Award Information

25 B Posted

Attached to
WTP-Solids Dewatering Equipment Procurement-DALT
Solicitation number
VD-WTP-Solids-Dewatering-2021A
Issued by
Ware County, Georgia

About this file

This Award Information file documents a pending project review for the V.D. Parrott, Jr. Water Treatment Plant Solids Dewatering Equipment Procurement by the Board of Water, Light and Sinking Fund Commissioners of the City of Dalton, Georgia (Dalton Utilities). Sealed proposals for the procurement were required to be submitted by 5:00 P.M. Eastern time on August 31, 2021, with three copies delivered to Leslie Rush at Dalton Utilities Administration Building, 1200 V.D. Parrott Jr. Parkway, Dalton, Georgia 30721, and two additional copies to Raymond Cordon at Barge Design Solutions, 6525 The Corners Parkway, Suite 450, Peachtree Corners, Georgia 30092. The project involves furnishing state-of-the-art dewatering equipment designed to produce a minimum solids throughput of 1,000 dry pounds per hour at a minimum feed flow rate of 100 gallons per minute, achieving a minimum of 95% suspended solids recovery with a sludge cake concentration of 20-25% and polymer use of 20-35 pounds per dry ton active.

Additional proposal instructions and complete bidding documents were available for examination at Dalton Utilities, Department of Watershed Services, and could be obtained directly from Barge Design Solutions, Inc., the design consultant, at (678) 515-9416 or raymond.cordon@bargedesign.com. No specific pricing terms, set-asides, funding sources, or contract award amounts are detailed in this file, which reflects the project's pending review status.

Text of this file

Project is Pending Review

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .