This is a Statement of Work (SOW) for shipyard services on the NOAA Research Vessel AUK (hull number R5001), a 50-foot vessel with a 19-foot beam and 5.1-foot draft. The work must be performed at a contractor facility within 50 miles of Scituate Harbor MA, with a performance period of February 1, 2025 through August 30, 2025.
The SOW outlines 12 specific tasks including: hull cleaning and antifouling coating application; Prop-Speed coating renewal; seacock inspection and lubrication; generator servicing; inverter and charger testing; interior bulkhead replacement (120 square feet); science winch servicing; meteorological sensor updates; head sole renewal and toilet replacement; cushion replacement; and main engine servicing for two Cummins QSC8.3 engines. The contractor must provide all facilities, labor, materials, and tools unless otherwise specified. The work requires certified welders when applicable and must meet ABYC and USCG Subchapter T requirements. A site visit to 175 Edward Foster Road, Scituate MA is strongly encouraged for bidders to inspect the vessel before submitting quotes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Clauses and Provisions.pdf | ||
| NOAA IPP Implementation Notice.pdf | ||
| RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work –Annual Shipyard Services NOAA Research Vessel AUK
A] GENERAL INFORMATION:
1] This Statement of Work contains the requirements for shipyard services on the NOAA Research Vessel AUK, hull number R5001.
2] The general characteristics of the vessel are as follows:
Length: 50 feet Beam: 19 feet Draft: ~5.1 feet Displacement: ~25 long tons
3] All work shall be accomplished at the contractor’s facility. Contractor’s facility shall be located with a 50-statute mile radius of Scituate Harbor MA. NOAA shall deliver the vessel to the contractor’s facility, and the vessel shall be returned to NOAA at the contractor’s facility. The period of performance is:
February 1, 2025 through on or before August 30, 2025
4] Coordination of the work schedules shall be the responsibility of the contractor to avoid any delays or disruptions in order to meet the period of performance. The contractor shall provide all facilities, labor, materials, tools, and services required to complete the work unless stated otherwise in the tasks below.
5] Upon arrival at the contractor’s facility the contractor shall accept full responsibility for the safety of the vessel, including fire protection, security patrols, water-tight integrity, protection from adverse environmental conditions, etc. This responsibility shall terminate only after all work is complete, work is inspected and accepted by NOAA, and NOAA personnel remove the vessel from the contractor’s facility.
6] NOAA employees and contractors may be working on board the vessel during the contract period of performance on a not to interfere basis. During this period, these personnel shall be given full access to the vessel during normal working hours.
7] If hauling is required, the contractor shall ensure that all machinery and equipment used to haul the vessel is fully functional, suitable for the task, rated for loads at least 20% greater than the maximum weight of the vessel, and operated by trained, competent personnel. A docking plan for the vessel will be provided with this solicitation.
8] The Government reserves the right to award some or all tasks.
9] All work performed under this SOW shall meet or exceed all current requirements of ABYC and USCG (Subchapter T) as applicable to this size and type of vessel, in addition to any specific requirements stated below.
10] In the event defects or damage unrelated to the work tasks defined below are discovered, the contractor shall submit a Condition Found Report (CFR) to the Government Contact Point (GCP). The CFR shall define corrective actions needed, the cost for that work (separated into labor, materials, services, and total), and the impact to the period of performance. No additional work shall be performed without prior approval by the GCP or Contracting Officer.
11] If required, all welding done as part of the tasks shall be performed by certified welders working in accordance with approved weld procedures. Certifications and approvals by USCG, ABS, or another nationally recognized authority are acceptable, and copies of these shall be provided with the quote. The new plate shall be 5083 alloy of the H321 or H116 temper, and of a thickness equal to the removed plate.
Filler wire shall be 5183 alloy. Weld throat widths shall equal the original welds, and weld patterns (continuous, skip, etc.) will be the same as original patterns. After welding, the contractor shall remove all smoke, soot, and oxides with a wire brush, and de-burr all sharp edges.
12] All work performed on the vessel shall be accomplished as described below unless alternatives are presented in writing BEFORE the work commences, and are agreed to by NOAA. Any work that does not adhere to the descriptions shall be redone at the contractor’s expense within the defined period of performance.
13] A site visit is strongly encouraged. Bidders are strongly encouraged to inspect the vessel on which services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of the performance of the contract, to the extent such information is reasonably obtainable.
In no event shall a failure to inspect the vessel constitute grounds for a claim after award of the contract.
Address for site visit: 175 Edward Foster Road Scituate MA 02066.
Government Contact Point: Dave Slocum, 978-500-0761, dave.slocum@noaa.gov
14) In all cases where the government requires notification during the work, the government will respond within one business day of notification.
B] SPECIFIC WORK TASKS
1] Haul, block, clean, store, launch Remove the vessel from the water. Pressure-wash the entire hull from sheer line to keel removing all dirt, grime, and marine growth. Clean all surfaces within the tunnel. Clean all fittings below waterline, including propulsor components, struts, stern tubes, rudders, foils, fins, through-hulls, etc. Clean transducers with a non-metallic brush, taking care to not mar the emitting surface in any way. Replace, in kind, six (6) anodes with Performance Metals HYAA Boater’s Dream Long Life Aluminum Anode (No substitutions are permitted).
Block the vessel in a level attitude with the keels 36” minimum off the ground. Inspect the hull, coatings, and all attachments and report any damage or discrepancies to the GCP in writing. Provide electrical power to the vessel suitable for its shore power system.
Upon completion of all work done on the hard, launch the vessel, inspect all compartments for leaks, and secure it dockside. If dockside testing or underway trials are required after launch, provide prior notification to the GCP so NOAA personnel can attend.
2] Underbody coating system Prepare the hull surfaces to be painted and apply one coat of Interspeed 5640 non-copper antifouling paint of the same color as existing paint. Provide an extra coat at the hull’s leading edges, including the hydrofoils, tracking fins, and each hull. Paint will be applied in accordance with the coating manufacturer’s application requirements. During the coating process, temporarily shift individual blocks under the hull to ensure all portions of the hull are recoated. The Contractor will have an OEM representative or certified technician oversee the application process. Notify the GCP after completion of painting.
3] Renew Prop-Speed coating Renew the Prop-speed coatings on the propellers and shafts. Manufacturer procedures shall be used in all cases. The contractor shall ensure that all environmental conditions are within the manufacture's specified parameters prior to starting application of all coatings. Upon completion, schedule an inspection of the coating system by the GCP.
4] Inspect and lubricate seacocks Disassemble and visually inspect all seacocks in the hull bottom and topsides. Provide a written report describing the condition of each seacock to the GCP. If required, present a CFR for all recommended repairs. Reassemble seacocks, lubricating all contacting parts in accordance with manufacturer’s guidance. Upon reassembly, demonstrate proper operation of all seacocks. Once the vessel is returned to the water, inspect all seacocks and associated through-hulls to ensure they are leak-free.
5] Service generator Service the generator as follows:
• Visually inspect for signs of leaks and degradation mailto:dave.slocum@noaa.gov
• Adjust cylinder head valves
• Conduct operational testing dockside
All work shall be carried out by technicians trained for the brands and models of machinery. Upon completion, NOAA staff will run the generator while the contractor records performance parameters and demonstrates that the machine is operating properly.
6] Inspect and test the inverter and charger Conduct inspections of the installed inverter(s) and battery charger(s). Inspect all wiring, breakers, and switches directly associated with the devices. Test both units under load to determine if performance meets OEM standards. Provide a written report of performance of the devices to the GCP, and include any recommendations for repairs or revisions.
7] Renew interior bulkheads There are approximately 120 square feet of material in the interior linings, bulkheads, and cabinetry that require replacement due to age or past removals. Locations include the port and starboard stairwells, the computer dry lab and the pilothouse port bench and starboard panel. The Contractor shall inspect the vessel with NOAA staff prior to bidding to clarify exact locations and areas. Replacement paneling shall be marine plywood of matching thickness covered with laminate matching existing coverings.
8] Service science winch Service the science winch as follows:
a) All work in accordance with OEM standards
b) Remove cable, clean, trim per GCP instructions
c) Inspect the winch drum, renew paint and finishes where required
d) Renew winch gear oil
e) Inspect and test the slip-rings
f) Reinstall cable under load
g) Lubricate cable with protective film such as Fluid Film
h) Re-terminate both ends of cable
Upon completing all work above, the GCP will operate the winch so the contractor can demonstrate proper operation.
9] Update Met sensors and wiring Inspect and prove proper operation of components. Identify and report on any sensors or components needing service or replacement.
10] Renew head sole, replace toilet
a) Remove and dispose of the existing toilet, discharge pump, and piping between them.
b) Remove the existing head on-off switch.
c) Remove all existing finish on the head sole, prep and replace with new primer and nonskid.
d) Replace the toilet and pump with Headhunter ‘Bravo’ or equal.
e) Replace the on-off switch.
f) Test the head in the presence of the GCP to demonstrate proper operation and zero leaks.
11] Replace cushions and covers Replace the foam cushions and fabric covers on the seats and backs of the pilothouse bench and the main cabin settee. New foam will be of the same thickness and density, and covers will be of Sunbrella or equal of the same color as those removed.
12] Service main engines Conduct the following work on both Cummins QSC8.3 main engines:
a) Visual inspection dockside
b) Assess performance while underway (NOAA will operate vessel)
c) Adjust valves
d) Provide written report on condition
C] OTHER INFORMATION
1] IT Security Requirements The Certification and Accreditation (C&A) requirements of 48 CFR 1352.239-73 do not apply, and a Security Accreditation Package is not required. The Contractor will not be accessing US government computers or IT systems for this effort. The Contractor will not be accessing any information that is not within the public domain for this effort. The contractor will not be processing, transmitting or storing privileged access information (i.e., non-public) in carrying out the tasks of this contract.
D] GOVERNMENT POINT OF CONTACT:
Dave Slocum
PH: 978-500-0761,
EMAIL: dave.slocum@noaa.gov mailto:dave.slocum@noaa.gov
File details come from the government source that posted it. Updated .