B-2 Smart Grid Communications SOW.pdf
PDF 136 KB Posted
- Attached to
- Technical Communications & Writing/Editing Support Cyber Physical Systems and Smart Grid Program Federal contract opportunity
- Solicitation number
- NIST-RFQ-21-73-01968
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B-4 Smart Grid Communications SOW Q_A Revised.pdf | ||
| B-4 Q_and_A Final.pdf | ||
| B-2 Provisions Clauses SG Comm.docx | DOCX document | |
| B-2 Combined Synopsis Solicitation SG Comm.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Technical Communications & Writing/Editing Support
Cyber Physical Systems and Smart Grid Program
1. BACKGROUND
Cyber-physical systems (CPS) can be described as smart and connected systems that encompass computational (i.e., hardware and software) and physical components, seamlessly integrated and closely interacting to sense and respond to the changing state of the real world. These systems involve a high degree of complexity at numerous spatial and temporal scales and highly networked communications integrating computational and physical components.
In particular, the smart grid is considered an example of a cyber-physical system, one in which NIST has a mandated role. Under Title XIII, Section 1305 of the Energy Independence and Security Act (EISA) of 2007, the U. S. Department of Commerce, National Institute of Standards and Technology (NIST) has “primary responsibility to coordinate development of a framework that includes protocols and model standards for information management to achieve interoperability of Smart Grid devices and systems.” This role provides a catalyst for a timely deployment of a secure and reliable smart grid that upgrades the aging electrical power grid infrastructure.
2. PURPOSE
The NIST Smart Grid and CPS programs coordinate cyber-physical systems development (including smart grid and internet of things) through various stakeholders’ engagement activities.
Timely communications with stakeholders for the NIST CPS and Smart Grid program are an essential element for the program to achieve its goals. These stakeholders are extremely diverse and include senior-level federal officials; state and local electrical power regulators and companies; elected officials; electronic and IT equipment manufacturers; and consumers.
To ensure that stakeholders are fully informed about the very wide range of activities affecting development of standards and deployment of smart grid infrastructure components, the NIST CPS and Smart Grid program requires professional communications services from a contractor with demonstrated technical knowledge of the fields of physical science (especially energy research), electronics, and information technology, as well as proven ability to translate complex technical materials into engaging Web site content, reports, and other communications products intended for a broad public audience.
3. GENERAL REQUIREMENTS
The Contractor shall provide communications and technical writing support services for the NIST CPS and Smart Grid program. The Contractor shall attend meetings and interpret research results which describe smart grid and cyber physical systems as well as related physical sciences, engineering, physics, electronics, energy, computer science, or information technology, and to gather information in the above disciplines and to synthesize them into other written materials.
The Contractor shall interact with NIST research staff on a regular basis to become familiar with the research programs and identify topics appropriate to communicate to the public. The Contractor shall produce text for the Cyber- Physical Systems and Smart Grid Program Websites, reports, fact sheets, announcements, newsletter articles, and other written and/or multimedia materials describing the Cyber-Physical Systems, Internet-of-Things (IoT), and Smart Grid related activities.
The Contractor shall produce all written materials in clear, readable, engaging, and understandable Standard English in a journalistic style appropriate for an audience of college educated laypersons. All deliverables shall be provided in a way such that they may be made publicly available in compliance with Section 508 requirements.
The Contractor shall not respond to any media inquiries. The Contractor shall immediately relay any/all inquiries from the media to the Technical Information Contact and/or Contracting Officer. The Contractor shall not grant or give interviews, comments, or any other response without the knowledge and approval of the NIST Director of Public Affairs Office.
4. SPECIFIC TASKS
The Contractor shall:
a. Develop content, including narrative and graphical content, describing NIST's Smart Grid and Cyber-Physical-Systems/Internet-of-Things activities for publication on the NIST Websites. Approximately one such request is estimated per month.
b. Provide approximately four (4) fact sheets describing specific programs or topics areas related to the Cyber-Physical Systems and Smart Grid that help the Program meet its communications and strategic goals;
c. Provide at least twenty (20) announcements or newsletter articles that describe accomplishments of the Cyber-Physical Systems and Smart Grid program, SEPA or others involved in Cyber-Physical Systems, IoT and Smart Grid activities to stakeholders such as policy makers, regulators, standards development organizations, manufacturers or consumers;
d. Serve as the editor for a Cyber-Physical Systems and Smart Grid electronic newsletter (4-6 pages each) in conjunction with NIST staff.
Newsletters are bi-monthly with an additional year-end newsletter;
seven newsletters are estimated per year.
e. Provide a description of communications plans and tactics keyed to the
Cyber-Physical Systems and Smart Grid Program's major strategic goals;
f. Provide editing for short reports or correspondence on an occasional, as-needed basis;
g. Attend all CPS, IoT and Smart Grid related meetings virtually or at NIST in
Gaithersburg, MD;
h. Attend selected meetings of the Smart Electric Power Alliance (SEPA) or other related meetings, to gather information to be included in fact sheets, newsletter items, and other materials;
i. Provide at least three (3) ghost written magazine articles, op-eds, speeches or other materials for the NIST Cyber-Physical Systems and Smart Grid program to help achieve program communications goals; and
j. Provide advice, on an as-needed basis, pertaining to current and/or upcoming projects for Cyber-Physical Systems and Smart Grid Program managers designed to help the program meet its strategic goals. These iterations shall be summarized in a monthly report.
5. DELIVERABLES AND DELIVERABLE DATES
Standards for Acceptance of Deliverables: The Technical Point of Contact (TPOC) will provide comments on each deliverable within 5 calendars days from receipt of a given deliverable. The Contractor shall make any needed changes to the deliverables within 5 calendar days from receipt of electronic or written comments from the TPOC.
Deliverable Due Date 0 A project plan, to be updated throughout the Period of Performance.
Within one week of the start of the contract.
1 Text and relevant graphics for the Cyber-Physical Systems and Smart
Dates mutually agreed upon by the Contractor and the TPOC.
Grid website (Section 4.a)
2 Fact sheets (Section 4.b) Dates mutually agreed upon by the Contractor and the TPOC.
3 Announcements or newsletter (Section 4.c)
Dates mutually agreed upon by the Contractor and the TPOC.
4 Edit a bi-monthly newsletter (Section 4.d)
Bi-monthly - Dates mutually agreed upon by the Contractor and the
TPOC.
5 Descriptions of communications plans and tactics (Section 4.e)
Dates mutually agreed upon by the Contractor and the TPOC.
6 Editing for short reports (Section 4.f) Occasional, as needed basis. Dates mutually agreed upon by the Contractor and the TPOC.
7 Attend selected Meetings of the SEPA to gather information or other relevant meetings (Section 4.h)
Dates/locations to be determined.
8 Ghost written magazine articles, op-eds, speeches or other materials (Section 4.i)
Dates mutually agreed upon by the Contractor and the TPOC.
9 Summarize communications advice in a monthly report (Section 4.j)
Due by the fifth day of the next month.
6. PERIOD AND PLACE OF PERFORMANCE
a. Period of Performance
The period of performance shall be from October 1, 2021 through September 30, 2022.
b. Place of Performance
The primary place of performance is the Contractor’s facility.
Additionally, the locations for required travel for attendance at the SEPA meetings or other appropriate events will be determined and coordinated between the NIST TPOC and the Contractor.
7. PERFORMANCE REQUIREMENTS SUMMARY
All materials prepared by the Contractor will be reviewed by the designated NIST staff experts within the NIST Cyber-Physical Systems and Smart Grid program as appropriate. Acceptable quality will include the following measures:
a. No more than 10 percent of written products shall be deemed factually inaccurate by subject matters experts reviewing the text;
b. No more than one rewrite is required to meet the agreed upon style, format requirements, flow, and readability required for the NIST Web site, Cyber-Physical Systems and Smart Grid newsletter or other specific formats.
Performance will be monitored by the assigned Cyber-Physical Systems and Smart Grid Program TPOC to ensure that acceptable levels of writing quality as described above have been achieved.
8. TRAVEL
The Contractor may be required to travel to the NIST campus for meetings and attend workshops or conferences to present work as determined by the TPOC.
The Contractor shall not represent the Government. Any travel requirements shall be within the United States. The Government will provide at least two weeks advance notice of travel requirements.
The Contractor shall attend all CPS, IoT and Smart Grid related meetings held virtually or at the NIST Gaithersburg campus, and travel to selected meetings approved by NIST, including those of the Smart Electric Power Alliance (SEPA), which will be held in the United States, but may be on the West Coast, Mid- West, or East Coast. NIST anticipates approximately two meetings requiring travel.
All travel shall be approved in advance by the NIST TPOC. Approved travel will be reimbursed in accordance with the Federal Travel Regulation and the Department of Commerce Travel Handbook up to the not-to-exceed amount of $3,000.00. Note that local travel will not be reimbursed.
9. KEY PERSONNEL
It is estimated that this work will require at least one contractor Key Personnel employee. The Key Personnel shall have at least five (5) years of experience in journalistic writing and editing. The Key Personnel must be familiar with technical details of the Cyber-Physical Systems and Smart Grid program and the energy, physics, engineering, electronics, computer science disciplines as evidenced by an advanced degree (master’s or doctorate) in physics, chemistry, engineering, computer science, or related fields. The Contractor must be able to work with multiple stakeholders and to prioritize workload to meet frequent deadlines.
10. GOVERNMENT FURNISHED PROPERTY, DATA, AND/OR
INFORMATION
Following award, the Government will provide the Contractor with the following:
a. Computing hardware, software, and access to NIST information technology resources including NIST email, network access, and online collaboration tools such Microsoft Office and Google G-Suite.
Government furnished equipment will be provided in an as-is and working condition. The Contractor is responsible for the safety and protection of any equipment that may be provided for remote work. All equipment provided shall be returned to the Government at the end of the task order in the condition it was received in.
All property, data, and information provided by the Government in the performance of this task remains the property of the Government and shall be surrendered to the Government upon completion or termination of this requirement. Likewise, all deliverables generated under this requirement are the property of the Government. The Government is not responsible for paying for Wi-Fi or cell phone charges.
11. RISK ASSESSMENT
This requirement is determined to be classified as IT Low Risk.
12. DATA RIGHTS
All written material produced under this contract become the property of the U.S.
government and as such will be in the public domain. FAR Clause 52.227-17:
Rights in Data – Special Works is applicable to this requirement.
| Cyber Physical Systems and Smart Grid Program |
| 1. BACKGROUND |
| 2. PURPOSE |
| 3. GENERAL REQUIREMENTS |
| 4. SPECIFIC TASKS |
| 5. DELIVERABLES AND DELIVERABLE DATES |
| 7. PERFORMANCE REQUIREMENTS SUMMARY |
| 9. KEY PERSONNEL |
| 11. RISK ASSESSMENT |
| This requirement is determined to be classified as IT Low Risk. |
| 12. DATA RIGHTS |
File details come from the government source that posted it. Updated .