AWARD Cypress Mulch for Fayette County Public.pdf
PDF 55 KB Posted
- Solicitation number
- PE-65615-NONST-2024-000000019
- Issued by
- Fayette County, Georgia
About this file
The document is the Evaluation Notes for the Request for Quote (RFQ 24-028-075) for providing, delivering, and installing cypress mulch to Fayette County Public Schools in Georgia. The RFQ was awarded to two vendors: Super Mulch/Complete Resource Management for bagged mulch and 770 Tree Guy for loose mulch with blow-in service. The pricing for the bagged mulch is $1.975 per cubic foot, the loose mulch is $1.30 per cubic foot, and the blow-in service for loose mulch is $1.85 per cubic foot. Both awarded vendors met all the general and technical specifications outlined in the RFQ.
The pricing structures, delivery, and installation services provided by the awarded vendors are the key details of this contract opportunity. The pricing appears competitive, and the vendors have demonstrated the capability to fulfill the requirements of the RFQ.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cypress Mulch for Fayette County Public Schoo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Evaluation Notes Cypress Mulch for Fayette County Public Schools (RFQ 24-028-075)
Super Mulch/Complete Resource Management (Awarded: Bagged Mulch)
Pricing:
● Cypress Mulch (Bagged) Cost per Cubic Foot: $1.975
● Cypress Mulch (Loose) Cost per Cubic Foot: $1.30
● Blow-in Service for Loose Mulch Cost per Cubic Foot: NO BID
General Specifications Scoring Notes
● All general specifications were met.
Technical Specifications Scoring Notes
● All technical specifications were met.
770 Tree Guy (Awarded: Loose Mulch with Blow-in Service)
Pricing:
● Cypress Mulch (Bagged) Cost per Cubic Foot: $2.02
● Cypress Mulch (Loose) Cost per Cubic Foot: $1.26
● Blow-in Service for Loose Mulch Cost per Cubic Foot: $1.85
General Specifications Scoring Notes
● All general specifications were met.
Technical Specifications Scoring Notes
● All technical specifications were met.
File details come from the government source that posted it. Updated .