This is an Award Information document for a state and local contract opportunity in Georgia involving the construction of a conditioned room at the YRWRF (Yancy Regional Waste and Recycling Facility). The project involves the provision and installation of a pre-fabricated conditioned room within the existing YRWRF Warehouse to create a climate-controlled and secure storage space for critical items. The scope of work requires contractors to deliver and install this specialized facility that will protect sensitive materials from environmental fluctuations while maintaining security protocols.

The document does not contain specific information regarding pricing terms, set-asides, incumbent contractors, funding sources, contract duration, renewal options, response deadlines, site visit schedules, or bidder conference details in the provided Award Information file. Additional contract documents such as the detailed Scope of Work, bid specifications, or solicitation materials would be necessary to obtain comprehensive information about contract value, bidding requirements, timeline expectations, and other material terms of the award.

Text of this file

BID TABULATION Page 1 of 1

BL032-22

Provision of Yellow River Water Reclamation Facility Warehouse Conditioned Room Department of Water Resources

ITEM #

1.1

ITEM # DESCRIPTION UNIT

PRICE

TOTAL

PRICE

UNIT

PRICE

TOTAL

PRICE

2.1 Additional 1" RGS Conduit LF 100 $55.00 $5,500.00 $25.00 $2,500.00

2.2 Additional #6 Wire LF 300 $1.89 $567.00 $25.00 $7,500.00

2.3 Additional Type 1 Lighting Fixture EA 2 $200.00 $400.00 $2,000.00 $4,000.00

2.4 Additional 1" SCH 40 PVC Pipe LF 30 $13.45 $403.50 $15.00 $450.00

Recommended Vendor:

Carter Construction Partners, Inc.

Attn: Allen Carter 5051 Peachtree Corners Cir Suite 200 Peachtree Corners, GA 30096 acarter@carter-cp.com

$260,000.00$141,806.00

$6,870.50 $274,450.00

APPROX.

QTY

Lump Sum Price for removal and relocation of existing shelving and fencing within the warehouse, furnishing and installation of prefabricated conditioned room, including HVAC, at YRWRF.

SECTION B

GRAND TOTAL

SECTION B TOTAL $14,450.00

$148,676.50

SECTION A

DESCRIPTION

Carter Construction Partners, Inc.

(L) Multiplex, LLC

(L)

BASE BIDBASE BID

km

20220608134200742.pdf
BL032-22 Tab.pdf

Other files

File Type Posted
Addendum #2 —
Notice of Bid —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .