Award_BidTabulation_WY NP GRTE 13(1).pdf
PDF 157 KB Posted
- Solicitation number
- 69056726F00069N
About this file
This is a Bid Tabulation Report for a road repair construction project in Grand Teton National Park, Wyoming. The project, designated WY NP GRTE 13(1), involves repairs to North Park Road at Milepost 15.8 and is managed by the Western Federal Lands Highway Division (WFLHD) in Vancouver, Washington. The solicitation number is 69056726R000006, with bids opened on May 5, 2026, and the contract awarded to Missouri River Contractors LLC on May 19, 2026, at a bid amount of $1,626,895.00. The Engineer's Estimate for the project was $1,122,159.30, and the other responsive bids ranged from $1,685,669.00 (H-K Contractors, Inc.) to $2,565,270.00 (Oftedal Construction, Inc.).
The project encompasses numerous line items covering mobilization, construction survey and staking, quality control, testing, scheduling, soil erosion control, clearing and grubbing, culvert removal and installation, roadway excavation, aggregate base work, asphalt concrete pavement, underdrains, equipment rental (dump trucks, backhoes, rollers, excavators), labor, signage and delineator work, pavement markings, and extensive temporary traffic control measures including traffic signal systems, cones, drums, pavement markings, construction signs, flaggers, and traffic control supervisors. The report details unit prices and extended amounts for each line item across all four contractors, providing a comprehensive itemized comparison of their bids on a Schedule A basis for this base contract award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : WY NP GRTE 13(1) Project Name: Repair North Park Road at Milepost 15.8
Contractor Responsive? Base Schedule A
OFTEDAL CONSTRUCTION, INC. $2,565,270.00
M.A. DeAtley Construction, Inc. $2,268,100.00
H-K CONTRACTORS, INC $1,685,669.00
Missouri River Contractors LLC $1,626,895.00 Engineer's Estimate $1,122,159.30
Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
Project No. : WY NP GRTE 13(1) Project Name: Repair North Park Road at Milepost 15.8
Division: Western Federal Lands
Schedule: A Schedule Type: Base Lead Designer: Joshua Christopher Solicitation No. : 69056726R000006 Opened at: WFLHD Vancouver, WA
Opened by: Rebekah Webb
State: WY County: Teton Federal Land: Grand Teton National
Park Bid Open Date and Time: 05/05/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive
OFTEDAL CONSTRUCTION,
INC.,
206 HIGHWAY 59 N,
PO BOX,
MILES CITY,
MT,
59301
$2,565,270.00
M.A. DeAtley Construction, Inc., 829 Evans Rd., Clarkston, WA, 99403
$2,268,100.00
H-K CONTRACTORS, INC,
P.O. BOX 51450,
Idaho Falls, ID, 83405
$1,685,669.00
Missouri River Contractors LLC, 2385 McClellan Creek Road, East Helena, MT, 59635
$1,626,895.00
Engineer's Estimate $1,122,159.30
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Project No. : WY NP GRTE 13(1) Project Name: Repair North Park Road at Milepost 15.8
Schedule: A Schedule Type: Base
Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
REBEKAH
RUTH WEBB
Digitally signed by
REBEKAH RUTH WEBB
Date: 2026.05.06 13:43:12 -07'00'
05/19/2026Missouri River Contractors
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION OFTEDAL
CONSTRUCTION, INC. $750,000.00
M.A. DeAtley Construction, Inc. $550,000.00
H-K CONTRACTORS,
INC $434,511.50
Missouri River Contractors LLC $313,000.00
Engineer's Estimate ALL LPSM LPSM $187,026.60
A0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
M.A. DeAtley Construction, Inc. $100,000.00
H-K CONTRACTORS,
INC $50,000.00
OFTEDAL
CONSTRUCTION, INC. $50,000.00
Missouri River Contractors LLC $31,000.00
Engineer's Estimate ALL LPSM LPSM $17,292.20
A0060 15301-0000 CONTRACTOR
QUALITY CONTROL
M.A. DeAtley Construction, Inc. $150,000.00
OFTEDAL
CONSTRUCTION, INC. $150,000.00
H-K CONTRACTORS,
INC $100,000.00
Missouri River Contractors LLC $85,000.00
Engineer's Estimate ALL LPSM LPSM $25,938.30
A0080 15401-0000 CONTRACTOR
TESTING
OFTEDAL
CONSTRUCTION, INC. $241,000.00
M.A. DeAtley Construction, Inc. $150,000.00
H-K CONTRACTORS,
INC $100,000.00
Missouri River Contractors LLC $25,000.00
Engineer's Estimate ALL LPSM LPSM $17,292.20
A0100 15501-0000 CONSTRUCTION
SCHEDULE
H-K CONTRACTORS,
INC $50,000.00
OFTEDAL
CONSTRUCTION, INC. $20,000.00
Missouri River Contractors LLC $10,000.00
M.A. DeAtley Construction, Inc. $5,000.00
Engineer's Estimate ALL LPSM LPSM $10,000.00
Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0120 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Missouri River Contractors LLC 840.000 $35.00 $29,400.00
M.A. DeAtley Construction, Inc. 840.000 $30.00 $25,200.00
H-K CONTRACTORS,
INC 840.000 $20.00 $16,800.00
OFTEDAL
CONSTRUCTION, INC. 840.000 $20.00 $16,800.00
Engineer's Estimate 840.000 LNFT $15.00 $12,600.00
A0140 20101-0000 CLEARING AND
GRUBBING
M.A. DeAtley Construction, Inc. 0.200 $200,000.00 $40,000.00
Missouri River Contractors LLC 0.200 $100,000.00 $20,000.00
H-K CONTRACTORS,
INC 0.200 $82,000.00 $16,400.00
OFTEDAL
CONSTRUCTION, INC. 0.200 $50,000.00 $10,000.00
Engineer's Estimate 0.200 ACRE $18,000.00 $3,600.00
A0160 20301-1900 REMOVAL OF PIPE
CULVERT
Missouri River Contractors LLC 1.000 $30,000.00 $30,000.00
H-K CONTRACTORS,
INC 1.000 $15,000.00 $15,000.00
M.A. DeAtley Construction, Inc. 1.000 $10,000.00 $10,000.00
OFTEDAL
CONSTRUCTION, INC. 1.000 $5,000.00 $5,000.00
Engineer's Estimate 1.000 EACH $6,000.00 $6,000.00
A0180 20401-0000 ROADWAY
EXCAVATION
OFTEDAL
CONSTRUCTION, INC. 1,380.000 $250.00 $345,000.00
Missouri River Contractors LLC 1,380.000 $190.00 $262,200.00
M.A. DeAtley Construction, Inc. 1,380.000 $150.00 $207,000.00
H-K CONTRACTORS,
INC 1,380.000 $121.00 $166,980.00
Engineer's Estimate 1,380.000 CUYD $85.00 $117,300.00
A0200 20410-0000 SELECT BORROW OFTEDAL
CONSTRUCTION, INC. 800.000 $275.00 $220,000.00
M.A. DeAtley Construction, Inc. 800.000 $235.00 $188,000.00
H-K CONTRACTORS,
INC 800.000 $220.00 $176,000.00
Missouri River Contractors LLC 800.000 $209.00 $167,200.00
Engineer's Estimate 800.000 CUYD $150.00 $120,000.00
A0220 20702-0000 STABILIZATION
GEOTEXTILE
OFTEDAL
CONSTRUCTION, INC. 2,800.000 $15.00 $42,000.00
Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0220 20702-0000 STABILIZATION
GEOTEXTILE
M.A. DeAtley Construction, Inc. 2,800.000 $10.00 $28,000.00
H-K CONTRACTORS,
INC 2,800.000 $9.00 $25,200.00
Missouri River Contractors LLC 2,800.000 $6.50 $18,200.00
Engineer's Estimate 2,800.000 SQYD $6.00 $16,800.00
A0240 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
M.A. DeAtley Construction, Inc. 580.000 $230.00 $133,400.00
OFTEDAL
CONSTRUCTION, INC. 580.000 $175.00 $101,500.00
Missouri River Contractors LLC 580.000 $150.00 $87,000.00
H-K CONTRACTORS,
INC 580.000 $115.00 $66,700.00
Engineer's Estimate 580.000 TON $150.00 $87,000.00
A0260 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
H-K CONTRACTORS,
INC 260.000 $525.00 $136,500.00
M.A. DeAtley Construction, Inc. 260.000 $500.00 $130,000.00
Missouri River Contractors LLC 260.000 $500.00 $130,000.00
OFTEDAL
CONSTRUCTION, INC. 260.000 $375.00 $97,500.00
Engineer's Estimate 260.000 TON $450.00 $117,000.00
A0280 60201-0800 24-INCH PIPE
CULVERT
Missouri River Contractors LLC 85.000 $875.00 $74,375.00
M.A. DeAtley Construction, Inc. 85.000 $750.00 $63,750.00
H-K CONTRACTORS,
INC 85.000 $500.00 $42,500.00
OFTEDAL
CONSTRUCTION, INC. 85.000 $225.00 $19,125.00
Engineer's Estimate 85.000 LNFT $520.00 $44,200.00
A0300 60501-0000 STANDARD
UNDERDRAIN
SYSTEM
Missouri River Contractors LLC 210.000 $200.00 $42,000.00
OFTEDAL
CONSTRUCTION, INC. 210.000 $150.00 $31,500.00
H-K CONTRACTORS,
INC 210.000 $130.00 $27,300.00
M.A. DeAtley Construction, Inc. 210.000 $130.00 $27,300.00
Engineer's Estimate 210.000 LNFT $80.00 $16,800.00
A0320 62201-0250 DUMP TRUCK, 10
CUBIC YARD
MINIMUM
CAPACITY
M.A. DeAtley Construction, Inc. 40.000 $250.00 $10,000.00
OFTEDAL
CONSTRUCTION, INC. 40.000 $185.00 $7,400.00
Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0320 62201-0250 DUMP TRUCK, 10
CUBIC YARD
MINIMUM
CAPACITY
Missouri River Contractors LLC 40.000 $160.00 $6,400.00
H-K CONTRACTORS,
INC 40.000 $150.00 $6,000.00
Engineer's Estimate 40.000 HOUR $180.00 $7,200.00 A0340 62201-0350 BACKHOE LOADER M.A. DeAtley
Construction, Inc. 40.000 $275.00 $11,000.00
OFTEDAL
CONSTRUCTION, INC. 40.000 $200.00 $8,000.00
Missouri River Contractors LLC 40.000 $165.00 $6,600.00
H-K CONTRACTORS,
INC 40.000 $150.00 $6,000.00
Engineer's Estimate 40.000 HOUR $210.00 $8,400.00 A0360 62201-2050 ROLLER M.A. DeAtley
Construction, Inc. 40.000 $225.00 $9,000.00
OFTEDAL
CONSTRUCTION, INC. 40.000 $200.00 $8,000.00
Missouri River Contractors LLC 40.000 $155.00 $6,200.00
H-K CONTRACTORS,
INC 40.000 $150.00 $6,000.00
Engineer's Estimate 40.000 HOUR $150.00 $6,000.00
A0380 62201-3100 HYDRAULIC
EXCAVATOR, 3/4
CUBIC YARD
MINIMUM
CAPACITY WITH
THUMB
ATTACHMENT
OFTEDAL
CONSTRUCTION, INC. 40.000 $300.00 $12,000.00
M.A. DeAtley Construction, Inc. 40.000 $250.00 $10,000.00
Missouri River Contractors LLC 40.000 $200.00 $8,000.00
H-K CONTRACTORS,
INC 40.000 $180.00 $7,200.00
Engineer's Estimate 40.000 HOUR $200.00 $8,000.00
A0400 62301-0000 GENERAL LABOR OFTEDAL
CONSTRUCTION, INC. 80.000 $150.00 $12,000.00
M.A. DeAtley Construction, Inc. 80.000 $125.00 $10,000.00
H-K CONTRACTORS,
INC 80.000 $100.00 $8,000.00
Missouri River Contractors LLC 80.000 $100.00 $8,000.00
Engineer's Estimate 80.000 HOUR $110.00 $8,800.00
A0420 63316-1000 REMOVE AND
RESET SIGN
SYSTEM
OFTEDAL
CONSTRUCTION, INC. 2.000 $4,000.00 $8,000.00
H-K CONTRACTORS,
INC 2.000 $2,370.00 $4,740.00
Missouri River Contractors LLC 2.000 $2,250.00 $4,500.00
Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0420 63316-1000 REMOVE AND
RESET SIGN
SYSTEM
M.A. DeAtley Construction, Inc. 2.000 $400.00 $800.00
Engineer's Estimate 2.000 EACH $850.00 $1,700.00
A0440 63316-2000 REMOVE AND
RESET DELINEATOR
OFTEDAL
CONSTRUCTION, INC. 2.000 $210.00 $420.00
H-K CONTRACTORS,
INC 2.000 $185.00 $370.00
Missouri River Contractors LLC 2.000 $175.00 $350.00
M.A. DeAtley Construction, Inc. 2.000 $100.00 $200.00
Engineer's Estimate 2.000 EACH $130.00 $260.00
A0460 63401-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID (WHITE)
OFTEDAL
CONSTRUCTION, INC. 1,600.000 $4.50 $7,200.00
M.A. DeAtley Construction, Inc. 1,600.000 $4.00 $6,400.00
H-K CONTRACTORS,
INC 1,600.000 $3.75 $6,000.00
Missouri River Contractors LLC 1,600.000 $3.60 $5,760.00
Engineer's Estimate 1,600.000 LNFT $8.00 $12,800.00
A0480 63401-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID (YELLOW)
OFTEDAL
CONSTRUCTION, INC. 1,600.000 $4.50 $7,200.00
M.A. DeAtley Construction, Inc. 1,600.000 $4.00 $6,400.00
H-K CONTRACTORS,
INC 1,600.000 $3.75 $6,000.00
Missouri River Contractors LLC 1,600.000 $3.60 $5,760.00
Engineer's Estimate 1,600.000 LNFT $8.00 $12,800.00
A0500 63501-2000 TEMPORARY
TRAFFIC CONTROL,
TRAFFIC SIGNAL
SYSTEM
M.A. DeAtley Construction, Inc. $150,000.00
OFTEDAL
CONSTRUCTION, INC. $70,000.00
H-K CONTRACTORS,
INC $42,000.00
Missouri River Contractors LLC $39,900.00
Engineer's Estimate ALL LPSM LPSM $35,000.00
A0520 63502-0700 TEMPORARY
TRAFFIC CONTROL,
CONE
OFTEDAL
CONSTRUCTION, INC. 50.000 $70.00 $3,500.00
H-K CONTRACTORS,
INC 50.000 $58.00 $2,900.00
Missouri River Contractors LLC 50.000 $55.00 $2,750.00
M.A. DeAtley Construction, Inc. 50.000 $45.00 $2,250.00
Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0520 63502-0700 TEMPORARY
TRAFFIC CONTROL,
CONE
Engineer's Estimate 50.000 EACH $90.00 $4,500.00
A0540 63502-1300 TEMPORARY
TRAFFIC CONTROL,
DRUM
M.A. DeAtley Construction, Inc. 50.000 $150.00 $7,500.00
OFTEDAL
CONSTRUCTION, INC. 50.000 $80.00 $4,000.00
H-K CONTRACTORS,
INC 50.000 $72.00 $3,600.00
Missouri River Contractors LLC 50.000 $68.00 $3,400.00
Engineer's Estimate 50.000 EACH $140.00 $7,000.00
A0560 63503-0700 TEMPORARY
TRAFFIC CONTROL,
PAVEMENT
MARKINGS
M.A. DeAtley Construction, Inc. 850.000 $2.00 $1,700.00
OFTEDAL
CONSTRUCTION, INC. 850.000 $1.50 $1,275.00
H-K CONTRACTORS,
INC 850.000 $1.05 $892.50
Missouri River Contractors LLC 850.000 $1.00 $850.00
Engineer's Estimate 850.000 LNFT $8.00 $6,800.00
A0580 63504-1000 TEMPORARY
TRAFFIC CONTROL,
CONSTRUCTION
SIGN
OFTEDAL
CONSTRUCTION, INC. 90.000 $65.00 $5,850.00
H-K CONTRACTORS,
INC 90.000 $47.50 $4,275.00
Missouri River Contractors LLC 90.000 $45.00 $4,050.00
M.A. DeAtley Construction, Inc. 90.000 $30.00 $2,700.00
Engineer's Estimate 90.000 SQFT $95.00 $8,550.00
A0600 63506-0500 TEMPORARY
TRAFFIC CONTROL,
FLAGGER
Missouri River Contractors LLC 700.000 $80.00 $56,000.00
OFTEDAL
CONSTRUCTION, INC. 700.000 $80.00 $56,000.00
M.A. DeAtley Construction, Inc. 700.000 $75.00 $52,500.00
H-K CONTRACTORS,
INC 700.000 $69.00 $48,300.00
Engineer's Estimate 700.000 HOUR $65.00 $45,500.00
A0620 63507-0700 TEMPORARY
TRAFFIC CONTROL,
TRAFFIC CONTROL
SUPERVISOR
OFTEDAL
CONSTRUCTION, INC. 60.000 $4,250.00 $255,000.00
M.A. DeAtley Construction, Inc. 60.000 $3,000.00 $180,000.00
Missouri River Contractors LLC 60.000 $2,400.00 $144,000.00
H-K CONTRACTORS,
INC 60.000 $1,825.00 $109,500.00
Engineer's Estimate 60.000 DAY $2,500.00 $150,000.00
Report Generated on 05/06/2026 4:21 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]