Award_BidTabulation_WY NP GRTE 13(1).pdf

PDF 157 KB Posted

Attached to
WY NP GRTE 13(1), Repair North Park Road at Milepost 15. 8
Solicitation number
69056726F00069N
Issued by

About this file

This is a Bid Tabulation Report for a road repair construction project in Grand Teton National Park, Wyoming. The project, designated WY NP GRTE 13(1), involves repairs to North Park Road at Milepost 15.8 and is managed by the Western Federal Lands Highway Division (WFLHD) in Vancouver, Washington. The solicitation number is 69056726R000006, with bids opened on May 5, 2026, and the contract awarded to Missouri River Contractors LLC on May 19, 2026, at a bid amount of $1,626,895.00. The Engineer's Estimate for the project was $1,122,159.30, and the other responsive bids ranged from $1,685,669.00 (H-K Contractors, Inc.) to $2,565,270.00 (Oftedal Construction, Inc.).

The project encompasses numerous line items covering mobilization, construction survey and staking, quality control, testing, scheduling, soil erosion control, clearing and grubbing, culvert removal and installation, roadway excavation, aggregate base work, asphalt concrete pavement, underdrains, equipment rental (dump trucks, backhoes, rollers, excavators), labor, signage and delineator work, pavement markings, and extensive temporary traffic control measures including traffic signal systems, cones, drums, pavement markings, construction signs, flaggers, and traffic control supervisors. The report details unit prices and extended amounts for each line item across all four contractors, providing a comprehensive itemized comparison of their bids on a Schedule A basis for this base contract award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TABULATION REPORT

Project No. : WY NP GRTE 13(1) Project Name: Repair North Park Road at Milepost 15.8

Contractor Responsive? Base Schedule A

OFTEDAL CONSTRUCTION, INC. $2,565,270.00

M.A. DeAtley Construction, Inc. $2,268,100.00

H-K CONTRACTORS, INC $1,685,669.00

Missouri River Contractors LLC $1,626,895.00 Engineer's Estimate $1,122,159.30

Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Rebekah Webb

Project No. : WY NP GRTE 13(1) Project Name: Repair North Park Road at Milepost 15.8

Division: Western Federal Lands

Schedule: A Schedule Type: Base Lead Designer: Joshua Christopher Solicitation No. : 69056726R000006 Opened at: WFLHD Vancouver, WA

Opened by: Rebekah Webb

State: WY County: Teton Federal Land: Grand Teton National

Park Bid Open Date and Time: 05/05/2026

Contract Awarded to: Award Date:

Contractor Comment Bid Amount Responsive

OFTEDAL CONSTRUCTION,

INC.,

206 HIGHWAY 59 N,

PO BOX,

MILES CITY,

MT,

59301

$2,565,270.00

M.A. DeAtley Construction, Inc., 829 Evans Rd., Clarkston, WA, 99403

$2,268,100.00

H-K CONTRACTORS, INC,

P.O. BOX 51450,

Idaho Falls, ID, 83405

$1,685,669.00

Missouri River Contractors LLC, 2385 McClellan Creek Road, East Helena, MT, 59635

$1,626,895.00

Engineer's Estimate $1,122,159.30

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Date:

Project No. : WY NP GRTE 13(1) Project Name: Repair North Park Road at Milepost 15.8

Schedule: A Schedule Type: Base

Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Rebekah Webb

REBEKAH

RUTH WEBB

Digitally signed by

REBEKAH RUTH WEBB

Date: 2026.05.06 13:43:12 -07'00'

05/19/2026Missouri River Contractors

Line Item Number

Pay Item Number Description Contractor Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION OFTEDAL

CONSTRUCTION, INC. $750,000.00

M.A. DeAtley Construction, Inc. $550,000.00

H-K CONTRACTORS,

INC $434,511.50

Missouri River Contractors LLC $313,000.00

Engineer's Estimate ALL LPSM LPSM $187,026.60

A0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

M.A. DeAtley Construction, Inc. $100,000.00

H-K CONTRACTORS,

INC $50,000.00

OFTEDAL

CONSTRUCTION, INC. $50,000.00

Missouri River Contractors LLC $31,000.00

Engineer's Estimate ALL LPSM LPSM $17,292.20

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL

M.A. DeAtley Construction, Inc. $150,000.00

OFTEDAL

CONSTRUCTION, INC. $150,000.00

H-K CONTRACTORS,

INC $100,000.00

Missouri River Contractors LLC $85,000.00

Engineer's Estimate ALL LPSM LPSM $25,938.30

A0080 15401-0000 CONTRACTOR

TESTING

OFTEDAL

CONSTRUCTION, INC. $241,000.00

M.A. DeAtley Construction, Inc. $150,000.00

H-K CONTRACTORS,

INC $100,000.00

Missouri River Contractors LLC $25,000.00

Engineer's Estimate ALL LPSM LPSM $17,292.20

A0100 15501-0000 CONSTRUCTION

SCHEDULE

H-K CONTRACTORS,

INC $50,000.00

OFTEDAL

CONSTRUCTION, INC. $20,000.00

Missouri River Contractors LLC $10,000.00

M.A. DeAtley Construction, Inc. $5,000.00

Engineer's Estimate ALL LPSM LPSM $10,000.00

Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0120 15705-1400 SOIL EROSION

CONTROL, FIBER

ROLL

Missouri River Contractors LLC 840.000 $35.00 $29,400.00

M.A. DeAtley Construction, Inc. 840.000 $30.00 $25,200.00

H-K CONTRACTORS,

INC 840.000 $20.00 $16,800.00

OFTEDAL

CONSTRUCTION, INC. 840.000 $20.00 $16,800.00

Engineer's Estimate 840.000 LNFT $15.00 $12,600.00

A0140 20101-0000 CLEARING AND

GRUBBING

M.A. DeAtley Construction, Inc. 0.200 $200,000.00 $40,000.00

Missouri River Contractors LLC 0.200 $100,000.00 $20,000.00

H-K CONTRACTORS,

INC 0.200 $82,000.00 $16,400.00

OFTEDAL

CONSTRUCTION, INC. 0.200 $50,000.00 $10,000.00

Engineer's Estimate 0.200 ACRE $18,000.00 $3,600.00

A0160 20301-1900 REMOVAL OF PIPE

CULVERT

Missouri River Contractors LLC 1.000 $30,000.00 $30,000.00

H-K CONTRACTORS,

INC 1.000 $15,000.00 $15,000.00

M.A. DeAtley Construction, Inc. 1.000 $10,000.00 $10,000.00

OFTEDAL

CONSTRUCTION, INC. 1.000 $5,000.00 $5,000.00

Engineer's Estimate 1.000 EACH $6,000.00 $6,000.00

A0180 20401-0000 ROADWAY

EXCAVATION

OFTEDAL

CONSTRUCTION, INC. 1,380.000 $250.00 $345,000.00

Missouri River Contractors LLC 1,380.000 $190.00 $262,200.00

M.A. DeAtley Construction, Inc. 1,380.000 $150.00 $207,000.00

H-K CONTRACTORS,

INC 1,380.000 $121.00 $166,980.00

Engineer's Estimate 1,380.000 CUYD $85.00 $117,300.00

A0200 20410-0000 SELECT BORROW OFTEDAL

CONSTRUCTION, INC. 800.000 $275.00 $220,000.00

M.A. DeAtley Construction, Inc. 800.000 $235.00 $188,000.00

H-K CONTRACTORS,

INC 800.000 $220.00 $176,000.00

Missouri River Contractors LLC 800.000 $209.00 $167,200.00

Engineer's Estimate 800.000 CUYD $150.00 $120,000.00

A0220 20702-0000 STABILIZATION

GEOTEXTILE

OFTEDAL

CONSTRUCTION, INC. 2,800.000 $15.00 $42,000.00

Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0220 20702-0000 STABILIZATION

GEOTEXTILE

M.A. DeAtley Construction, Inc. 2,800.000 $10.00 $28,000.00

H-K CONTRACTORS,

INC 2,800.000 $9.00 $25,200.00

Missouri River Contractors LLC 2,800.000 $6.50 $18,200.00

Engineer's Estimate 2,800.000 SQYD $6.00 $16,800.00

A0240 30202-2000 ROADWAY

AGGREGATE,

METHOD 2

M.A. DeAtley Construction, Inc. 580.000 $230.00 $133,400.00

OFTEDAL

CONSTRUCTION, INC. 580.000 $175.00 $101,500.00

Missouri River Contractors LLC 580.000 $150.00 $87,000.00

H-K CONTRACTORS,

INC 580.000 $115.00 $66,700.00

Engineer's Estimate 580.000 TON $150.00 $87,000.00

A0260 40301-0100 ASPHALT

CONCRETE

PAVEMENT, TYPE 1

H-K CONTRACTORS,

INC 260.000 $525.00 $136,500.00

M.A. DeAtley Construction, Inc. 260.000 $500.00 $130,000.00

Missouri River Contractors LLC 260.000 $500.00 $130,000.00

OFTEDAL

CONSTRUCTION, INC. 260.000 $375.00 $97,500.00

Engineer's Estimate 260.000 TON $450.00 $117,000.00

A0280 60201-0800 24-INCH PIPE

CULVERT

Missouri River Contractors LLC 85.000 $875.00 $74,375.00

M.A. DeAtley Construction, Inc. 85.000 $750.00 $63,750.00

H-K CONTRACTORS,

INC 85.000 $500.00 $42,500.00

OFTEDAL

CONSTRUCTION, INC. 85.000 $225.00 $19,125.00

Engineer's Estimate 85.000 LNFT $520.00 $44,200.00

A0300 60501-0000 STANDARD

UNDERDRAIN

SYSTEM

Missouri River Contractors LLC 210.000 $200.00 $42,000.00

OFTEDAL

CONSTRUCTION, INC. 210.000 $150.00 $31,500.00

H-K CONTRACTORS,

INC 210.000 $130.00 $27,300.00

M.A. DeAtley Construction, Inc. 210.000 $130.00 $27,300.00

Engineer's Estimate 210.000 LNFT $80.00 $16,800.00

A0320 62201-0250 DUMP TRUCK, 10

CUBIC YARD

MINIMUM

CAPACITY

M.A. DeAtley Construction, Inc. 40.000 $250.00 $10,000.00

OFTEDAL

CONSTRUCTION, INC. 40.000 $185.00 $7,400.00

Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0320 62201-0250 DUMP TRUCK, 10

CUBIC YARD

MINIMUM

CAPACITY

Missouri River Contractors LLC 40.000 $160.00 $6,400.00

H-K CONTRACTORS,

INC 40.000 $150.00 $6,000.00

Engineer's Estimate 40.000 HOUR $180.00 $7,200.00 A0340 62201-0350 BACKHOE LOADER M.A. DeAtley

Construction, Inc. 40.000 $275.00 $11,000.00

OFTEDAL

CONSTRUCTION, INC. 40.000 $200.00 $8,000.00

Missouri River Contractors LLC 40.000 $165.00 $6,600.00

H-K CONTRACTORS,

INC 40.000 $150.00 $6,000.00

Engineer's Estimate 40.000 HOUR $210.00 $8,400.00 A0360 62201-2050 ROLLER M.A. DeAtley

Construction, Inc. 40.000 $225.00 $9,000.00

OFTEDAL

CONSTRUCTION, INC. 40.000 $200.00 $8,000.00

Missouri River Contractors LLC 40.000 $155.00 $6,200.00

H-K CONTRACTORS,

INC 40.000 $150.00 $6,000.00

Engineer's Estimate 40.000 HOUR $150.00 $6,000.00

A0380 62201-3100 HYDRAULIC

EXCAVATOR, 3/4

CUBIC YARD

MINIMUM

CAPACITY WITH

THUMB

ATTACHMENT

OFTEDAL

CONSTRUCTION, INC. 40.000 $300.00 $12,000.00

M.A. DeAtley Construction, Inc. 40.000 $250.00 $10,000.00

Missouri River Contractors LLC 40.000 $200.00 $8,000.00

H-K CONTRACTORS,

INC 40.000 $180.00 $7,200.00

Engineer's Estimate 40.000 HOUR $200.00 $8,000.00

A0400 62301-0000 GENERAL LABOR OFTEDAL

CONSTRUCTION, INC. 80.000 $150.00 $12,000.00

M.A. DeAtley Construction, Inc. 80.000 $125.00 $10,000.00

H-K CONTRACTORS,

INC 80.000 $100.00 $8,000.00

Missouri River Contractors LLC 80.000 $100.00 $8,000.00

Engineer's Estimate 80.000 HOUR $110.00 $8,800.00

A0420 63316-1000 REMOVE AND

RESET SIGN

SYSTEM

OFTEDAL

CONSTRUCTION, INC. 2.000 $4,000.00 $8,000.00

H-K CONTRACTORS,

INC 2.000 $2,370.00 $4,740.00

Missouri River Contractors LLC 2.000 $2,250.00 $4,500.00

Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0420 63316-1000 REMOVE AND

RESET SIGN

SYSTEM

M.A. DeAtley Construction, Inc. 2.000 $400.00 $800.00

Engineer's Estimate 2.000 EACH $850.00 $1,700.00

A0440 63316-2000 REMOVE AND

RESET DELINEATOR

OFTEDAL

CONSTRUCTION, INC. 2.000 $210.00 $420.00

H-K CONTRACTORS,

INC 2.000 $185.00 $370.00

Missouri River Contractors LLC 2.000 $175.00 $350.00

M.A. DeAtley Construction, Inc. 2.000 $100.00 $200.00

Engineer's Estimate 2.000 EACH $130.00 $260.00

A0460 63401-0300 PAVEMENT

MARKINGS, TYPE B,

SOLID (WHITE)

OFTEDAL

CONSTRUCTION, INC. 1,600.000 $4.50 $7,200.00

M.A. DeAtley Construction, Inc. 1,600.000 $4.00 $6,400.00

H-K CONTRACTORS,

INC 1,600.000 $3.75 $6,000.00

Missouri River Contractors LLC 1,600.000 $3.60 $5,760.00

Engineer's Estimate 1,600.000 LNFT $8.00 $12,800.00

A0480 63401-0300 PAVEMENT

MARKINGS, TYPE B,

SOLID (YELLOW)

OFTEDAL

CONSTRUCTION, INC. 1,600.000 $4.50 $7,200.00

M.A. DeAtley Construction, Inc. 1,600.000 $4.00 $6,400.00

H-K CONTRACTORS,

INC 1,600.000 $3.75 $6,000.00

Missouri River Contractors LLC 1,600.000 $3.60 $5,760.00

Engineer's Estimate 1,600.000 LNFT $8.00 $12,800.00

A0500 63501-2000 TEMPORARY

TRAFFIC CONTROL,

TRAFFIC SIGNAL

SYSTEM

M.A. DeAtley Construction, Inc. $150,000.00

OFTEDAL

CONSTRUCTION, INC. $70,000.00

H-K CONTRACTORS,

INC $42,000.00

Missouri River Contractors LLC $39,900.00

Engineer's Estimate ALL LPSM LPSM $35,000.00

A0520 63502-0700 TEMPORARY

TRAFFIC CONTROL,

CONE

OFTEDAL

CONSTRUCTION, INC. 50.000 $70.00 $3,500.00

H-K CONTRACTORS,

INC 50.000 $58.00 $2,900.00

Missouri River Contractors LLC 50.000 $55.00 $2,750.00

M.A. DeAtley Construction, Inc. 50.000 $45.00 $2,250.00

Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0520 63502-0700 TEMPORARY

TRAFFIC CONTROL,

CONE

Engineer's Estimate 50.000 EACH $90.00 $4,500.00

A0540 63502-1300 TEMPORARY

TRAFFIC CONTROL,

DRUM

M.A. DeAtley Construction, Inc. 50.000 $150.00 $7,500.00

OFTEDAL

CONSTRUCTION, INC. 50.000 $80.00 $4,000.00

H-K CONTRACTORS,

INC 50.000 $72.00 $3,600.00

Missouri River Contractors LLC 50.000 $68.00 $3,400.00

Engineer's Estimate 50.000 EACH $140.00 $7,000.00

A0560 63503-0700 TEMPORARY

TRAFFIC CONTROL,

PAVEMENT

MARKINGS

M.A. DeAtley Construction, Inc. 850.000 $2.00 $1,700.00

OFTEDAL

CONSTRUCTION, INC. 850.000 $1.50 $1,275.00

H-K CONTRACTORS,

INC 850.000 $1.05 $892.50

Missouri River Contractors LLC 850.000 $1.00 $850.00

Engineer's Estimate 850.000 LNFT $8.00 $6,800.00

A0580 63504-1000 TEMPORARY

TRAFFIC CONTROL,

CONSTRUCTION

SIGN

OFTEDAL

CONSTRUCTION, INC. 90.000 $65.00 $5,850.00

H-K CONTRACTORS,

INC 90.000 $47.50 $4,275.00

Missouri River Contractors LLC 90.000 $45.00 $4,050.00

M.A. DeAtley Construction, Inc. 90.000 $30.00 $2,700.00

Engineer's Estimate 90.000 SQFT $95.00 $8,550.00

A0600 63506-0500 TEMPORARY

TRAFFIC CONTROL,

FLAGGER

Missouri River Contractors LLC 700.000 $80.00 $56,000.00

OFTEDAL

CONSTRUCTION, INC. 700.000 $80.00 $56,000.00

M.A. DeAtley Construction, Inc. 700.000 $75.00 $52,500.00

H-K CONTRACTORS,

INC 700.000 $69.00 $48,300.00

Engineer's Estimate 700.000 HOUR $65.00 $45,500.00

A0620 63507-0700 TEMPORARY

TRAFFIC CONTROL,

TRAFFIC CONTROL

SUPERVISOR

OFTEDAL

CONSTRUCTION, INC. 60.000 $4,250.00 $255,000.00

M.A. DeAtley Construction, Inc. 60.000 $3,000.00 $180,000.00

Missouri River Contractors LLC 60.000 $2,400.00 $144,000.00

H-K CONTRACTORS,

INC 60.000 $1,825.00 $109,500.00

Engineer's Estimate 60.000 DAY $2,500.00 $150,000.00

Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]