This is a Bid Tabulation Report for a federal highway construction project conducted by the Western Federal Lands Highway Division (WFLHD). The project, ID FLAP BONNER 841(1), involves improvements to Trestle Creek Road, Mile Post 100 to 103.7 in Bonner County, Idaho, located on Kaniksu National Forest lands. The solicitation number is 69056725R000015, and bids were opened on February 26, 2026 at WFLHD's Vancouver, Washington office. Four responsive contractors submitted bids: M.A. DeAtley Construction, Inc. ($4,404,980.00), Thompson Contracting, Inc. ($4,264,915.00), MJ Hughes Construction ($3,463,239.50), and Granite Construction Company, which was marked non-responsive with a bid of $3,828,445.00. The Engineer's Estimate was $5,043,000.00. MJ Hughes Construction was awarded the contract on March 12, 2026, as the lowest responsive bidder.

The tabulation details 37 line items covering site preparation, earthwork, erosion control, pavement, drainage structures, riprap placement, traffic control, and environmental mitigation work. Pricing is structured by line item with unit prices and extended amounts. Key work includes roadway excavation (6,500 cubic yards), asphalt concrete pavement (8,000 tons), aggregate base grading (10,000 cubic yards), and extensive riprap placement. Labor, equipment rental, and miscellaneous services are itemized with specific hourly or daily rates. The report was generated on February 26, 2026 by Rebekah Webb and certified by Contracting Officer Marino Chea on the same date, spanning 11 pages of detailed bid comparisons.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TABULATION REPORT

Project No. : ID FLAP BONNER 841(1) Project Name: Trestle Creek Road, MP 100 to 103.7

Contractor Responsive? Base Schedule A M.A. DeAtley Construction, Inc. $4,404,980.00 Thompson Contracting, Inc. $4,264,915.00 Granite Construction Company No $3,828,445.00 MJ Hughes Construction $3,463,239.50 Engineer's Estimate $5,043,000.00

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Rebekah Webb

Project No. : ID FLAP BONNER 841 (1)

Project Name: Trestle Creek Road, MP 100 to 103.7

Division: Western Federal Lands

Schedule: A Schedule Type: Base Lead Designer: Emily King Solicitation No. : 69056725R000015 Opened at: WFLHD Vancouver, WA

Opened by: Rebekah Webb

State: ID County: Bonner Federal Land: Kaniksu National

Forest Bid Open Date and Time: 02/26/2026

Contract Awarded to: Award Date:

Contractor Comment Bid Amount Responsive M.A. DeAtley Construction, Inc., 829 Evans Rd., Clarkston, WA, 99403

$4,404,980.00

Thompson Contracting, Inc., PO Box 449, Libby, MT, 59923

$4,264,915.00

Granite Construction Company, 585 West Beach Street, Watsonville, CA, 95076

$3,828,445.00 No

MJ Hughes Construction, 11510 NE 87th Ave, Vancouver, WA, 98662

$3,463,239.50

Engineer's Estimate $5,043,000.00

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Date:

Project No. : ID FLAP BONNER 841(1) Project Name: Trestle Creek Road, MP 100 to 103.7 Schedule: A Schedule Type: Base

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Rebekah Webb

MARINO

CHEA

Digitally signed by

MARINO CHEA

Date: 2026.02.26 10:12:27 -08'00'

MJ Hughes Construction 3/12/2026

Line Item Number

Pay Item Number Description Contractor Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION M.A. DeAtley Construction, Inc. $582,985.00

Thompson Contracting, Inc. $440,000.00

Granite Construction Company $382,000.00

MJ Hughes Construction $345,000.00

Engineer's Estimate ALL LPSM LPSM $416,665.00

A0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

Granite Construction Company $276,000.00

M.A. DeAtley Construction, Inc. $125,000.00

MJ Hughes Construction $103,000.00

Thompson Contracting, Inc. $68,000.00

Engineer's Estimate ALL LPSM LPSM $86,000.00

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL

Thompson Contracting, Inc. $555,000.00

Granite Construction Company $278,000.00

M.A. DeAtley Construction, Inc. $265,000.00

MJ Hughes Construction $250,000.00

Engineer's Estimate ALL LPSM LPSM $108,000.00

A0080 15401-0000 CONTRACTOR

TESTING

Thompson Contracting, Inc. $350,000.00

Granite Construction Company $285,000.00

MJ Hughes Construction $250,000.00

M.A. DeAtley Construction, Inc. $150,000.00

Engineer's Estimate ALL LPSM LPSM $86,000.00

A0100 15501-0000 CONSTRUCTION

SCHEDULE

Granite Construction Company $275,000.00

Thompson Contracting, Inc. $100,000.00

MJ Hughes Construction $85,000.00

M.A. DeAtley Construction, Inc. $5,000.00

Engineer's Estimate ALL LPSM LPSM $22,000.00

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0120 15705-0100 SOIL EROSION

CONTROL, SILT

FENCE

Thompson Contracting, Inc. 6,400.000 $8.00 $51,200.00

M.A. DeAtley Construction, Inc. 6,400.000 $7.50 $48,000.00

MJ Hughes Construction 6,400.000 $6.75 $43,200.00

Granite Construction Company 6,400.000 $3.50 $22,400.00

Engineer's Estimate 6,400.000 LNFT $9.75 $62,400.00

A0140 15705-1400 SOIL EROSION

CONTROL, FIBER

ROLL

Thompson Contracting, Inc. 4,530.000 $8.00 $36,240.00

MJ Hughes Construction 4,530.000 $6.75 $30,577.50

M.A. DeAtley Construction, Inc. 4,530.000 $6.50 $29,445.00

Granite Construction Company 4,530.000 $4.00 $18,120.00

Engineer's Estimate 4,530.000 LNFT $8.50 $38,505.00

A0160 15802-0000 WATERING FOR

DUST CONTROL

M.A. DeAtley Construction, Inc. $115,000.00

Thompson Contracting, Inc. $96,000.00

Granite Construction Company $45,000.00

MJ Hughes Construction $38,100.00

Engineer's Estimate ALL LPSM LPSM $45,000.00

A0180 20103-0000 CLEARING AND

GRUBBING

M.A. DeAtley Construction, Inc. 2,400.000 $12.00 $28,800.00

MJ Hughes Construction 2,400.000 $9.00 $21,600.00

Granite Construction Company 2,400.000 $4.50 $10,800.00

Thompson Contracting, Inc. 2,400.000 $2.00 $4,800.00

Engineer's Estimate 2,400.000 SQYD $9.00 $21,600.00

A0200 20301-0700 REMOVAL OF

DELINEATOR

MJ Hughes Construction 6.000 $75.00 $450.00

Granite Construction Company 6.000 $50.00 $300.00

M.A. DeAtley Construction, Inc. 6.000 $15.00 $90.00

Thompson Contracting, Inc. 6.000 $15.00 $90.00

Engineer's Estimate 6.000 EACH $170.00 $1,020.00

A0220 20301-1900 REMOVAL OF PIPE

CULVERT

M.A. DeAtley Construction, Inc. 5.000 $2,500.00 $12,500.00

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0220 20301-1900 REMOVAL OF PIPE

CULVERT

MJ Hughes Construction 5.000 $1,500.00 $7,500.00

Thompson Contracting, Inc. 5.000 $1,400.00 $7,000.00

Granite Construction Company 5.000 $350.00 $1,750.00

Engineer's Estimate 5.000 EACH $2,600.00 $13,000.00 A0240 20301-2400 REMOVAL OF SIGN Granite Construction

Company 8.000 $100.00 $800.00

MJ Hughes Construction 8.000 $93.00 $744.00

Thompson Contracting, Inc. 8.000 $60.00 $480.00

M.A. DeAtley Construction, Inc. 8.000 $50.00 $400.00

Engineer's Estimate 8.000 EACH $170.00 $1,360.00

A0260 20301-2800 REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS (36

-INCH DIAMETER

WELL)

M.A. DeAtley Construction, Inc. 1.000 $7,500.00 $7,500.00

Granite Construction Company 1.000 $5,000.00 $5,000.00

MJ Hughes Construction 1.000 $5,000.00 $5,000.00

Thompson Contracting, Inc. 1.000 $2,500.00 $2,500.00

Engineer's Estimate 1.000 EACH $1,200.00 $1,200.00

A0280 20301-2800 REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

(LOG SILL)

M.A. DeAtley Construction, Inc. 1.000 $5,000.00 $5,000.00

MJ Hughes Construction 1.000 $5,000.00 $5,000.00

Granite Construction Company 1.000 $3,000.00 $3,000.00

Thompson Contracting, Inc. 1.000 $2,000.00 $2,000.00

Engineer's Estimate 1.000 EACH $920.00 $920.00

A0300 20401-0000 ROADWAY

EXCAVATION

M.A. DeAtley Construction, Inc. 6,500.000 $65.00 $422,500.00

Granite Construction Company 6,500.000 $27.00 $175,500.00

Thompson Contracting, Inc. 6,500.000 $25.00 $162,500.00

MJ Hughes Construction 6,500.000 $15.00 $97,500.00

Engineer's Estimate 6,500.000 CUYD $60.00 $390,000.00 A0320 20410-0000 SELECT BORROW Thompson

Contracting, Inc. 400.000 $80.00 $32,000.00

MJ Hughes Construction 400.000 $75.00 $30,000.00

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0320 20410-0000 SELECT BORROW M.A. DeAtley Construction, Inc. 400.000 $72.50 $29,000.00

Granite Construction Company 400.000 $45.00 $18,000.00

Engineer's Estimate 400.000 CUYD $80.00 $32,000.00

A0340 20701-0100 SEPARATION-

STABILIZATION

GEOTEXTILE, CLASS

1, TYPE A (WOVEN)

M.A. DeAtley Construction, Inc. 5,000.000 $4.00 $20,000.00

Thompson Contracting, Inc. 5,000.000 $2.50 $12,500.00

MJ Hughes Construction 5,000.000 $2.35 $11,750.00

Granite Construction Company 5,000.000 $2.00 $10,000.00

Engineer's Estimate 5,000.000 SQYD $2.75 $13,750.00

A0360 25101-0200 PLACED RIPRAP,

METHOD A, CLASS

Thompson Contracting, Inc. 34.000 $170.00 $5,780.00

M.A. DeAtley Construction, Inc. 34.000 $165.00 $5,610.00

MJ Hughes Construction 34.000 $150.00 $5,100.00

Granite Construction Company 34.000 $100.00 $3,400.00

Engineer's Estimate 34.000 CUYD $330.00 $11,220.00

A0380 25101-0400 PLACED RIPRAP,

METHOD A, CLASS

M.A. DeAtley Construction, Inc. 2,650.000 $160.00 $424,000.00

MJ Hughes Construction 2,650.000 $110.00 $291,500.00

Granite Construction Company 2,650.000 $100.00 $265,000.00

Thompson Contracting, Inc. 2,650.000 $45.00 $119,250.00

Engineer's Estimate 2,650.000 CUYD $230.00 $609,500.00

A0400 25126-0000 REMOVE AND

RESET BOULDER

Granite Construction Company 1.000 $13,000.00 $13,000.00

Thompson Contracting, Inc. 1.000 $1,000.00 $1,000.00

M.A. DeAtley Construction, Inc. 1.000 $900.00 $900.00

MJ Hughes Construction 1.000 $750.00 $750.00

Engineer's Estimate 1.000 EACH $150.00 $150.00

A0420 30103-2000 AGGREGATE BASE

GRADING D

M.A. DeAtley Construction, Inc. 10,000.000 $72.50 $725,000.00

Thompson Contracting, Inc. 10,000.000 $59.00 $590,000.00

Granite Construction Company 10,000.000 $53.00 $530,000.00

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0420 30103-2000 AGGREGATE BASE

GRADING D

MJ Hughes Construction 10,000.000 $52.00 $520,000.00

Engineer's Estimate 10,000.000 CUYD $70.00 $700,000.00

A0460 30302-1000 DITCH

RECONDITIONING

M.A. DeAtley Construction, Inc. 5,000.000 $10.25 $51,250.00

Granite Construction Company 5,000.000 $4.30 $21,500.00

Thompson Contracting, Inc. 5,000.000 $2.00 $10,000.00

MJ Hughes Construction 5,000.000 $1.75 $8,750.00

Engineer's Estimate 5,000.000 LNFT $13.90 $69,500.00

A0480 40101-0600 ASPHALT

CONCRETE

PAVEMENT,

GYRATORY MIX,

1/2-INCH

NOMINAL

MAXIMUM SIZE

AGGREGATE, 0.3

TO <3 MILLION

ESAL

Thompson Contracting, Inc. 8,000.000 $125.00 $1,000,000.00

MJ Hughes Construction 8,000.000 $105.00 $840,000.00

M.A. DeAtley Construction, Inc. 8,000.000 $95.00 $760,000.00

Granite Construction Company 8,000.000 $90.00 $720,000.00

Engineer's Estimate 8,000.000 TON $175.00 $1,400,000.00 A0540 41201-0000 TACK COAT Thompson

Contracting, Inc. 11.000 $1,200.00 $13,200.00

MJ Hughes Construction 11.000 $1,100.00 $12,100.00

M.A. DeAtley Construction, Inc. 11.000 $950.00 $10,450.00

Granite Construction Company 11.000 $900.00 $9,900.00

Engineer's Estimate 11.000 TON $2,100.00 $23,100.00

A0560 60201-0600 18-INCH PIPE

CULVERT

MJ Hughes Construction 150.000 $160.00 $24,000.00

M.A. DeAtley Construction, Inc. 150.000 $140.00 $21,000.00

Granite Construction Company 150.000 $130.00 $19,500.00

Thompson Contracting, Inc. 150.000 $100.00 $15,000.00

Engineer's Estimate 150.000 LNFT $140.00 $21,000.00

A0580 60704-0000 CLEANING

CULVERT IN PLACE

M.A. DeAtley Construction, Inc. 32.000 $1,000.00 $32,000.00

Thompson Contracting, Inc. 32.000 $1,000.00 $32,000.00

Granite Construction Company 32.000 $700.00 $22,400.00

MJ Hughes Construction 32.000 $600.00 $19,200.00

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0580 60704-0000 CLEANING

CULVERT IN PLACE Engineer's Estimate 32.000 EACH $2,000.00 $64,000.00

A0600 62201-0150 DUMP TRUCK, 7

CUBIC YARD

MINIMUM

CAPACITY

MJ Hughes Construction 60.000 $200.00 $12,000.00

Thompson Contracting, Inc. 60.000 $175.00 $10,500.00

M.A. DeAtley Construction, Inc. 60.000 $165.00 $9,900.00

Granite Construction Company 60.000 $155.00 $9,300.00

Engineer's Estimate 60.000 HOUR $125.00 $7,500.00

A0620 62201-0900 WHEEL LOADER, 2

CUBIC YARD

MINIMUM RATED

CAPACITY

MJ Hughes Construction 20.000 $200.00 $4,000.00

Thompson Contracting, Inc. 20.000 $175.00 $3,500.00

M.A. DeAtley Construction, Inc. 20.000 $170.00 $3,400.00

Granite Construction Company 20.000 $165.00 $3,300.00

Engineer's Estimate 20.000 HOUR $230.00 $4,600.00

A0640 62201-2850 MOTOR GRADER,

12 FOOT

MINIMUM BLADE

M.A. DeAtley Construction, Inc. 40.000 $215.00 $8,600.00

MJ Hughes Construction 40.000 $200.00 $8,000.00

Granite Construction Company 40.000 $180.00 $7,200.00

Thompson Contracting, Inc. 40.000 $175.00 $7,000.00

Engineer's Estimate 40.000 HOUR $250.00 $10,000.00

A0660 62201-3350 HYDRAULIC

EXCAVATOR, 1

CUBIC YARD

MINIMUM

CAPACITY

MJ Hughes Construction 100.000 $200.00 $20,000.00

Thompson Contracting, Inc. 100.000 $200.00 $20,000.00

M.A. DeAtley Construction, Inc. 100.000 $185.00 $18,500.00

Granite Construction Company 100.000 $150.00 $15,000.00

Engineer's Estimate 100.000 HOUR $230.00 $23,000.00 A0680 62301-0000 GENERAL LABOR MJ Hughes

Construction 100.000 $150.00 $15,000.00

Thompson Contracting, Inc. 100.000 $100.00 $10,000.00

Granite Construction Company 100.000 $70.00 $7,000.00

M.A. DeAtley Construction, Inc. 100.000 $60.00 $6,000.00

Engineer's Estimate 100.000 HOUR $100.00 $10,000.00

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0700 62403-0000 FURNISHING AND

PLACING TOPSOIL

Thompson Contracting, Inc. 50.000 $120.00 $6,000.00

Granite Construction Company 50.000 $100.00 $5,000.00

M.A. DeAtley Construction, Inc. 50.000 $100.00 $5,000.00

MJ Hughes Construction 50.000 $80.00 $4,000.00

Engineer's Estimate 50.000 CUYD $190.00 $9,500.00

A0720 62635-3000 CUTTINGS,

WILLOW POLE

(GOVERNMENT -

FURNISHED)

M.A. DeAtley Construction, Inc. 650.000 $25.00 $16,250.00

Thompson Contracting, Inc. 650.000 $22.00 $14,300.00

Granite Construction Company 650.000 $9.00 $5,850.00

MJ Hughes Construction 650.000 $9.00 $5,850.00

Engineer's Estimate 650.000 EACH $15.50 $10,075.00 A0740 63302-0000 SIGN SYSTEM Thompson

Contracting, Inc. 160.000 $150.00 $24,000.00

M.A. DeAtley Construction, Inc. 160.000 $110.00 $17,600.00

Granite Construction Company 160.000 $85.00 $13,600.00

MJ Hughes Construction 160.000 $75.00 $12,000.00

Engineer's Estimate 160.000 SQFT $170.00 $27,200.00

A0760 63309-0300 DELINEATOR, TYPE

3 (WHITE)

Thompson Contracting, Inc. 11.000 $340.00 $3,740.00

MJ Hughes Construction 11.000 $200.00 $2,200.00

Granite Construction Company 11.000 $110.00 $1,210.00

M.A. DeAtley Construction, Inc. 11.000 $60.00 $660.00

Engineer's Estimate 11.000 EACH $190.00 $2,090.00

A0780 63401-1500 PAVEMENT

MARKINGS, TYPE H,

SOLID (WHITE,

STOP BAR)

M.A. DeAtley Construction, Inc. 90.000 $20.00 $1,800.00

MJ Hughes Construction 90.000 $20.00 $1,800.00

Thompson Contracting, Inc. 90.000 $6.50 $585.00

Granite Construction Company 90.000 $5.00 $450.00

Engineer's Estimate 90.000 LNFT $4.00 $360.00

A0800 63401-1500 PAVEMENT

MARKINGS, TYPE H,

SOLID (YELLOW)

M.A. DeAtley Construction, Inc. 210.000 $20.00 $4,200.00

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0800 63401-1500 PAVEMENT

MARKINGS, TYPE H,

SOLID (YELLOW)

MJ Hughes Construction 210.000 $20.00 $4,200.00

Thompson Contracting, Inc. 210.000 $3.00 $630.00

Granite Construction Company 210.000 $2.50 $525.00

Engineer's Estimate 210.000 LNFT $3.50 $735.00

A0820 63501-0000 TEMPORARY

TRAFFIC CONTROL

MJ Hughes Construction $100,000.00

Granite Construction Company $75,000.00

Thompson Contracting, Inc. $44,000.00

M.A. DeAtley Construction, Inc. $20,000.00

Engineer's Estimate ALL LPSM LPSM $22,500.00

A0840 63502-2000 TEMPORARY

TRAFFIC CONTROL,

PORTABLE

CHANGEABLE

MESSAGE SIGN

Thompson Contracting, Inc. 2.000 $10,000.00 $20,000.00

MJ Hughes Construction 2.000 $7,500.00 $15,000.00

Granite Construction Company 2.000 $7,000.00 $14,000.00

M.A. DeAtley Construction, Inc. 2.000 $6,600.00 $13,200.00

Engineer's Estimate 2.000 EACH $20,000.00 $40,000.00

A0860 63507-0600 TEMPORARY

TRAFFIC CONTROL,

PILOT CAR

Thompson Contracting, Inc. 105.000 $1,200.00 $126,000.00

Granite Construction Company 105.000 $800.00 $84,000.00

MJ Hughes Construction 105.000 $800.00 $84,000.00

M.A. DeAtley Construction, Inc. 105.000 $550.00 $57,750.00

Engineer's Estimate 105.000 DAY $850.00 $89,250.00

A0880 63507-0700 TEMPORARY

TRAFFIC CONTROL,

TRAFFIC CONTROL

SUPERVISOR

Thompson Contracting, Inc. 105.000 $1,700.00 $178,500.00

MJ Hughes Construction 105.000 $1,000.00 $105,000.00

Granite Construction Company 105.000 $800.00 $84,000.00

M.A. DeAtley Construction, Inc. 105.000 $635.00 $66,675.00

Engineer's Estimate 105.000 DAY $1,300.00 $136,500.00

A0900 64703-5000 MITIGATION, ROOT

WAD (CONSERVED)

M.A. DeAtley Construction, Inc. 5.000 $1,450.00 $7,250.00

Thompson Contracting, Inc. 5.000 $1,000.00 $5,000.00

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0900 64703-5000 MITIGATION, ROOT

WAD (CONSERVED)

Granite Construction Company 5.000 $700.00 $3,500.00

MJ Hughes Construction 5.000 $480.00 $2,400.00

Engineer's Estimate 5.000 EACH $7,000.00 $35,000.00

A0920 64703-6000 MITIGATION, FISH

PASSAGE BOULDER

(CONSERVED)

Granite Construction Company 150.000 $325.00 $48,750.00

M.A. DeAtley Construction, Inc. 150.000 $260.00 $39,000.00

Thompson Contracting, Inc. 150.000 $240.00 $36,000.00

MJ Hughes Construction 150.000 $48.00 $7,200.00

Engineer's Estimate 150.000 EACH $900.00 $135,000.00

A0940 64704-1000 MITIGATION,

STREAMBED

MATERIAL

(CONSERVED BANK

STONE)

M.A. DeAtley Construction, Inc. 13.000 $405.00 $5,265.00

Thompson Contracting, Inc. 13.000 $240.00 $3,120.00

MJ Hughes Construction 13.000 $86.00 $1,118.00

Granite Construction Company 13.000 $30.00 $390.00

Engineer's Estimate 13.000 CUYD $600.00 $7,800.00

A0960 64704-1000 MITIGATION,

STREAMBED

MATERIAL

(CONSERVED)

M.A. DeAtley Construction, Inc. 1,300.000 $175.00 $227,500.00

Thompson Contracting, Inc. 1,300.000 $35.00 $45,500.00

Granite Construction Company 1,300.000 $30.00 $39,000.00

MJ Hughes Construction 1,300.000 $10.50 $13,650.00

Engineer's Estimate 1,300.000 CUYD $180.00 $234,000.00

Report Generated on 02/26/2026 1:08 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

File details come from the government source that posted it. Updated .