Award_Bid Tab_OR DOT 18(1).pdf
PDF 290 KB Posted
- Solicitation number
- 69056723C000016
About this file
This is a tabulation of bids report for project OR DOT 18(1), the replacement of bridges on OR58 from the Coast Fork Willamette River to Lower Salt Cr in Lane County, Oregon. The base schedule was awarded to Stellar J Corporation on April 17, 2023 for $11,705,291 based on their total bid of $18,239,831 which was the lowest responsive bid. The project is under the Department of Transportation Federal Highway Administration and involves replacement of multiple bridges as well as roadway work. Work will include structural concrete, reinforcing steel, bearing devices, micropiles, temporary support structures, painting, and traffic control. Bids were received from Stellar J Corporation, Farline Bridge, and Conway Construction, Inc. and ranged from $11.7M to $15.4M for the base schedule.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 03/21/23
1 out of 23 Project No: OR DOT 18(1)
Project Name: OR58: Coast Fork Willamette River to Lower Salt Cr Bridges
Contractor Responsive?
Engineer's Estimate
Conway Construction, Inc.
Farline Bridge
Stellar J Corporation
Base Schedule A
$8,428,937.44
$15,425,506.40
$14,321,912.20
$11,705,291.00
Option: Z
$6,573,348.99
$6,870,426.40
$6,749,184.60
$6,534,540.00
Contractor Responsive?
Engineer's Estimate
Conway Construction, Inc.
Farline Bridge
Stellar J Corporation
Total Base Schedule A and Option(s): Z
$15,002,286.43
$22,295,932.80
$21,071,096.80
$18,239,831.00 Base Schedule A Aw arded 04/17/2023
R eport D ate: 03/21/23 11 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Solcitation N o: 69056723B
000010
D ivision: W estern Federal Lands
State: O R
C ounty: Lane
Federal Land: W illam ette N ational Forest
O pened at: FH
W A
V ancouver, W
A O ffice
O pened by: R obert K olln
D ate: 03/21/23
I certify that this B id Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
D ate:
C ontract A w arded to:
A w ard D ate:
C ontractor
C om m ent
B id A m ount
R esponsive
Stellar J C orporation
$11,705,291.00 1363 D ow n R iver D rive
W oodland, W
A 98674
Farline B ridge
$14,321,912.20 1445 M iller D R
Stayton, O R
973839431
C onw ay C onstruction, Inc.
$15,425,506.40 6620 N
W W hitney R
d. Suite 100
V ancouver, W
A 98665
Engineer's Estim ate
$8,428,937.44
Stellar J C orporation
04/17/2023
Base Schedule A Aw arded 04/17/2023 eport D ate: 03/21/23 12 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
15101-0000 M
O B
ILIZA
TIO
N
Stellar J C orporation
Lum p Sum
$1,250,000.00 Farline B ridge Lum p Sum $1,433,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$3,600,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$903,100.44
A
15201-0000 C
O N
STR
U
C
TIO
N
SU
R V
EY
A
N D
STA
K
IN
G
Stellar J C orporation
Lum p Sum
$125,000.00 Farline B ridge Lum p Sum $57,900.00
C onw ay C onstruction, Inc.
Lum p Sum
$30,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$70,000.00
A
15301-0010 C
O N
TR
A
C
TO
R Q
U A
LITY
C
O N
TR
O
L A N
D A
SSU
R
A N
C E
Stellar J C orporation
Lum p Sum
$400,000.00 Farline B ridge Lum p Sum $685,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$500,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$120,000.00
A
15401-0000 C
O N
TR
A
C
TO
R
TESTIN
G
Stellar J C orporation
Lum p Sum
$150,000.00 Farline B ridge Lum p Sum $240,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$190,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$120,000.00
A
15501-0000 C
O N
STR
U
C
TIO
N
SC
H
ED
U
LE
Stellar J C orporation
Lum p Sum
$5,000.00 Farline B ridge Lum p Sum $55,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$50,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$16,000.00
A
15705-0100
SO
IL ER
O
SIO
N
C O
N
TR
O
L, SILT FEN
C E
Stellar J C orporation
$9.00 $8,730.00
Farline B ridge
$3.00 $2,910.00
C onw ay C onstruction, Inc.
$8.00 $7,760.00
Engineer's Estim ate
LN
FT
$6.00
$5,820.00 eport D ate: 03/21/23 13 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
15705-1400
SO
IL ER
O
SIO
N
C O
N
TR
O
L, FIB
ER
R
O
LL
Stellar J C orporation
$9.00 $12,870.00
Farline B ridge
$3.50 $5,005.00
C onw ay C onstruction, Inc.
$8.00 $11,440.00
Engineer's Estim ate
1,430
LN
FT
$8.40
$12,012.00
A
15706-1600
SO
IL ER
O
SIO
N
C O
N
TR
O
L, STA
B
ILIZED
C O
N
STR
U C
TIO
N
EX
IT
Stellar J C orporation
$5,000.00 $30,000.00
Farline B ridge
$2,000.00 $12,000.00
C onw ay C onstruction, Inc.
$7,000.00 $42,000.00
Engineer's Estim ate
EA
C H
$5,760.00 $34,560.00
A
20304-4000 R
EM
O
V A
L O F B
R
ID
G
E SU
PER
STR
U C
TU
R
E (EN
D
FR
A
M
ES)
Stellar J C orporation
Lum p Sum
$40,000.00 Farline B ridge Lum p Sum $200,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$200,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$10,800.00
A
20304-5000 R
EM
O
V A
L O F B
U
ILD
IN
G
(U
SG
S G A
G
E STA
TIO
N
Stellar J C orporation
Lum p Sum
$40,000.00 Farline B ridge Lum p Sum $75,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$25,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$21,600.00
A
20305-1000 R
EM
O
V A
L O F C
O N
C R
ETE
Stellar J C orporation
$700.00 $36,400.00
Farline B ridge
$575.00 $29,900.00
C onw ay C onstruction, Inc.
$600.00 $31,200.00
Engineer's Estim ate
C
U Y
D $420.00
$21,840.00
A
20801-0000
STR
U C
TU
R
E EX
C
A V
A
TIO
N
Stellar J C orporation
$200.00 $423,400.00
Farline B ridge
$90.00 $190,530.00
C onw ay C onstruction, Inc.
$120.00 $254,040.00
Engineer's Estim ate
2,117 C
U Y
D $95.00
$201,115.00 eport D ate: 03/21/23 14 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
20811-0000
SH
O R
IN
G
A N
D B
R A
C
IN
G
Stellar J C orporation
$60.00 $33,000.00
Farline B ridge
$100.00 $55,000.00
C onw ay C onstruction, Inc.
$240.00 $132,000.00
Engineer's Estim ate
SQ
FT
$54.00
$29,700.00
A
20815-0000 C
O
FFER
D A
M S
Stellar J C orporation
Lum p Sum
$950,000.00 Farline B ridge Lum p Sum $1,000,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$200,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$480,000.00
A
20820-0000 D
EW
A
TER
IN
G
Stellar J C orporation
Lum p Sum
$350,000.00 Farline B ridge Lum p Sum $180,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$200,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$150,000.00
A
25101-0300
PLA
C
ED
R
IPR
A P, M
ETH
O
D A
, C
LA
SS 3
Stellar J C orporation
$250.00 $423,750.00
Farline B ridge
$120.00 $203,400.00
C onw ay C onstruction, Inc.
$200.00 $339,000.00
Engineer's Estim ate
1,695 C
U Y
D $120.00
$203,400.00
A
30202-2000 R
O A
D W
A Y
A G
G R
EG
A
TE, M
ETH
O D
Stellar J C orporation
$100.00 $9,800.00
Farline B ridge
$175.00 $17,150.00
C onw ay C onstruction, Inc.
$35.00 $3,430.00
Engineer's Estim ate
TO
N $48.00
$4,704.00
A
40302-0100 A
SPH
A
LT C
O
N C
R
ETE PA
V
EM
EN
T, TY
PE 1 (2" TH
IC
K N
ESS)
Stellar J C orporation
$30.00 $24,540.00
Farline B ridge
$25.82 $21,120.76
C onw ay C onstruction, Inc.
$28.00 $22,904.00
Engineer's Estim ate
SQ
Y D
$21.60 $17,668.80 eport D ate: 03/21/23 15 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
41301-0600 A
SPH
A
LT PA
V
EM
EN
T M
ILLIN
G
, 2-IN
C H
D
EPTH
Stellar J C orporation
$40.00 $32,720.00
Farline B ridge
$17.43 $14,257.74
C onw ay C onstruction, Inc.
$14.00 $11,452.00
Engineer's Estim ate
SQ
Y D
$21.60 $17,668.80
A
41401-2000 C
R A
C K
S, C
LEA
N
IN
G A
N D
SEA
LIN
G
Stellar J C orporation
$60.00 $21,000.00
Farline B ridge
$61.00 $21,350.00
C onw ay C onstruction, Inc.
$46.00 $16,100.00
Engineer's Estim ate
LN
FT
$24.00
$8,400.00
A
50201-0000 C
O N
C R
ETE PA
V
EM
EN
T R
ESTO
R A
TIO
N
, PA
V
EM
EN
T PA
TC
H
Stellar J C orporation
$350.00 $7,000.00
Farline B ridge
$350.00 $7,000.00
C onw ay C onstruction, Inc.
$500.00 $10,000.00
Engineer's Estim ate
SQ
Y D
$720.00 $14,400.00
A
55201-0200
STR
U C
TU
R
A L C
O N
C R
ETE, C
LA
SS A
(A
E)
Stellar J C orporation
$1,000.00 $743,000.00
Farline B ridge
$1,500.00 $1,114,500.00
C onw ay C onstruction, Inc.
$2,400.00 $1,783,200.00
Engineer's Estim ate
C
U Y
D $1,200.00
$891,600.00
A
55220-0000 R
EPA
IR
C O
N C
R
ETE
Stellar J C orporation
$1,800.00 $72,000.00
Farline B ridge
$500.00 $20,000.00
C onw ay C onstruction, Inc.
$5,000.00 $200,000.00
Engineer's Estim ate
SQ
Y D
$720.00 $28,800.00
A
55225-0000 C
LEA
N
A N
D R
ESEA
L JO
IN
TS
Stellar J C orporation
$60.00 $4,800.00
Farline B ridge
$57.00 $4,560.00
C onw ay C onstruction, Inc.
$50.00 $4,000.00
Engineer's Estim ate
LN
FT
$48.00
$3,840.00 eport D ate: 03/21/23 16 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
55235-0000
EX
PA
N
SIO
N
JO
IN
TS (A
SPH
A
LTIC
PLU
G
SEA
L)
Stellar J C orporation
$250.00 $19,500.00
Farline B ridge
$173.00 $13,494.00
C onw ay C onstruction, Inc.
$240.00 $18,720.00
Engineer's Estim ate
LN
FT
$216.00
$16,848.00
A
55401-1000 R
EIN
FO
R C
IN
G
STEEL
Stellar J C orporation
$4.00 $812,480.00
Farline B ridge
$3.50 $710,920.00
C onw ay C onstruction, Inc.
$2.50 $507,800.00
Engineer's Estim ate
203,120
LB
$2.90 $589,048.00
A
55501-0000
STR
U C
TU
R
A
L STEEL (R
IV
ET R
EPLA
C
EM
EN
T)
Stellar J C orporation
Lum p Sum
$3,000.00 Farline B ridge Lum p Sum $25,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$12,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$10,000.00
A
55506-0000 M
ISC
ELLA
N
EO
U
S STEEL (EN
D
FR
A M
E)
Stellar J C orporation
$60,000.00 $360,000.00
Farline B ridge
$85,000.00 $510,000.00
C onw ay C onstruction, Inc.
$80,000.00 $480,000.00
Engineer's Estim ate
EA
C H
$34,000.00 $204,000.00
A
55506-0000 M
ISC
ELLA
N
EO
U
S STEEL (SEA
T B R
A C
K
ET)
Stellar J C orporation
$6,000.00 $432,000.00
Farline B ridge
$15,000.00 $1,080,000.00
C onw ay C onstruction, Inc.
$6,400.00 $460,800.00
Engineer's Estim ate
EA
C H
$6,820.00 $491,040.00
A
55506-0000 M
ISC
ELLA
N
EO
U
S STEEL (TR
U
SS A
N C
H O
R
IN
G
SY
STEM
Stellar J C orporation
$60,000.00 $240,000.00
Farline B ridge
$45,000.00 $180,000.00
C onw ay C onstruction, Inc.
$90,000.00 $360,000.00
Engineer's Estim ate
EA
C H
$28,800.00 $115,200.00 eport D ate: 03/21/23 17 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
55506-0000 M
ISC
ELLA
N
EO
U
S STEEL (EN
D A
N C
H O
R A
G E)
Stellar J C orporation
$75,000.00 $600,000.00
Farline B ridge
$100,000.00 $800,000.00
C onw ay C onstruction, Inc.
$120,000.00 $960,000.00
Engineer's Estim ate
EA
C H
$27,000.00 $216,000.00
A
55506-0000 M
ISC
ELLA
N
EO
U
S STEEL (JA
C K
ETIN
G
Stellar J C orporation
$175,000.00 $700,000.00
Farline B ridge
$185,000.00 $740,000.00
C onw ay C onstruction, Inc.
$170,000.00 $680,000.00
Engineer's Estim ate
EA
C H
$165,000.00 $660,000.00
A
55901-0000 M
EM
B
R A
N E W
A
TER
PR
O
O
FIN
G
Stellar J C orporation
$37.00 $30,266.00
Farline B ridge
$37.00 $30,266.00
C onw ay C onstruction, Inc.
$42.00 $34,356.00
Engineer's Estim ate
SQ
Y D
$54.00 $44,172.00
A
56101-0000
STR
U C
TU
R
A L C
O N
C R
ETE IN
JEC
TIO
N
A N
D C
R A
C K
R
EPA
IR
Stellar J C orporation
$65.00 $55,250.00
Farline B ridge
$78.00 $66,300.00
C onw ay C onstruction, Inc.
$74.00 $62,900.00
Engineer's Estim ate
LN
FT
$45.00
$38,250.00
A
56203-0000
TEM
PO
R
A R
Y
SU
PPO
R
T STR
U
C
TU
R E (B
R
ID
G
E JA
C K
IN
G
Stellar J C orporation
$75,000.00 $300,000.00
Farline B ridge
$150,000.00 $600,000.00
C onw ay C onstruction, Inc.
$100,000.00 $400,000.00
Engineer's Estim ate
EA
C H
$24,000.00 $96,000.00
A
56203-0000
TEM
PO
R
A R
Y
SU
PPO
R
T STR
U
C
TU
R E (B
R
ID
G
E JA
C K
IN
G
Stellar J C orporation
$40,000.00 $80,000.00
Farline B ridge
$450,000.00 $900,000.00
C onw ay C onstruction, Inc.
$150,000.00 $300,000.00
Engineer's Estim ate
EA
C H
$36,000.00 $72,000.00 eport D ate: 03/21/23 18 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
56302-2000
PA
IN
TIN
G
, STEEL STR
U C
TU
R
E (SU
B
STR
U
C
TU
R E)
Stellar J C orporation
$40.00 $134,000.00
Farline B ridge
$73.45 $246,057.50
C onw ay C onstruction, Inc.
$76.00 $254,600.00
Engineer's Estim ate
3,350
SQ
FT
$30.00
$100,500.00
A
56302-2000
PA
IN
TIN
G
, STEEL STR
U C
TU
R
E
Stellar J C orporation
$350.00 $525,000.00
Farline B ridge
$177.30 $265,950.00
C onw ay C onstruction, Inc.
$175.00 $262,500.00
Engineer's Estim ate
1,500
SQ
FT
$110.00
$165,000.00
A
56302-2000
PA
IN
TIN
G
, STEEL STR
U C
TU
R
E
Stellar J C orporation
$90.00 $211,500.00
Farline B ridge
$70.45 $165,557.50
C onw ay C onstruction, Inc.
$75.00 $176,250.00
Engineer's Estim ate
2,350
SQ
FT
$80.00
$188,000.00
A
56401-3000 B
EA
R
IN
G
D
EV
IC
E, SLID
IN
G
Stellar J C orporation
$5,000.00 $30,000.00
Farline B ridge
$40,000.00 $240,000.00
C onw ay C onstruction, Inc.
$20,000.00 $120,000.00
Engineer's Estim ate
EA
C H
$8,000.00 $48,000.00
A
56701-0000 M
IC
R
O
PILE
Stellar J C orporation
$300.00 $805,200.00
Farline B ridge
$242.00 $649,528.00
C onw ay C onstruction, Inc.
$460.00 $1,234,640.00
Engineer's Estim ate
2,684
LN
FT
$265.00
$711,260.00
A
56705-0000 M
IC
R
O
PILE LO
A D
V
ER
IFIC
A
TIO
N
TEST
Stellar J C orporation
$30,000.00 $60,000.00
Farline B ridge
$20,000.00 $40,000.00
C onw ay C onstruction, Inc.
$21,000.00 $42,000.00
Engineer's Estim ate
EA
C H
$3,600.00 $7,200.00 eport D ate: 03/21/23 19 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
56706-0000 M
IC
R
O
PILE PR
O O
F LO
A
D
TEST
Stellar J C orporation
$5,000.00 $20,000.00
Farline B ridge
$4,500.00 $18,000.00
C onw ay C onstruction, Inc.
$5,000.00 $20,000.00
Engineer's Estim ate
EA
C H
$1,200.00 $4,800.00
A
57501-0000 M
IN
O
R B
R
ID
G E W
O R
K
Stellar J C orporation
Lum p Sum
$200,000.00 Farline B ridge Lum p Sum $280,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$112,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$100,000.00
A
57705-0200
FIB
ER
R
EIN
FO
R C
ED
PO
LY
M
ER
(FR
P), STR
EN
G
TH
EN
IN
G
SY
STEM
(C
FR
P)
Stellar J C orporation
$90.00 $82,800.00
Farline B ridge
$82.00 $75,440.00
C onw ay C onstruction, Inc.
$160.00 $147,200.00
Engineer's Estim ate
SQ
FT
$144.00
$132,480.00
A
57705-0200
FIB
ER
R
EIN
FO
R C
ED
PO
LY
M
ER
(FR
P), STR
EN
G
TH
EN
IN
G
SY
STEM
(C
FR
P)
Stellar J C orporation
$105.00 $161,700.00
Farline B ridge
$82.00 $126,280.00
C onw ay C onstruction, Inc.
$85.00 $130,900.00
Engineer's Estim ate
1,540
SQ
FT
$72.00
$110,880.00
A
60103-4200 C
O N
C R
ETE, PLA
N
K (R
EM
O
V E A
N D
R
ESET)
Stellar J C orporation
$500.00 $2,000.00
Farline B ridge
$10.00 $40.00
C onw ay C onstruction, Inc.
$18,000.00 $72,000.00
Engineer's Estim ate
EA
C H
$1,800.00 $7,200.00
A
60510-0300
4-IN
C H
C O
LLEC
TO
R
PIPE
Stellar J C orporation
$10.00 $39,000.00
Farline B ridge
$22.00 $85,800.00
C onw ay C onstruction, Inc.
$5.00 $19,500.00
Engineer's Estim ate
3,900
LN
FT
$7.20
$28,080.00 eport D ate: 03/21/23 20 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
61601-1000
SLO
PE PA
V
IN
G
, C O
N C
R
ETE
Stellar J C orporation
$250.00 $87,500.00
Farline B ridge
$250.00 $87,500.00
C onw ay C onstruction, Inc.
$250.00 $87,500.00
Engineer's Estim ate
SQ
Y D
$228.00 $79,800.00
A
62201-0250 D
U M
P TR
U
C K
, 10 C U
B
IC
Y A
R D
M
IN
IM
U
M C
A
PA
C
ITY
Stellar J C orporation
$180.00 $7,200.00
Farline B ridge
$195.00 $7,800.00
C onw ay C onstruction, Inc.
$200.00 $8,000.00
Engineer's Estim ate
H
O U
R $186.00
$7,440.00
A
62201-0500 B
A C
K H
O
E LO
A D
ER
, 4 C
U B
IC
FO
O T M
IN
IM
U M
R A
TED
C
A
PA
C
ITY
B U
C K
ET, 4-W
H
EEL D
R
IV
E
Stellar J C orporation
$110.00 $4,400.00
Farline B ridge
$165.00 $6,600.00
C onw ay C onstruction, Inc.
$190.00 $7,600.00
Engineer's Estim ate
H
O U
R $210.00
$8,400.00
A
62201-3150 H
Y D
R A
U
LIC
EX
C
A V
A
TO
R , C
R A
W
LER
M O
U N
TED
, 1.0 C
U B
IC
Y
A R
D M
IN
IM
U M
C A
PA
C
ITY
W
ITH
TH
U M
B
A
TTA
C H
M
EN
T
Stellar J C orporation
$150.00 $6,000.00
Farline B ridge
$215.00 $8,600.00
C onw ay C onstruction, Inc.
$230.00 $9,200.00
Engineer's Estim ate
H
O U
R $228.00
$9,120.00
A
62201-3750 C
H A
IN
SA
W
Stellar J C orporation
$80.00 $1,600.00
Farline B ridge
$50.00 $1,000.00
C onw ay C onstruction, Inc.
$120.00 $2,400.00
Engineer's Estim ate
H
O U
R $96.00
$1,920.00
A
62301-0000 G
EN
ER
A
L LA
B O
R
Stellar J C orporation
$75.00 $12,000.00
Farline B ridge
$115.00 $18,400.00
C onw ay C onstruction, Inc.
$117.00 $18,720.00
Engineer's Estim ate
H
O U
R $98.40
$15,744.00 eport D ate: 03/21/23 21 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
62501-0000
TU
R
F ESTA
B
LISH
M
EN
T
Stellar J C orporation
$20,000.00 $30,000.00
Farline B ridge
$4,500.00 $6,750.00
C onw ay C onstruction, Inc.
$5,400.00 $8,100.00
Engineer's Estim ate
1.5 A
C R
E $6,000.00
$9,000.00
A
62635-3000 C
U
TTIN
G S, W
ILLO
W
PO
LE
Stellar J C orporation
$35.00 $17,150.00
Farline B ridge
$40.00 $19,600.00
C onw ay C onstruction, Inc.
$25.00 $12,250.00
Engineer's Estim ate
EA
C H
$16.80 $8,232.00
A
63302-0000
SIG
N
SY
STEM
Stellar J C orporation
$40.00 $1,280.00
Farline B ridge
$85.00 $2,720.00
C onw ay C onstruction, Inc.
$200.00 $6,400.00
Engineer's Estim ate
SQ
FT
$120.00
$3,840.00
A
63401-0300
PA
V
EM
EN
T M
A R
K
IN
G
S, TY
PE B
, SO
LID
Stellar J C orporation
$2.00 $3,760.00
Farline B ridge
$0.75 $1,410.00
C onw ay C onstruction, Inc.
$0.78 $1,466.40
Engineer's Estim ate
1,880
LN
FT
$1.50
$2,820.00
A
63501-1000
TEM
PO
R
A R
Y
TR
A
FFIC
C O
N
TR
O
L, TR
A
FFIC
C O
N
TR
O
L SU
PER
V
ISO
R
Stellar J C orporation
Lum p Sum
$200,000.00 Farline B ridge Lum p Sum $350,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$157,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$372,000.00
A
63502-0300
TEM
PO
R
A R
Y
TR
A
FFIC
C O
N
TR
O L, A
R R
O W
B O
A R
D
, TY
PE C
Stellar J C orporation
$2,000.00 $4,000.00
Farline B ridge
$5,300.00 $10,600.00
C onw ay C onstruction, Inc.
$4,000.00 $8,000.00
Engineer's Estim ate
EA
C H
$8,040.00 $16,080.00 eport D ate: 03/21/23 22 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
63502-0500
TEM
PO
R
A R
Y
TR
A
FFIC
C O
N
TR
O L, B
A R
R
IC
A D
E TY
PE 2
Stellar J C orporation
$65.00 $325.00
Farline B ridge
$55.00 $275.00
C onw ay C onstruction, Inc.
$55.00 $275.00
Engineer's Estim ate
EA
C H
$108.00 $540.00
A
63502-0600
TEM
PO
R
A R
Y
TR
A
FFIC
C O
N
TR
O L, B
A R
R
IC
A D
E TY
PE 3
Stellar J C orporation
$165.00 $1,650.00
Farline B ridge
$165.00 $1,650.00
C onw ay C onstruction, Inc.
$218.00 $2,180.00
Engineer's Estim ate
EA
C H
$450.00 $4,500.00
A
63502-0700
TEM
PO
R
A R
Y
TR
A
FFIC
C O
N
TR
O L, C
O N
E
Stellar J C orporation
$5.00 $1,060.00
Farline B ridge
$21.00 $4,452.00
C onw ay C onstruction, Inc.
$24.00 $5,088.00
Engineer's Estim ate
EA
C H
$30.00 $6,360.00
A
63502-1300
TEM
PO
R
A R
Y
TR
A
FFIC
C O
N
TR
O L, D
R U
M
Stellar J C orporation
$40.00 $5,040.00
Farline B ridge
$49.00 $6,174.00
C onw ay C onstruction, Inc.
$46.00 $5,796.00
Engineer's Estim ate
EA
C H
$84.00 $10,584.00
A
63502-2000
TEM
PO
R
A R
Y
TR
A
FFIC
C O
N
TR
O
L, PO
R
TA
B
LE C
H A
N G
EA
B
LE M
ESSA
G
E SIG
N
Stellar J C orporation
$4,000.00 $24,000.00
Farline B ridge
$10,000.00 $60,000.00
C onw ay C onstruction, Inc.
$26,000.00 $156,000.00
Engineer's Estim ate
EA
C H
$24,000.00 $144,000.00
A
63504-1000
TEM
PO
R
A R
Y
TR
A
FFIC
C O
N
TR
O L, C
O N
STR
U
C
TIO
N
SIG
N
Stellar J C orporation
$30.00 $9,510.00
Farline B ridge
$10.00 $3,170.00
C onw ay C onstruction, Inc.
$37.00 $11,729.00
Engineer's Estim ate
SQ
FT
$36.00
$11,412.00 eport D ate: 03/21/23 23 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: A
Schedule Type: B ase
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
A
63506-0500
TEM
PO
R
A R
Y
TR
A
FFIC
C O
N
TR
O
L, FLA
G G
ER
Stellar J C orporation
$70.00 $80,360.00
Farline B ridge
$67.90 $77,949.20
C onw ay C onstruction, Inc.
$95.00 $109,060.00
Engineer's Estim ate
1,148 H
O U
R $81.60
$93,676.80
A
63506-0600
TEM
PO
R
A R
Y
TR
A
FFIC
C O
N
TR
O
L, PILO
T C A
R
Stellar J C orporation
$125.00 $71,750.00
Farline B ridge
$84.80 $48,675.20
C onw ay C onstruction, Inc.
$125.00 $71,750.00
Engineer's Estim ate
H
O U
R $98.40
$56,481.60
A
64620-0000 R
EM
O
V E A
N D
R
ESET (B
O A
T R A
M P)
Stellar J C orporation
$40,000.00 $40,000.00
Farline B ridge
$105,370.30 $105,370.30
C onw ay C onstruction, Inc.
$5,300.00 $5,300.00
Engineer's Estim ate
EA
C H
$24,000.00 $24,000.00
Total Schedule - A ll Item s
Stellar J C orporation
$11,705,291.00 Farline B ridge $14,321,912.20
C onw ay C onstruction, Inc.
$15,425,506.40 Engineer's Estim ate $8,428,937.44 eport D ate: 03/21/23 2 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: Z
Schedule Type: O ptions
Solcitation N o: 69056723B
000010
D ivision: W estern Federal Lands
State: O R
C ounty: Lane
Federal Land: W illam ette N ational Forest
O pened at: FH
W A
V ancouver, W
A O ffice
O pened by: R obert K olln
D ate: 03/21/23
I certify that this B id Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
D ate:
C ontract A w arded to:
A w ard D ate:
C ontractor
C om m ent
B id A m ount
R esponsive
Stellar J C orporation
$6,534,540.00 1363 D ow n R iver D rive
W oodland, W
A 98674
Farline B ridge
$6,749,184.60 1445 M iller D R
Stayton, O R
973839431
C onw ay C onstruction, Inc.
$6,870,426.40 6620 N
W W hitney R
d. Suite 100
V ancouver, W
A 98665
Engineer's Estim ate
$6,573,348.99
D
EA
N A
LA
N
U
M A
TH
U
M
D igitally signed by D
EA
N
A
LA
N
U M
A
TH
U M
D ate: 2023.03.22 08:51:23 -07'00' eport D ate: 03/21/23 3 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: Z
Schedule Type: O ptions
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
Z0020 15101-0000
M O
B
ILIZA
TIO
N
Stellar J C orporation
Lum p Sum
$300,000.00 Farline B ridge Lum p Sum $688,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$650,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$704,287.39
Z0040 15201-0000
C O
N
STR
U C
TIO
N
SU
R
V
EY
A N
D
STA
K
IN
G
Stellar J C orporation
Lum p Sum
$30,000.00 Farline B ridge Lum p Sum $15,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$5,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$30,000.00
Z0060 15301-0010
C O
N
TR
A C
TO
R
Q U
A
LITY
C O
N
TR
O L A
N D
A
SSU
R A
N C
E
Stellar J C orporation
Lum p Sum
$15,000.00 Farline B ridge Lum p Sum $75,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$100,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$60,000.00
Z0080 15401-0000
C O
N
TR
A C
TO
R
TESTIN
G
Stellar J C orporation
Lum p Sum
$50,000.00 Farline B ridge Lum p Sum $25,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$40,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$60,000.00
Z0100 15501-0000
C O
N
STR
U C
TIO
N
SC
H
ED
U
LE
Stellar J C orporation
Lum p Sum
$2,500.00 Farline B ridge Lum p Sum $15,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$20,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$8,000.00
Z0120 15705-0100
SO
IL ER
O
SIO
N C
O N
TR
O
L, SILT FEN
C
E
Stellar J C orporation
$15.00 $3,450.00
Farline B ridge
$5.00 $1,150.00
C onw ay C onstruction, Inc.
$8.00 $1,840.00
Engineer's Estim ate
LN
FT
$6.00
$1,380.00 eport D ate: 03/21/23 4 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: Z
Schedule Type: O ptions
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
Z0140 15705-1400
SO
IL ER
O
SIO
N C
O N
TR
O
L, FIB
ER
R O
LL
Stellar J C orporation
$8.00 $6,160.00
Farline B ridge
$4.00 $3,080.00
C onw ay C onstruction, Inc.
$8.00 $6,160.00
Engineer's Estim ate
LN
FT
$8.40
$6,468.00
Z0160 15706-1600
SO
IL ER
O
SIO
N C
O N
TR
O
L, STA
B
ILIZED
C
O N
STR
U
C
TIO
N
EX
IT
Stellar J C orporation
$6,000.00 $12,000.00
Farline B ridge
$2,000.00 $4,000.00
C onw ay C onstruction, Inc.
$6,000.00 $12,000.00
Engineer's Estim ate
EA
C H
$5,760.00 $11,520.00
Z0180 20120-1000
R
EM
O V
A
L, IN
D
IV
ID
U
A
L TR
EE
Stellar J C orporation
$1,500.00 $45,000.00
Farline B ridge
$240.00 $7,200.00
C onw ay C onstruction, Inc.
$650.00 $19,500.00
Engineer's Estim ate
EA
C H
$720.00 $21,600.00
Z0200 20305-1000
R
EM
O V
A L O
F C O
N C
R
ETE
Stellar J C orporation
$1,500.00 $57,000.00
Farline B ridge
$425.00 $16,150.00
C onw ay C onstruction, Inc.
$600.00 $22,800.00
Engineer's Estim ate
C
U Y
D $420.00
$15,960.00
Z0220 20801-0000
STR
U
C
TU
R
E EX
C A
V A
TIO
N
Stellar J C orporation
$100.00 $197,200.00
Farline B ridge
$68.00 $134,096.00
C onw ay C onstruction, Inc.
$114.00 $224,808.00
Engineer's Estim ate
1,972 C
U Y
D $95.00
$187,340.00
Z0240 20815-0000
C O
FFER
D
A M
S
Stellar J C orporation
Lum p Sum
$900,000.00 Farline B ridge Lum p Sum $980,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$70,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$730,000.00 eport D ate: 03/21/23 5 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: Z
Schedule Type: O ptions
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
Z0260 20820-0000
D
EW
A
TER
IN
G
Stellar J C orporation
Lum p Sum
$100,000.00 Farline B ridge Lum p Sum $70,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$90,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$150,000.00
Z0280 25101-0300
PLA
C
ED
R
IPR
A
P, M
ETH
O D
A , C
LA
SS 3
Stellar J C orporation
$275.00 $445,500.00
Farline B ridge
$120.00 $194,400.00
C onw ay C onstruction, Inc.
$110.00 $178,200.00
Engineer's Estim ate
1,620 C
U Y
D $120.00
$194,400.00
Z0300 50201-0000
C O
N C
R
ETE PA
V
EM
EN
T R
ESTO
R
A
TIO
N
, PA
V
EM
EN
T PA
TC
H
Stellar J C orporation
$250.00 $11,250.00
Farline B ridge
$275.00 $12,375.00
C onw ay C onstruction, Inc.
$300.00 $13,500.00
Engineer's Estim ate
SQ
Y D
$720.00 $32,400.00
Z0320 55106-1000
SH
EET PILE, IN
PLA
C
E (TIE B
A
C K
Stellar J C orporation
Lum p Sum
$800,000.00 Farline B ridge Lum p Sum $1,250,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$1,500,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$810,000.00
Z0340 55106-1000
SH
EET PILE, IN
PLA
C
E
Stellar J C orporation
Lum p Sum
$200,000.00 Farline B ridge Lum p Sum $380,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$360,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$270,000.00
Z0360 55201-0200
STR
U
C
TU
R A
L C O
N C
R
ETE, C
LA
SS A
(A E)
Stellar J C orporation
$800.00 $373,600.00
Farline B ridge
$990.00 $462,330.00
C onw ay C onstruction, Inc.
$1,500.00 $700,500.00
Engineer's Estim ate
C
U Y
D $1,200.00
$560,400.00 eport D ate: 03/21/23 6 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: Z
Schedule Type: O ptions
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
Z0380 55201-1200
STR
U
C
TU
R A
L C O
N C
R
ETE, C
LA
SS S (SEA
L)
Stellar J C orporation
$450.00 $83,700.00
Farline B ridge
$505.00 $93,930.00
C onw ay C onstruction, Inc.
$700.00 $130,200.00
Engineer's Estim ate
C
U Y
D $300.00
$55,800.00
Z0400 55235-0000
EX
PA
N
SIO
N
JO
IN
TS (A
SPH
A
LTIC
PLU
G
SEA
L)
Stellar J C orporation
$250.00 $19,500.00
Farline B ridge
$173.00 $13,494.00
C onw ay C onstruction, Inc.
$230.00 $17,940.00
Engineer's Estim ate
LN
FT
$216.00
$16,848.00
Z0420 55401-1000
R
EIN
FO
R
C
IN
G
STEEL
Stellar J C orporation
$3.50 $245,770.00
Farline B ridge
$2.05 $143,951.00
C onw ay C onstruction, Inc.
$2.00 $140,440.00
Engineer's Estim ate
70,220
LB
$2.90 $203,638.00
Z0440 55501-0000
STR
U
C
TU
R A
L STEEL (B
O
LT R
EPLA
C
EM
EN
T)
Stellar J C orporation
Lum p Sum
$35,000.00 Farline B ridge Lum p Sum $38,750.00
C onw ay C onstruction, Inc.
Lum p Sum
$12,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$25,200.00
Z0460 55506-0000
M
ISC
ELLA
N
EO
U
S STEEL (JA
C
K
ETIN
G
Stellar J C orporation
$115,000.00 $920,000.00
Farline B ridge
$90,000.00 $720,000.00
C onw ay C onstruction, Inc.
$100,000.00 $800,000.00
Engineer's Estim ate
EA
C H
$112,000.00 $896,000.00
Z0480 56302-2000
PA
IN
TIN
G
, STEEL STR
U
C
TU
R E
Stellar J C orporation
$175.00 $315,000.00
Farline B ridge
$137.80 $248,040.00
C onw ay C onstruction, Inc.
$136.00 $244,800.00
Engineer's Estim ate
1,800
SQ
FT
$80.00
$144,000.00 eport D ate: 03/21/23 7 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: Z
Schedule Type: O ptions
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
Z0500 56701-0000
M
IC
R O
PILE
Stellar J C orporation
$300.00 $540,000.00
Farline B ridge
$242.00 $435,600.00
C onw ay C onstruction, Inc.
$460.00 $828,000.00
Engineer's Estim ate
1,800
LN
FT
$265.00
$477,000.00
Z0520 56705-0000
M
IC
R O
PILE LO
A
D V
ER
IFIC
A
TIO
N
TEST
Stellar J C orporation
$25,000.00 $50,000.00
Farline B ridge
$20,000.00 $40,000.00
C onw ay C onstruction, Inc.
$20,000.00 $40,000.00
Engineer's Estim ate
EA
C H
$3,600.00 $7,200.00
Z0540 56706-0000
M
IC
R O
PILE PR
O
O
F LO
A D
TEST
Stellar J C orporation
$5,000.00 $20,000.00
Farline B ridge
$4,500.00 $18,000.00
C onw ay C onstruction, Inc.
$5,000.00 $20,000.00
Engineer's Estim ate
EA
C H
$1,200.00 $4,800.00
Z0560 56901-0000
C O
N C
R
ETE O
V
ER
LA
Y
, C
LA
SS M
PC
O
Stellar J C orporation
$62.00 $131,440.00
Farline B ridge
$62.00 $131,440.00
C onw ay C onstruction, Inc.
$85.00 $180,200.00
Engineer's Estim ate
2,120
SQ
Y D
$60.00 $127,200.00
Z0580 57705-0200
FIB
ER
R
EIN
FO
R
C
ED
PO
LY
M
ER
(FR
P), STR
EN
G
TH
EN
IN
G
SY
STEM
(C
FR
P)
Stellar J C orporation
$100.00 $216,000.00
Farline B ridge
$82.00 $177,120.00
C onw ay C onstruction, Inc.
$75.00 $162,000.00
Engineer's Estim ate
2,160
SQ
FT
$72.00
$155,520.00
Z0600 62501-0000
TU
R
F ESTA
B
LISH
M
EN
T
Stellar J C orporation
$20,000.00 $20,000.00
Farline B ridge
$4,500.00 $4,500.00
C onw ay C onstruction, Inc.
$5,400.00 $5,400.00
Engineer's Estim ate
1.0 A
C R
E $6,000.00
$6,000.00 eport D ate: 03/21/23 8 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: Z
Schedule Type: O ptions
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
Z0620 62630-0350
PLA
N
TIN
G
S, TR
EES, B
A
LLED
A N
D B
U R
LA
PPED
Stellar J C orporation
$1,200.00 $72,000.00
Farline B ridge
$500.00 $30,000.00
C onw ay C onstruction, Inc.
$80.00 $4,800.00
Engineer's Estim ate
EA
C H
$960.00 $57,600.00
Z0640 62635-3000
C U
TTIN
G
S, W
ILLO
W
PO
LE
Stellar J C orporation
$30.00 $15,300.00
Farline B ridge
$40.00 $20,400.00
C onw ay C onstruction, Inc.
$25.00 $12,750.00
Engineer's Estim ate
EA
C H
$16.80 $8,568.00
Z0660 63401-0300
PA
V
EM
EN
T M A
R K
IN
G
S, TY
PE B
, SO
LID
Stellar J C orporation
$2.00 $4,760.00
Farline B ridge
$0.65 $1,547.00
C onw ay C onstruction, Inc.
$0.68 $1,618.40
Engineer's Estim ate
2,380
LN
FT
$1.50
$3,570.00
Z0680 63401-0400
PA
V
EM
EN
T M A
R K
IN
G
S, TY
PE B
, B R
O K
EN
Stellar J C orporation
$6.00 $7,200.00
Farline B ridge
$0.35 $420.00
C onw ay C onstruction, Inc.
$0.37 $444.00
Engineer's Estim ate
1,200
LN
FT
$0.48
$576.00
Z0700 63502-0500
TEM
PO
R A
R Y
TR
A
FFIC
C
O N
TR
O
L, B A
R R
IC
A
D
E TY
PE 2
Stellar J C orporation
$5.00 $10.00
Farline B ridge
$55.00 $110.00
C onw ay C onstruction, Inc.
$55.00 $110.00
Engineer's Estim ate
EA
C H
$108.00 $216.00
Z0720 63502-0600
TEM
PO
R A
R Y
TR
A
FFIC
C
O N
TR
O
L, B A
R R
IC
A
D
E TY
PE 3
Stellar J C orporation
$5.00 $10.00
Farline B ridge
$165.00 $330.00
C onw ay C onstruction, Inc.
$218.00 $436.00
Engineer's Estim ate
EA
C H
$450.00 $900.00 eport D ate: 03/21/23 9 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: Z
Schedule Type: O ptions
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
Z0740 63502-0700
TEM
PO
R A
R Y
TR
A
FFIC
C
O N
TR
O
L, C O
N E
Stellar J C orporation
$5.00 $140.00
Farline B ridge
$21.00 $588.00
C onw ay C onstruction, Inc.
$24.00 $672.00
Engineer's Estim ate
EA
C H
$30.00 $840.00
Z0760 63502-1300
TEM
PO
R A
R Y
TR
A
FFIC
C
O N
TR
O
L, D R
U M
Stellar J C orporation
$5.00 $120.00
Farline B ridge
$49.00 $1,176.00
C onw ay C onstruction, Inc.
$45.00 $1,080.00
Engineer's Estim ate
EA
C H
$84.00 $2,016.00
Z0780 63502-2000
TEM
PO
R A
R Y
TR
A
FFIC
C
O N
TR
O
L, PO
R
TA
B
LE C
H
A N
G
EA
B
LE M
ESSA
G
E SIG
N
Stellar J C orporation
$6,000.00 $12,000.00
Farline B ridge
$10,000.00 $20,000.00
C onw ay C onstruction, Inc.
$20,000.00 $40,000.00
Engineer's Estim ate
EA
C H
$24,000.00 $48,000.00
Z0800 63504-1000
TEM
PO
R A
R Y
TR
A
FFIC
C
O N
TR
O
L, C O
N
STR
U C
TIO
N
SIG
N
Stellar J C orporation
$30.00 $2,490.00
Farline B ridge
$10.00 $830.00
C onw ay C onstruction, Inc.
$36.00 $2,988.00
Engineer's Estim ate
SQ
FT
$36.00
$2,988.00
Z0820 63506-0500
TEM
PO
R A
R Y
TR
A
FFIC
C
O N
TR
O
L, FLA
G
G
ER
Stellar J C orporation
$70.00 $13,440.00
Farline B ridge
$67.90 $13,036.80
C onw ay C onstruction, Inc.
$95.00 $18,240.00
Engineer's Estim ate
H
O U
R $81.60
$15,667.20
Z0840 63506-0600
TEM
PO
R A
R Y
TR
A
FFIC
C
O N
TR
O
L, PILO
T C
A R
Stellar J C orporation
$125.00 $12,000.00
Farline B ridge
$84.80 $8,140.80
C onw ay C onstruction, Inc.
$125.00 $12,000.00
Engineer's Estim ate
H
O U
R $98.40
$9,446.40 eport D ate: 03/21/23 10 out of 23
Project N o: O
R D
O T 18(1)
Project N am e: O R
58: C oast Fork W illam ette R iver to Low er Salt C r B ridges
Schedule: Z
Schedule Type: O ptions
Line Item
Pay Item N o.
D escription Q uantity U nit U nit Price A m ount
N um ber
Z0860 64630-0000
R O
A D
SID
E D
EV
ELO
PM
EN
T (A C
C
ESS R
O A
D
Stellar J C orporation
Lum p Sum
$250,000.00 Farline B ridge Lum p Sum $255,000.00
C onw ay C onstruction, Inc.
Lum p Sum
$180,000.00 Engineer's Estim ate A
LL
LPSM
Lum p Sum
$450,000.00
Total Schedule - A ll Item s
Stellar J C orporation
$6,534,540.00 Farline B ridge $6,749,184.60
C onw ay C onstruction, Inc.
$6,870,426.40 Engineer's Estim ate $6,573,348.99
| 2023-04-17T15:01:18-0700 | |
| DEAN ALAN UMATHUM |