About this file
This document is a Notice of Intent to Award for a solicitation by the Fayette County Public Schools Purchasing Department for student desks, teacher desks, and chairs (RFP 24-040-075). The intent is to communicate the preliminary results of the selection process. The selected respondent is Georgia Specialty Equipment, LLC for an award term of May 9, 2024 to June 30, 2025. Contact information is provided for project coordination, contract/solicitation questions, and accounts payable. The document includes a tabulation of the scoring and pricing for all respondents, with Georgia Specialty Equipment, LLC receiving the highest total score of 91.6 and the lowest total cost option.
The pricing details show the total costs for each respondent under the two available options. The document indicates that the selected items from some respondents did not meet or exceed the solicitation specifications, resulting in point deductions. Respondents were required to provide completed forms, reference information, and manufacturer product data sheets as part of their submissions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Student Desks Teacher Desks and Chairs for Fa.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fayette County Public Schools Purchasing Department
205 LaFayette Avenue, LaFayette Educational Center, Building A, Fayetteville, GA 30214
(770) 460-3535 ext. 1043 or purchasing@fcboe.org
Notice of Intent to Award Student Desks, Teacher Desks, and Chairs for Fayette County Public Schools (RFP 24-040-075)
May 9, 2024
The Fayette County Public Schools Purchasing Department would like to thank all respondents who participated in this solicitation.
The intent of this notice is to communicate the preliminary results of the selection process performed by the Purchasing Department and end-users. This is not an acceptance of your response, nor is it a confirmation of a contract or order. Based on the dollar value of this solicitation, final approval may be required from the Superintendent or the Board of Education as required by policy.
Selected Respondent:
Georgia Specialty Equipment, LLC 137 North 85 Parkway Fayetteville, Georgia 30214
Award Term:
May 9, 2024 - June 30, 2025
The following staff may be contacted for more information:
For project coordination including ordering and delivery:
Mike Satterfield, Director of Facilities Services 770-460-3522 and satterfield.mike@fcboe.org
For contract/solicitation questions:
Jamie Marrero, Purchasing Associate 770-460-3522 or marrero.jamie@fcboe.org
For accounts payable or billing information:
Finance Department, Accounts Payable 770-460-3535 or invoices.finance@fcboe.org
Attachments:
Tabulations mailto:purchasing@mail.fcboe.org mailto:satterfield.mike@fcboe.org mailto:marrero.jamie@fcboe.org mailto:invoices.finance@mail.fcboe.org
Tabulated Score
Respondent Name Total Score
Total Cost with Option 2 (Preferred)
Total Cost with Option 1
Office Design Concepts 54.7 $127,023.54 $133,804.44 Sheffield Office Products 51.6 $135,852.00 $143,916.00 Schools' In LLC dba Schools In 58.9 $126,058.80 $116,818.80 School Specialty, LLC 69.1 $107,961.12 $108,580.08 School Outfitters 57.0 $112,064.88 $110,502.48 Krueger International, Inc 62.5 $139,285.24 $138,406.20 Georgia Specialty Equipment, LLC 91.6 $75,516.00 $75,516.00 Georgia Correctional Industries 68.6 $117,917.12 $122,482.36 Quality Specialty Products 82.1 $64,008.00 $64,008.00 Office Creations 35.0 $210,000.00 $214,000.00 HCONE International Impex LLC 86.0 $62,813.00 $76,925.28 Lakeshore Learning Materials, LLC 43.6 $201,035.64 $191,459.64 Meteor Education, LLC 48.6 $188,912.16 $196,895.52 CWC, Inc 54.3 $107,128.77 $104,402.59
OFE 52.4 $134,100.00 $135,340.00
Office Design Concepts
Reference Specifications/Required Forms Points Possible Points Awarded General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 7 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 10 Respondent proposed items that meets or exceeds the solicitations specifications. 20 0
SECTION TOTAL 50 30
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $127,023.54
Total Project Cost with Option 1 $133,804.44 Total Project Cost Option 2 (Preferred Option) $127,023.54
SECTION TOTAL 50 24.7
TOTAL TABULATED SCORE 100 54.7
Notes:
Respondent provided the following furniture options that do not meet or exceed the solicitation specifications; student desks options 1 and 2 have particle board tops (instead of solid plastic), teacher task chair is plastic (instead of upholstery), student chair specifications do not include the gauge of steel used (needed to confirm proper specifications are met), and teacher desk is made of a combination of laminate and metal, instead of laminate (solicitation requires the desk to be laminate including the laminate/wood middle drawer).
-20 Points
Sheffield Office Products
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 0 Respondent has provided completed Business Capability Form, as required. 7 3.5 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 6 Respondent proposed items that meets or exceeds the solicitations specifications. 20 12
SECTION TOTAL 50 28.5
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $135,852.00
Total Project Cost with Option 1 $143,916.00 Total Project Cost Option 2 (Preferred Option) $135,852.00
SECTION TOTAL 50 23.1
TOTAL TABULATED SCORE 100 51.6
Notes: Respondent did not provide completed Reference Form, as required. -6 Points
Respondent did not provide Manufacture Product Data Sheets, as required. Only received data sheets for 3 out of the 5 items proposed. -4 Points Respondent only provided Manufacture Product Data Sheets for 3 of the 5 items proposed.
Only able to confirm that three (3) items met/exceeded solicitation specifications. -8 Points
Schools In
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 7 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 10 Respondent proposed items that meets or exceeds the solicitations specifications. 20 4
SECTION TOTAL 50 34
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $126,058.80
Total Project Cost with Option 1 $116,818.80 Total Project Cost Option 2 (Preferred Option) $126,058.80
SECTION TOTAL 50 24.9
TOTAL TABULATED SCORE 100 58.9
Notes:
Respondent provided items that did not meet or exceed the provided specifications, as required. Student desk options 1 and 2 had a steel frame made of 16 gauge steel and the adjustable legs were made of 19 gauge steel, instead of 12 gauge steel frame and 16 gauge steel adjustable legs. Student chair leg bracket is made of 15 gauge steel instead of 14.
Teacher desk is made of a combination of laminate and metal, instead of laminate.
(solicitation requires the desk to be laminate including the laminate/wood drawer)
-16 Points
School Specialty
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 5 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 10 Respondent proposed items that meets or exceeds the solicitations specifications. 20 12
SECTION TOTAL 50 40
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $107,961.12
Total Project Cost with Option 1 $108,580.08 Total Project Cost Option 2 (Preferred Option) $107,961.12
SECTION TOTAL 50 29.1
TOTAL TABULATED SCORE 100 69.1
Notes: Respondent provided a completed Business Capability Form but did not have it notorized, as required. -2 Points
Respondent provided the Manufacture Product Data Sheet for each item but there was information missing about the product(s). Student desks options 1 and 2 were missing the top tickness measurement and the steel gauge of the frame and legs. Student chair was missing the seat mount bracket steel gauge size. Teacher desks was missing dimensions, only listed as a 60" Rectangular Desk Shell.
-8 Points
School Outfitters
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 3 Respondent has provided completed Business Capability Form, as required. 7 5 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 10 Respondent proposed items that meets or exceeds the solicitations specifications. 20 4
SECTION TOTAL 50 29
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $112,064.88
Total Project Cost with Option 1 $110,502.48 Total Project Cost Option 2 (Preferred Option) $112,064.88
SECTION TOTAL 50 28.0
TOTAL TABULATED SCORE 100 57
Notes:
Respondent provided a blank Reference Form with an attachment of References. Reference Form provided with solicitation had to be completed to earn maximum points in this category.
-3 Points
Respondent notorized the blank Business Capability Form but did not notarize the attachment with answers. -2 Points Respondent provided items that did not meet or exceed the provided specifications, as required. Student desk options 1 is the wrong shape (boomerand), tapazoid shape is requred. Student desk option 1 and 2 had a steel frame made of 16 gauge steel, instead of 12 gauge steel frame. Student chair leg bracket is made of 16 gauge steel instead of 14.
Teacher desk is made of a combination of laminate and metal, instead of laminate.
Krueger International
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 5 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 10 Respondent proposed items that meets or exceeds the solicitations specifications. 20 12
SECTION TOTAL 50 40
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $139,285.24
Total Project Cost with Option 1 $138,406.20 Total Project Cost Option 2 (Preferred Option) $139,285.24
SECTION TOTAL 50 22.5
TOTAL TABULATED SCORE 100 62.5
Notes: Respondent provided a completed Business Capability Form but did not notarize it as required. -2 Points
Respondent provided the Manufacture Product Data Sheet for each item but there was information missing about the product(s). Student desks options 1 and 2 were missing the desk's dimensions, adjustable leg, and the steel gauge of the frame and legs. Student chair was missing the seat frame/mount bracket/leg steel gauge sizes. Teacher desk was missing the middle drawer option.
-8 Points
GA Specialty Equipment
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 7 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 10 Respondent proposed items that meets or exceeds the solicitations specifications. 20 20
SECTION TOTAL 50 50
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $75,516.00
Total Project Cost with Option 1 $75,516.00 Total Project Cost Option 2 (Preferred Option) $75,516.00
SECTION TOTAL 50 41.6
TOTAL TABULATED SCORE 100 91.6
Notes:
GA Correctional Industries
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 0 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 3.5 Respondent has provided completed solicitation Cost Proposal, as required. 5 2.5 Respondent provided Manufacturer Product Data Sheets, as required. 10 10 Respondent proposed items that meets or exceeds the solicitations specifications. 20 20
SECTION TOTAL 50 42
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $117,917.12
Total Project Cost with Option 1 $122,482.36 Total Project Cost Option 2 (Preferred Option) $117,917.12
SECTION TOTAL 50 26.6
TOTAL TABULATED SCORE 100 68.6
Notes: Respondent did not provide completed Respondent Information Form, as required. -2 Points
Respondent provided answers to questions on the Business Capability Form but did not include required attachments nor notarized the document. -3.5 Points
Respondent provided an altered Cost Proposal which removed the signature line. Cost Proposal Sheets provided with the solicitation are required to be completed and submitted to obtain the maximum amount of points for this section.
-2.5 Points
Quality Specialty Products
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 3 Respondent has provided completed Business Capability Form, as required. 7 5 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 10 Respondent proposed items that meets or exceeds the solicitations specifications. 20 8
SECTION TOTAL 50 33
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $64,008.00
Total Project Cost with Option 1 $64,008.00 Total Project Cost Option 2 (Preferred Option) $64,008.00
SECTION TOTAL 50 49.1
TOTAL TABULATED SCORE 100 82.1
Notes:
Respondent did not provide completed Reference Form as required but submitted an attachment of References. Reference Form provided with solicitation had to be completed to earn maximum points in this category.
-3 Points
Respondent provided a completed Business Capability Form but did not notorize it as required. -2 Points
Respondent provided items that did not meet or exceed the provided specifications, as required. Student desk option 1 is the wrong shape (Fish) instead of trapezoid as required.
Student desk option 1 and 2 have a laminate top instead of the solid plastic top required.
Teacher desk is made of a combination of laminate and metal, instead of laminate.
-12 Points
Office Creations
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 7 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 0 Respondent proposed items that meets or exceeds the solicitations specifications. 20 0
SECTION TOTAL 50 20
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $210,000.00
Total Project Cost with Option 1 $214,000.00 Total Project Cost Option 2 (Preferred Option) $210,000.00
SECTION TOTAL 50 15.0
TOTAL TABULATED SCORE 100 35
Notes:
Respondent did not provide copies of the Manufacturer Product Data Sheets, as required.
Respondent provided the model numbers of each product with a link to the product data on an attachment.
-10 Points
No Manufacturer Product Data Sheets were provided to confirm if the items proposed met or exceeded the specifications. -20 Points
Lakeshore Learning
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 5 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 10 Respondent proposed items that meets or exceeds the solicitations specifications. 20 0
SECTION TOTAL 50 28
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $201,035.64
Total Project Cost with Option 1 $191,459.64 Total Project Cost Option 2 (Preferred Option) $201,035.64
SECTION TOTAL 50 15.6
TOTAL TABULATED SCORE 100 43.6
Notes: Respondent provided answers to the Business Capability Form but the notary was on a separate sheet of paper with no indication of which items were considered. -2 Points
Respondent provided the following furniture options that do not meet or exceed solicitation specifications; student desks options 1 and 2 have laminate tops (instead of solid plastic) and no steel gauge size listed for the frame/legs, student chair specifications do not include the gauge of steel used (needed to confirm proper specifications are met), and teacher desk is made of a combination of laminate and metal, instead of laminate (solicitation requires the desk to be laminate including the laminate/wood drawer).
HCONE International
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 7 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 8 Respondent proposed items that meets or exceeds the solicitations specifications. 20 8
SECTION TOTAL 50 36
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $62,813.00
Total Project Cost with Option 1 $76,925.28 Total Project Cost Option 2 (Preferred Option) $62,813.00
SECTION TOTAL 50 50
TOTAL TABULATED SCORE 100 86
Notes: Respondent provided a Manufacturer Product Data Sheet for all items with the exception of the teacher desk. (Only included the data sheet for the middle drawer) -2 Points
Respondent provided the Manufacture Product Data Sheet for each item but there was information missing about the product(s). Student desk option 1 is missing the adjustable leg steel gauge, which is required to be a minimum 16 gauge. Teacher desk manufacturer product data sheet(s) was not included in bid submission (only a desk drawer), no specifications could be confirmed to meet or exceed the specifications outlined in the bid.
Respondent provided a product that did not meet or exceed the minimum required specifications. Student desk option 2 has a steel 16 gauge frame instead of 12 as required.
-12 Points
Meteor Education
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 5 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 10 Respondent proposed items that meets or exceeds the solicitations specifications. 20 4
SECTION TOTAL 50 32
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $188,912.16
Total Project Cost with Option 1 $196,895.52 Total Project Cost Option 2 (Preferred Option) $188,912.16
SECTION TOTAL 50 16.6
TOTAL TABULATED SCORE 100 48.6
Notes: Respondent provided answers to the Business Capability Form but did not notorize it as required. -2 Points
Respondent provided the following furniture options that do not meet or exceed solicitation specifications; student desks options 1 and 2 have laminate tops (instead of solid plastic), student chair specifications do not include the gauge of steel used (needed to confirm proper specifications are met), and teacher desk does not include wood drawer(s).
CWC
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 7 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 5 Respondent proposed items that meets or exceeds the solicitations specifications. 20 0
SECTION TOTAL 50 25
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $107,128.77
Total Project Cost with Option 1 $104,402.59 Total Project Cost Option 2 (Preferred Option) $107,128.77
SECTION TOTAL 50 29.3
TOTAL TABULATED SCORE 100 54.3
Notes: Respondent provided Manufacturer Product Data Sheets but did not include information about the product. Only picture and color options. -5 Points
Respondent provided the following furniture options that do not meet or exceed solicitation specifications; student desks options 1 and 2 have laminate tops (instead of solid plastic) with no specifications, student chair specifications were not included, and teacher desk is a combination of laminate and metal, which is required to be laminate/wood only (solicitation requires the desk to be laminate including the laminate/wood drawer) with no specifications, teacher chair specifications were not included. (specifications are needed to confirm proper specifications are met)
OFE
General Specifications Scoring
Repondent has provided completed Respondent Information Form, as required. 2 2 Respondent has provided completed Reference Form, as required. 6 6 Respondent has provided completed Business Capability Form, as required. 7 7 Respondent has provided completed solicitation Cost Proposal, as required. 5 5 Respondent provided Manufacturer Product Data Sheets, as required. 10 5 Respondent proposed items that meets or exceeds the solicitations specifications. 20 4
SECTION TOTAL 50 29
Pricing Analysis
Total Project Cost with Option 2 (Tabulated Pricing) $134,100.00
Total Project Cost with Option 1 $135,340.00 Total Project Cost Option 2 (Preferred Option) $134,100.00
SECTION TOTAL 50 23.4
TOTAL TABULATED SCORE 100 52.4
Notes:
Respondent provided Manufacturer Product Data Sheets but did not include information about the product. Only picture and color options. With the exception of the teacher desks, which did include some specifications.
-5 Points
Respondent provided the following furniture options that do not meet or exceed solicitation specifications; student desks options 1 and 2 appear to have laminate tops (instead of solid plastic) with no specifications, student chair specifications were not included, and teacher chair specifications were not included. (specifications are needed to confirm proper specifications are met)
| Intent to Award Notice_ Student Desks, Teacher Desks, Chairs for Fayette County Public Schools (RFP 24-040-075) |
| Tabulations_ Student Desks, Teacher Desks, and Chairs for Fayette County Public Schools (RFQ 24-040-075) |
File details come from the government source that posted it. Updated .