Award_BidTabulation_WA ERFO FS GIFPN603 2020-1(1)_1.pdf
PDF 622 KB Posted
- Solicitation number
- 69056726C000003
About this file
This is a Bid Tabulation Report for the Gifford Pinchot Repairs 2020, Phase 1 project (Project No.: WA ERFO FS GIFPN603 2020-1(1)) located in Lewis, Pierce, and Skamania counties, Washington. The project is managed by the Western Federal Lands division and involves road and infrastructure repairs in the Gifford Pinchot National Forest. Eight construction companies submitted bids, with total project costs ranging from $1,885,813 (Ironwood Commercial Builders) to $4,839,485 (Q. King Trucking and Construction).
The bid includes detailed line items for various construction activities such as mobilization, soil erosion control, roadway excavation, culvert work, traffic control, and turf establishment. The bid opening occurred on 09/30/2025 at the WFLHD Vancouver, WA office, with Marino Chea as the contracting officer. JJH Earthworks LLC was awarded the contract on 12/09/2025, with a total bid of $2,459,999, which was the second-lowest submitted bid. The project includes multiple complex construction tasks with specific quantities and unit prices for each line item, covering activities like stream diversion, geotextile installation, roadway aggregate placement, and equipment usage.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : WA ERFO FS GIFPN603 2020-1(1) Project Name: Gifford Pinchot Repairs 2020, Phase 1
Contractor Responsive? Base Schedule A
Q. King Trucking and Construction, Inc. $4,839,485.00
Moreno and Nelson Construction Corp
$4,693,333.00
Quigg Bros., Inc. $4,470,867.00
James Dean Construction, Inc $3,515,931.00
Crestline Construction Co. LLC $3,512,229.00
North Cascade Excavating, LLC $3,096,499.00
JJH Earthworks LLC $2,459,999.00
Ironwood Commercial Builders, Inc. $1,885,813.00
Engineer's Estimate $2,632,870.00
Rebekah Webb Cross-Out
Project No. : WA ERFO FS
GIFPN603 2020-1(1)
Project Name: Gifford Pinchot Repairs 2020, Phase
Division: Western Federal Lands
Schedule: A Schedule Type: Base Lead Designer:
Solicitation No. : 69056724B000011 Opened at: WFLHD Vancouver, WA
Opened by: Marino Chea
State: WA County: Lewis, Pierce, Skamania
Federal Land: Gifford Pinchot National Forest
Bid Open Date and Time: 09/30/2025
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive
Q. King Trucking and Construction, Inc., 473 Peters Rd., Randle, 98377
$4,839,485.00
Moreno and Nelson Construction Corp, PO Box 794, Walla Walla, 99362
$4,693,333.00
Quigg Bros., Inc., 819 West State Street, Aberdeen, 98520
$4,470,867.00
James Dean Construction, Inc, 579 Hwy 141, White Salmon, 98672
$3,515,931.00
Crestline Construction Co. LLC, 3600 Crates Way #100, The Dalles, 97058
$3,512,229.00
North Cascade Excavating, LLC, 428 N Pekin Rd, Woodland, 98674
$3,096,499.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
JJH Earthworks, LLC 12/09/2025
JJH Earthworks LLC, 19318 Electron Rd E, Orting, 98360
$2,459,999.00
Ironwood Commercial Builders, Inc., 3953 Industrial Way Suite E, Concord, 94520
$1,885,813.00
Engineer's Estimate $2,632,870.00
Project No. : WA ERFO FS GIFPN603 2020-1(1) Project Name: Gifford Pinchot Repairs 2020, Phase
Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION North Cascade Excavating, LLC
$715,000.00
Quigg Bros., Inc. $450,000.00
Q. King Trucking and Construction, Inc.
$400,000.00
Moreno and Nelson Construction Corp
$360,561.00
Crestline Construction Co. LLC
$350,000.00
James Dean Construction, Inc
$350,000.00
JJH Earthworks LLC $140,000.00
Ironwood Commercial Builders, Inc.
$89,163.00
Engineer's Estimate ALL LPSM LPSM $238,000.00
A0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Q. King Trucking and Construction, Inc. $150,000.00
James Dean Construction, Inc
$100,000.00
Quigg Bros., Inc. $100,000.00
North Cascade Excavating, LLC
$65,000.00
Moreno and Nelson Construction Corp
$59,190.00
JJH Earthworks LLC $50,000.00
Crestline Construction Co. LLC $35,000.00
Ironwood Commercial Builders, Inc.
$22,670.00
Engineer's Estimate ALL LPSM LPSM $60,000.00
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0060 15301-0010 CONTRACTOR
QUALITY CONTROL
AND ASSURANCE
North Cascade Excavating, LLC
$220,000.00
Moreno and Nelson Construction Corp $190,590.00
Quigg Bros., Inc. $180,000.00
Crestline Construction Co. LLC $155,000.00
James Dean Construction, Inc
$150,000.00
JJH Earthworks LLC $150,000.00
Q. King Trucking and Construction, Inc.
$150,000.00
Ironwood Commercial Builders, Inc.
$22,502.00
Engineer's Estimate ALL LPSM LPSM $60,000.00
A0080 15401-0000 CONTRACTOR
TESTING
Quigg Bros., Inc. $190,000.00
James Dean Construction, Inc
$150,000.00
Q. King Trucking and Construction, Inc. $150,000.00
JJH Earthworks LLC $100,000.00
North Cascade Excavating, LLC
$55,000.00
Moreno and Nelson Construction Corp
$47,350.00
Crestline Construction Co. LLC
$42,000.00
Ironwood Commercial Builders, Inc.
$21,158.00
Engineer's Estimate ALL LPSM LPSM $60,000.00
A0100 15501-0000 CONSTRUCTION
SCHEDULE
Q. King Trucking and Construction, Inc. $50,000.00
Crestline Construction Co. LLC $25,000.00
James Dean Construction, Inc
$25,000.00
Quigg Bros., Inc. $20,000.00
Ironwood Commercial Builders, Inc.
$13,502.00
North Cascade Excavating, LLC $6,000.00
Moreno and Nelson Construction Corp $5,390.00
JJH Earthworks LLC $5,000.00
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0100 15501-0000 CONSTRUCTION
SCHEDULE
Engineer's Estimate ALL LPSM LPSM $10,000.00
A0120 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION (NF-
2810 M.P. 0.9)
Moreno and Nelson Construction Corp $25,830.00
JJH Earthworks LLC $25,000.00
Q. King Trucking and Construction, Inc. $25,000.00
North Cascade Excavating, LLC
$20,000.00
Ironwood Commercial Builders, Inc.
$10,972.00
James Dean Construction, Inc
$8,000.00
Crestline Construction Co. LLC $6,000.00
Quigg Bros., Inc. $5,000.00
Engineer's Estimate ALL LPSM LPSM $3,000.00
A0140 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION (NF-
2810 M.P. 1.3)
Moreno and Nelson Construction Corp
$25,830.00
JJH Earthworks LLC $25,000.00
Q. King Trucking and Construction, Inc.
$25,000.00
North Cascade Excavating, LLC $20,000.00
Ironwood Commercial Builders, Inc.
$12,539.00
James Dean Construction, Inc $8,000.00
Crestline Construction Co. LLC
$6,000.00
Quigg Bros., Inc. $5,000.00
Engineer's Estimate ALL LPSM LPSM $5,000.00
A0160 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION (NF-
5900 M.P. 0.6)
Moreno and Nelson Construction Corp $36,120.00
JJH Earthworks LLC $25,000.00
Q. King Trucking and Construction, Inc. $25,000.00
Ironwood Commercial Builders, Inc.
$21,316.00
North Cascade Excavating, LLC $20,000.00
Quigg Bros., Inc. $20,000.00
James Dean Construction, Inc
$8,000.00
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0160 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION (NF-
5900 M.P. 0.6)
Crestline Construction Co. LLC
$6,000.00
Engineer's Estimate ALL LPSM LPSM $6,000.00
A0180 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION (NF-
5900 M.P. 0.9)
Moreno and Nelson Construction Corp
$25,830.00
JJH Earthworks LLC $25,000.00
Q. King Trucking and Construction, Inc.
$25,000.00
North Cascade Excavating, LLC $20,000.00
Quigg Bros., Inc. $20,000.00
James Dean Construction, Inc $8,000.00
Ironwood Commercial Builders, Inc.
$6,897.00
Crestline Construction Co. LLC $6,000.00
Engineer's Estimate ALL LPSM LPSM $2,000.00
A0200 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION (NF-
5900 M.P. 1.0)
Moreno and Nelson Construction Corp $25,830.00
JJH Earthworks LLC $25,000.00
Q. King Trucking and Construction, Inc. $25,000.00
North Cascade Excavating, LLC
$20,000.00
Quigg Bros., Inc. $20,000.00
James Dean Construction, Inc
$8,000.00
Crestline Construction Co. LLC $6,000.00
Ironwood Commercial Builders, Inc.
$5,016.00
Engineer's Estimate ALL LPSM LPSM $2,000.00
A0220 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION (NF-
5900 M.P. 1.2)
Moreno and Nelson Construction Corp
$25,830.00
JJH Earthworks LLC $25,000.00
Q. King Trucking and Construction, Inc.
$25,000.00
North Cascade Excavating, LLC $20,000.00
Quigg Bros., Inc. $20,000.00
James Dean Construction, Inc $10,000.00
Rebekah Webb Cross-Out
A0220 15702-6000 SOIL EROSION
CONTROL,
TEMPORARY
STREAM
DIVERSION (NF-
5900 M.P. 1.2)
Ironwood Commercial Builders, Inc.
$7,523.00
Crestline Construction Co. LLC $6,000.00
Engineer's Estimate ALL LPSM LPSM $2,000.00
A0240 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
JJH Earthworks LLC 3,148.000 $40.00 $125,920.00
Crestline Construction Co. LLC
3,148.000 $20.00 $62,960.00
Q. King Trucking and Construction, Inc.
3,148.000 $20.00 $62,960.00
Quigg Bros., Inc. 3,148.000 $14.00 $44,072.00
Ironwood Commercial Builders, Inc.
3,148.000 $12.00 $37,776.00
Moreno and Nelson Construction Corp
3,148.000 $9.00 $28,332.00
North Cascade Excavating, LLC
3,148.000 $7.00 $22,036.00
James Dean Construction, Inc
3,148.000 $4.00 $12,592.00
Engineer's Estimate 3,148.000 LNFT $5.00 $15,740.00
A0260 20103-0000 CLEARING AND
GRUBBING
Q. King Trucking and Construction, Inc. 2,520.000 $100.00 $252,000.00
Ironwood Commercial Builders, Inc.
2,520.000 $21.00 $52,920.00
JJH Earthworks LLC 2,520.000 $20.00 $50,400.00
Quigg Bros., Inc. 2,520.000 $20.00 $50,400.00
North Cascade Excavating, LLC 2,520.000 $12.00 $30,240.00
James Dean Construction, Inc
2,520.000 $10.00 $25,200.00
Crestline Construction Co. LLC 2,520.000 $5.00 $12,600.00
Moreno and Nelson Construction Corp
2,520.000 $3.00 $7,560.00
Engineer's Estimate 2,520.000 SQYD $20.00 $50,400.00
A0280 20301-0200 REMOVAL OF
BOULDER
Ironwood Commercial Builders, Inc.
1.000 $15,049.00 $15,049.00
JJH Earthworks LLC 1.000 $5,000.00 $5,000.00
Q. King Trucking and Construction, Inc.
1.000 $5,000.00 $5,000.00
North Cascade Excavating, LLC 1.000 $2,000.00 $2,000.00
Quigg Bros., Inc. 1.000 $2,000.00 $2,000.00
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0280 20301-0200 REMOVAL OF
BOULDER
Moreno and Nelson Construction Corp
1.000 $1,910.00 $1,910.00
Crestline Construction Co. LLC 1.000 $1,250.00 $1,250.00
James Dean Construction, Inc
1.000 $100.00 $100.00
Engineer's Estimate 1.000 EACH $5,000.00 $5,000.00
A0300 20401-0000 ROADWAY
EXCAVATION
James Dean Construction, Inc
1,800.000 $140.00 $252,000.00
Moreno and Nelson Construction Corp 1,800.000 $121.00 $217,800.00
Q. King Trucking and Construction, Inc. 1,800.000 $100.00 $180,000.00
JJH Earthworks LLC 1,800.000 $80.00 $144,000.00
Ironwood Commercial Builders, Inc.
1,800.000 $78.00 $140,400.00
Crestline Construction Co. LLC 1,800.000 $75.00 $135,000.00
North Cascade Excavating, LLC
1,800.000 $68.00 $122,400.00
Quigg Bros., Inc. 1,800.000 $40.00 $72,000.00
Engineer's Estimate 1,800.000 CUYD $75.00 $135,000.00
A0320 20402-0000 SUBEXCAVATION Quigg Bros., Inc. 900.000 $250.00 $225,000.00
JJH Earthworks LLC 900.000 $120.00 $108,000.00
Q. King Trucking and Construction, Inc. 900.000 $100.00 $90,000.00
Crestline Construction Co. LLC 900.000 $75.00 $67,500.00
Moreno and Nelson Construction Corp 900.000 $65.00 $58,500.00
James Dean Construction, Inc 900.000 $54.00 $48,600.00
North Cascade Excavating, LLC 900.000 $36.00 $32,400.00
Ironwood Commercial Builders, Inc.
900.000 $21.00 $18,900.00
Engineer's Estimate 900.000 CUYD $85.00 $76,500.00
A0340 20403-0000 UNCLASSIFIED
BORROW
Q. King Trucking and Construction, Inc.
2,000.000 $150.00 $300,000.00
Crestline Construction Co. LLC 2,000.000 $135.00 $270,000.00
Moreno and Nelson Construction Corp
2,000.000 $100.00 $200,000.00
Quigg Bros., Inc. 2,000.000 $100.00 $200,000.00
Rebekah Webb Cross-Out
A0340 20403-0000 UNCLASSIFIED
BORROW
James Dean Construction, Inc
2,000.000 $80.00 $160,000.00
Ironwood Commercial Builders, Inc.
2,000.000 $76.00 $152,000.00
JJH Earthworks LLC 2,000.000 $60.00 $120,000.00
North Cascade Excavating, LLC 2,000.000 $50.00 $100,000.00
Engineer's Estimate 2,000.000 CUYD $50.00 $100,000.00
A0360 20410-0000 SELECT BORROW Moreno and Nelson Construction Corp
900.000 $260.00 $234,000.00
Q. King Trucking and Construction, Inc.
900.000 $200.00 $180,000.00
Quigg Bros., Inc. 900.000 $180.00 $162,000.00
Crestline Construction Co. LLC
900.000 $165.00 $148,500.00
Ironwood Commercial Builders, Inc.
900.000 $135.00 $121,500.00
James Dean Construction, Inc
900.000 $80.00 $72,000.00
JJH Earthworks LLC 900.000 $80.00 $72,000.00
North Cascade Excavating, LLC 900.000 $75.00 $67,500.00
Engineer's Estimate 900.000 CUYD $80.00 $72,000.00
A0380 20421-0000 ROCK EXCAVATION Q. King Trucking and Construction, Inc.
160.000 $1,000.00 $160,000.00
Moreno and Nelson Construction Corp
160.000 $380.00 $60,800.00
North Cascade Excavating, LLC
160.000 $325.00 $52,000.00
Quigg Bros., Inc. 160.000 $250.00 $40,000.00
JJH Earthworks LLC 160.000 $200.00 $32,000.00
Ironwood Commercial Builders, Inc.
160.000 $123.00 $19,680.00
James Dean Construction, Inc 160.000 $123.00 $19,680.00
Crestline Construction Co. LLC 160.000 $110.00 $17,600.00
Engineer's Estimate 160.000 CUYD $650.00 $104,000.00
A0400 20701-0100 SEPARATION-
STABILIZATION
GEOTEXTILE, CLASS
1, TYPE A (NON-
WOVEN)
JJH Earthworks LLC 560.000 $30.00 $16,800.00
Ironwood Commercial Builders, Inc.
560.000 $15.00 $8,400.00
Q. King Trucking and Construction, Inc.
560.000 $10.00 $5,600.00
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0400 20701-0100 SEPARATION-
STABILIZATION
GEOTEXTILE, CLASS
1, TYPE A (NON-
WOVEN)
Quigg Bros., Inc. 560.000 $10.00 $5,600.00
Crestline Construction Co. LLC 560.000 $7.00 $3,920.00
North Cascade Excavating, LLC
560.000 $7.00 $3,920.00
Moreno and Nelson Construction Corp 560.000 $6.00 $3,360.00
James Dean Construction, Inc
560.000 $2.00 $1,120.00
Engineer's Estimate 560.000 SQYD $15.00 $8,400.00
A0420 20703-2000 GEOGRID,
STABILIZATION
(BIAXIAL)
JJH Earthworks LLC 500.000 $30.00 $15,000.00
Q. King Trucking and Construction, Inc. 500.000 $20.00 $10,000.00
Ironwood Commercial Builders, Inc.
500.000 $19.00 $9,500.00
North Cascade Excavating, LLC 500.000 $11.00 $5,500.00
Crestline Construction Co. LLC
500.000 $10.00 $5,000.00
Quigg Bros., Inc. 500.000 $8.00 $4,000.00
Moreno and Nelson Construction Corp
500.000 $7.00 $3,500.00
James Dean Construction, Inc 500.000 $2.00 $1,000.00
Engineer's Estimate 500.000 SQYD $6.00 $3,000.00
A0440 20720-0200 REINFORCEMENT
GEOSYNTHETIC,
TYPE 2 (GEOGRID)
JJH Earthworks LLC 2,500.000 $40.00 $100,000.00
Q. King Trucking and Construction, Inc. 2,500.000 $20.00 $50,000.00
Ironwood Commercial Builders, Inc.
2,500.000 $12.00 $30,000.00
Crestline Construction Co. LLC 2,500.000 $10.00 $25,000.00
Quigg Bros., Inc. 2,500.000 $8.00 $20,000.00
North Cascade Excavating, LLC 2,500.000 $7.00 $17,500.00
Moreno and Nelson Construction Corp 2,500.000 $6.00 $15,000.00
James Dean Construction, Inc
2,500.000 $2.00 $5,000.00
Engineer's Estimate 2,500.000 SQYD $8.00 $20,000.00
A0460 25101-0300 PLACED RIPRAP,
METHOD A, CLASS
Q. King Trucking and Construction, Inc.
140.000 $500.00 $70,000.00
Moreno and Nelson Construction Corp
140.000 $450.00 $63,000.00
Rebekah Webb Cross-Out
A0460 25101-0300 PLACED RIPRAP,
METHOD A, CLASS
Ironwood Commercial Builders, Inc.
140.000 $385.00 $53,900.00
Quigg Bros., Inc. 140.000 $300.00 $42,000.00
Crestline Construction Co. LLC 140.000 $288.00 $40,320.00
JJH Earthworks LLC 140.000 $280.00 $39,200.00
North Cascade Excavating, LLC
140.000 $215.00 $30,100.00
James Dean Construction, Inc
140.000 $50.00 $7,000.00
Engineer's Estimate 140.000 CUYD $350.00 $49,000.00
A0480 26101-1000 REINFORCED SOIL
SLOPE, WELDED
WIRE FACE
Moreno and Nelson Construction Corp 10,326.000 $210.00 $2,168,460.00
Q. King Trucking and Construction, Inc.
10,326.000 $160.00 $1,652,160.00
James Dean Construction, Inc 10,326.000 $154.00 $1,590,204.00
Quigg Bros., Inc. 10,326.000 $150.00 $1,548,900.00
North Cascade Excavating, LLC 10,326.000 $100.00 $1,032,600.00
Crestline Construction Co. LLC
10,326.000 $90.00 $929,340.00
JJH Earthworks LLC 10,326.000 $50.00 $516,300.00
Ironwood Commercial Builders, Inc.
10,326.000 $26.00 $268,476.00
Engineer's Estimate 10,326.000 SQFT $100.00 $1,032,600.00
A0500 30201-2000 ROADWAY
AGGREGATE,
METHOD 2
Ironwood Commercial Builders, Inc.
700.000 $276.00 $193,200.00
Moreno and Nelson Construction Corp
700.000 $230.00 $161,000.00
Q. King Trucking and Construction, Inc. 700.000 $200.00 $140,000.00
Crestline Construction Co. LLC
700.000 $168.00 $117,600.00
Quigg Bros., Inc. 700.000 $140.00 $98,000.00
JJH Earthworks LLC 700.000 $125.00 $87,500.00
North Cascade Excavating, LLC
700.000 $120.00 $84,000.00
James Dean Construction, Inc
700.000 $89.00 $62,300.00
Engineer's Estimate 700.000 CUYD $140.00 $98,000.00
A0520 30302-1000 DITCH
RECONDITIONING
JJH Earthworks LLC 400.000 $30.00 $12,000.00
Report Generated on 10/01/2025 5:12 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0520 30302-1000 DITCH
RECONDITIONING
Ironwood Commercial Builders, Inc.
400.000 $25.00 $10,000.00
Crestline Construction Co. LLC 400.000 $23.00 $9,200.00
Q. King Trucking and Construction, Inc.
400.000 $20.00 $8,000.00
Moreno and Nelson Construction Corp 400.000 $10.00 $4,000.00
North Cascade Excavating, LLC
400.000 $10.00 $4,000.00
Quigg Bros., Inc. 400.000 $10.00 $4,000.00
James Dean Construction, Inc
400.000 $5.00 $2,000.00
Engineer's Estimate 400.000 LNFT $30.00 $12,000.00
A0540 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
JJH Earthworks LLC 175.000 $900.00 $157,500.00
Ironwood Commercial Builders, Inc.
175.000 $782.00 $136,850.00
Quigg Bros., Inc. 175.000 $625.00 $109,375.00
Q. King Trucking and Construction, Inc. 175.000 $550.00 $96,250.00
James Dean Construction, Inc 175.000 $500.00 $87,500.00
Moreno and Nelson Construction Corp 175.000 $500.00 $87,500.00
North Cascade Excavating, LLC 175.000 $400.00 $70,000.00
Crestline Construction Co. LLC 175.000 $303.00 $53,025.00
Engineer's Estimate 175.000 TON $200.00 $35,000.00
A0560 41801-1000 ASPHALT
CONCRETE
PAVEMENT PATCH,
TYPE 1
Crestline Construction Co. LLC
10.000 $2,261.00 $22,610.00
Q. King Trucking and Construction, Inc.
10.000 $1,000.00 $10,000.00
Moreno and Nelson Construction Corp 10.000 $770.00 $7,700.00
North Cascade Excavating, LLC
10.000 $650.00 $6,500.00
JJH Earthworks LLC 10.000 $500.00 $5,000.00
Ironwood Commercial Builders, Inc.
10.000 $283.00 $2,830.00
Quigg Bros., Inc. 10.000 $200.00 $2,000.00
James Dean Construction, Inc 10.000 $100.00 $1,000.00
Engineer's Estimate 10.000 SQYD $300.00 $3,000.00
Report Generated on 10/01/2025 5:12 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0580 60201-0800 24-INCH PIPE
CULVERT
Moreno and Nelson Construction Corp
45.000 $410.00 $18,450.00
Q. King Trucking and Construction, Inc. 45.000 $400.00 $18,000.00
Crestline Construction Co. LLC
45.000 $355.00 $15,975.00
Quigg Bros., Inc. 45.000 $250.00 $11,250.00
Ironwood Commercial Builders, Inc.
45.000 $237.00 $10,665.00
JJH Earthworks LLC 45.000 $200.00 $9,000.00
James Dean Construction, Inc
45.000 $180.00 $8,100.00
North Cascade Excavating, LLC 45.000 $140.00 $6,300.00
Engineer's Estimate 45.000 LNFT $180.00 $8,100.00
A0600 60201-1000 36-INCH PIPE
CULVERT
Q. King Trucking and Construction, Inc. 280.000 $450.00 $126,000.00
Crestline Construction Co. LLC
280.000 $386.00 $108,080.00
Moreno and Nelson Construction Corp 280.000 $280.00 $78,400.00
Quigg Bros., Inc. 280.000 $270.00 $75,600.00
Ironwood Commercial Builders, Inc.
280.000 $264.00 $73,920.00
JJH Earthworks LLC 280.000 $230.00 $64,400.00
James Dean Construction, Inc
280.000 $170.00 $47,600.00
North Cascade Excavating, LLC
280.000 $115.00 $32,200.00
Engineer's Estimate 280.000 LNFT $250.00 $70,000.00
A0620 60501-0000 STANDARD
UNDERDRAIN
SYSTEM
Crestline Construction Co. LLC 370.000 $92.00 $34,040.00
Moreno and Nelson Construction Corp 370.000 $88.00 $32,560.00
Ironwood Commercial Builders, Inc.
370.000 $42.00 $15,540.00
Quigg Bros., Inc. 370.000 $40.00 $14,800.00
JJH Earthworks LLC 370.000 $30.00 $11,100.00
Q. King Trucking and Construction, Inc.
370.000 $30.00 $11,100.00
North Cascade Excavating, LLC
370.000 $25.00 $9,250.00
James Dean Construction, Inc
370.000 $15.00 $5,550.00
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0620 60501-0000 STANDARD
UNDERDRAIN
SYSTEM
Engineer's Estimate 370.000 LNFT $100.00 $37,000.00
A0640 60601-0000 SPILLWAY
ASSEMBLY
Crestline Construction Co. LLC 4.000 $23,000.00 $92,000.00
Ironwood Commercial Builders, Inc.
4.000 $15,734.00 $62,936.00
Q. King Trucking and Construction, Inc.
4.000 $15,000.00 $60,000.00
Moreno and Nelson Construction Corp
4.000 $13,390.00 $53,560.00
North Cascade Excavating, LLC 4.000 $11,000.00 $44,000.00
Quigg Bros., Inc. 4.000 $6,000.00 $24,000.00
James Dean Construction, Inc 4.000 $3,000.00 $12,000.00
JJH Earthworks LLC 4.000 $3,000.00 $12,000.00
Engineer's Estimate 4.000 EACH $4,500.00 $18,000.00
A0660 60702-1000 REMOVING,
CLEANING, AND
RELAYING CULVERT
(84-INCH)
Quigg Bros., Inc. 62.000 $4,000.00 $248,000.00
Crestline Construction Co. LLC 62.000 $2,350.00 $145,700.00
Moreno and Nelson Construction Corp 62.000 $1,110.00 $68,820.00
James Dean Construction, Inc 62.000 $1,100.00 $68,200.00
Q. King Trucking and Construction, Inc. 62.000 $1,000.00 $62,000.00
JJH Earthworks LLC 62.000 $350.00 $21,700.00
Ironwood Commercial Builders, Inc.
62.000 $228.00 $14,136.00
North Cascade Excavating, LLC
62.000 $150.00 $9,300.00
Engineer's Estimate 62.000 LNFT $250.00 $15,500.00
A0680 60702-1000 REMOVING,
CLEANING, AND
RELAYING CULVERT
(96-INCH)
Quigg Bros., Inc. 70.000 $4,200.00 $294,000.00
Crestline Construction Co. LLC 70.000 $3,100.00 $217,000.00
Moreno and Nelson Construction Corp 70.000 $1,160.00 $81,200.00
James Dean Construction, Inc 70.000 $1,100.00 $77,000.00
Q. King Trucking and Construction, Inc. 70.000 $1,000.00 $70,000.00
JJH Earthworks LLC 70.000 $400.00 $28,000.00
Ironwood Commercial Builders, Inc.
70.000 $276.00 $19,320.00
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0680 60702-1000 REMOVING,
CLEANING, AND
RELAYING CULVERT
(96-INCH)
North Cascade Excavating, LLC
70.000 $150.00 $10,500.00
Engineer's Estimate 70.000 LNFT $250.00 $17,500.00
A0700 60704-0000 CLEANING
CULVERT IN PLACE
Crestline Construction Co. LLC
2.000 $13,000.00 $26,000.00
James Dean Construction, Inc
2.000 $5,000.00 $10,000.00
Quigg Bros., Inc. 2.000 $4,000.00 $8,000.00
JJH Earthworks LLC 2.000 $2,500.00 $5,000.00
Ironwood Commercial Builders, Inc.
2.000 $2,467.00 $4,934.00
North Cascade Excavating, LLC 2.000 $2,000.00 $4,000.00
Q. King Trucking and Construction, Inc. 2.000 $1,000.00 $2,000.00
Moreno and Nelson Construction Corp 2.000 $830.00 $1,660.00
Engineer's Estimate 2.000 EACH $1,500.00 $3,000.00
A0720 62201-0250 DUMP TRUCK, 10
CUBIC YARD
MINIMUM
CAPACITY
Ironwood Commercial Builders, Inc.
75.000 $312.00 $23,400.00
Moreno and Nelson Construction Corp
75.000 $250.00 $18,750.00
Q. King Trucking and Construction, Inc.
75.000 $250.00 $18,750.00
James Dean Construction, Inc
75.000 $225.00 $16,875.00
Quigg Bros., Inc. 75.000 $220.00 $16,500.00
Crestline Construction Co. LLC
75.000 $207.00 $15,525.00
JJH Earthworks LLC 75.000 $180.00 $13,500.00
North Cascade Excavating, LLC
75.000 $170.00 $12,750.00
Engineer's Estimate 75.000 HOUR $250.00 $18,750.00
A0740 62201-0550 BACKHOE LOADER,
6 CUBIC FOOT
MINIMUM RATED
CAPACITY BUCKET,
24-INCH WIDTH
Ironwood Commercial Builders, Inc.
75.000 $329.00 $24,675.00
Moreno and Nelson Construction Corp 75.000 $240.00 $18,000.00
James Dean Construction, Inc
75.000 $225.00 $16,875.00
Q. King Trucking and Construction, Inc.
75.000 $225.00 $16,875.00
Quigg Bros., Inc. 75.000 $200.00 $15,000.00
Crestline Construction Co. LLC 75.000 $191.00 $14,325.00
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0740 62201-0550 BACKHOE LOADER,
6 CUBIC FOOT
MINIMUM RATED
CAPACITY BUCKET,
24-INCH WIDTH
North Cascade Excavating, LLC
75.000 $140.00 $10,500.00
JJH Earthworks LLC 75.000 $120.00 $9,000.00
Engineer's Estimate 75.000 HOUR $300.00 $22,500.00
A0760 62201-3400 HYDRAULIC
EXCAVATOR, 1
CUBIC YARD
MINIMUM
CAPACITY WITH
THUMB
ATTACHMENT
Ironwood Commercial Builders, Inc.
75.000 $394.00 $29,550.00
Moreno and Nelson Construction Corp 75.000 $310.00 $23,250.00
Q. King Trucking and Construction, Inc.
75.000 $250.00 $18,750.00
James Dean Construction, Inc
75.000 $225.00 $16,875.00
Quigg Bros., Inc. 75.000 $220.00 $16,500.00
Crestline Construction Co. LLC
75.000 $205.00 $15,375.00
North Cascade Excavating, LLC
75.000 $190.00 $14,250.00
JJH Earthworks LLC 75.000 $150.00 $11,250.00
Engineer's Estimate 75.000 HOUR $300.00 $22,500.00
A0780 62301-0000 GENERAL LABOR Moreno and Nelson Construction Corp
144.000 $165.00 $23,760.00
Q. King Trucking and Construction, Inc.
144.000 $150.00 $21,600.00
Ironwood Commercial Builders, Inc.
144.000 $137.00 $19,728.00
Quigg Bros., Inc. 144.000 $120.00 $17,280.00
Crestline Construction Co. LLC 144.000 $106.00 $15,264.00
James Dean Construction, Inc
144.000 $105.00 $15,120.00
JJH Earthworks LLC 144.000 $94.00 $13,536.00
North Cascade Excavating, LLC
144.000 $72.00 $10,368.00
Engineer's Estimate 144.000 HOUR $120.00 $17,280.00
A0800 62502-0000 TURF
ESTABLISHMENT
Q. King Trucking and Construction, Inc.
5,070.000 $7.00 $35,490.00
Moreno and Nelson Construction Corp 5,070.000 $5.00 $25,350.00
Ironwood Commercial Builders, Inc.
5,070.000 $4.00 $20,280.00
Crestline Construction Co. LLC 5,070.000 $3.00 $15,210.00
North Cascade Excavating, LLC
5,070.000 $3.00 $15,210.00
Report Generated on 10/01/2025 5:12 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
A0800 62502-0000 TURF
ESTABLISHMENT
JJH Earthworks LLC 5,070.000 $2.50 $12,675.00
James Dean Construction, Inc 5,070.000 $2.00 $10,140.00
Quigg Bros., Inc. 5,070.000 $2.00 $10,140.00
Engineer's Estimate 5,070.000 SQYD $12.00 $60,840.00
A0820 62901-1100 ROLLED EROSION
CONTROL
PRODUCT, TYPE 4
Crestline Construction Co. LLC 4,300.000 $36.00 $154,800.00
Moreno and Nelson Construction Corp 4,300.000 $12.00 $51,600.00
North Cascade Excavating, LLC 4,300.000 $8.00 $34,400.00
Ironwood Commercial Builders, Inc.
4,300.000 $7.00 $30,100.00
Quigg Bros., Inc. 4,300.000 $7.00 $30,100.00
JJH Earthworks LLC 4,300.000 $6.00 $25,800.00
Q. King Trucking and Construction, Inc.
4,300.000 $5.00 $21,500.00
James Dean Construction, Inc
4,300.000 $2.50 $10,750.00
Engineer's Estimate 4,300.000 SQYD $7.00 $30,100.00
A0840 63502-0600 TEMPORARY
TRAFFIC CONTROL,
BARRICADE TYPE 3
Crestline Construction Co. LLC 8.000 $3,800.00 $30,400.00
Moreno and Nelson Construction Corp 8.000 $820.00 $6,560.00
Ironwood Commercial Builders, Inc.
8.000 $735.00 $5,880.00
Quigg Bros., Inc. 8.000 $700.00 $5,600.00
JJH Earthworks LLC 8.000 $601.00 $4,808.00
James Dean Construction, Inc 8.000 $500.00 $4,000.00
North Cascade Excavating, LLC
8.000 $500.00 $4,000.00
Q. King Trucking and Construction, Inc.
8.000 $500.00 $4,000.00
Engineer's Estimate 8.000 EACH $270.00 $2,160.00
A0860 63502-1200 TEMPORARY
TRAFFIC CONTROL,
TUBULAR MARKER,
TYPE 28-INCH
Crestline Construction Co. LLC 60.000 $251.00 $15,060.00
Moreno and Nelson Construction Corp
60.000 $210.00 $12,600.00
JJH Earthworks LLC 60.000 $100.00 $6,000.00
Q. King Trucking and Construction, Inc.
60.000 $50.00 $3,000.00
Quigg Bros., Inc. 60.000 $50.00 $3,000.00
North Cascade Excavating, LLC
60.000 $45.00 $2,700.00
Report Generated on 10/01/2025 5:12 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Rebekah Webb
Rebekah Webb Cross-Out
A0860 63502-1200 TEMPORARY
TRAFFIC CONTROL,
TUBULAR MARKER,
TYPE 28-INCH
Ironwood Commercial Builders, Inc.
60.000 $35.00 $2,100.00
James Dean Construction, Inc 60.000 $10.00 $600.00
Engineer's Estimate 60.000 EACH $40.00 $2,400.00
A0880 63504-1000 TEMPORARY
TRAFFIC CONTROL,
CONSTRUCTION
SIGN
Crestline Construction Co. LLC 215.000 $100.00 $21,500.00
James Dean Construction, Inc
215.000 $50.00 $10,750.00
Quigg Bros., Inc. 215.000 $50.00 $10,750.00
Moreno and Nelson Construction Corp
215.000 $46.00 $9,890.00
Ironwood Commercial Builders, Inc.
215.000 $38.00 $8,170.00
Q. King Trucking and Construction, Inc.
215.000 $30.00 $6,450.00
North Cascade Excavating, LLC 215.000 $25.00 $5,375.00
JJH Earthworks LLC 215.000 $12.00 $2,580.00
Engineer's Estimate 215.000 SQFT $40.00 $8,600.00
A0900 63506-0500 TEMPORARY
TRAFFIC CONTROL,
FLAGGER
Q. King Trucking and Construction, Inc. 110.000 $200.00 $22,000.00
Moreno and Nelson Construction Corp 110.000 $165.00 $18,150.00
Ironwood Commercial Builders, Inc.
110.000 $144.00 $15,840.00
James Dean Construction, Inc 110.000 $120.00 $13,200.00
Crestline Construction Co. LLC
110.000 $105.00 $11,550.00
Quigg Bros., Inc. 110.000 $100.00 $11,000.00
JJH Earthworks LLC 110.000 $73.00 $8,030.00
North Cascade Excavating, LLC
110.000 $70.00 $7,700.00
Engineer's Estimate 110.000 HOUR $100.00 $11,000.00
Rebekah Webb Cross-Out
Rebekah Webb Cross-Out
File details come from the government source that posted it. Updated .