This document contains a bid tabulation report for the OR FLAP DOT 46(1) project to restore Oregon Caves Highway (OR 46). Tidewater Contractors, Inc. was awarded the contract for $3,492,955.00 to be completed by March 1, 2023. The project is funded through the Federal Highway Administration and involves clearing and grubbing, roadway excavation, mechanically stabilized earth wall installation, asphalt paving, and erosion control measures. Six contractors submitted bids by the February 7, 2023 deadline, with cost estimates ranging from Tidewater Contractors' low bid to Conway Construction, Inc.'s high bid of $7,693,556.00.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 02/08/23
1 out of 10 Project No: OR FLAP DOT 46(1)
Project Name: Oregon Caves Highway (OR 46) Restoration
Schedule: A
Schedule Type: Base
Solcitation No: 69056722B000014
Division: Western Federal Lands
State: OR County: Josephine
Federal Land: Oregon Caves National Monument & Preserve Opened at: FHWA Vancouver, WA Office
Opened by: Robert Kolln
Date: 02/07/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
TIDEWATER CONTRACTORS INC. $3,492,955.00
PO Box 1956 Brookings, OR 97415
JRT Construction LLC $3,848,791.00 225 Driver Valley Road #100 Oakland, OR 97462
Steve Manning Construction Inc $3,947,940.00 P.O. Box 491660 Redding, CA 96049
Steelhead Constructors JV $4,274,707.00 PO Box 536 Palo Cedro, CA 96073
Rocky Mountain Construction LLC $4,521,640.00 4815 Tingley Lane #A Klamath Falls, OR 97603
Conway Construction, Inc. $7,693,556.00 6620 NW Whitney Rd. Suite 100 Vancouver, WA 98665
Engineer's Estimate $3,734,285.00
ANDRES
ARREDONDO
Digitally signed by
ANDRES ARREDONDO
Date: 2023.02.08 09:58:02 -08'00'
Tidewater Contractors, Inc 03/01/2023
2 out of 10 Project No: OR FLAP DOT 46(1)
Project Name: Oregon Caves Highway (OR 46) Restoration
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
TIDEWATER CONTRACTORS INC. Lump Sum $400,000.00 JRT Construction LLC Lump Sum $383,000.00 Steve Manning Construction Inc Lump Sum $300,000.00 Steelhead Constructors JV Lump Sum $420,000.00 Rocky Mountain Construction LLC Lump Sum $1,495,000.00 Conway Construction, Inc. Lump Sum $3,042,770.00 Engineer's Estimate ALL LPSM Lump Sum $400,000.00
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
TIDEWATER CONTRACTORS INC. Lump Sum $100,000.00 JRT Construction LLC Lump Sum $75,000.00 Steve Manning Construction Inc Lump Sum $29,700.00 Steelhead Constructors JV Lump Sum $75,000.00 Rocky Mountain Construction LLC Lump Sum $65,000.00 Conway Construction, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $55,000.00
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
TIDEWATER CONTRACTORS INC. Lump Sum $100,000.00 JRT Construction LLC Lump Sum $329,000.00 Steve Manning Construction Inc Lump Sum $92,000.00 Steelhead Constructors JV Lump Sum $250,000.00 Rocky Mountain Construction LLC Lump Sum $85,000.00 Conway Construction, Inc. Lump Sum $205,000.00 Engineer's Estimate ALL LPSM Lump Sum $74,000.00
A0080 15401-0000 CONTRACTOR TESTING
TIDEWATER CONTRACTORS INC. Lump Sum $100,000.00 JRT Construction LLC Lump Sum $200,000.00 Steve Manning Construction Inc Lump Sum $120,000.00 Steelhead Constructors JV Lump Sum $30,000.00 Rocky Mountain Construction LLC Lump Sum $180,000.00 Conway Construction, Inc. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $74,000.00
A0100 15501-0000 CONSTRUCTION SCHEDULE
TIDEWATER CONTRACTORS INC. Lump Sum $10,000.00 JRT Construction LLC Lump Sum $60,000.00 Steve Manning Construction Inc Lump Sum $21,000.00 Steelhead Constructors JV Lump Sum $10,000.00 Rocky Mountain Construction LLC Lump Sum $6,500.00 Conway Construction, Inc. Lump Sum $70,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
3 out of 10 Project No: OR FLAP DOT 46(1)
Project Name: Oregon Caves Highway (OR 46) Restoration
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE
TIDEWATER CONTRACTORS INC. $7.00 $7,350.00
JRT Construction LLC $4.50 $4,725.00 Steve Manning Construction Inc $8.00 $8,400.00 Steelhead Constructors JV $20.00 $21,000.00 Rocky Mountain Construction LLC $7.00 $7,350.00 Conway Construction, Inc. $6.00 $6,300.00 Engineer's Estimate 1,050 LNFT $10.00 $10,500.00
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
TIDEWATER CONTRACTORS INC. $8.00 $14,000.00
JRT Construction LLC $9.00 $15,750.00 Steve Manning Construction Inc $9.00 $15,750.00 Steelhead Constructors JV $9.00 $15,750.00 Rocky Mountain Construction LLC $10.00 $17,500.00 Conway Construction, Inc. $9.00 $15,750.00 Engineer's Estimate 1,750 LNFT $10.00 $17,500.00
A0160 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
TIDEWATER CONTRACTORS INC. $100.00 $300.00
JRT Construction LLC $100.00 $300.00 Steve Manning Construction Inc $400.00 $1,200.00 Steelhead Constructors JV $260.00 $780.00 Rocky Mountain Construction LLC $500.00 $1,500.00 Conway Construction, Inc. $250.00 $750.00 Engineer's Estimate 3 EACH $450.00 $1,350.00
A0180 20103-0000 CLEARING AND GRUBBING
TIDEWATER CONTRACTORS INC. $7.00 $6,300.00
JRT Construction LLC $38.00 $34,200.00 Steve Manning Construction Inc $30.00 $27,000.00 Steelhead Constructors JV $15.00 $13,500.00 Rocky Mountain Construction LLC $12.00 $10,800.00 Conway Construction, Inc. $25.00 $22,500.00 Engineer's Estimate 900 SQYD $25.00 $22,500.00
A0200 20301-1900 REMOVAL OF PIPE CULVERT
TIDEWATER CONTRACTORS INC. $2,500.00 $5,000.00
JRT Construction LLC $2,000.00 $4,000.00 Steve Manning Construction Inc $2,750.00 $5,500.00 Steelhead Constructors JV $1,600.00 $3,200.00 Rocky Mountain Construction LLC $2,850.00 $5,700.00 Conway Construction, Inc. $5,000.00 $10,000.00 Engineer's Estimate 2 EACH $3,500.00 $7,000.00
4 out of 10 Project No: OR FLAP DOT 46(1)
Project Name: Oregon Caves Highway (OR 46) Restoration
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0220 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (SOLDIER PILE WALL)
TIDEWATER CONTRACTORS INC. $50,000.00 $100,000.00
JRT Construction LLC $10,000.00 $20,000.00 Steve Manning Construction Inc $12,000.00 $24,000.00 Steelhead Constructors JV $55,000.00 $110,000.00 Rocky Mountain Construction LLC $12,800.00 $25,600.00 Conway Construction, Inc. $100,000.00 $200,000.00 Engineer's Estimate 2 EACH $25,000.00 $50,000.00
A0240 20302-1200 REMOVAL OF GUARDRAIL
TIDEWATER CONTRACTORS INC. $6.00 $8,520.00
JRT Construction LLC $5.00 $7,100.00 Steve Manning Construction Inc $5.00 $7,100.00 Steelhead Constructors JV $3.50 $4,970.00 Rocky Mountain Construction LLC $6.50 $9,230.00 Conway Construction, Inc. $5.00 $7,100.00 Engineer's Estimate 1,420 LNFT $15.00 $21,300.00
A0260 20401-0000 ROADWAY EXCAVATION
TIDEWATER CONTRACTORS INC. $75.00 $37,500.00
JRT Construction LLC $87.00 $43,500.00 Steve Manning Construction Inc $110.00 $55,000.00 Steelhead Constructors JV $84.00 $42,000.00 Rocky Mountain Construction LLC $62.00 $31,000.00 Conway Construction, Inc. $30.00 $15,000.00 Engineer's Estimate 500 CUYD $60.00 $30,000.00
A0280 20402-0000 SUBEXCAVATION
TIDEWATER CONTRACTORS INC. $75.00 $26,250.00
JRT Construction LLC $62.00 $21,700.00 Steve Manning Construction Inc $220.00 $77,000.00 Steelhead Constructors JV $68.00 $23,800.00 Rocky Mountain Construction LLC $70.00 $24,500.00 Conway Construction, Inc. $30.00 $10,500.00 Engineer's Estimate 350 CUYD $50.00 $17,500.00
A0300 20411-0000 SELECT BORROW
TIDEWATER CONTRACTORS INC. $70.00 $42,000.00
JRT Construction LLC $55.00 $33,000.00 Steve Manning Construction Inc $59.00 $35,400.00 Steelhead Constructors JV $64.00 $38,400.00 Rocky Mountain Construction LLC $45.00 $27,000.00 Conway Construction, Inc. $60.00 $36,000.00 Engineer's Estimate 600 TON $60.00 $36,000.00
5 out of 10 Project No: OR FLAP DOT 46(1)
Project Name: Oregon Caves Highway (OR 46) Restoration
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0320 20701-0400 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE D (WOVEN)
TIDEWATER CONTRACTORS INC. $4.00 $2,400.00
JRT Construction LLC $5.25 $3,150.00 Steve Manning Construction Inc $12.00 $7,200.00 Steelhead Constructors JV $5.50 $3,300.00 Rocky Mountain Construction LLC $4.50 $2,700.00 Conway Construction, Inc. $7.00 $4,200.00 Engineer's Estimate 600 SQYD $5.00 $3,000.00
A0340 20703-2000 GEOGRID, STABILIZATION
TIDEWATER CONTRACTORS INC. $4.00 $5,200.00
JRT Construction LLC $4.75 $6,175.00 Steve Manning Construction Inc $12.00 $15,600.00 Steelhead Constructors JV $3.50 $4,550.00 Rocky Mountain Construction LLC $6.00 $7,800.00 Conway Construction, Inc. $15.17 $19,721.00 Engineer's Estimate 1,300 SQYD $10.00 $13,000.00
A0360 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE
TIDEWATER CONTRACTORS INC. $160.00 $320,000.00
JRT Construction LLC $135.00 $270,000.00 Steve Manning Construction Inc $345.00 $690,000.00 Steelhead Constructors JV $220.00 $440,000.00 Rocky Mountain Construction LLC $185.00 $370,000.00 Conway Construction, Inc. $180.00 $360,000.00 Engineer's Estimate 2,000 SQFT $175.00 $350,000.00
A0380 30202-1000 ROADWAY AGGREGATE, METHOD 1
TIDEWATER CONTRACTORS INC. $75.00 $9,750.00
JRT Construction LLC $107.00 $13,910.00 Steve Manning Construction Inc $59.00 $7,670.00 Steelhead Constructors JV $110.00 $14,300.00 Rocky Mountain Construction LLC $100.00 $13,000.00 Conway Construction, Inc. $55.00 $7,150.00 Engineer's Estimate 130 TON $100.00 $13,000.00
A0400 30202-2000 ROADWAY AGGREGATE, METHOD 2
TIDEWATER CONTRACTORS INC. $70.00 $49,000.00
JRT Construction LLC $63.00 $44,100.00 Steve Manning Construction Inc $59.00 $41,300.00 Steelhead Constructors JV $57.00 $39,900.00 Rocky Mountain Construction LLC $60.00 $42,000.00 Conway Construction, Inc. $55.00 $38,500.00 Engineer's Estimate 700 TON $55.00 $38,500.00
6 out of 10 Project No: OR FLAP DOT 46(1)
Project Name: Oregon Caves Highway (OR 46) Restoration
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0420 30206-0500 ROADWAY AGGREGATE, SHOULDER FINISHING
TIDEWATER CONTRACTORS INC. $1.50 $58,500.00
JRT Construction LLC $2.10 $81,900.00 Steve Manning Construction Inc $1.30 $50,700.00 Steelhead Constructors JV $2.50 $97,500.00 Rocky Mountain Construction LLC $3.00 $117,000.00 Conway Construction, Inc. $2.00 $78,000.00 Engineer's Estimate 39,000 LNFT $3.00 $117,000.00
A0440 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
TIDEWATER CONTRACTORS INC. $145.00 $1,305,000.00
JRT Construction LLC $164.00 $1,476,000.00 Steve Manning Construction Inc $180.00 $1,620,000.00 Steelhead Constructors JV $190.00 $1,710,000.00 Rocky Mountain Construction LLC $130.00 $1,170,000.00 Conway Construction, Inc. $250.00 $2,250,000.00 Engineer's Estimate 9,000 TON $180.00 $1,620,000.00
A0500 41201-0000 TACK COAT
TIDEWATER CONTRACTORS INC. $1.00 $45.00
JRT Construction LLC $750.00 $33,750.00 Steve Manning Construction Inc $1,800.00 $81,000.00 Steelhead Constructors JV $890.00 $40,050.00 Rocky Mountain Construction LLC $679.00 $30,555.00 Conway Construction, Inc. $800.00 $36,000.00 Engineer's Estimate 45.0 TON $1,000.00 $45,000.00
A0520 41301-0900 ASPHALT PAVEMENT MILLING, 3 1/2-INCH DEPTH
TIDEWATER CONTRACTORS INC. $7.50 $360,000.00
JRT Construction LLC $7.25 $348,000.00 Steve Manning Construction Inc $5.20 $249,600.00 Steelhead Constructors JV $8.50 $408,000.00 Rocky Mountain Construction LLC $6.25 $300,000.00 Conway Construction, Inc. $8.00 $384,000.00 Engineer's Estimate 48,000 SQYD $6.00 $288,000.00
A0540 60201-0600 18-INCH PIPE CULVERT
TIDEWATER CONTRACTORS INC. $200.00 $13,000.00
JRT Construction LLC $242.00 $15,730.00 Steve Manning Construction Inc $180.00 $11,700.00 Steelhead Constructors JV $190.00 $12,350.00 Rocky Mountain Construction LLC $240.00 $15,600.00 Conway Construction, Inc. $200.00 $13,000.00 Engineer's Estimate 65 LNFT $175.00 $11,375.00
7 out of 10 Project No: OR FLAP DOT 46(1)
Project Name: Oregon Caves Highway (OR 46) Restoration
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0560 60704-0000 CLEANING CULVERT IN PLACE
TIDEWATER CONTRACTORS INC. $1,700.00 $47,600.00
JRT Construction LLC $1,350.00 $37,800.00 Steve Manning Construction Inc $1,000.00 $28,000.00 Steelhead Constructors JV $2,400.00 $67,200.00 Rocky Mountain Construction LLC $1,200.00 $33,600.00 Conway Construction, Inc. $4,000.00 $112,000.00 Engineer's Estimate 28 EACH $2,500.00 $70,000.00
A0580 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS (8' POSTS)
TIDEWATER CONTRACTORS INC. $40.00 $49,000.00
JRT Construction LLC $35.00 $42,875.00 Steve Manning Construction Inc $46.00 $56,350.00 Steelhead Constructors JV $46.00 $56,350.00 Rocky Mountain Construction LLC $45.00 $55,125.00 Conway Construction, Inc. $45.00 $55,125.00 Engineer's Estimate 1,225 LNFT $55.00 $67,375.00
A0600 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
TIDEWATER CONTRACTORS INC. $32.00 $21,600.00
JRT Construction LLC $28.00 $18,900.00 Steve Manning Construction Inc $42.00 $28,350.00 Steelhead Constructors JV $41.00 $27,675.00 Rocky Mountain Construction LLC $36.00 $24,300.00 Conway Construction, Inc. $40.00 $27,000.00 Engineer's Estimate 675 LNFT $45.00 $30,375.00
A0620 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
TIDEWATER CONTRACTORS INC. $5,050.00 $60,600.00
JRT Construction LLC $3,925.00 $47,100.00 Steve Manning Construction Inc $4,100.00 $49,200.00 Steelhead Constructors JV $4,400.00 $52,800.00 Rocky Mountain Construction LLC $5,100.00 $61,200.00 Conway Construction, Inc. $4,500.00 $54,000.00 Engineer's Estimate 12 EACH $4,500.00 $54,000.00
A0640 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
TIDEWATER CONTRACTORS INC. $130.00 $2,600.00
JRT Construction LLC $135.00 $2,700.00 Steve Manning Construction Inc $140.00 $2,800.00 Steelhead Constructors JV $185.00 $3,700.00 Rocky Mountain Construction LLC $235.00 $4,700.00 Conway Construction, Inc. $170.00 $3,400.00 Engineer's Estimate 20 HOUR $170.00 $3,400.00
8 out of 10 Project No: OR FLAP DOT 46(1)
Project Name: Oregon Caves Highway (OR 46) Restoration
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0660 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
TIDEWATER CONTRACTORS INC. $175.00 $3,500.00
JRT Construction LLC $114.00 $2,280.00 Steve Manning Construction Inc $140.00 $2,800.00 Steelhead Constructors JV $175.00 $3,500.00 Rocky Mountain Construction LLC $185.00 $3,700.00 Conway Construction, Inc. $170.00 $3,400.00 Engineer's Estimate 20 HOUR $165.00 $3,300.00
A0680 62201-2050 ROLLER
TIDEWATER CONTRACTORS INC. $150.00 $3,000.00
JRT Construction LLC $126.00 $2,520.00 Steve Manning Construction Inc $140.00 $2,800.00 Steelhead Constructors JV $150.00 $3,000.00 Rocky Mountain Construction LLC $225.00 $4,500.00 Conway Construction, Inc. $170.00 $3,400.00 Engineer's Estimate 20 HOUR $180.00 $3,600.00
A0700 62301-0000 GENERAL LABOR
TIDEWATER CONTRACTORS INC. $80.00 $3,200.00
JRT Construction LLC $62.00 $2,480.00 Steve Manning Construction Inc $90.00 $3,600.00 Steelhead Constructors JV $100.00 $4,000.00 Rocky Mountain Construction LLC $120.00 $4,800.00 Conway Construction, Inc. $85.00 $3,400.00 Engineer's Estimate 40 HOUR $100.00 $4,000.00
A0720 62901-1000 ROLLED EROSION CONTROL PRODUCT, TYPE 3.B
TIDEWATER CONTRACTORS INC. $8.00 $2,400.00
JRT Construction LLC $10.10 $3,030.00 Steve Manning Construction Inc $10.00 $3,000.00 Steelhead Constructors JV $19.00 $5,700.00 Rocky Mountain Construction LLC $22.00 $6,600.00 Conway Construction, Inc. $25.00 $7,500.00 Engineer's Estimate 300 SQYD $8.00 $2,400.00
A0740 63316-1000 REMOVE AND RESET SIGN
TIDEWATER CONTRACTORS INC. $750.00 $750.00
JRT Construction LLC $900.00 $900.00 Steve Manning Construction Inc $300.00 $300.00 Steelhead Constructors JV $710.00 $710.00 Rocky Mountain Construction LLC $1,950.00 $1,950.00 Conway Construction, Inc. $600.00 $600.00 Engineer's Estimate 1 EACH $650.00 $650.00
9 out of 10 Project No: OR FLAP DOT 46(1)
Project Name: Oregon Caves Highway (OR 46) Restoration
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0760 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID (YELLOW)
TIDEWATER CONTRACTORS INC. $0.33 $12,870.00
JRT Construction LLC $0.21 $8,190.00 Steve Manning Construction Inc $0.40 $15,600.00 Steelhead Constructors JV $0.57 $22,230.00 Rocky Mountain Construction LLC $0.30 $11,700.00 Conway Construction, Inc. $0.30 $11,700.00 Engineer's Estimate 39,000 LNFT $0.30 $11,700.00
A0780 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID (WHITE)
TIDEWATER CONTRACTORS INC. $0.34 $13,260.00
JRT Construction LLC $0.23 $8,970.00 Steve Manning Construction Inc $0.40 $15,600.00 Steelhead Constructors JV $0.57 $22,230.00 Rocky Mountain Construction LLC $0.30 $11,700.00 Conway Construction, Inc. $0.30 $11,700.00 Engineer's Estimate 39,000 LNFT $0.30 $11,700.00
A0800 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
TIDEWATER CONTRACTORS INC. Lump Sum $70,000.00 JRT Construction LLC Lump Sum $40,000.00 Steve Manning Construction Inc Lump Sum $21,000.00 Steelhead Constructors JV Lump Sum $29,000.00 Rocky Mountain Construction LLC Lump Sum $100,000.00 Conway Construction, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00
A0820 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TIDEWATER CONTRACTORS INC. $300.00 $1,200.00
JRT Construction LLC $240.00 $960.00 Steve Manning Construction Inc $120.00 $480.00 Steelhead Constructors JV $390.00 $1,560.00 Rocky Mountain Construction LLC $215.00 $860.00 Conway Construction, Inc. $350.00 $1,400.00 Engineer's Estimate 4 EACH $300.00 $1,200.00
A0840 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
TIDEWATER CONTRACTORS INC. $50.00 $4,000.00
JRT Construction LLC $30.00 $2,400.00 Steve Manning Construction Inc $50.00 $4,000.00 Steelhead Constructors JV $100.00 $8,000.00 Rocky Mountain Construction LLC $27.00 $2,160.00 Conway Construction, Inc. $40.00 $3,200.00 Engineer's Estimate 80 EACH $30.00 $2,400.00
10 out of 10 Project No: OR FLAP DOT 46(1)
Project Name: Oregon Caves Highway (OR 46) Restoration
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0860 63502-2900 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS, AND LETTERS (STOP BAR)
TIDEWATER CONTRACTORS INC. $500.00 $1,000.00
JRT Construction LLC $1,500.00 $3,000.00 Steve Manning Construction Inc $400.00 $800.00 Steelhead Constructors JV $320.00 $640.00 Rocky Mountain Construction LLC $1,000.00 $2,000.00 Conway Construction, Inc. $750.00 $1,500.00 Engineer's Estimate 2 EACH $350.00 $700.00
A0880 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER (PINNED)
TIDEWATER CONTRACTORS INC. $60.00 $26,400.00
JRT Construction LLC $40.00 $17,600.00 Steve Manning Construction Inc $57.00 $25,080.00 Steelhead Constructors JV $69.00 $30,360.00 Rocky Mountain Construction LLC $52.00 $22,880.00 Conway Construction, Inc. $50.00 $22,000.00 Engineer's Estimate 440 LNFT $40.00 $17,600.00
A0900 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TIDEWATER CONTRACTORS INC. $40.00 $13,360.00
JRT Construction LLC $44.00 $14,696.00 Steve Manning Construction Inc $40.00 $13,360.00 Steelhead Constructors JV $53.00 $17,702.00 Rocky Mountain Construction LLC $45.00 $15,030.00 Conway Construction, Inc. $35.00 $11,690.00 Engineer's Estimate 334 SQFT $40.00 $13,360.00
A0920 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
TIDEWATER CONTRACTORS INC. $85.00 $76,500.00
JRT Construction LLC $76.00 $68,400.00 Steve Manning Construction Inc $90.00 $81,000.00 Steelhead Constructors JV $100.00 $90,000.00 Rocky Mountain Construction LLC $105.00 $94,500.00 Conway Construction, Inc. $87.00 $78,300.00 Engineer's Estimate 900 HOUR $90.00 $81,000.00
Total Schedule - All Items
TIDEWATER CONTRACTORS INC. $3,492,955.00
JRT Construction LLC $3,848,791.00 Steve Manning Construction Inc $3,947,940.00 Steelhead Constructors JV $4,274,707.00 Rocky Mountain Construction LLC $4,521,640.00 Conway Construction, Inc. $7,693,556.00 Engineer's Estimate $3,734,285.00