AVN Form A55 Public Notification of Bundled Requirements.pdf

PDF 198 KB Posted

Attached to
V-22 Next Phase COI
Solicitation number
SPRPA1-22-R-001E
Issued by

View the file

Other files

File Type Posted
V-22 NEXT PHASE COI(20210810-4314).xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AVN Form A55, NOV 2017

Public Notification of Bundled Requirements

Contract Number: SPRPA1-17-D-009U Estimated Award Date: 30 SEP 2023 Description of Product(s)/Service(s)/Program: A ten (10) (5 year base period and a 5 year unpriced option period) year Firm Fixed Price Incentive Fee proposal for the acquisition of a comprehensive and holistic performance based supply chain management program in support of the V-22 aircraft parts with Bell Boeing Joint Project Office (cage: 3B1R2).

Contracting Officer: Suzanne Brown, Suzanne.brown@dla.mil, 215-737-3791

Disclaimer:

This Notice of Intent to Bundle is issued for information and planning purposes only and does not constitute a solicitation. This announcement does not constitute a guarantee or otherwise commit the Government, in any way, to solicit or award a contract now or in the future.

SPRPA1-22-R-001E is the planned solicitation number and is being used for notice identification only; a solicitation is not being issued at this time.

Justification: The Contracting Officer has found the bundling of this requirement necessary and justified based on the following:

- Market Research

Potential Sources

DLA Aviation performed a comprehensive market research effort to identify potential sources in accordance with FAR Part 10.0002(b)(2). DLA Aviation issued a Federal Business Opportunities (FedBizOpps) Potential Sources Sought (PSS) advertisement on September 1, 2021 as required by FAR 5.201. This market research resulted in one response from Bell Boeing Joint Project Office. The results of the market research efforts did not identify any source other than Bell Boeing with the capability or interest to meet the entirety of the requirement.

- Cost Savings:

The anticipated contract for this effort will be awarded against the Bell Boeing V-22 Captains of Industry (BBCOI) contract, SPRPA1-17-D-009U. The PCO has determined to proceed with the initiative based on a minimum estimate of 5-10% in cost savings per FAR 7.107, which reflects the expected savings associated with the various efficiencies that are anticipated under the COI.

The 10 year (5 year priced base period and a 5 year unpriced option period) estimated value of the program is $686.2M—for a total of approximately 4,314 NSNs—and DLA expects to save a minimum between $34.3M to $68.6M per FAR 7.107 based on the above. The Business Case Analysis also supports saving up 20% or $137.2M The value of the anticipated savings meets the threshold for measurable substantial benefits required to justify a bundled acquisition.

mailto:Suzanne.brown@dla.mil

AVN Form A55, NOV 2017

- Historical Acquisition:

The three year total dollar value of the historical DLA contracts awarded to support the V-22 aircraft Supply Chain includes an item population of 4,314 NSNs valued at $187.3M, with approximately $40.0M going to small business, an average of $13.3 per year. As noted above, the total number of NSNs for this requirement is approximately 4,314.

- Small Business Action Plan

Under this program, Bell Boeing Joint Project Office is incentivized to actually increase workload to the small business sector. The requirement for compliance in small business subcontracting will be closely monitored under COI.

The benefits of having Bell Boeing act as the integrator with "single point accountability" for the supply chain transfers to the small business community in a variety of ways. Using a similar COI Program for comparison; Boeing COI Phase 1, Boeing introduced competition at unprecedented levels in an effort to reduce costs. The introduction of competition to requirements previously subcontracted under single source scenarios resulted in the following small business statistics which are an increase from those previously achieved by Boeing. The following statistics are actuals from Bell Boeing’s Subcontracting Plan dated 07 October 2014:

PB Increment 1 - Small Business 62.96% PB Increment 2 - Small Business 41.08% Stock Increment 1A - Small Business 74.94%

- Other matters:

The proposed acquisition cannot be divided into reasonably small lots (not less than economic production runs) to permit offers on quantities less than the total requirement. Delivery schedules cannot be established on a realistic basis that will encourage small business participation to the extent consistent with the actual requirements of the Government. Finally, the proposed acquisition cannot be structured so as to make it likely that small businesses can compete for the prime contract.

File details come from the government source that posted it. Updated .