Award_Bid Tabulations_WA USFS OkWen617 76(1).pdf

PDF 1 MB Posted

Attached to
WA USFS OkWen617 76(1), Icicle Creek Road Rock Fall Mitigation
Solicitation number
69056725C000004
Issued by

About this file

This is a bid tabulation document for the Icicle Creek Road Rock Fall Mitigation project (WA USFS OkWen617 76(1)) issued by the Federal Highway Administration. The project included three alternate schedules (A, B, and C) with Schedule C ultimately being awarded to Pipkin Construction on November 25, 2024 with a bid amount of $1,871,956.00.

The project received bids from four contractors: Pipkin Inc. (dba Pipkin Construction), Accord Contractors, Rock Supremacy LLC, and Construction Solutions Group LLC. Schedule C, which was awarded, included work items such as mobilization, construction survey and staking, contractor quality control, soil erosion control, tree removal, pavement removal and replacement, ditch reconditioning, concrete barrier installation, draped rockfall protection (cable net), roadside rockfall protection (gabion barrier), and temporary roadway rockfall protection. The Engineer's Estimate for Schedule C was $2,720,505.00, with competing bids ranging from Pipkin's winning bid of $1,871,956.00 to Construction Solutions Group's high bid of $2,895,826.00.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 11/05/24

1 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Contractor Responsive?

Engineer's Estimate

Accord Contractors

Construction Solutions Group, LLC

Pipkin Inc., dba Pipkin Construction

Rock Supremacy, LLC

Alternate Schedule A

$1,737,945.00

$1,582,210.00

$2,254,747.30

$1,382,856.00

$1,747,069.70

Alternate Schedule B

$2,043,215.00

$2,152,810.00

$2,501,757.20

$1,545,094.00

$1,925,827.30

Alternate Schedule C

$2,720,505.00

$2,781,180.00

$2,895,826.00

$1,871,956.00

$2,389,275.95

Schedule C Awarded

Pipkin Construction 11/25/2024

3 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Pipkin Inc., dba Pipkin Construction Lump Sum $157,000.00 Accord Contractors Lump Sum $90,000.00 Rock Supremacy, LLC Lump Sum $352,430.00 Construction Solutions Group, LLC Lump Sum $609,900.00 Engineer's Estimate ALL LPSM Lump Sum $190,000.00

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Pipkin Inc., dba Pipkin Construction Lump Sum $9,000.00 Accord Contractors Lump Sum $12,000.00 Rock Supremacy, LLC Lump Sum $29,696.00 Construction Solutions Group, LLC Lump Sum $57,500.00 Engineer's Estimate ALL LPSM Lump Sum $43,000.00

A0060 15301-0000 CONTRACTOR QUALITY CONTROL

Pipkin Inc., dba Pipkin Construction Lump Sum $17,500.00 Accord Contractors Lump Sum $23,000.00 Rock Supremacy, LLC Lump Sum $71,140.00 Construction Solutions Group, LLC Lump Sum $185,000.00 Engineer's Estimate ALL LPSM Lump Sum $43,000.00

A0080 15401-0000 CONTRACTOR TESTING

Pipkin Inc., dba Pipkin Construction Lump Sum $12,500.00 Accord Contractors Lump Sum $7,000.00 Rock Supremacy, LLC Lump Sum $40,688.00 Construction Solutions Group, LLC Lump Sum $74,000.00 Engineer's Estimate ALL LPSM Lump Sum $43,000.00

A0100 15501-0000 CONSTRUCTION SCHEDULE

Pipkin Inc., dba Pipkin Construction Lump Sum $8,000.00 Accord Contractors Lump Sum $12,000.00 Rock Supremacy, LLC Lump Sum $41,322.00 Construction Solutions Group, LLC Lump Sum $32,000.00 Engineer's Estimate ALL LPSM Lump Sum $8,000.00

A0120 15701-0000 SOIL EROSION CONTROL

Pipkin Inc., dba Pipkin Construction Lump Sum $9,000.00 Accord Contractors Lump Sum $8,000.00 Rock Supremacy, LLC Lump Sum $25,000.00 Construction Solutions Group, LLC Lump Sum $6,050.00 Engineer's Estimate ALL LPSM Lump Sum $9,600.00

4 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0140 20220-1000 REMOVAL, INDIVIDUAL TREE

Pipkin Inc., dba Pipkin Construction $2,150.00 $64,500.00 Accord Contractors $750.00 $22,500.00 Rock Supremacy, LLC $1,250.00 $37,500.00 Construction Solutions Group, LLC $653.40 $19,602.00 Engineer's Estimate 30 EACH $500.00 $15,000.00

A0160 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

Pipkin Inc., dba Pipkin Construction $20.00 $7,000.00 Accord Contractors $80.00 $28,000.00 Rock Supremacy, LLC $9.90 $3,465.00 Construction Solutions Group, LLC $18.70 $6,545.00 Engineer's Estimate 350 SQYD $25.00 $8,750.00

A0180 20315-0000 SAWCUTTING PAVEMENT

Pipkin Inc., dba Pipkin Construction $3.50 $3,570.00 Accord Contractors $13.00 $13,260.00 Rock Supremacy, LLC $2.20 $2,244.00 Construction Solutions Group, LLC $8.80 $8,976.00 Engineer's Estimate 1,020 LNFT $3.50 $3,570.00

A0200 20401-0000 ROADWAY EXCAVATION

Pipkin Inc., dba Pipkin Construction $190.00 $3,800.00 Accord Contractors $150.00 $3,000.00 Rock Supremacy, LLC $71.50 $1,430.00 Construction Solutions Group, LLC $159.50 $3,190.00 Engineer's Estimate 20 CUYD $200.00 $4,000.00

A0220 30202-2000 ROADWAY AGGREGATE, METHOD 2

Pipkin Inc., dba Pipkin Construction $190.00 $7,600.00 Accord Contractors $300.00 $12,000.00 Rock Supremacy, LLC $176.00 $7,040.00 Construction Solutions Group, LLC $149.60 $5,984.00 Engineer's Estimate 40 TON $120.00 $4,800.00

A0240 30302-1000 DITCH RECONDITIONING

Pipkin Inc., dba Pipkin Construction $33.00 $23,430.00 Accord Contractors $300.00 $213,000.00 Rock Supremacy, LLC $38.50 $27,335.00 Construction Solutions Group, LLC $36.30 $25,773.00 Engineer's Estimate 710 LNFT $32.00 $22,720.00

5 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 40301-0000 ASPHALT CONCRETE PAVEMENT

Pipkin Inc., dba Pipkin Construction $650.00 $9,750.00 Accord Contractors $500.00 $7,500.00 Rock Supremacy, LLC $660.00 $9,900.00 Construction Solutions Group, LLC $1,100.00 $16,500.00 Engineer's Estimate 15 TON $500.00 $7,500.00

A0280 61801-0000 CONCRETE BARRIER

Pipkin Inc., dba Pipkin Construction $180.00 $91,800.00 Accord Contractors $150.00 $76,500.00 Rock Supremacy, LLC $203.50 $103,785.00 Construction Solutions Group, LLC $121.00 $61,710.00 Engineer's Estimate 510 LNFT $180.00 $91,800.00

A0300 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Pipkin Inc., dba Pipkin Construction $200.00 $8,000.00 Accord Contractors $220.00 $8,800.00 Rock Supremacy, LLC $225.00 $9,000.00 Construction Solutions Group, LLC $286.00 $11,440.00 Engineer's Estimate 40 HOUR $225.00 $9,000.00

A0320 62201-0700 BACKHOE LOADER, 1 CUBIC YARD MINIMUM CAPACITY FRONTEND BUCKET, 10 CUBIC FOOT MINIMUM

CAPACITY BACKHOE BUCKET, 90 HP MINIMUM FLYWHEEL

Pipkin Inc., dba Pipkin Construction $190.00 $7,600.00 Accord Contractors $220.00 $8,800.00 Rock Supremacy, LLC $180.00 $7,200.00 Construction Solutions Group, LLC $258.50 $10,340.00 Engineer's Estimate 40 HOUR $222.00 $8,880.00

A0340 62201-3750 CHAIN SAW

Pipkin Inc., dba Pipkin Construction $87.00 $1,740.00 Accord Contractors $200.00 $4,000.00 Rock Supremacy, LLC $120.00 $2,400.00 Construction Solutions Group, LLC $220.00 $4,400.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00

6 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0360 62301-0000 GENERAL LABOR

Pipkin Inc., dba Pipkin Construction $75.00 $4,500.00 Accord Contractors $200.00 $12,000.00 Rock Supremacy, LLC $120.00 $7,200.00 Construction Solutions Group, LLC $165.00 $9,900.00 Engineer's Estimate 60 HOUR $127.00 $7,620.00

A0380 63302-0000 SIGN SYSTEM

Pipkin Inc., dba Pipkin Construction $115.00 $2,415.00 Accord Contractors $70.00 $1,470.00 Rock Supremacy, LLC $88.00 $1,848.00 Construction Solutions Group, LLC $45.10 $947.10 Engineer's Estimate 21 SQFT $175.00 $3,675.00

A0400 63308-3000 OBJECT MARKER, TYPE 3

Pipkin Inc., dba Pipkin Construction $375.00 $750.00 Accord Contractors $500.00 $1,000.00 Rock Supremacy, LLC $440.00 $880.00 Construction Solutions Group, LLC $880.00 $1,760.00 Engineer's Estimate 2 EACH $230.00 $460.00

A0420 63316-1000 REMOVE AND RESET SIGN

Pipkin Inc., dba Pipkin Construction $750.00 $750.00 Accord Contractors $800.00 $800.00 Rock Supremacy, LLC $660.00 $660.00 Construction Solutions Group, LLC $550.00 $550.00 Engineer's Estimate 1 EACH $1,000.00 $1,000.00

A0440 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (yellow)

Pipkin Inc., dba Pipkin Construction $0.70 $1,851.50 Accord Contractors $7.00 $18,515.00 Rock Supremacy, LLC $0.49 $1,296.05 Construction Solutions Group, LLC $3.30 $8,728.50 Engineer's Estimate 2,645 LNFT $4.50 $11,902.50

A0460 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (white)

Pipkin Inc., dba Pipkin Construction $0.70 $2,460.50 Accord Contractors $7.00 $24,605.00 Rock Supremacy, LLC $0.49 $1,722.35 Construction Solutions Group, LLC $3.30 $11,599.50 Engineer's Estimate 3,515 LNFT $4.50 $15,817.50

7 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0480 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (yellow)

Pipkin Inc., dba Pipkin Construction $0.70 $609.00 Accord Contractors $8.00 $6,960.00 Rock Supremacy, LLC $0.49 $426.30 Construction Solutions Group, LLC $3.30 $2,871.00 Engineer's Estimate 870 LNFT $3.00 $2,610.00

A0500 63501-0000 TEMPORARY TRAFFIC CONTROL

Pipkin Inc., dba Pipkin Construction Lump Sum $2,700.00 Accord Contractors Lump Sum $20,000.00 Rock Supremacy, LLC Lump Sum $27,500.00 Construction Solutions Group, LLC Lump Sum $33,000.00 Engineer's Estimate ALL LPSM Lump Sum $57,000.00

A0520 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Pipkin Inc., dba Pipkin Construction $85.00 $27,200.00 Accord Contractors $175.00 $56,000.00 Rock Supremacy, LLC $82.50 $26,400.00 Construction Solutions Group, LLC $101.20 $32,384.00 Engineer's Estimate 320 HOUR $110.00 $35,200.00

A0540 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Pipkin Inc., dba Pipkin Construction $1,300.00 $72,800.00 Accord Contractors $1,500.00 $84,000.00 Rock Supremacy, LLC $1,300.00 $72,800.00 Construction Solutions Group, LLC $101.20 $5,667.20 Engineer's Estimate 56 DAY $1,400.00 $78,400.00

A0560 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Pipkin Inc., dba Pipkin Construction $80.00 $5,280.00 Accord Contractors $500.00 $33,000.00 Rock Supremacy, LLC $132.00 $8,712.00 Construction Solutions Group, LLC $275.00 $18,150.00 Engineer's Estimate 66 DAY $275.00 $18,150.00

A0580 65101-2000 DRAPED ROCKFALL PROTECTION, CABLE NET

Pipkin Inc., dba Pipkin Construction $115.00 $649,750.00 Accord Contractors $130.00 $734,500.00 Rock Supremacy, LLC $117.00 $661,050.00 Construction Solutions Group, LLC $123.20 $696,080.00 Engineer's Estimate 5,650 SQYD $165.00 $932,250.00

8 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: A

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0600 65602-0000 TEMPORARY ROADWAY ROCKFALL PROTECTION

Pipkin Inc., dba Pipkin Construction Lump Sum $170,000.00 Accord Contractors Lump Sum $40,000.00 Rock Supremacy, LLC Lump Sum $165,000.00 Construction Solutions Group, LLC Lump Sum $294,200.00 Engineer's Estimate ALL LPSM Lump Sum $58,240.00

Total Schedule - All Items

Pipkin Inc., dba Pipkin Construction $1,382,856.00 Accord Contractors $1,582,210.00 Rock Supremacy, LLC $1,747,069.70 Construction Solutions Group, LLC $2,254,747.30 Engineer's Estimate $1,737,945.00

9 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: B

Schedule Type: Alternate

Solcitation No: 69056723B000009

Division: Western Federal Lands

State: WA County: Chelan

Federal Land: Okanogan-Wenatchee National Forest Opened at: WFLHD Vancouver, WA

Opened by: Marino Chea

Date: 11/05/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Pipkin Inc., dba Pipkin Construction $1,545,094.00 4801 Contractors Drive East Wenatchee, WA 98802

Rock Supremacy, LLC $1,925,827.30 65147 N Hwy 97 Bend, OR 97701

Accord Contractors $2,152,810.00 12826 SE 40th Ln Ste 204 Bellvue, WA 98006

Construction Solutions Group, LLC $2,501,757.20 425 Highland Ave St. Louis, MO 63122

Engineer's Estimate $2,043,215.00

10 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0020 15101-0000 MOBILIZATION

Pipkin Inc., dba Pipkin Construction Lump Sum $161,000.00 Rock Supremacy, LLC Lump Sum $352,430.00 Accord Contractors Lump Sum $80,000.00 Construction Solutions Group, LLC Lump Sum $654,200.00 Engineer's Estimate ALL LPSM Lump Sum $220,000.00

B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Pipkin Inc., dba Pipkin Construction Lump Sum $12,000.00 Rock Supremacy, LLC Lump Sum $29,696.00 Accord Contractors Lump Sum $8,000.00 Construction Solutions Group, LLC Lump Sum $83,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

B0060 15301-0000 CONTRACTOR QUALITY CONTROL

Pipkin Inc., dba Pipkin Construction Lump Sum $20,000.00 Rock Supremacy, LLC Lump Sum $71,140.00 Accord Contractors Lump Sum $20,000.00 Construction Solutions Group, LLC Lump Sum $196,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

B0080 15401-0000 CONTRACTOR TESTING

Pipkin Inc., dba Pipkin Construction Lump Sum $15,000.00 Rock Supremacy, LLC Lump Sum $40,688.00 Accord Contractors Lump Sum $5,000.00 Construction Solutions Group, LLC Lump Sum $79,500.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

B0100 15501-0000 CONSTRUCTION SCHEDULE

Pipkin Inc., dba Pipkin Construction Lump Sum $10,000.00 Rock Supremacy, LLC Lump Sum $41,322.00 Accord Contractors Lump Sum $10,000.00 Construction Solutions Group, LLC Lump Sum $32,000.00 Engineer's Estimate ALL LPSM Lump Sum $9,000.00

B0120 15701-0000 SOIL EROSION CONTROL

Pipkin Inc., dba Pipkin Construction Lump Sum $12,500.00 Rock Supremacy, LLC Lump Sum $25,000.00 Accord Contractors Lump Sum $5,000.00 Construction Solutions Group, LLC Lump Sum $18,800.00 Engineer's Estimate ALL LPSM Lump Sum $16,000.00

11 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0140 20220-1000 REMOVAL, INDIVIDUAL TREE

Pipkin Inc., dba Pipkin Construction $2,150.00 $64,500.00 Rock Supremacy, LLC $1,250.00 $37,500.00 Accord Contractors $800.00 $24,000.00 Construction Solutions Group, LLC $653.40 $19,602.00 Engineer's Estimate 30 EACH $500.00 $15,000.00

B0160 20301-2400 REMOVAL OF SIGN

Pipkin Inc., dba Pipkin Construction $550.00 $550.00 Rock Supremacy, LLC $250.00 $250.00 Accord Contractors $800.00 $800.00 Construction Solutions Group, LLC $550.00 $550.00 Engineer's Estimate 1 EACH $1,000.00 $1,000.00

B0180 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

Pipkin Inc., dba Pipkin Construction $20.00 $13,200.00 Rock Supremacy, LLC $9.90 $6,534.00 Accord Contractors $20.00 $13,200.00 Construction Solutions Group, LLC $18.70 $12,342.00 Engineer's Estimate 660 SQYD $25.00 $16,500.00

B0200 20315-0000 SAWCUTTING PAVEMENT

Pipkin Inc., dba Pipkin Construction $3.50 $5,670.00 Rock Supremacy, LLC $2.20 $3,564.00 Accord Contractors $150.00 $243,000.00 Construction Solutions Group, LLC $8.80 $14,256.00 Engineer's Estimate 1,620 LNFT $3.50 $5,670.00

B0220 20401-0000 ROADWAY EXCAVATION

Pipkin Inc., dba Pipkin Construction $145.00 $14,500.00 Rock Supremacy, LLC $71.50 $7,150.00 Accord Contractors $150.00 $15,000.00 Construction Solutions Group, LLC $159.50 $15,950.00 Engineer's Estimate 100 CUYD $200.00 $20,000.00

B0240 30202-2000 ROADWAY AGGREGATE, METHOD 2

Pipkin Inc., dba Pipkin Construction $135.00 $25,650.00 Rock Supremacy, LLC $176.00 $33,440.00 Accord Contractors $140.00 $26,600.00 Construction Solutions Group, LLC $149.60 $28,424.00 Engineer's Estimate 190 TON $120.00 $22,800.00

12 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0260 30302-1000 DITCH RECONDITIONING

Pipkin Inc., dba Pipkin Construction $25.00 $28,000.00 Rock Supremacy, LLC $38.50 $43,120.00 Accord Contractors $300.00 $336,000.00 Construction Solutions Group, LLC $27.50 $30,800.00 Engineer's Estimate 1,120 LNFT $32.00 $35,840.00

B0280 40301-0000 ASPHALT CONCRETE PAVEMENT

Pipkin Inc., dba Pipkin Construction $330.00 $24,750.00 Rock Supremacy, LLC $330.00 $24,750.00 Accord Contractors $400.00 $30,000.00 Construction Solutions Group, LLC $440.00 $33,000.00 Engineer's Estimate 75 TON $500.00 $37,500.00

B0300 61801-0000 CONCRETE BARRIER

Pipkin Inc., dba Pipkin Construction $180.00 $118,800.00 Rock Supremacy, LLC $203.50 $134,310.00 Accord Contractors $170.00 $112,200.00 Construction Solutions Group, LLC $121.00 $79,860.00 Engineer's Estimate 660 LNFT $180.00 $118,800.00

B0320 61801-0000 CONCRETE BARRIER (NARROW BASE)

Pipkin Inc., dba Pipkin Construction $180.00 $20,160.00 Rock Supremacy, LLC $275.00 $30,800.00 Accord Contractors $180.00 $20,160.00 Construction Solutions Group, LLC $121.00 $13,552.00 Engineer's Estimate 112 LNFT $180.00 $20,160.00

B0340 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Pipkin Inc., dba Pipkin Construction $200.00 $8,000.00 Rock Supremacy, LLC $225.00 $9,000.00 Accord Contractors $200.00 $8,000.00 Construction Solutions Group, LLC $286.00 $11,440.00 Engineer's Estimate 40 HOUR $225.00 $9,000.00

B0360 62201-0700 BACKHOE LOADER, 1 CUBIC YARD MINIMUM CAPACITY FRONTEND BUCKET, 10 CUBIC FOOT MINIMUM

CAPACITY BACKHOE BUCKET, 90 HP MINIMUM FLYWHEEL

Pipkin Inc., dba Pipkin Construction $190.00 $7,600.00 Rock Supremacy, LLC $180.00 $7,200.00 Accord Contractors $200.00 $8,000.00 Construction Solutions Group, LLC $258.50 $10,340.00 Engineer's Estimate 40 HOUR $222.00 $8,880.00

13 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0380 62201-3750 CHAIN SAW

Pipkin Inc., dba Pipkin Construction $87.00 $1,740.00 Rock Supremacy, LLC $120.00 $2,400.00 Accord Contractors $175.00 $3,500.00 Construction Solutions Group, LLC $220.00 $4,400.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00

B0400 62301-0000 GENERAL LABOR

Pipkin Inc., dba Pipkin Construction $75.00 $4,500.00 Rock Supremacy, LLC $120.00 $7,200.00 Accord Contractors $140.00 $8,400.00 Construction Solutions Group, LLC $110.00 $6,600.00 Engineer's Estimate 60 HOUR $127.00 $7,620.00

B0420 63302-0000 SIGN SYSTEM

Pipkin Inc., dba Pipkin Construction $105.00 $7,035.00 Rock Supremacy, LLC $88.00 $5,896.00 Accord Contractors $70.00 $4,690.00 Construction Solutions Group, LLC $45.10 $3,021.70 Engineer's Estimate 67 SQFT $175.00 $11,725.00

B0440 63308-3000 OBJECT MARKER, TYPE 3

Pipkin Inc., dba Pipkin Construction $375.00 $1,500.00 Rock Supremacy, LLC $440.00 $1,760.00 Accord Contractors $400.00 $1,600.00 Construction Solutions Group, LLC $550.00 $2,200.00 Engineer's Estimate 4 EACH $230.00 $920.00

B0460 63316-1000 REMOVE AND RESET SIGN

Pipkin Inc., dba Pipkin Construction $750.00 $750.00 Rock Supremacy, LLC $660.00 $660.00 Accord Contractors $800.00 $800.00 Construction Solutions Group, LLC $550.00 $550.00 Engineer's Estimate 1 EACH $1,000.00 $1,000.00

B0480 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (white)

Pipkin Inc., dba Pipkin Construction $0.70 $4,819.50 Rock Supremacy, LLC $0.49 $3,373.65 Accord Contractors $7.00 $48,195.00 Construction Solutions Group, LLC $2.75 $18,933.75 Engineer's Estimate 6,885 LNFT $4.50 $30,982.50

14 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0500 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (yellow)

Pipkin Inc., dba Pipkin Construction $0.70 $4,210.50 Rock Supremacy, LLC $0.49 $2,947.35 Accord Contractors $7.00 $42,105.00 Construction Solutions Group, LLC $2.75 $16,541.25 Engineer's Estimate 6,015 LNFT $4.50 $27,067.50

B0520 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (yellow)

Pipkin Inc., dba Pipkin Construction $0.70 $609.00 Rock Supremacy, LLC $0.49 $426.30 Accord Contractors $8.00 $6,960.00 Construction Solutions Group, LLC $2.75 $2,392.50 Engineer's Estimate 870 LNFT $3.00 $2,610.00

B0540 63501-0000 TEMPORARY TRAFFIC CONTROL

Pipkin Inc., dba Pipkin Construction Lump Sum $3,500.00 Rock Supremacy, LLC Lump Sum $27,500.00 Accord Contractors Lump Sum $8,000.00 Construction Solutions Group, LLC Lump Sum $38,500.00 Engineer's Estimate ALL LPSM Lump Sum $68,000.00

B0560 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Pipkin Inc., dba Pipkin Construction $85.00 $34,000.00 Rock Supremacy, LLC $82.50 $33,000.00 Accord Contractors $180.00 $72,000.00 Construction Solutions Group, LLC $101.20 $40,480.00 Engineer's Estimate 400 HOUR $110.00 $44,000.00

B0580 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Pipkin Inc., dba Pipkin Construction $1,300.00 $78,000.00 Rock Supremacy, LLC $1,300.00 $78,000.00 Accord Contractors $1,400.00 $84,000.00 Construction Solutions Group, LLC $101.20 $6,072.00 Engineer's Estimate 60 DAY $1,400.00 $84,000.00

B0600 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Pipkin Inc., dba Pipkin Construction $80.00 $5,600.00 Rock Supremacy, LLC $132.00 $9,240.00 Accord Contractors $380.00 $26,600.00 Construction Solutions Group, LLC $275.00 $19,250.00 Engineer's Estimate 70 DAY $275.00 $19,250.00

15 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0620 65101-2000 DRAPED ROCKFALL PROTECTION, CABLE NET

Pipkin Inc., dba Pipkin Construction $115.00 $649,750.00 Rock Supremacy, LLC $117.00 $661,050.00 Accord Contractors $140.00 $791,000.00 Construction Solutions Group, LLC $123.20 $696,080.00 Engineer's Estimate 5,650 SQYD $165.00 $932,250.00

B0640 65402-1000 ROADSIDE ROCKFALL PROTECTION, GABION BARRIER

Pipkin Inc., dba Pipkin Construction $430.00 $17,200.00 Rock Supremacy, LLC $737.00 $29,480.00 Accord Contractors $1,000.00 $40,000.00 Construction Solutions Group, LLC $473.00 $18,920.00 Engineer's Estimate 40 CUYD $796.00 $31,840.00

B0660 65602-0000 TEMPORARY ROADWAY ROCKFALL PROTECTION

Pipkin Inc., dba Pipkin Construction Lump Sum $170,000.00 Rock Supremacy, LLC Lump Sum $165,000.00 Accord Contractors Lump Sum $50,000.00 Construction Solutions Group, LLC Lump Sum $294,200.00 Engineer's Estimate ALL LPSM Lump Sum $72,800.00

Total Schedule - All Items

Pipkin Inc., dba Pipkin Construction $1,545,094.00 Rock Supremacy, LLC $1,925,827.30 Accord Contractors $2,152,810.00 Construction Solutions Group, LLC $2,501,757.20 Engineer's Estimate $2,043,215.00

16 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: C

Schedule Type: Alternate

Solcitation No: 69056723B000009

Division: Western Federal Lands

State: WA County: Chelan

Federal Land: Okanogan-Wenatchee National Forest Opened at: WFLHD Vancouver, WA

Opened by: Marino Chea

Date: 11/05/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Pipkin Inc., dba Pipkin Construction $1,871,956.00 4801 Contractors Drive East Wenatchee, WA 98802

Rock Supremacy, LLC $2,389,275.95 65147 N Hwy 97 Bend, OR 97701

Accord Contractors $2,781,180.00 12826 SE 40th Ln Ste 204 Bellvue, WA 98006

Construction Solutions Group, LLC $2,895,826.00 425 Highland Ave St. Louis, MO 63122

Engineer's Estimate $2,720,505.00

Pipkin Construction 11/25/2024

17 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0020 15101-0000 MOBILIZATION

Pipkin Inc., dba Pipkin Construction Lump Sum $169,000.00 Rock Supremacy, LLC Lump Sum $396,700.00 Accord Contractors Lump Sum $75,000.00 Construction Solutions Group, LLC Lump Sum $692,600.00 Engineer's Estimate ALL LPSM Lump Sum $300,000.00

C0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Pipkin Inc., dba Pipkin Construction Lump Sum $17,000.00 Rock Supremacy, LLC Lump Sum $29,696.00 Accord Contractors Lump Sum $8,000.00 Construction Solutions Group, LLC Lump Sum $98,500.00 Engineer's Estimate ALL LPSM Lump Sum $68,000.00

C0060 15301-0000 CONTRACTOR QUALITY CONTROL

Pipkin Inc., dba Pipkin Construction Lump Sum $25,000.00 Rock Supremacy, LLC Lump Sum $71,040.00 Accord Contractors Lump Sum $25,000.00 Construction Solutions Group, LLC Lump Sum $227,000.00 Engineer's Estimate ALL LPSM Lump Sum $68,000.00

C0080 15401-0000 CONTRACTOR TESTING

Pipkin Inc., dba Pipkin Construction Lump Sum $17,500.00 Rock Supremacy, LLC Lump Sum $40,688.00 Accord Contractors Lump Sum $8,000.00 Construction Solutions Group, LLC Lump Sum $85,000.00 Engineer's Estimate ALL LPSM Lump Sum $68,000.00

C0100 15501-0000 CONSTRUCTION SCHEDULE

Pipkin Inc., dba Pipkin Construction Lump Sum $12,800.00 Rock Supremacy, LLC Lump Sum $41,323.00 Accord Contractors Lump Sum $6,000.00 Construction Solutions Group, LLC Lump Sum $32,000.00 Engineer's Estimate ALL LPSM Lump Sum $12,000.00

C0120 15701-0000 SOIL EROSION CONTROL

Pipkin Inc., dba Pipkin Construction Lump Sum $18,000.00 Rock Supremacy, LLC Lump Sum $25,000.00 Accord Contractors Lump Sum $5,000.00 Construction Solutions Group, LLC Lump Sum $24,300.00 Engineer's Estimate ALL LPSM Lump Sum $28,000.00

18 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0140 20220-1000 REMOVAL, INDIVIDUAL TREE

Pipkin Inc., dba Pipkin Construction $2,150.00 $64,500.00 Rock Supremacy, LLC $1,250.00 $37,500.00 Accord Contractors $800.00 $24,000.00 Construction Solutions Group, LLC $653.40 $19,602.00 Engineer's Estimate 30 EACH $500.00 $15,000.00

C0160 20301-2400 REMOVAL OF SIGN

Pipkin Inc., dba Pipkin Construction $550.00 $550.00 Rock Supremacy, LLC $250.00 $250.00 Accord Contractors $800.00 $800.00 Construction Solutions Group, LLC $550.00 $550.00 Engineer's Estimate 1 EACH $1,000.00 $1,000.00

C0180 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

Pipkin Inc., dba Pipkin Construction $17.00 $22,270.00 Rock Supremacy, LLC $9.90 $12,969.00 Accord Contractors $80.00 $104,800.00 Construction Solutions Group, LLC $18.70 $24,497.00 Engineer's Estimate 1,310 SQYD $25.00 $32,750.00

C0200 20315-0000 SAWCUTTING PAVEMENT

Pipkin Inc., dba Pipkin Construction $3.50 $8,627.50 Rock Supremacy, LLC $2.20 $5,423.00 Accord Contractors $20.00 $49,300.00 Construction Solutions Group, LLC $6.60 $16,269.00 Engineer's Estimate 2,465 LNFT $3.50 $8,627.50

C0220 20401-0000 ROADWAY EXCAVATION

Pipkin Inc., dba Pipkin Construction $145.00 $18,125.00 Rock Supremacy, LLC $71.50 $8,937.50 Accord Contractors $150.00 $18,750.00 Construction Solutions Group, LLC $159.50 $19,937.50 Engineer's Estimate 125 CUYD $200.00 $25,000.00

C0240 30202-2000 ROADWAY AGGREGATE, METHOD 2

Pipkin Inc., dba Pipkin Construction $135.00 $32,400.00 Rock Supremacy, LLC $176.00 $42,240.00 Accord Contractors $240.00 $57,600.00 Construction Solutions Group, LLC $149.60 $35,904.00 Engineer's Estimate 240 TON $120.00 $28,800.00

19 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0260 30302-1000 DITCH RECONDITIONING

Pipkin Inc., dba Pipkin Construction $20.00 $38,000.00 Rock Supremacy, LLC $38.50 $73,150.00 Accord Contractors $290.00 $551,000.00 Construction Solutions Group, LLC $22.00 $41,800.00 Engineer's Estimate 1,900 LNFT $32.00 $60,800.00

C0280 40301-0000 ASPHALT CONCRETE PAVEMENT

Pipkin Inc., dba Pipkin Construction $330.00 $31,350.00 Rock Supremacy, LLC $330.00 $31,350.00 Accord Contractors $500.00 $47,500.00 Construction Solutions Group, LLC $385.00 $36,575.00 Engineer's Estimate 95 TON $500.00 $47,500.00

C0300 61801-0000 CONCRETE BARRIER (NARROW BASE)

Pipkin Inc., dba Pipkin Construction $180.00 $101,520.00 Rock Supremacy, LLC $275.00 $155,100.00 Accord Contractors $170.00 $95,880.00 Construction Solutions Group, LLC $122.10 $68,864.40 Engineer's Estimate 564 LNFT $180.00 $101,520.00

C0320 61801-0000 CONCRETE BARRIER

Pipkin Inc., dba Pipkin Construction $180.00 $145,800.00 Rock Supremacy, LLC $203.50 $164,835.00 Accord Contractors $160.00 $129,600.00 Construction Solutions Group, LLC $121.00 $98,010.00 Engineer's Estimate 810 LNFT $180.00 $145,800.00

C0340 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Pipkin Inc., dba Pipkin Construction $200.00 $8,000.00 Rock Supremacy, LLC $225.00 $9,000.00 Accord Contractors $210.00 $8,400.00 Construction Solutions Group, LLC $286.00 $11,440.00 Engineer's Estimate 40 HOUR $225.00 $9,000.00

C0360 62201-0700 BACKHOE LOADER, 1 CUBIC YARD MINIMUM CAPACITY FRONTEND BUCKET, 10 CUBIC FOOT MINIMUM

CAPACITY BACKHOE BUCKET, 90 HP MINIMUM FLYWHEEL

Pipkin Inc., dba Pipkin Construction $190.00 $7,600.00 Rock Supremacy, LLC $180.00 $7,200.00 Accord Contractors $220.00 $8,800.00 Construction Solutions Group, LLC $258.50 $10,340.00 Engineer's Estimate 40 HOUR $222.00 $8,880.00

20 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0380 62201-3750 CHAIN SAW

Pipkin Inc., dba Pipkin Construction $87.00 $1,740.00 Rock Supremacy, LLC $120.00 $2,400.00 Accord Contractors $180.00 $3,600.00 Construction Solutions Group, LLC $220.00 $4,400.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00

C0400 62301-0000 GENERAL LABOR

Pipkin Inc., dba Pipkin Construction $75.00 $4,500.00 Rock Supremacy, LLC $120.00 $7,200.00 Accord Contractors $150.00 $9,000.00 Construction Solutions Group, LLC $110.00 $6,600.00 Engineer's Estimate 60 HOUR $127.00 $7,620.00

C0420 63302-0000 SIGN SYSTEM

Pipkin Inc., dba Pipkin Construction $90.00 $8,190.00 Rock Supremacy, LLC $88.00 $8,008.00 Accord Contractors $65.00 $5,915.00 Construction Solutions Group, LLC $45.10 $4,104.10 Engineer's Estimate 91 SQFT $175.00 $15,925.00

C0440 63308-3000 OBJECT MARKER, TYPE 3

Pipkin Inc., dba Pipkin Construction $375.00 $2,250.00 Rock Supremacy, LLC $440.00 $2,640.00 Accord Contractors $500.00 $3,000.00 Construction Solutions Group, LLC $550.00 $3,300.00 Engineer's Estimate 6 EACH $230.00 $1,380.00

C0460 63316-1000 REMOVE AND RESET SIGN

Pipkin Inc., dba Pipkin Construction $750.00 $750.00 Rock Supremacy, LLC $660.00 $660.00 Accord Contractors $800.00 $800.00 Construction Solutions Group, LLC $550.00 $550.00 Engineer's Estimate 1 EACH $1,000.00 $1,000.00

C0480 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (yellow)

Pipkin Inc., dba Pipkin Construction $0.70 $6,737.50 Rock Supremacy, LLC $0.49 $4,716.25 Accord Contractors $7.00 $67,375.00 Construction Solutions Group, LLC $2.48 $23,870.00 Engineer's Estimate 9,625 LNFT $4.50 $43,312.50

21 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0500 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (white)

Pipkin Inc., dba Pipkin Construction $0.70 $8,645.00 Rock Supremacy, LLC $0.49 $6,051.50 Accord Contractors $7.00 $86,450.00 Construction Solutions Group, LLC $2.48 $30,628.00 Engineer's Estimate 12,350 LNFT $4.50 $55,575.00

C0520 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (yellow)

Pipkin Inc., dba Pipkin Construction $0.70 $1,911.00 Rock Supremacy, LLC $0.49 $1,337.70 Accord Contractors $7.00 $19,110.00 Construction Solutions Group, LLC $2.48 $6,770.40 Engineer's Estimate 2,730 LNFT $3.00 $8,190.00

C0540 63501-0000 TEMPORARY TRAFFIC CONTROL

Pipkin Inc., dba Pipkin Construction Lump Sum $5,000.00 Rock Supremacy, LLC Lump Sum $27,500.00 Accord Contractors Lump Sum $7,000.00 Construction Solutions Group, LLC Lump Sum $44,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00

C0560 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Pipkin Inc., dba Pipkin Construction $85.00 $48,450.00 Rock Supremacy, LLC $82.50 $47,025.00 Accord Contractors $180.00 $102,600.00 Construction Solutions Group, LLC $101.20 $57,684.00 Engineer's Estimate 570 HOUR $110.00 $62,700.00

C0580 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Pipkin Inc., dba Pipkin Construction $1,300.00 $81,900.00 Rock Supremacy, LLC $1,300.00 $81,900.00 Accord Contractors $1,300.00 $81,900.00 Construction Solutions Group, LLC $101.20 $6,375.60 Engineer's Estimate 63 DAY $1,400.00 $88,200.00

C0600 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Pipkin Inc., dba Pipkin Construction $80.00 $5,840.00 Rock Supremacy, LLC $132.00 $9,636.00 Accord Contractors $500.00 $36,500.00 Construction Solutions Group, LLC $275.00 $20,075.00 Engineer's Estimate 73 DAY $275.00 $20,075.00

22 out of 22

Project No: WA USFS OkWen617 76(1)

Project Name: Icicle Creek Road Rock Fall Mitigation

Schedule: C

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0620 65101-2000 DRAPED ROCKFALL PROTECTION, CABLE NET

Pipkin Inc., dba Pipkin Construction $115.00 $649,750.00 Rock Supremacy, LLC $117.00 $661,050.00 Accord Contractors $130.00 $734,500.00 Construction Solutions Group, LLC $123.20 $696,080.00 Engineer's Estimate 5,650 SQYD $165.00 $932,250.00

C0640 65402-1000 ROADSIDE ROCKFALL PROTECTION, GABION BARRIER

Pipkin Inc., dba Pipkin Construction $395.00 $138,250.00 Rock Supremacy, LLC $605.00 $211,750.00 Accord Contractors $1,000.00 $350,000.00 Construction Solutions Group, LLC $440.00 $154,000.00 Engineer's Estimate 350 CUYD $796.00 $278,600.00

C0660 65602-0000 TEMPORARY ROADWAY ROCKFALL PROTECTION

Pipkin Inc., dba Pipkin Construction Lump Sum $170,000.00 Rock Supremacy, LLC Lump Sum $165,000.00 Accord Contractors Lump Sum $50,000.00 Construction Solutions Group, LLC Lump Sum $294,200.00 Engineer's Estimate ALL LPSM Lump Sum $104,000.00

Total Schedule - All Items

Pipkin Inc., dba Pipkin Construction $1,871,956.00 Rock Supremacy, LLC $2,389,275.95 Accord Contractors $2,781,180.00 Construction Solutions Group, LLC $2,895,826.00 Engineer's Estimate $2,720,505.00