Award Recommendation_Ripman Construction_591.26452.AGY_Clare Boiler Repl.pdf

PDF 13 MB Posted

Attached to
Notice of Intent to Award 260000000482; 591/26452. AGY
Solicitation number
NIA1 171 270000000109 1
Issued by
Clinton County, Michigan

About this file

This is a Bid Tabulation and Award Recommendation document from the Michigan Department of Transportation (MDOT) and the Department of Technology, Management & Budget (DTMB) State Facilities Administration for the Clare Welcome Center Boiler Replacement project (File Number 26452). The project involves the replacement of non-functioning boilers at the facility that have exceeded their useful life. The bid opening occurred on December 20, 2026, at 2:00 p.m., with four contractors submitting bids. The recommendation is to award the contract to the second low bidder, Ripman Construction Company, Inc., located in St. Helen, Michigan, as the low bidder, Smillie Plumbing & Heating, withdrew their bid. Ripman Construction's bid was deemed responsive and responsible following a comprehensive evaluation conducted on November 4, 2026, which included review of bid forms, addenda acknowledgments, contractor qualifications, project experience, and interview responses.

The contract award to Ripman Construction Company, Inc., is for $95,134.00, with 100% of the funding provided by MDOT Special Maintenance Funds. The evaluation process confirmed that Ripman Construction is a Michigan firm, maintains an acceptable Experience Modification Rate, has satisfactory project references, and meets all responsiveness and responsibility criteria, including compliance with prevailing wage and Davis-Bacon Act requirements. All four bidders submitted bid bonds at 5.00%, with the low bidder's bond noted as not signed by the company, rendering that bid non-responsive. The project superintendent is a permanent full-time employee of the contractor, and the company is comfortable with its ability to complete the project within the specified duration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agency Name

10/21/2026

Bid Tabulation and Recommendation For Contract AwardDMB-412 (R 10/96)

MDOT/Boilers Replacement

Available Funds $

Bid opening date and time 12/20/2026Bid Expiration Date

AGY./ 26452File Number

Director SAB Architect

FUNDS:

Adequate

Revised W.O./M.O.P.

Addendum

Additional Funds $

RECOMMENDATION (Return to Facilities Administration)

REASON FOR PROJECT (Must be filled in)

BID SECURITY

NOT REQUIRED REQUIRED

BIDDERS BASE BIDCert. of Awardability? BID BOND

Bid Package # 1

Scope Clare Welcome Center Boiler Replacement Index Number

BOND %

Matt Lusby - MDOT

, 2:00 p.m.

Qualified Dis. Veteran?

DMB-402 (RPIMS revision date: 04/08) DTMB State Facilities Administration, Design & Construction

Warehouse Complex, Building 600

P.O. Box 30026

Lansing, Michigan 48909

AWARD:BIDDER:

Low

Second

Third

Monarch Welding & Engineering, Inc. Not Signed

23635 Mound Rd.

Warren MI 48091

Smillie Plumbing & Heating $62,100.00Bond

10270 Pierce Road

Freeland MI 486239036

5.00%

Ripman Construction Company, Inc. $95,134.00Bond

2026 S. Maple Valley Road

St. Helen MI 48656

5.00%Yes

J.E. Johnson, Inc. $99,000.00Bond

1550 E. Virginia Dr., P.O. Box 1863

Midland MI 48641

5.00%

Shreck, Inc. $108,950.00Bond

4132 Keepsake Ln

Lansing MI 48906

5.00%Yes

Page 1 of 1591 26452/ . AGY

Non-responsive. Bid Bond not signed by company.

Award a construction contract to the second low bidder, Ripman Construction Company, Inc., for the amount of $95,134.00 . The low bidder, Smillie Plumbing and Heating, withdrew their bid.

Replacement of the boilers is necessary as the existing units are not functioning to meet the needs of the facility and are beyond useful life. The replacements will provide for the comfort and safety of users of the facility and extend the functional life of the facility.

X X Funding Source:

100% MDOT Special

Maintenance Funds

EBB

[Withdrew Bid]

BEST VALUE

CONSTRUCTION BIDDER EVALUATION

April 2025

File No. 26452 Project Name/Phase: Clare Boiler Replacement Bidder: Ripman Construction Company

PSC: Date: 11/4/26

EVALUATION CHECKLIST

PART ONE: Responsiveness and Responsibility Yes No Review bid forms and bid submittals prior to interview Are all bid forms and bid submittals in order, complete, and signed? X Have all addenda been acknowledged? X Is the bidder a Michigan firm? X Will 50% or more of the persons employed on the project have been residents of the State of Michigan for not less than one year before the beginning of this project?

X

Does the Contractor acknowledge that all subcontractors are required to obtain a State Project Registration (SPR) from the Department of Labor & Economic Opportunity, Wage & Hour Division?

X

Are DCD contractor performance evaluations (if any) acceptable? (Add comments pg. 5 if No) Are the completed projects of similar size and complexity, and references, acceptable? X Is the project superintendent’s resume and past experience with similar projects acceptable? X Does this contractor have a satisfactory (under 1.0) Experience Modification Rate (EMR)? X Is the contractor a member of the MIOSHA Michigan Voluntary Protection Program (MVPP) through the

Michigan Department of Labor and Economic Opportunity (LEO - Michigan Voluntary Protection Program (MVPP))?

Is the company or are principal individuals on the Federal System for Award Management (http://www.SAM.gov) exclusion list?

X

Does this contractor have open MIOSHA violations within the last three (3) years prior to bid opening?

(http://www.osha.gov/pls/imis/establishment.html)

X

Does this work include asbestos abatement? If so, does this contractor and/or any asbestos abatement subcontractors have more than four (4) notices of violation?

X

Interview Within the last five (5) years has your organization been issued a Notice Requiring Assurance of Due Performance, Notice of Intent to Default, or Default – Notice of Termination for Cause, on a State of Michigan project? (If yes, attach a detailed explanation.)

X

Within the last five (5) years has any officer or partner of your organization been an officer or partner of another organization that has been issued a Notice Requiring Assurance of Due Performance, Notice of Intent to Default, or Default – Notice of Termination for Cause, on a State of Michigan project? (If yes, attach a detailed explanation.)

X

Is your proposal mathematically, correct? X

Do you have any concerns with or need clarifications of the bid documents? (If yes, attach a detailed explanation.)

X

Does the bid contain deviations such as substitutions or voluntary alternates? X If there are deviations, have those deviations been reviewed?

Have you included all components for a complete project? X Are you comfortable with your bid and your ability to complete the project within the duration specified? X Do you understand the Soil Erosion and Sedimentation Control requirements (if any) for the project?

Do you understand the Special Working Conditions and Supplemental Conditions (if any) for the project?

Do you understand substantial and final completion and liquidated damages, if any? X Does your proposed project schedule reflect the project duration outlined in the bid documents? X Do you anticipate any difficulties obtaining your performance and payment bonds? X Are you using the bonding capacity of any other entity (i.e., subcontractor)?

Do you understand the Davis-Bacon Act / Prevailing Wage requirements per the bid documents? X PSC and PD discuss and decide post-interview Is this contractor responsive? X Is this contractor responsible? X Question to bidder

X

X

BEST VALUE

CONSTRUCTION BIDDER EVALUATION

April 2025

Do you still wish your bid to remain in consideration? X

Comments/Explanations of Negative Responses (may attach other sheets)

Signed:

Date

EVALUATION CHECKLIST

PART TWO: Qualitative Components

E x c e ll e n t

A c c e p ta b le

N o t A c c e p ta b le

Interview How do you plan to provide communications and information for this project?

What is your management plan for this project?

Have you worked successfully with the DTMB Design and Construction Division?

Have you worked successfully with the Client Agency?

Have you worked successfully with the Professional Service Contractor?

How many projects have your successfully completed with your principal subcontractors (if any)?

_____ not worked with before ______ 1-5 _______ 5-10+ What percentage of the project work will be self-performed?

___ 5% or less; ___ 6 to 50%; ___ more than 50% What other projects do you currently have under contract? (Attach separate sheet) Has any required specialized construction been adequately addressed?

What are your primary concerns regarding the successful completion of this project?

How do you intend to record the project as-built documents?

Is the project superintendent a permanent full-time employee of the contractor?

The following section only applies if these items were specifically requested for review in the bid documents.

Was a bid breakdown submitted? ___Y ___ N

If yes, is that bid breakdown satisfactory?

Was a list of subcontractors submitted? ___Y ___ N

If so, is that list acceptable?

The following section only applies if a project schedule was requested as part of the post-bidding submittals.

Has a proposed project schedule been submitted? ___Y ____ N Is the proposed project schedule acceptable?

Project-Specific Qualitative Questions

(Can also include additional questions specific to the project)

11/4/26

Michigan.gov/MiProcurement

Version 2023-1 Page 1 of 1

CODE OF CONDUCT ACKNOWLEDGEMENT

You are receiving this form because you are an evaluation member participating in the evaluation, negotiation, and award process for solicitation # 26452 for the purchase of the Clare Welcome Center Boiler.

To learn more about the requirements for this form, including who must sign, refer to the Code of Conduct Form Considerations Reference Guide.

An evaluation member must do the following:

1. Comply with Civil Service rule 2-8 (Ethical Standards of Conduct) and Public Act 196 of 1973

(State Ethics Act).

2. Comply with Chapter 1, Section 1.4 of the Michigan Procurement Policy Manual.

3. Disclose, to the Solicitation Manager, any actual or potential conflict of interest you have with a bidder, or any situation that may call into question your ability to participate impartially and without bias. Conflict of interest includes any personal, financial, business or other interest that impairs, may impair or give the appearance of impairing independent judgment or action in the performance of duties as an evaluation member. This disclosure requirement extends to any member of the evaluation member’s immediate family as defined in Civil Service rule 2-8.

Disclosure of the specific relationship or conflict is not required if the evaluator voluntarily withdraws from participating.

4. Report any actual or perceived conflict of interest of others to the Solicitation Manager or Procurement Executive.

5. Failure to disclose any conflict of interest may result in the following: (a) removal from the evaluation team, (b) contact made with State employees department director, (c) contact made with Governor’s legal counsel or State Ethics Board; (d) disciplinary action, (e) non-state employee evaluators may be (1) prevented from working for the State of Michigan in any capacity,

(2) the individual and the contractor the individual works for may be barred from receiving future contracts, and any existing contract with the evaluator or the evaluator’s employer, or contractor may be canceled.

6. Perform evaluation duties impartially and without bias.

7. Review and understand the solicitation documents and addendums.

8. Review and understand the proposals received.

9. Attend scheduled meetings and be prepared to actively participate in the evaluation process based on bidder submissions.

10. Ensure the details of the evaluation remain confidential until a notification of award has been made. This does not preclude the evaluator from discussing the overall status of the project with the evaluator’s management.

11. Attend any post award activities such as debrief and protest meetings, and vendor kick-off meetings.

My signature below (or an acknowledgement to the Solicitation Manager via email) indicates I have read and understand the above requirements and will abide by them.

Evaluator Name (Print) Matthew Lusby

Signature/Date 11/4/26