AWARD Elevator Mondernization and Maintenance.pdf
PDF 282 KB Posted
- Attached to
- Elevator Modernization and Maintenance for Fayette County Public Schools (RFP 25-007-075)
- Solicitation number
- PE-65615-NONST-2025-000000042
- Issued by
- Fayette County, Georgia
About this file
This document is a Notice of Intent to Award for an Elevator Modernization and Maintenance contract solicited by the Fayette County Public Schools Purchasing Department. The intent is to communicate the preliminary results of the selection process for RFP 25-007-075, which requested modernization and maintenance services for the school district's elevators. ABEC Elevator was selected as the respondent and will be awarded a contract for the period of November 1, 2024 to June 30, 2030.
The tabulations provide a detailed comparison of the three responding vendors, including their proposed annual maintenance costs, total modernization costs, and scored evaluation criteria such as respondent information, letters of recommendation, business capability, cost proposal, and required paperwork. ABEC Elevator received the highest total calculated score of 61, followed by Premier Elevator DBA Elevated with a score of 57 and TK Elevator with a score of 41. The document also includes notes regarding any deficiencies or exceptions in the vendors' proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Elevator Modernization and Maintenance for Fa.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fayette County Public Schools Purchasing Department
205 LaFayette Avenue, LaFayette Educational Center, Building A, Fayetteville, GA 30214
(770) 460-3535 ext. 1043 or purchasing@fcboe.org
Notice of Intent to Award Elevator Modernization and Maintenance for Fayette County Public Schools (RFP 25-007-075)
October 23, 2024
The Fayette County Public Schools Purchasing Department would like to thank all respondents who participated in this solicitation.
The intent of this notice is to communicate the preliminary results of the selection process performed by the Purchasing Department and end-users. This is not an acceptance of your response, nor is it a confirmation of a contract or order. Based on the dollar value of this solicitation, final approval may be required from the Superintendent or the Board of Education as required by policy.
Selected Respondent:
ABEC Elevator 3343 Peachtree Road, Suite 145-988 Atlanta, Georgia 30326
Award Term:
November 1, 2024 - June 30, 2030
The following staff may be contacted for more information:
For project coordination including ordering and delivery:
Scott Hindman, Lead Electronic Technician 770-460-3522 or hindman.scott@fcboe.org
For contract/solicitation questions:
Jamie Marrero, Purchasing Associate 770-460-3522 or marrero.jamie@fcboe.org
For accounts payable or billing information:
Finance Department, Accounts Payable 770-460-3535 or invoices.finance@fcboe.org
Attachments:
Tabulations...
mailto:purchasing@mail.fcboe.org mailto:hindman.scott@fcboe.org mailto:marrero.jamie@fcboe.org mailto:invoices.finance@mail.fcboe.org
Tabulations
Vendor Name Tabulated
Score
Annual Maintenance
Cost
Total Modernization
Cost TK Elevator 41 $16,800.00 $788,130.00 Premier Elevator DBA Elevated 57 $15,120.00 $1,118,900.00 ABEC Elevator 61 $13,440.00 $962,820.00
Bid Analysis
TK Elevator Premier Elevator DBA Elevated ABEC Elevator Annual Maintenance Cost $16,800.00 $15,120.00 $13,440.00 Total Modernization Cost $788,130.00 [1] $1,118,900.00 $962,820.00 [2]
SPECIFICATION SCORE SCORE SCORE
Completed Form Required Respondent Information Excellent (4) Respondent Information Excellent (4) Respondent Information Excellent (4) Completed Form Required Letters of Recommendation Poor (0) [3] Letters of Recommendation Excellent (4) Letters of Recommendation Excellent (4) [4] Completed Form Required Business Capability Fair (2) [5] Business Capability Fair (2) [6] Business Capability Excellent (4) Completed Form Required Cost Proposal Excellent (4) Cost Proposal Excellent (4) Cost Proposal Excellent (4) Complete Paperwork Required W-9 Excellent (4) W-9 Excellent (4) W-9 Excellent (4) Complete Paperwork Required Certificate of Insurance Fair (2) [7] Certificate of Insurance Fair (2) [8] Certificate of Insurance Fair (2) [9] Complete Paperwork Required E-Verify Documents Excellent (4) E-Verify Documents Excellent (4) E-Verify Documents Excellent (4) Bid Submission Paperwork Organization/Documentation Fair (2) [10] Organization/Documentation Excellent (4) Organization/Documentation Excellent (4) Bid Submission Requirement Site Visit Excellent (4) Site Visit Excellent (4) Site Visit Excellent (4) Maintenance Cost $16,800.00 Good (3) $15,120.00 Good (3) $13,440.00 Excellent (4) Modernization Cost $788,130.00 Excellent (4) $1,118,900.00 Fair (2) $962,820.00 Good (3) Regular Service Rate (Per Hour) $349.78 Poor (0) $150.00 Excellent (4) $195.00 [11] Good (3) Emergency Service Rate (Per Hour) $594.63 [12] Poor (0) $150.00 Excellent (4) $195.00 [13] Good (3) Repair Labor Rate (Per Hour) $629.61 Poor (0) $150.00 Excellent (4) $195.00 [14] Good (3) Helper Labor Rate (Per Hour) $279.83 Poor (0) $125.00 Excellent (4) $156.00 [15] Good (3) Travel Charge (Mileage Included) $0.00 Excellent (4) $150.00 Poor (0) $195.00 [16] Poor (0) Service Charge (Per Service/Repair) $95.00 Poor (0) $0.00 Excellent (4) $0.00 Excellent (4) Fuel Surcharge (Per Service/Repair) $0.00 Excellent (4) $4.00 Poor (0) $0.00 Excellent (4)
TOTAL CALCULATED SCORE 41 57 61
Notes
[1] TK Elevator Modernization recommendations include additional work outside of solicitation work scope. Total cost for recommended modernization $1,022,580.00
Modernization Proposal includes Initial Progress Payment of 50%**
[2] ABEC Elevator recommendation is to completely bring all elevators to compliance without a complete modernization of every elevator. Total cost $404,370.00
[3] TK Elevator did not provide Letters of Recommendation, as required.
[4] ABEC Elevator provided four (4) Letters of Recommendation. More than required.
[5] TK Elevator did not notarize Business Capability Form, as required.
[6] Premier Elevator DBA Elevated did not notarize Business Capability Form, as required.
[7] TK Elevator provided only a current Sample Certificate of Insurance and not a current listing Fayette County Public Schools as the Certificate Holder, as required.
[8] Premier Elevator DBA Elevated only provided current proof Certificate of Insurance but did not list Fayette County Public Schools listed as the Certificate Holder, as required.
[9] ABEC Elevator provided current Certificate of Insurance but did not list Fayette County Public Schools as the Certificate Holder, as required.
[10] TK Elevator is missing supporting documentation with bid submission.
[11] ABEC Elevator Regular Service Rate has a two (2) hour minimum
[12] TK Elevator Emergency Service Rate has a two (2) hour minimum
[13] ABEC Elevator Emergency Service Rate has a two (2) hour minimum
[14] ABEC Elevator Repair Labor Rate has a two (2) hour minimum
[15] ABEC Elevator Helper Labor Rate has a two (2) hour minimum
[16] ABEC Elevator Travel Charge includes sixty (60) miles
| Intent to Award Notice_ RFP 25-007-075 |
| Tabulations_ Elevator Modernization and Maintenance for Fayette County Public Schools (RFP 25-007-075) (1) |
File details come from the government source that posted it. Updated .