This is a tabulation of bids report for project OR DOT 18(1), the replacement of bridges on OR58 from the Coast Fork Willamette River to Lower Salt Cr in Lane County, Oregon. The base schedule was awarded to Stellar J Corporation on April 17, 2023 for $11,705,291 based on their total bid of $18,239,831 which was the lowest responsive bid. The project is under the Department of Transportation Federal Highway Administration and involves replacement of multiple bridges as well as roadway work. Work will include structural concrete, reinforcing steel, bearing devices, micropiles, temporary support structures, painting, and traffic control. Bids were received from Stellar J Corporation, Farline Bridge, and Conway Construction, Inc. and ranged from $11.7M to $15.4M for the base schedule.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 03/21/23

1 out of 23 Project No: OR DOT 18(1)

Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges

Contractor Responsive?

Engineer's Estimate

Conway Construction, Inc.

Farline Bridge

Stellar J Corporation

Base Schedule A

$8,428,937.44

$15,425,506.40

$14,321,912.20

$11,705,291.00

Option: Z

$6,573,348.99

$6,870,426.40

$6,749,184.60

$6,534,540.00

Contractor Responsive?

Engineer's Estimate

Conway Construction, Inc.

Farline Bridge

Stellar J Corporation

Total Base Schedule A and Option(s): Z

$15,002,286.43

$22,295,932.80

$21,071,096.80

$18,239,831.00 Base Schedule A Aw arded 04/17/2023

R eport D ate: 03/21/23 11 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Solcitation N o: 69056723B

000010

D ivision: W estern Federal Lands

State: O R

C ounty: Lane

Federal Land: W illam ette N ational Forest

O pened at: FH

W A

V ancouver, W

A O ffice

O pened by: R obert K olln

D ate: 03/21/23

I certify that this B id Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

D ate:

C ontract A w arded to:

A w ard D ate:

C ontractor

C om m ent

B id A m ount

R esponsive

Stellar J C orporation

$11,705,291.00 1363 D ow n R iver D rive

W oodland, W

A 98674

Farline B ridge

$14,321,912.20 1445 M iller D R

Stayton, O R

973839431

C onw ay C onstruction, Inc.

$15,425,506.40 6620 N

W W hitney R

d. Suite 100

V ancouver, W

A 98665

Engineer's Estim ate

$8,428,937.44

Stellar J C orporation

04/17/2023

Base Schedule A Aw arded 04/17/2023 eport D ate: 03/21/23 12 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

15101-0000 M

O B

ILIZA

TIO

N

Stellar J C orporation

Lum p Sum

$1,250,000.00 Farline B ridge Lum p Sum $1,433,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$3,600,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$903,100.44

A

15201-0000 C

O N

STR

U

C

TIO

N

SU

R V

EY

A

N D

STA

K

IN

G

Stellar J C orporation

Lum p Sum

$125,000.00 Farline B ridge Lum p Sum $57,900.00

C onw ay C onstruction, Inc.

Lum p Sum

$30,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$70,000.00

A

15301-0010 C

O N

TR

A

C

TO

R Q

U A

LITY

C

O N

TR

O

L A N

D A

SSU

R

A N

C E

Stellar J C orporation

Lum p Sum

$400,000.00 Farline B ridge Lum p Sum $685,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$500,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$120,000.00

A

15401-0000 C

O N

TR

A

C

TO

R

TESTIN

G

Stellar J C orporation

Lum p Sum

$150,000.00 Farline B ridge Lum p Sum $240,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$190,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$120,000.00

A

15501-0000 C

O N

STR

U

C

TIO

N

SC

H

ED

U

LE

Stellar J C orporation

Lum p Sum

$5,000.00 Farline B ridge Lum p Sum $55,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$50,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$16,000.00

A

15705-0100

SO

IL ER

O

SIO

N

C O

N

TR

O

L, SILT FEN

C E

Stellar J C orporation

$9.00 $8,730.00

Farline B ridge

$3.00 $2,910.00

C onw ay C onstruction, Inc.

$8.00 $7,760.00

Engineer's Estim ate

LN

FT

$6.00

$5,820.00 eport D ate: 03/21/23 13 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

15705-1400

SO

IL ER

O

SIO

N

C O

N

TR

O

L, FIB

ER

R

O

LL

Stellar J C orporation

$9.00 $12,870.00

Farline B ridge

$3.50 $5,005.00

C onw ay C onstruction, Inc.

$8.00 $11,440.00

Engineer's Estim ate

1,430

LN

FT

$8.40

$12,012.00

A

15706-1600

SO

IL ER

O

SIO

N

C O

N

TR

O

L, STA

B

ILIZED

C O

N

STR

U C

TIO

N

EX

IT

Stellar J C orporation

$5,000.00 $30,000.00

Farline B ridge

$2,000.00 $12,000.00

C onw ay C onstruction, Inc.

$7,000.00 $42,000.00

Engineer's Estim ate

EA

C H

$5,760.00 $34,560.00

A

20304-4000 R

EM

O

V A

L O F B

R

ID

G

E SU

PER

STR

U C

TU

R

E (EN

D

FR

A

M

ES)

Stellar J C orporation

Lum p Sum

$40,000.00 Farline B ridge Lum p Sum $200,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$200,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$10,800.00

A

20304-5000 R

EM

O

V A

L O F B

U

ILD

IN

G

(U

SG

S G A

G

E STA

TIO

N

Stellar J C orporation

Lum p Sum

$40,000.00 Farline B ridge Lum p Sum $75,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$25,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$21,600.00

A

20305-1000 R

EM

O

V A

L O F C

O N

C R

ETE

Stellar J C orporation

$700.00 $36,400.00

Farline B ridge

$575.00 $29,900.00

C onw ay C onstruction, Inc.

$600.00 $31,200.00

Engineer's Estim ate

C

U Y

D $420.00

$21,840.00

A

20801-0000

STR

U C

TU

R

E EX

C

A V

A

TIO

N

Stellar J C orporation

$200.00 $423,400.00

Farline B ridge

$90.00 $190,530.00

C onw ay C onstruction, Inc.

$120.00 $254,040.00

Engineer's Estim ate

2,117 C

U Y

D $95.00

$201,115.00 eport D ate: 03/21/23 14 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

20811-0000

SH

O R

IN

G

A N

D B

R A

C

IN

G

Stellar J C orporation

$60.00 $33,000.00

Farline B ridge

$100.00 $55,000.00

C onw ay C onstruction, Inc.

$240.00 $132,000.00

Engineer's Estim ate

SQ

FT

$54.00

$29,700.00

A

20815-0000 C

O

FFER

D A

M S

Stellar J C orporation

Lum p Sum

$950,000.00 Farline B ridge Lum p Sum $1,000,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$200,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$480,000.00

A

20820-0000 D

EW

A

TER

IN

G

Stellar J C orporation

Lum p Sum

$350,000.00 Farline B ridge Lum p Sum $180,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$200,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$150,000.00

A

25101-0300

PLA

C

ED

R

IPR

A P, M

ETH

O

D A

, C

LA

SS 3

Stellar J C orporation

$250.00 $423,750.00

Farline B ridge

$120.00 $203,400.00

C onw ay C onstruction, Inc.

$200.00 $339,000.00

Engineer's Estim ate

1,695 C

U Y

D $120.00

$203,400.00

A

30202-2000 R

O A

D W

A Y

A G

G R

EG

A

TE, M

ETH

O D

Stellar J C orporation

$100.00 $9,800.00

Farline B ridge

$175.00 $17,150.00

C onw ay C onstruction, Inc.

$35.00 $3,430.00

Engineer's Estim ate

TO

N $48.00

$4,704.00

A

40302-0100 A

SPH

A

LT C

O

N C

R

ETE PA

V

EM

EN

T, TY

PE 1 (2" TH

IC

K N

ESS)

Stellar J C orporation

$30.00 $24,540.00

Farline B ridge

$25.82 $21,120.76

C onw ay C onstruction, Inc.

$28.00 $22,904.00

Engineer's Estim ate

SQ

Y D

$21.60 $17,668.80 eport D ate: 03/21/23 15 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

41301-0600 A

SPH

A

LT PA

V

EM

EN

T M

ILLIN

G

, 2-IN

C H

D

EPTH

Stellar J C orporation

$40.00 $32,720.00

Farline B ridge

$17.43 $14,257.74

C onw ay C onstruction, Inc.

$14.00 $11,452.00

Engineer's Estim ate

SQ

Y D

$21.60 $17,668.80

A

41401-2000 C

R A

C K

S, C

LEA

N

IN

G A

N D

SEA

LIN

G

Stellar J C orporation

$60.00 $21,000.00

Farline B ridge

$61.00 $21,350.00

C onw ay C onstruction, Inc.

$46.00 $16,100.00

Engineer's Estim ate

LN

FT

$24.00

$8,400.00

A

50201-0000 C

O N

C R

ETE PA

V

EM

EN

T R

ESTO

R A

TIO

N

, PA

V

EM

EN

T PA

TC

H

Stellar J C orporation

$350.00 $7,000.00

Farline B ridge

$350.00 $7,000.00

C onw ay C onstruction, Inc.

$500.00 $10,000.00

Engineer's Estim ate

SQ

Y D

$720.00 $14,400.00

A

55201-0200

STR

U C

TU

R

A L C

O N

C R

ETE, C

LA

SS A

(A

E)

Stellar J C orporation

$1,000.00 $743,000.00

Farline B ridge

$1,500.00 $1,114,500.00

C onw ay C onstruction, Inc.

$2,400.00 $1,783,200.00

Engineer's Estim ate

C

U Y

D $1,200.00

$891,600.00

A

55220-0000 R

EPA

IR

C O

N C

R

ETE

Stellar J C orporation

$1,800.00 $72,000.00

Farline B ridge

$500.00 $20,000.00

C onw ay C onstruction, Inc.

$5,000.00 $200,000.00

Engineer's Estim ate

SQ

Y D

$720.00 $28,800.00

A

55225-0000 C

LEA

N

A N

D R

ESEA

L JO

IN

TS

Stellar J C orporation

$60.00 $4,800.00

Farline B ridge

$57.00 $4,560.00

C onw ay C onstruction, Inc.

$50.00 $4,000.00

Engineer's Estim ate

LN

FT

$48.00

$3,840.00 eport D ate: 03/21/23 16 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

55235-0000

EX

PA

N

SIO

N

JO

IN

TS (A

SPH

A

LTIC

PLU

G

SEA

L)

Stellar J C orporation

$250.00 $19,500.00

Farline B ridge

$173.00 $13,494.00

C onw ay C onstruction, Inc.

$240.00 $18,720.00

Engineer's Estim ate

LN

FT

$216.00

$16,848.00

A

55401-1000 R

EIN

FO

R C

IN

G

STEEL

Stellar J C orporation

$4.00 $812,480.00

Farline B ridge

$3.50 $710,920.00

C onw ay C onstruction, Inc.

$2.50 $507,800.00

Engineer's Estim ate

203,120

LB

$2.90 $589,048.00

A

55501-0000

STR

U C

TU

R

A

L STEEL (R

IV

ET R

EPLA

C

EM

EN

T)

Stellar J C orporation

Lum p Sum

$3,000.00 Farline B ridge Lum p Sum $25,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$12,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$10,000.00

A

55506-0000 M

ISC

ELLA

N

EO

U

S STEEL (EN

D

FR

A M

E)

Stellar J C orporation

$60,000.00 $360,000.00

Farline B ridge

$85,000.00 $510,000.00

C onw ay C onstruction, Inc.

$80,000.00 $480,000.00

Engineer's Estim ate

EA

C H

$34,000.00 $204,000.00

A

55506-0000 M

ISC

ELLA

N

EO

U

S STEEL (SEA

T B R

A C

K

ET)

Stellar J C orporation

$6,000.00 $432,000.00

Farline B ridge

$15,000.00 $1,080,000.00

C onw ay C onstruction, Inc.

$6,400.00 $460,800.00

Engineer's Estim ate

EA

C H

$6,820.00 $491,040.00

A

55506-0000 M

ISC

ELLA

N

EO

U

S STEEL (TR

U

SS A

N C

H O

R

IN

G

SY

STEM

Stellar J C orporation

$60,000.00 $240,000.00

Farline B ridge

$45,000.00 $180,000.00

C onw ay C onstruction, Inc.

$90,000.00 $360,000.00

Engineer's Estim ate

EA

C H

$28,800.00 $115,200.00 eport D ate: 03/21/23 17 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

55506-0000 M

ISC

ELLA

N

EO

U

S STEEL (EN

D A

N C

H O

R A

G E)

Stellar J C orporation

$75,000.00 $600,000.00

Farline B ridge

$100,000.00 $800,000.00

C onw ay C onstruction, Inc.

$120,000.00 $960,000.00

Engineer's Estim ate

EA

C H

$27,000.00 $216,000.00

A

55506-0000 M

ISC

ELLA

N

EO

U

S STEEL (JA

C K

ETIN

G

Stellar J C orporation

$175,000.00 $700,000.00

Farline B ridge

$185,000.00 $740,000.00

C onw ay C onstruction, Inc.

$170,000.00 $680,000.00

Engineer's Estim ate

EA

C H

$165,000.00 $660,000.00

A

55901-0000 M

EM

B

R A

N E W

A

TER

PR

O

O

FIN

G

Stellar J C orporation

$37.00 $30,266.00

Farline B ridge

$37.00 $30,266.00

C onw ay C onstruction, Inc.

$42.00 $34,356.00

Engineer's Estim ate

SQ

Y D

$54.00 $44,172.00

A

56101-0000

STR

U C

TU

R

A L C

O N

C R

ETE IN

JEC

TIO

N

A N

D C

R A

C K

R

EPA

IR

Stellar J C orporation

$65.00 $55,250.00

Farline B ridge

$78.00 $66,300.00

C onw ay C onstruction, Inc.

$74.00 $62,900.00

Engineer's Estim ate

LN

FT

$45.00

$38,250.00

A

56203-0000

TEM

PO

R

A R

Y

SU

PPO

R

T STR

U

C

TU

R E (B

R

ID

G

E JA

C K

IN

G

Stellar J C orporation

$75,000.00 $300,000.00

Farline B ridge

$150,000.00 $600,000.00

C onw ay C onstruction, Inc.

$100,000.00 $400,000.00

Engineer's Estim ate

EA

C H

$24,000.00 $96,000.00

A

56203-0000

TEM

PO

R

A R

Y

SU

PPO

R

T STR

U

C

TU

R E (B

R

ID

G

E JA

C K

IN

G

Stellar J C orporation

$40,000.00 $80,000.00

Farline B ridge

$450,000.00 $900,000.00

C onw ay C onstruction, Inc.

$150,000.00 $300,000.00

Engineer's Estim ate

EA

C H

$36,000.00 $72,000.00 eport D ate: 03/21/23 18 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

56302-2000

PA

IN

TIN

G

, STEEL STR

U C

TU

R

E (SU

B

STR

U

C

TU

R E)

Stellar J C orporation

$40.00 $134,000.00

Farline B ridge

$73.45 $246,057.50

C onw ay C onstruction, Inc.

$76.00 $254,600.00

Engineer's Estim ate

3,350

SQ

FT

$30.00

$100,500.00

A

56302-2000

PA

IN

TIN

G

, STEEL STR

U C

TU

R

E

Stellar J C orporation

$350.00 $525,000.00

Farline B ridge

$177.30 $265,950.00

C onw ay C onstruction, Inc.

$175.00 $262,500.00

Engineer's Estim ate

1,500

SQ

FT

$110.00

$165,000.00

A

56302-2000

PA

IN

TIN

G

, STEEL STR

U C

TU

R

E

Stellar J C orporation

$90.00 $211,500.00

Farline B ridge

$70.45 $165,557.50

C onw ay C onstruction, Inc.

$75.00 $176,250.00

Engineer's Estim ate

2,350

SQ

FT

$80.00

$188,000.00

A

56401-3000 B

EA

R

IN

G

D

EV

IC

E, SLID

IN

G

Stellar J C orporation

$5,000.00 $30,000.00

Farline B ridge

$40,000.00 $240,000.00

C onw ay C onstruction, Inc.

$20,000.00 $120,000.00

Engineer's Estim ate

EA

C H

$8,000.00 $48,000.00

A

56701-0000 M

IC

R

O

PILE

Stellar J C orporation

$300.00 $805,200.00

Farline B ridge

$242.00 $649,528.00

C onw ay C onstruction, Inc.

$460.00 $1,234,640.00

Engineer's Estim ate

2,684

LN

FT

$265.00

$711,260.00

A

56705-0000 M

IC

R

O

PILE LO

A D

V

ER

IFIC

A

TIO

N

TEST

Stellar J C orporation

$30,000.00 $60,000.00

Farline B ridge

$20,000.00 $40,000.00

C onw ay C onstruction, Inc.

$21,000.00 $42,000.00

Engineer's Estim ate

EA

C H

$3,600.00 $7,200.00 eport D ate: 03/21/23 19 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

56706-0000 M

IC

R

O

PILE PR

O O

F LO

A

D

TEST

Stellar J C orporation

$5,000.00 $20,000.00

Farline B ridge

$4,500.00 $18,000.00

C onw ay C onstruction, Inc.

$5,000.00 $20,000.00

Engineer's Estim ate

EA

C H

$1,200.00 $4,800.00

A

57501-0000 M

IN

O

R B

R

ID

G E W

O R

K

Stellar J C orporation

Lum p Sum

$200,000.00 Farline B ridge Lum p Sum $280,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$112,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$100,000.00

A

57705-0200

FIB

ER

R

EIN

FO

R C

ED

PO

LY

M

ER

(FR

P), STR

EN

G

TH

EN

IN

G

SY

STEM

(C

FR

P)

Stellar J C orporation

$90.00 $82,800.00

Farline B ridge

$82.00 $75,440.00

C onw ay C onstruction, Inc.

$160.00 $147,200.00

Engineer's Estim ate

SQ

FT

$144.00

$132,480.00

A

57705-0200

FIB

ER

R

EIN

FO

R C

ED

PO

LY

M

ER

(FR

P), STR

EN

G

TH

EN

IN

G

SY

STEM

(C

FR

P)

Stellar J C orporation

$105.00 $161,700.00

Farline B ridge

$82.00 $126,280.00

C onw ay C onstruction, Inc.

$85.00 $130,900.00

Engineer's Estim ate

1,540

SQ

FT

$72.00

$110,880.00

A

60103-4200 C

O N

C R

ETE, PLA

N

K (R

EM

O

V E A

N D

R

ESET)

Stellar J C orporation

$500.00 $2,000.00

Farline B ridge

$10.00 $40.00

C onw ay C onstruction, Inc.

$18,000.00 $72,000.00

Engineer's Estim ate

EA

C H

$1,800.00 $7,200.00

A

60510-0300

4-IN

C H

C O

LLEC

TO

R

PIPE

Stellar J C orporation

$10.00 $39,000.00

Farline B ridge

$22.00 $85,800.00

C onw ay C onstruction, Inc.

$5.00 $19,500.00

Engineer's Estim ate

3,900

LN

FT

$7.20

$28,080.00 eport D ate: 03/21/23 20 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

61601-1000

SLO

PE PA

V

IN

G

, C O

N C

R

ETE

Stellar J C orporation

$250.00 $87,500.00

Farline B ridge

$250.00 $87,500.00

C onw ay C onstruction, Inc.

$250.00 $87,500.00

Engineer's Estim ate

SQ

Y D

$228.00 $79,800.00

A

62201-0250 D

U M

P TR

U

C K

, 10 C U

B

IC

Y A

R D

M

IN

IM

U

M C

A

PA

C

ITY

Stellar J C orporation

$180.00 $7,200.00

Farline B ridge

$195.00 $7,800.00

C onw ay C onstruction, Inc.

$200.00 $8,000.00

Engineer's Estim ate

H

O U

R $186.00

$7,440.00

A

62201-0500 B

A C

K H

O

E LO

A D

ER

, 4 C

U B

IC

FO

O T M

IN

IM

U M

R A

TED

C

A

PA

C

ITY

B U

C K

ET, 4-W

H

EEL D

R

IV

E

Stellar J C orporation

$110.00 $4,400.00

Farline B ridge

$165.00 $6,600.00

C onw ay C onstruction, Inc.

$190.00 $7,600.00

Engineer's Estim ate

H

O U

R $210.00

$8,400.00

A

62201-3150 H

Y D

R A

U

LIC

EX

C

A V

A

TO

R , C

R A

W

LER

M O

U N

TED

, 1.0 C

U B

IC

Y

A R

D M

IN

IM

U M

C A

PA

C

ITY

W

ITH

TH

U M

B

A

TTA

C H

M

EN

T

Stellar J C orporation

$150.00 $6,000.00

Farline B ridge

$215.00 $8,600.00

C onw ay C onstruction, Inc.

$230.00 $9,200.00

Engineer's Estim ate

H

O U

R $228.00

$9,120.00

A

62201-3750 C

H A

IN

SA

W

Stellar J C orporation

$80.00 $1,600.00

Farline B ridge

$50.00 $1,000.00

C onw ay C onstruction, Inc.

$120.00 $2,400.00

Engineer's Estim ate

H

O U

R $96.00

$1,920.00

A

62301-0000 G

EN

ER

A

L LA

B O

R

Stellar J C orporation

$75.00 $12,000.00

Farline B ridge

$115.00 $18,400.00

C onw ay C onstruction, Inc.

$117.00 $18,720.00

Engineer's Estim ate

H

O U

R $98.40

$15,744.00 eport D ate: 03/21/23 21 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

62501-0000

TU

R

F ESTA

B

LISH

M

EN

T

Stellar J C orporation

$20,000.00 $30,000.00

Farline B ridge

$4,500.00 $6,750.00

C onw ay C onstruction, Inc.

$5,400.00 $8,100.00

Engineer's Estim ate

1.5 A

C R

E $6,000.00

$9,000.00

A

62635-3000 C

U

TTIN

G S, W

ILLO

W

PO

LE

Stellar J C orporation

$35.00 $17,150.00

Farline B ridge

$40.00 $19,600.00

C onw ay C onstruction, Inc.

$25.00 $12,250.00

Engineer's Estim ate

EA

C H

$16.80 $8,232.00

A

63302-0000

SIG

N

SY

STEM

Stellar J C orporation

$40.00 $1,280.00

Farline B ridge

$85.00 $2,720.00

C onw ay C onstruction, Inc.

$200.00 $6,400.00

Engineer's Estim ate

SQ

FT

$120.00

$3,840.00

A

63401-0300

PA

V

EM

EN

T M

A R

K

IN

G

S, TY

PE B

, SO

LID

Stellar J C orporation

$2.00 $3,760.00

Farline B ridge

$0.75 $1,410.00

C onw ay C onstruction, Inc.

$0.78 $1,466.40

Engineer's Estim ate

1,880

LN

FT

$1.50

$2,820.00

A

63501-1000

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O

L, TR

A

FFIC

C O

N

TR

O

L SU

PER

V

ISO

R

Stellar J C orporation

Lum p Sum

$200,000.00 Farline B ridge Lum p Sum $350,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$157,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$372,000.00

A

63502-0300

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, A

R R

O W

B O

A R

D

, TY

PE C

Stellar J C orporation

$2,000.00 $4,000.00

Farline B ridge

$5,300.00 $10,600.00

C onw ay C onstruction, Inc.

$4,000.00 $8,000.00

Engineer's Estim ate

EA

C H

$8,040.00 $16,080.00 eport D ate: 03/21/23 22 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

63502-0500

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, B

A R

R

IC

A D

E TY

PE 2

Stellar J C orporation

$65.00 $325.00

Farline B ridge

$55.00 $275.00

C onw ay C onstruction, Inc.

$55.00 $275.00

Engineer's Estim ate

EA

C H

$108.00 $540.00

A

63502-0600

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, B

A R

R

IC

A D

E TY

PE 3

Stellar J C orporation

$165.00 $1,650.00

Farline B ridge

$165.00 $1,650.00

C onw ay C onstruction, Inc.

$218.00 $2,180.00

Engineer's Estim ate

EA

C H

$450.00 $4,500.00

A

63502-0700

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, C

O N

E

Stellar J C orporation

$5.00 $1,060.00

Farline B ridge

$21.00 $4,452.00

C onw ay C onstruction, Inc.

$24.00 $5,088.00

Engineer's Estim ate

EA

C H

$30.00 $6,360.00

A

63502-1300

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, D

R U

M

Stellar J C orporation

$40.00 $5,040.00

Farline B ridge

$49.00 $6,174.00

C onw ay C onstruction, Inc.

$46.00 $5,796.00

Engineer's Estim ate

EA

C H

$84.00 $10,584.00

A

63502-2000

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O

L, PO

R

TA

B

LE C

H A

N G

EA

B

LE M

ESSA

G

E SIG

N

Stellar J C orporation

$4,000.00 $24,000.00

Farline B ridge

$10,000.00 $60,000.00

C onw ay C onstruction, Inc.

$26,000.00 $156,000.00

Engineer's Estim ate

EA

C H

$24,000.00 $144,000.00

A

63504-1000

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, C

O N

STR

U

C

TIO

N

SIG

N

Stellar J C orporation

$30.00 $9,510.00

Farline B ridge

$10.00 $3,170.00

C onw ay C onstruction, Inc.

$37.00 $11,729.00

Engineer's Estim ate

SQ

FT

$36.00

$11,412.00 eport D ate: 03/21/23 23 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

63506-0500

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O

L, FLA

G G

ER

Stellar J C orporation

$70.00 $80,360.00

Farline B ridge

$67.90 $77,949.20

C onw ay C onstruction, Inc.

$95.00 $109,060.00

Engineer's Estim ate

1,148 H

O U

R $81.60

$93,676.80

A

63506-0600

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O

L, PILO

T C A

R

Stellar J C orporation

$125.00 $71,750.00

Farline B ridge

$84.80 $48,675.20

C onw ay C onstruction, Inc.

$125.00 $71,750.00

Engineer's Estim ate

H

O U

R $98.40

$56,481.60

A

64620-0000 R

EM

O

V E A

N D

R

ESET (B

O A

T R A

M P)

Stellar J C orporation

$40,000.00 $40,000.00

Farline B ridge

$105,370.30 $105,370.30

C onw ay C onstruction, Inc.

$5,300.00 $5,300.00

Engineer's Estim ate

EA

C H

$24,000.00 $24,000.00

Total Schedule - A ll Item s

Stellar J C orporation

$11,705,291.00 Farline B ridge $14,321,912.20

C onw ay C onstruction, Inc.

$15,425,506.40 Engineer's Estim ate $8,428,937.44 eport D ate: 03/21/23 2 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: Z

Schedule Type: O ptions

Solcitation N o: 69056723B

000010

D ivision: W estern Federal Lands

State: O R

C ounty: Lane

Federal Land: W illam ette N ational Forest

O pened at: FH

W A

V ancouver, W

A O ffice

O pened by: R obert K olln

D ate: 03/21/23

I certify that this B id Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

D ate:

C ontract A w arded to:

A w ard D ate:

C ontractor

C om m ent

B id A m ount

R esponsive

Stellar J C orporation

$6,534,540.00 1363 D ow n R iver D rive

W oodland, W

A 98674

Farline B ridge

$6,749,184.60 1445 M iller D R

Stayton, O R

973839431

C onw ay C onstruction, Inc.

$6,870,426.40 6620 N

W W hitney R

d. Suite 100

V ancouver, W

A 98665

Engineer's Estim ate

$6,573,348.99

D

EA

N A

LA

N

U

M A

TH

U

M

D igitally signed by D

EA

N

A

LA

N

U M

A

TH

U M

D ate: 2023.03.22 08:51:23 -07'00' eport D ate: 03/21/23 3 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: Z

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Z0020 15101-0000

M O

B

ILIZA

TIO

N

Stellar J C orporation

Lum p Sum

$300,000.00 Farline B ridge Lum p Sum $688,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$650,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$704,287.39

Z0040 15201-0000

C O

N

STR

U C

TIO

N

SU

R

V

EY

A N

D

STA

K

IN

G

Stellar J C orporation

Lum p Sum

$30,000.00 Farline B ridge Lum p Sum $15,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$5,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$30,000.00

Z0060 15301-0010

C O

N

TR

A C

TO

R

Q U

A

LITY

C O

N

TR

O L A

N D

A

SSU

R A

N C

E

Stellar J C orporation

Lum p Sum

$15,000.00 Farline B ridge Lum p Sum $75,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$100,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$60,000.00

Z0080 15401-0000

C O

N

TR

A C

TO

R

TESTIN

G

Stellar J C orporation

Lum p Sum

$50,000.00 Farline B ridge Lum p Sum $25,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$40,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$60,000.00

Z0100 15501-0000

C O

N

STR

U C

TIO

N

SC

H

ED

U

LE

Stellar J C orporation

Lum p Sum

$2,500.00 Farline B ridge Lum p Sum $15,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$20,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$8,000.00

Z0120 15705-0100

SO

IL ER

O

SIO

N C

O N

TR

O

L, SILT FEN

C

E

Stellar J C orporation

$15.00 $3,450.00

Farline B ridge

$5.00 $1,150.00

C onw ay C onstruction, Inc.

$8.00 $1,840.00

Engineer's Estim ate

LN

FT

$6.00

$1,380.00 eport D ate: 03/21/23 4 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: Z

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Z0140 15705-1400

SO

IL ER

O

SIO

N C

O N

TR

O

L, FIB

ER

R O

LL

Stellar J C orporation

$8.00 $6,160.00

Farline B ridge

$4.00 $3,080.00

C onw ay C onstruction, Inc.

$8.00 $6,160.00

Engineer's Estim ate

LN

FT

$8.40

$6,468.00

Z0160 15706-1600

SO

IL ER

O

SIO

N C

O N

TR

O

L, STA

B

ILIZED

C

O N

STR

U

C

TIO

N

EX

IT

Stellar J C orporation

$6,000.00 $12,000.00

Farline B ridge

$2,000.00 $4,000.00

C onw ay C onstruction, Inc.

$6,000.00 $12,000.00

Engineer's Estim ate

EA

C H

$5,760.00 $11,520.00

Z0180 20120-1000

R

EM

O V

A

L, IN

D

IV

ID

U

A

L TR

EE

Stellar J C orporation

$1,500.00 $45,000.00

Farline B ridge

$240.00 $7,200.00

C onw ay C onstruction, Inc.

$650.00 $19,500.00

Engineer's Estim ate

EA

C H

$720.00 $21,600.00

Z0200 20305-1000

R

EM

O V

A L O

F C O

N C

R

ETE

Stellar J C orporation

$1,500.00 $57,000.00

Farline B ridge

$425.00 $16,150.00

C onw ay C onstruction, Inc.

$600.00 $22,800.00

Engineer's Estim ate

C

U Y

D $420.00

$15,960.00

Z0220 20801-0000

STR

U

C

TU

R

E EX

C A

V A

TIO

N

Stellar J C orporation

$100.00 $197,200.00

Farline B ridge

$68.00 $134,096.00

C onw ay C onstruction, Inc.

$114.00 $224,808.00

Engineer's Estim ate

1,972 C

U Y

D $95.00

$187,340.00

Z0240 20815-0000

C O

FFER

D

A M

S

Stellar J C orporation

Lum p Sum

$900,000.00 Farline B ridge Lum p Sum $980,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$70,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$730,000.00 eport D ate: 03/21/23 5 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: Z

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Z0260 20820-0000

D

EW

A

TER

IN

G

Stellar J C orporation

Lum p Sum

$100,000.00 Farline B ridge Lum p Sum $70,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$90,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$150,000.00

Z0280 25101-0300

PLA

C

ED

R

IPR

A

P, M

ETH

O D

A , C

LA

SS 3

Stellar J C orporation

$275.00 $445,500.00

Farline B ridge

$120.00 $194,400.00

C onw ay C onstruction, Inc.

$110.00 $178,200.00

Engineer's Estim ate

1,620 C

U Y

D $120.00

$194,400.00

Z0300 50201-0000

C O

N C

R

ETE PA

V

EM

EN

T R

ESTO

R

A

TIO

N

, PA

V

EM

EN

T PA

TC

H

Stellar J C orporation

$250.00 $11,250.00

Farline B ridge

$275.00 $12,375.00

C onw ay C onstruction, Inc.

$300.00 $13,500.00

Engineer's Estim ate

SQ

Y D

$720.00 $32,400.00

Z0320 55106-1000

SH

EET PILE, IN

PLA

C

E (TIE B

A

C K

Stellar J C orporation

Lum p Sum

$800,000.00 Farline B ridge Lum p Sum $1,250,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$1,500,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$810,000.00

Z0340 55106-1000

SH

EET PILE, IN

PLA

C

E

Stellar J C orporation

Lum p Sum

$200,000.00 Farline B ridge Lum p Sum $380,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$360,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$270,000.00

Z0360 55201-0200

STR

U

C

TU

R A

L C O

N C

R

ETE, C

LA

SS A

(A E)

Stellar J C orporation

$800.00 $373,600.00

Farline B ridge

$990.00 $462,330.00

C onw ay C onstruction, Inc.

$1,500.00 $700,500.00

Engineer's Estim ate

C

U Y

D $1,200.00

$560,400.00 eport D ate: 03/21/23 6 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: Z

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Z0380 55201-1200

STR

U

C

TU

R A

L C O

N C

R

ETE, C

LA

SS S (SEA

L)

Stellar J C orporation

$450.00 $83,700.00

Farline B ridge

$505.00 $93,930.00

C onw ay C onstruction, Inc.

$700.00 $130,200.00

Engineer's Estim ate

C

U Y

D $300.00

$55,800.00

Z0400 55235-0000

EX

PA

N

SIO

N

JO

IN

TS (A

SPH

A

LTIC

PLU

G

SEA

L)

Stellar J C orporation

$250.00 $19,500.00

Farline B ridge

$173.00 $13,494.00

C onw ay C onstruction, Inc.

$230.00 $17,940.00

Engineer's Estim ate

LN

FT

$216.00

$16,848.00

Z0420 55401-1000

R

EIN

FO

R

C

IN

G

STEEL

Stellar J C orporation

$3.50 $245,770.00

Farline B ridge

$2.05 $143,951.00

C onw ay C onstruction, Inc.

$2.00 $140,440.00

Engineer's Estim ate

70,220

LB

$2.90 $203,638.00

Z0440 55501-0000

STR

U

C

TU

R A

L STEEL (B

O

LT R

EPLA

C

EM

EN

T)

Stellar J C orporation

Lum p Sum

$35,000.00 Farline B ridge Lum p Sum $38,750.00

C onw ay C onstruction, Inc.

Lum p Sum

$12,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$25,200.00

Z0460 55506-0000

M

ISC

ELLA

N

EO

U

S STEEL (JA

C

K

ETIN

G

Stellar J C orporation

$115,000.00 $920,000.00

Farline B ridge

$90,000.00 $720,000.00

C onw ay C onstruction, Inc.

$100,000.00 $800,000.00

Engineer's Estim ate

EA

C H

$112,000.00 $896,000.00

Z0480 56302-2000

PA

IN

TIN

G

, STEEL STR

U

C

TU

R E

Stellar J C orporation

$175.00 $315,000.00

Farline B ridge

$137.80 $248,040.00

C onw ay C onstruction, Inc.

$136.00 $244,800.00

Engineer's Estim ate

1,800

SQ

FT

$80.00

$144,000.00 eport D ate: 03/21/23 7 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: Z

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Z0500 56701-0000

M

IC

R O

PILE

Stellar J C orporation

$300.00 $540,000.00

Farline B ridge

$242.00 $435,600.00

C onw ay C onstruction, Inc.

$460.00 $828,000.00

Engineer's Estim ate

1,800

LN

FT

$265.00

$477,000.00

Z0520 56705-0000

M

IC

R O

PILE LO

A

D V

ER

IFIC

A

TIO

N

TEST

Stellar J C orporation

$25,000.00 $50,000.00

Farline B ridge

$20,000.00 $40,000.00

C onw ay C onstruction, Inc.

$20,000.00 $40,000.00

Engineer's Estim ate

EA

C H

$3,600.00 $7,200.00

Z0540 56706-0000

M

IC

R O

PILE PR

O

O

F LO

A D

TEST

Stellar J C orporation

$5,000.00 $20,000.00

Farline B ridge

$4,500.00 $18,000.00

C onw ay C onstruction, Inc.

$5,000.00 $20,000.00

Engineer's Estim ate

EA

C H

$1,200.00 $4,800.00

Z0560 56901-0000

C O

N C

R

ETE O

V

ER

LA

Y

, C

LA

SS M

PC

O

Stellar J C orporation

$62.00 $131,440.00

Farline B ridge

$62.00 $131,440.00

C onw ay C onstruction, Inc.

$85.00 $180,200.00

Engineer's Estim ate

2,120

SQ

Y D

$60.00 $127,200.00

Z0580 57705-0200

FIB

ER

R

EIN

FO

R

C

ED

PO

LY

M

ER

(FR

P), STR

EN

G

TH

EN

IN

G

SY

STEM

(C

FR

P)

Stellar J C orporation

$100.00 $216,000.00

Farline B ridge

$82.00 $177,120.00

C onw ay C onstruction, Inc.

$75.00 $162,000.00

Engineer's Estim ate

2,160

SQ

FT

$72.00

$155,520.00

Z0600 62501-0000

TU

R

F ESTA

B

LISH

M

EN

T

Stellar J C orporation

$20,000.00 $20,000.00

Farline B ridge

$4,500.00 $4,500.00

C onw ay C onstruction, Inc.

$5,400.00 $5,400.00

Engineer's Estim ate

1.0 A

C R

E $6,000.00

$6,000.00 eport D ate: 03/21/23 8 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: Z

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Z0620 62630-0350

PLA

N

TIN

G

S, TR

EES, B

A

LLED

A N

D B

U R

LA

PPED

Stellar J C orporation

$1,200.00 $72,000.00

Farline B ridge

$500.00 $30,000.00

C onw ay C onstruction, Inc.

$80.00 $4,800.00

Engineer's Estim ate

EA

C H

$960.00 $57,600.00

Z0640 62635-3000

C U

TTIN

G

S, W

ILLO

W

PO

LE

Stellar J C orporation

$30.00 $15,300.00

Farline B ridge

$40.00 $20,400.00

C onw ay C onstruction, Inc.

$25.00 $12,750.00

Engineer's Estim ate

EA

C H

$16.80 $8,568.00

Z0660 63401-0300

PA

V

EM

EN

T M A

R K

IN

G

S, TY

PE B

, SO

LID

Stellar J C orporation

$2.00 $4,760.00

Farline B ridge

$0.65 $1,547.00

C onw ay C onstruction, Inc.

$0.68 $1,618.40

Engineer's Estim ate

2,380

LN

FT

$1.50

$3,570.00

Z0680 63401-0400

PA

V

EM

EN

T M A

R K

IN

G

S, TY

PE B

, B R

O K

EN

Stellar J C orporation

$6.00 $7,200.00

Farline B ridge

$0.35 $420.00

C onw ay C onstruction, Inc.

$0.37 $444.00

Engineer's Estim ate

1,200

LN

FT

$0.48

$576.00

Z0700 63502-0500

TEM

PO

R A

R Y

TR

A

FFIC

C

O N

TR

O

L, B A

R R

IC

A

D

E TY

PE 2

Stellar J C orporation

$5.00 $10.00

Farline B ridge

$55.00 $110.00

C onw ay C onstruction, Inc.

$55.00 $110.00

Engineer's Estim ate

EA

C H

$108.00 $216.00

Z0720 63502-0600

TEM

PO

R A

R Y

TR

A

FFIC

C

O N

TR

O

L, B A

R R

IC

A

D

E TY

PE 3

Stellar J C orporation

$5.00 $10.00

Farline B ridge

$165.00 $330.00

C onw ay C onstruction, Inc.

$218.00 $436.00

Engineer's Estim ate

EA

C H

$450.00 $900.00 eport D ate: 03/21/23 9 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: Z

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Z0740 63502-0700

TEM

PO

R A

R Y

TR

A

FFIC

C

O N

TR

O

L, C O

N E

Stellar J C orporation

$5.00 $140.00

Farline B ridge

$21.00 $588.00

C onw ay C onstruction, Inc.

$24.00 $672.00

Engineer's Estim ate

EA

C H

$30.00 $840.00

Z0760 63502-1300

TEM

PO

R A

R Y

TR

A

FFIC

C

O N

TR

O

L, D R

U M

Stellar J C orporation

$5.00 $120.00

Farline B ridge

$49.00 $1,176.00

C onw ay C onstruction, Inc.

$45.00 $1,080.00

Engineer's Estim ate

EA

C H

$84.00 $2,016.00

Z0780 63502-2000

TEM

PO

R A

R Y

TR

A

FFIC

C

O N

TR

O

L, PO

R

TA

B

LE C

H

A N

G

EA

B

LE M

ESSA

G

E SIG

N

Stellar J C orporation

$6,000.00 $12,000.00

Farline B ridge

$10,000.00 $20,000.00

C onw ay C onstruction, Inc.

$20,000.00 $40,000.00

Engineer's Estim ate

EA

C H

$24,000.00 $48,000.00

Z0800 63504-1000

TEM

PO

R A

R Y

TR

A

FFIC

C

O N

TR

O

L, C O

N

STR

U C

TIO

N

SIG

N

Stellar J C orporation

$30.00 $2,490.00

Farline B ridge

$10.00 $830.00

C onw ay C onstruction, Inc.

$36.00 $2,988.00

Engineer's Estim ate

SQ

FT

$36.00

$2,988.00

Z0820 63506-0500

TEM

PO

R A

R Y

TR

A

FFIC

C

O N

TR

O

L, FLA

G

G

ER

Stellar J C orporation

$70.00 $13,440.00

Farline B ridge

$67.90 $13,036.80

C onw ay C onstruction, Inc.

$95.00 $18,240.00

Engineer's Estim ate

H

O U

R $81.60

$15,667.20

Z0840 63506-0600

TEM

PO

R A

R Y

TR

A

FFIC

C

O N

TR

O

L, PILO

T C

A R

Stellar J C orporation

$125.00 $12,000.00

Farline B ridge

$84.80 $8,140.80

C onw ay C onstruction, Inc.

$125.00 $12,000.00

Engineer's Estim ate

H

O U

R $98.40

$9,446.40 eport D ate: 03/21/23 10 out of 23

Project N o: O

R D

O T 18(1)

Project N am e: O R

58: C oast Fork W illam ette R iver to Low er Salt C r B ridges

Schedule: Z

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Z0860 64630-0000

R O

A D

SID

E D

EV

ELO

PM

EN

T (A C

C

ESS R

O A

D

Stellar J C orporation

Lum p Sum

$250,000.00 Farline B ridge Lum p Sum $255,000.00

C onw ay C onstruction, Inc.

Lum p Sum

$180,000.00 Engineer's Estim ate A

LL

LPSM

Lum p Sum

$450,000.00

Total Schedule - A ll Item s

Stellar J C orporation

$6,534,540.00 Farline B ridge $6,749,184.60

C onw ay C onstruction, Inc.

$6,870,426.40 Engineer's Estim ate $6,573,348.99

2023-04-17T15:01:18-0700
DEAN ALAN UMATHUM

File details come from the government source that posted it. Updated .