prohibition on Contracting With Inverted

Domestic Corporations-Representation.

Effective

Date

2026-02

W912DW26QA023

Alternate Variation

Deviation Effective

Date

Effective Alternate Variation

Date Deviation Effective

Date

2026-02

Prohibition on Contracting with Inverted Domestic Corporations-Representation (Feb 2026)

(a) Definitions. As used in this clause-

Inverted domestic corporation means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).

Subsidiary means an entity in which more than 50 percent of the entity is owned-

(1) Directly by a parent corporation; or

(2) Through another subsidiary of a parent corporation.

(b) Government agencies are not permitted to use appropriated (or otherwise made available) funds for contracts with either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation, unless the exception at 9.108-3(b) applies or the requirement is waived in accordance with the procedures at 9.108-5.

B.01 Solicitation - 26QA023 - RCM Training & Pilot Study
A.02 Statement of Work - RCM Training & Pilot Study
B.01 Solicitation - 26QA023 - RCM Training & Pilot Study
B.01 Solicitation - 26QA023 - RCM Training & Pilot Study
B.01 Solicitation - 26QA023 - RCM Training & Pilot Study
B.01 Solicitation - 26QA023 - RCM Training & Pilot Study
B.01 Solicitation - 26QA023 - RCM Training & Pilot Study
B.01 Solicitation - 26QA023 - RCM Training & Pilot Study
B.01 Solicitation - 26QA023 - RCM Training & Pilot Study
B.01 Solicitation - 26QA023 - RCM Training & Pilot Study
B.01 Solicitation - 26QA023 - RCM Training & Pilot Study
B.04 Wage Determination - 2015-5541 Revision 27, Dated 03Dec25

File details come from the government source that posted it. Updated .