Awning Statement of Work (SOW) .docx

DOCX document 43 KB Posted

Attached to
--SFO Fort Macon - Awning Installation
Solicitation number
70Z08126QELIZ0014
Issued by

About this file

This is a Statement of Work (SOW) for the replacement and installation of stern and O-1 Deck awnings on the USCGC PABLO VALENT, a 154' Fast Response Cutter operated by the U.S. Coast Guard at SFO Fort Macon in Atlantic Beach, North Carolina. The contractor must provide all personnel, equipment, supplies, tools, materials, and supervision necessary to replace degraded awnings that currently contain numerous holes and rips. The period of performance shall not exceed 90 calendar days from the date of award, with the primary place of performance at the contractor's facilities and frequent visits to the Coast Guard facility at 2301 E Ft Macon Rd, Atlantic Beach, NC 28512.

The SOW establishes specific operational requirements including contractor provision of a designated Project Manager as the single point of contact who must be available to the Contracting Officer's Representative (COR) between 0800-1600 EST, Monday through Friday, and respond to technical issues within 4 hours. All contractor employees must comply with government regulations regarding safety, security, identification badges, and professional conduct at government facilities. The contractor must attend a Post Award Conference within 15 business days of award and submit a draft project plan for government review, with a final plan due 15 business days after the conference. Work shall be performed during standard business hours of 0730-1600 EST, Monday through Friday, though weekend and holiday work may be required. The COR has 15 business days to review deliverables, with the contractor having 15 business days to make corrections if needed. Quote submission deadline is August 5, 2026 at Noon EST, with a required site visit on July 27, 2026. The evaluation criterion is Lowest Price Technically Acceptable, and award is contemplated as a Firm-Fixed Price contract.

View the file

Other files

File Type Posted
clauses and provisions.pdf PDF
SCA.pdf PDF
70Z08126QELIZ0014_0_US.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #: 13927PR260000007

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

FRC AWNING

<Contracting Officer enter final date solicitation is released>

IMPORTANT: All instructions (highlighted in blue), user notes (highlighted in pink), and user input guidance (highlighted in yellow) should be removed before finalizing the SOW document.

1.0 GENERAL

1.1 BACKGROUND

Stern and O-1 Deck awning onboard USCGC PABLO VALENT, a 154’ Fast Response Cutter, is degraded with numerous holes and rips at increasing frequency. Awning needs to be replaced due to wear.

1.2 SCOPE

Replacement awnings will need to be installed by technicians.

1.3 OBJECTIVE

Replace stern and O-1 Deck awnings for 154’ Fast Response Cutter.

2.0 SPECIFIC REQUIREMENTS/TASKS

Replace stern and O-1 Deck awnings for 154’ Fast Response Cutter.

3.1 QUALIFIED PERSONNEL

The Contractor must provide qualified personnel to perform all requirements specified in this SOW.

3.3 PROJECT MANAGER

The Contractor must provide a Project Manager who must be responsible for all Contractor work performed under this SOW. The Project Manager must be a single point of contact for the Contracting Officer and the COR. The name of the Project Manager, and the name(s) of any alternate(s) who must act for the Contractor in the absence of the Project Manager, must be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate must have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates must be able to read, write, speak and understand English. Additionally, the Contractor must not replace the Project Manager without prior approval from the Contracting Officer.

3.4.1 The Project Manager must be available to the COR via telephone between the hours of 0800 and 1600 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 4 hours of notification.

3.5 EMPLOYEE IDENTIFICATION

3.5.1 Contractor employees visiting Government facilities must wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, name, clearance-level and badge expiration date. Visiting Contractor employees must comply with all Government escort rules and requirements. All Contractor employees must identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.

3.5.2 Contractor employees working on-site at Government facilities must wear a Government issued identification badge. All Contractor employees must identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.) and display the Government issued badge in plain view above the waist at all times.

3.6 EMPLOYEE CONDUCT

Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.7 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

4.2 PERIOD OF PERFORMANCE

The period of performance for this contract must not exceed 90 calendar days from the date of award.

4.3 PLACE OF PERFORMANCE

The primary place of performance will be the Contractor’s facilities with frequent visits to the United States Coast Guard at SFO Ft Macon 2301 E Ft Macon Rd, Atlantic Beach, NC 28512.

4.4 HOURS OF OPERATION

Contractor employees must generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.

4.5 TRAVEL

Contractor travel must not be required for this requirement.

4.6 POST AWARD CONFERENCE

The Contractor must attend a Post Award Conference with the Contracting Officer and the COR no later than 15 business days after the date of award. The purpose of the Post Award Conference, which will be chaired by the Contracting Officer, is to discuss technical and contracting objectives of this contract and review the Contractor's draft project plan. The Post Award Conference will be held at the Government’s facility, located at SFO Ft Macon 2301 E Ft Macon Rd, Atlantic Beach, NC 28512 or via teleconference.

4.7 PROJECT PLAN

The Contractor must provide a draft Project Plan at the Post Award Conference for Government review and comment. The plan, at a minimum, must include: (a) list of work to be performed;(b) project schedule; (c) description of intended results; (d) role of key personnel, if applicable and (e) how quality of service (project) will be maintained throughout life of contract. The Contractor must provide a final Project Plan to the COR not later than 15 business days after the Post Award Conference.

7.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

7.2 The COR will have 15 business days to review deliverables and make comments. The Contractor must have 15 business days to make corrections and redeliver.

7.3 All other review times and schedules for deliverables must be agreed upon by the parties based on the final approved Project Plan. The Contractor must be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor must work with personnel reviewing the deliverables to assure that the established schedule is maintained.