This document contains a bid tabulation report and related federal contract opportunity notice for the CO NP MULTI PMS(2) Pavement Preservation Colorado Phase 2 project. The bid tabulation report shows Intermountain Slurry Seal, Inc. provided the lowest bid of $7,404,400.00. The next lowest bids were from VSS International, Inc. at $9,294,325.00, H-K CONTRACTORS, INC at $10,900,890.00, and Central Southern Construction Corp. at $11,732,950.00. The engineer's estimate was $7,472,050.00. The related federal contract opportunity notice indicates contract 69056724D000003 for the project was awarded to Intermountain Slurry Seal, Inc. for $7,404,400.00, to be carried out starting February 1, 2024. The solicitation was issued by the Department of Transportation Federal Highway Administration. The project involves pavement preservation work across multiple locations in Colorado.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 12/19/23

1 out of 10 Project No: CO NP MULTI PMS(2)

Project Name: Pavement Preservation Colorado Phase 2

Schedule: A

Schedule Type: Base

Solcitation No: 69056723R000012

Division: Western Federal Lands

State: CO, WY County: Montrose, Mesa, Teller, Goshen

Federal Land: Opened at: FHWA Vancouver, WA Office

Opened by: Andres Arredondo

Date: 12/19/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Intermountain Slurry Seal, Inc. $7,404,400.00 520 North 400 West North Salt Lake, UT 84054

VSS International, Inc. $9,294,325.00 3785 Channel Drive West Sacramento, CA 95691

H-K CONTRACTORS, INC $10,900,890.00

P.O. BOX 51450

Idaho Falls , ID 834051450

Central Southern Construction Corp. $11,732,950.00 119 Sewald Street Jacksonville, FL 32204

Engineer's Estimate $7,472,050.00

ANDRES

ARREDONDO

Digitally signed by

ANDRES ARREDONDO

Date: 2023.12.19 15:26:52 -08'00'

Intermountain Slurry Seal, Inc. 02/01/2024

2 out of 10 Project No: CO NP MULTI PMS(2)

Project Name: Pavement Preservation Colorado Phase 2

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Intermountain Slurry Seal, Inc. Lump Sum $1,400,000.00 VSS International, Inc. Lump Sum $1,379,309.70 H-K CONTRACTORS, INC Lump Sum $2,350,000.00 Central Southern Construction Corp. Lump Sum $2,792,100.00 Engineer's Estimate ALL LPSM Lump Sum $1,205,000.00

A0040 15301-0000 CONTRACTOR QUALITY CONTROL

Intermountain Slurry Seal, Inc. Lump Sum $300,000.00 VSS International, Inc. Lump Sum $954,739.00 H-K CONTRACTORS, INC Lump Sum $200,000.00 Central Southern Construction Corp. Lump Sum $455,000.00 Engineer's Estimate ALL LPSM Lump Sum $285,000.00

A0060 15401-0000 CONTRACTOR TESTING

Intermountain Slurry Seal, Inc. Lump Sum $65,000.00 VSS International, Inc. Lump Sum $448,400.00 H-K CONTRACTORS, INC Lump Sum $85,000.00 Central Southern Construction Corp. Lump Sum $455,000.00 Engineer's Estimate ALL LPSM Lump Sum $228,000.00

A0080 15501-0000 CONSTRUCTION SCHEDULE

Intermountain Slurry Seal, Inc. Lump Sum $7,472.42 VSS International, Inc. Lump Sum $66,000.00 H-K CONTRACTORS, INC Lump Sum $50,000.00 Central Southern Construction Corp. Lump Sum $109,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

A0100 15701-0000 SOIL EROSION CONTROL

Intermountain Slurry Seal, Inc. Lump Sum $20,000.00 VSS International, Inc. Lump Sum $32,000.00 H-K CONTRACTORS, INC Lump Sum $55,000.00 Central Southern Construction Corp. Lump Sum $300,000.00 Engineer's Estimate ALL LPSM Lump Sum $2,800.00

A0120 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE

Intermountain Slurry Seal, Inc. $30.00 $7,500.00 VSS International, Inc. $42.80 $10,700.00

H-K CONTRACTORS, INC $50.00 $12,500.00

Central Southern Construction Corp. $150.00 $37,500.00 Engineer's Estimate 250 LNFT $22.00 $5,500.00

3 out of 10 Project No: CO NP MULTI PMS(2)

Project Name: Pavement Preservation Colorado Phase 2

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0140 20303-3200 REMOVAL OF SIDEWALK, CONCRETE

Intermountain Slurry Seal, Inc. $35.00 $6,650.00 VSS International, Inc. $53.27 $10,121.30

H-K CONTRACTORS, INC $75.00 $14,250.00

Central Southern Construction Corp. $170.00 $32,300.00 Engineer's Estimate 190 SQYD $30.00 $5,700.00

A0160 20401-0000 ROADWAY EXCAVATION

Intermountain Slurry Seal, Inc. $75.00 $12,750.00 VSS International, Inc. $92.50 $15,725.00

H-K CONTRACTORS, INC $100.00 $17,000.00

Central Southern Construction Corp. $325.00 $55,250.00 Engineer's Estimate 170 CUYD $45.00 $7,650.00

A0180 20420-0000 EMBANKMENT CONSTRUCTION

Intermountain Slurry Seal, Inc. $155.00 $62,000.00 VSS International, Inc. $117.15 $46,860.00

H-K CONTRACTORS, INC $120.00 $48,000.00

Central Southern Construction Corp. $200.00 $80,000.00 Engineer's Estimate 400 CUYD $120.00 $48,000.00

A0200 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

Intermountain Slurry Seal, Inc. $310.00 $10,850.00 VSS International, Inc. $217.80 $7,623.00

H-K CONTRACTORS, INC $300.00 $10,500.00

Central Southern Construction Corp. $900.00 $31,500.00 Engineer's Estimate 35 CUYD $250.00 $8,750.00

A0220 30202-2000 ROADWAY AGGREGATE, METHOD 2

Intermountain Slurry Seal, Inc. $55.00 $4,950.00 VSS International, Inc. $134.87 $12,138.30

H-K CONTRACTORS, INC $100.00 $9,000.00

Central Southern Construction Corp. $600.00 $54,000.00 Engineer's Estimate 90.0 TON $75.00 $6,750.00

A0240 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH

Intermountain Slurry Seal, Inc. $25.00 $70,000.00 VSS International, Inc. $28.81 $80,668.00

H-K CONTRACTORS, INC $7.00 $19,600.00

Central Southern Construction Corp. $20.00 $56,000.00 Engineer's Estimate 2,800 SQYD $18.00 $50,400.00

4 out of 10 Project No: CO NP MULTI PMS(2)

Project Name: Pavement Preservation Colorado Phase 2

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Intermountain Slurry Seal, Inc. $100.00 $46,000.00 VSS International, Inc. $312.73 $143,855.80

H-K CONTRACTORS, INC $200.00 $92,000.00

Central Southern Construction Corp. $600.00 $276,000.00 Engineer's Estimate 460.0 TON $220.00 $101,200.00

A0280 40601-0000 FOG SEAL

Intermountain Slurry Seal, Inc. $1,800.00 $171,000.00 VSS International, Inc. $220.00 $20,900.00

H-K CONTRACTORS, INC $1,500.00 $142,500.00

Central Southern Construction Corp. $1,200.00 $114,000.00 Engineer's Estimate 95.0 TON $800.00 $76,000.00

A0300 40702-0300 CHIP SEAL, TYPE 1C

Intermountain Slurry Seal, Inc. $3.50 $490,000.00 VSS International, Inc. $1.10 $154,000.00

H-K CONTRACTORS, INC $5.00 $700,000.00

Central Southern Construction Corp. $4.25 $595,000.00 Engineer's Estimate 140,000 SQYD $2.25 $315,000.00

A0340 40711-0000 EMULSIFIED ASPHALT

Intermountain Slurry Seal, Inc. $1,000.00 $257,000.00 VSS International, Inc. $440.00 $113,080.00

H-K CONTRACTORS, INC $1,000.00 $257,000.00

Central Southern Construction Corp. $1,200.00 $308,400.00 Engineer's Estimate 257.0 TON $750.00 $192,750.00

A0360 40712-0000 BLOTTER

Intermountain Slurry Seal, Inc. $50.00 $2,000.00 VSS International, Inc. $137.50 $5,500.00

H-K CONTRACTORS, INC $500.00 $20,000.00

Central Southern Construction Corp. $145.00 $5,800.00 Engineer's Estimate 40 TON $100.00 $4,000.00

A0380 40901-2000 MICRO SURFACING, TYPE 2

Intermountain Slurry Seal, Inc. $10.00 $510,000.00 VSS International, Inc. $10.25 $522,750.00

H-K CONTRACTORS, INC $10.00 $510,000.00

Central Southern Construction Corp. $12.00 $612,000.00 Engineer's Estimate 51,000 SQYD $6.75 $344,250.00

5 out of 10 Project No: CO NP MULTI PMS(2)

Project Name: Pavement Preservation Colorado Phase 2

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0400 40901-3000 MICRO SURFACING, TYPE 3

Intermountain Slurry Seal, Inc. $5.00 $1,650,000.00 VSS International, Inc. $5.99 $1,976,700.00

H-K CONTRACTORS, INC $10.25 $3,382,500.00

Central Southern Construction Corp. $7.00 $2,310,000.00 Engineer's Estimate 330,000 SQYD $5.50 $1,815,000.00

A0420 41201-0000 TACK COAT

Intermountain Slurry Seal, Inc. $1,000.00 $1,300.00 VSS International, Inc. $1,320.00 $1,716.00

H-K CONTRACTORS, INC $800.00 $1,040.00

Central Southern Construction Corp. $3,000.00 $3,900.00 Engineer's Estimate 1.3 TON $1,700.00 $2,210.00

A0440 41401-3000 CRACKS, CLEANING AND FILLING

Intermountain Slurry Seal, Inc. $10.00 $6,000.00 VSS International, Inc. $27.50 $16,500.00

H-K CONTRACTORS, INC $25.00 $15,000.00

Central Southern Construction Corp. $100.00 $60,000.00 Engineer's Estimate 600 LNFT $30.00 $18,000.00

A0460 41402-2000 CRACKS, CLEANING AND SEALING

Intermountain Slurry Seal, Inc. $10,000.00 $310,000.00 VSS International, Inc. $10,890.00 $337,590.00

H-K CONTRACTORS, INC $11,000.00 $341,000.00

Central Southern Construction Corp. $12,500.00 $387,500.00 Engineer's Estimate 31.00 MILE $8,500.00 $263,500.00

A0480 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1

Intermountain Slurry Seal, Inc. $125.00 $150,000.00 VSS International, Inc. $148.50 $178,200.00

H-K CONTRACTORS, INC $130.00 $156,000.00

Central Southern Construction Corp. $225.00 $270,000.00 Engineer's Estimate 1,200 SQYD $140.00 $168,000.00

A0500 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

Intermountain Slurry Seal, Inc. $75.00 $600,000.00 VSS International, Inc. $93.50 $748,000.00

H-K CONTRACTORS, INC $70.00 $560,000.00

Central Southern Construction Corp. $125.00 $1,000,000.00 Engineer's Estimate 8,000 SQYD $95.00 $760,000.00

6 out of 10 Project No: CO NP MULTI PMS(2)

Project Name: Pavement Preservation Colorado Phase 2

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0520 60201-0800 24-INCH PIPE CULVERT

Intermountain Slurry Seal, Inc. $400.00 $48,000.00 VSS International, Inc. $301.40 $36,168.00

H-K CONTRACTORS, INC $300.00 $36,000.00

Central Southern Construction Corp. $550.00 $66,000.00 Engineer's Estimate 120 LNFT $240.00 $28,800.00

A0540 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Intermountain Slurry Seal, Inc. $300.00 $12,000.00 VSS International, Inc. $356.95 $14,278.00

H-K CONTRACTORS, INC $250.00 $10,000.00

Central Southern Construction Corp. $600.00 $24,000.00 Engineer's Estimate 40 LNFT $150.00 $6,000.00

A0560 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

Intermountain Slurry Seal, Inc. $6,500.00 $6,500.00 VSS International, Inc. $4,719.00 $4,719.00

H-K CONTRACTORS, INC $5,000.00 $5,000.00

Central Southern Construction Corp. $7,500.00 $7,500.00 Engineer's Estimate 1 EACH $1,300.00 $1,300.00

A0580 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Intermountain Slurry Seal, Inc. $1,500.00 $3,000.00 VSS International, Inc. $4,400.00 $8,800.00

H-K CONTRACTORS, INC $4,000.00 $8,000.00

Central Southern Construction Corp. $7,000.00 $14,000.00 Engineer's Estimate 2 EACH $950.00 $1,900.00

A0600 60212-0800 ELBOW, 24-INCH

Intermountain Slurry Seal, Inc. $2,750.00 $5,500.00 VSS International, Inc. $1,017.50 $2,035.00

H-K CONTRACTORS, INC $2,200.00 $4,400.00

Central Southern Construction Corp. $3,500.00 $7,000.00 Engineer's Estimate 2 EACH $1,100.00 $2,200.00

A0620 60403-0000 INLET (DENVER NO 16)

Intermountain Slurry Seal, Inc. $5,000.00 $5,000.00 VSS International, Inc. $8,250.00 $8,250.00

H-K CONTRACTORS, INC $5,000.00 $5,000.00

Central Southern Construction Corp. $10,000.00 $10,000.00 Engineer's Estimate 1 EACH $15,000.00 $15,000.00

7 out of 10 Project No: CO NP MULTI PMS(2)

Project Name: Pavement Preservation Colorado Phase 2

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0640 60602-0700 PIPE ANCHOR ASSEMBLY, 24-INCH

Intermountain Slurry Seal, Inc. $2,500.00 $20,000.00 VSS International, Inc. $1,925.00 $15,400.00

H-K CONTRACTORS, INC $2,000.00 $16,000.00

Central Southern Construction Corp. $2,000.00 $16,000.00 Engineer's Estimate 8 EACH $1,600.00 $12,800.00

A0660 61501-0100 SIDEWALK, CONCRETE (4-inch depth)

Intermountain Slurry Seal, Inc. $85.00 $19,550.00 VSS International, Inc. $155.33 $35,725.90

H-K CONTRACTORS, INC $350.00 $80,500.00

Central Southern Construction Corp. $275.00 $63,250.00 Engineer's Estimate 230 SQYD $170.00 $39,100.00

A0680 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Intermountain Slurry Seal, Inc. $145.00 $11,600.00 VSS International, Inc. $220.00 $17,600.00

H-K CONTRACTORS, INC $150.00 $12,000.00

Central Southern Construction Corp. $250.00 $20,000.00 Engineer's Estimate 80 HOUR $165.00 $13,200.00

A0700 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

Intermountain Slurry Seal, Inc. $120.00 $9,600.00 VSS International, Inc. $220.00 $17,600.00

H-K CONTRACTORS, INC $160.00 $12,800.00

Central Southern Construction Corp. $250.00 $20,000.00 Engineer's Estimate 80 HOUR $180.00 $14,400.00

A0720 62201-2360 VACUUM SWEEPER

Intermountain Slurry Seal, Inc. $200.00 $16,000.00 VSS International, Inc. $220.00 $17,600.00

H-K CONTRACTORS, INC $300.00 $24,000.00

Central Southern Construction Corp. $350.00 $28,000.00 Engineer's Estimate 80 HOUR $200.00 $16,000.00

A0740 62301-0000 GENERAL LABOR

Intermountain Slurry Seal, Inc. $120.00 $9,600.00 VSS International, Inc. $110.00 $8,800.00

H-K CONTRACTORS, INC $85.00 $6,800.00

Central Southern Construction Corp. $50.00 $4,000.00 Engineer's Estimate 80 HOUR $85.00 $6,800.00

8 out of 10 Project No: CO NP MULTI PMS(2)

Project Name: Pavement Preservation Colorado Phase 2

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0760 62511-1000 SEEDING, DRY METHOD

Intermountain Slurry Seal, Inc. $50.00 $5,000.00 VSS International, Inc. $220.00 $22,000.00

H-K CONTRACTORS, INC $500.00 $50,000.00

Central Southern Construction Corp. $150.00 $15,000.00 Engineer's Estimate 100 SQYD $30.00 $3,000.00

A0780 63313-0000 RUMBLE STRIP (CENTERLINE)

Intermountain Slurry Seal, Inc. $22.00 $28,600.00 VSS International, Inc. $15.95 $20,735.00

H-K CONTRACTORS, INC $50.00 $65,000.00

Central Southern Construction Corp. $15.00 $19,500.00 Engineer's Estimate 1,300 LNFT $1.30 $1,690.00

A0800 63315-0000 RUMBLE STRIP

Intermountain Slurry Seal, Inc. $70.00 $4,200.00 VSS International, Inc. $366.30 $21,978.00

H-K CONTRACTORS, INC $500.00 $30,000.00

Central Southern Construction Corp. $350.00 $21,000.00 Engineer's Estimate 60 SQYD $130.00 $7,800.00

A0820 63401-0000 PAVEMENT MARKINGS (TYPE B)

Intermountain Slurry Seal, Inc. $0.25 $343,750.00 VSS International, Inc. $0.31 $426,250.00

H-K CONTRACTORS, INC $0.50 $687,500.00

Central Southern Construction Corp. $0.28 $385,000.00 Engineer's Estimate 1,375,000 LNFT $0.30 $412,500.00

A0840 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B)

Intermountain Slurry Seal, Inc. $225.00 $15,750.00 VSS International, Inc. $495.00 $34,650.00

H-K CONTRACTORS, INC $500.00 $35,000.00

Central Southern Construction Corp. $450.00 $31,500.00 Engineer's Estimate 70 EACH $210.00 $14,700.00

A0860 63407-0200 RECESSED PAVEMENT MARKER, BI-DIRECTIONAL REFLECTIVE

Intermountain Slurry Seal, Inc. $150.00 $18,000.00 VSS International, Inc. $154.00 $18,480.00

H-K CONTRACTORS, INC $200.00 $24,000.00

Central Southern Construction Corp. $50.00 $6,000.00 Engineer's Estimate 120 EACH $35.00 $4,200.00

9 out of 10 Project No: CO NP MULTI PMS(2)

Project Name: Pavement Preservation Colorado Phase 2

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0880 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

Intermountain Slurry Seal, Inc. $25.00 $11,000.00 VSS International, Inc. $33.00 $14,520.00

H-K CONTRACTORS, INC $50.00 $22,000.00

Central Southern Construction Corp. $55.00 $24,200.00 Engineer's Estimate 440 EACH $30.00 $13,200.00

A0900 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Intermountain Slurry Seal, Inc. $16,000.00 $64,000.00 VSS International, Inc. $22,000.00 $88,000.00

H-K CONTRACTORS, INC $25,000.00 $100,000.00

Central Southern Construction Corp. $10,000.00 $40,000.00 Engineer's Estimate 4 EACH $9,000.00 $36,000.00

A0920 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

Intermountain Slurry Seal, Inc. $0.30 $49,500.00 VSS International, Inc. $0.44 $72,600.00

H-K CONTRACTORS, INC $0.50 $82,500.00

Central Southern Construction Corp. $0.45 $74,250.00 Engineer's Estimate 165,000 LNFT $0.45 $74,250.00

A0940 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Intermountain Slurry Seal, Inc. $50.00 $22,500.00 VSS International, Inc. $99.00 $44,550.00

H-K CONTRACTORS, INC $50.00 $22,500.00

Central Southern Construction Corp. $110.00 $49,500.00 Engineer's Estimate 450.0 SQFT $35.00 $15,750.00

A0960 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Intermountain Slurry Seal, Inc. $25.00 $120,000.00 VSS International, Inc. $69.30 $332,640.00

H-K CONTRACTORS, INC $55.00 $264,000.00

Central Southern Construction Corp. $65.00 $312,000.00 Engineer's Estimate 4,800 HOUR $95.00 $456,000.00

A0980 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Intermountain Slurry Seal, Inc. $200.00 $40,000.00 VSS International, Inc. $96.80 $19,360.00

H-K CONTRACTORS, INC $110.00 $22,000.00

Central Southern Construction Corp. $90.00 $18,000.00 Engineer's Estimate 200 HOUR $135.00 $27,000.00

10 out of 10 Project No: CO NP MULTI PMS(2)

Project Name: Pavement Preservation Colorado Phase 2

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1000 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Intermountain Slurry Seal, Inc. $3,116.47 $355,277.58 VSS International, Inc. $6,215.00 $708,510.00

H-K CONTRACTORS, INC $2,000.00 $228,000.00

Central Southern Construction Corp. $500.00 $57,000.00 Engineer's Estimate 114 DAY $2,500.00 $285,000.00

Total Schedule - All Items

Intermountain Slurry Seal, Inc. $7,404,400.00 VSS International, Inc. $9,294,325.00

H-K CONTRACTORS, INC $10,900,890.00

Central Southern Construction Corp. $11,732,950.00 Engineer's Estimate $7,472,050.00