This is an Award Information document from the City of Dalton, Georgia, indicating no bidders were received for the Prater Alley Stormwater Detention Project. The project involves stormwater infrastructure improvements including installation of an underground detention pond with an above-ground pond bid alternate to provide flood storage. Work includes tree removal, excavation, grading, R-Tank system installation for the below-ground pond, and modular retaining wall installation for the above-ground pond, with approximately 0.96 acres of ground disturbance. A mandatory pre-bid meeting was scheduled for May 25, 2023 at 1:00 PM at the Public Works Office located at 535 Elm Street, Dalton, Georgia 30721. Sealed bids were to be received by June 15, 2023 at 2:00 PM, with work to commence tentatively on July 3, 2023 for a 24-week period. All work was to be performed according to latest Georgia Department of Transportation Standards and Specifications and directed by plans developed by Arcadis-U.S., Inc.

Prospective contractors were required to be in compliance with the Georgia Security and Immigration Compliance Act and submit a signed, notarized affidavit verifying compliance with O.C.G.A. 13-10-91. Bid packages, specifications, and contract documents were available for public inspection at the City of Dalton Public Works Department. Inquiries regarding the project were directed to Jackson Sheppard, Public Works, at (706) 278-7077 or jsheppard@daltonga.gov. The absence of bidders received indicates the solicitation did not result in any responsive submissions for contract award.

Text of this file

NO BIDDERS

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .