B-4866 Drawings.pdf
PDF 24 MB Posted
- Solicitation number
- PW-27-809
- Issued by
- Los Angeles County, California
About this file
This is a comprehensive project document package from the City of Long Beach Public Works Department for the Naples Vista del Golfo (VDG) Tieback Cap Repair project located at 11-31 Vista del Golfo, Long Beach, California 90803. The project scope includes contractor mobilization and demobilization, installation of 45 tieback anchors with grouting, repair of existing pile cap cracks and spalling, repair of 37 handrail post pockets, removal and reinstallation of five private floating docks and gangways with modifications to avoid anchor rod conflicts, placement of 52 cubic yards of lightweight cellular concrete, painting of seawall caps covering approximately 330 linear feet, and comprehensive best management practices and environmental protection measures. The project requires submittal of shop drawings stamped by a California-licensed professional engineer for the tieback anchor system and concrete cap form system, along with supporting documentation including construction schedules, schedules of values, dock relocation and storage plans, tieback grouting procedures, tieback testing procedures, and product specification submittals. The project design is based on the 2022 California Building Code with Seismic Design Category II parameters and incorporates current standards including the 2015 Standard Specifications for Public Works Construction and Title 18 of the Long Beach Municipal Code.
The project documentation specifies that all work must comply with current City of Long Beach plans and specifications for waterfront structure construction, with exceptions approved by the engineer. Key materials include IBO/Titan 3016 high-strength steel tieback rods with an ultimate strength of 49.5 kips, design load of 29 kips, and lock-off load of 22 kips; grout meeting specific cement-to-water ratios; and approved products including Sikacrete 211 SCC Plus, Sikatop 122 Plus, Sikatop 123 Plus, Sika Armatec 110 Epocem, Sikaflex 2C NS EZ Mix+, Sikaflex 429 Primer, and Rust Oleum Marine Coatings for finishing. The contractor bears sole responsibility for site conditions, liability insurance, utility location and protection, and debris removal with all surplus materials disposed of using approved legal methods. All work must be performed in accordance with OSHA, Cal-OSHA, and American Disabilities Act requirements, with contractor-provided equipment for controlling turbidity, containing debris, and preventing spills into coastal waters. The project does not identify any specific set-asides for small businesses or other categories, though standard compliance with applicable regulations is required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| R-7322 Specifications.pdf | ||
| Seller Guidance v4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .