Summary of Augustus Street and South 4th Street Sidewalks Specifications
This specifications document outlines the construction requirements for a sidewalk improvement project in Washington. The project encompasses the construction of new ADA-compliant sidewalks along the northerly side of Augustus Street, extending approximately 550 feet easterly from South 5th Street to South 3rd Street, and along the easterly side of South 4th Street, extending approximately 200 feet northerly from Augustus Street to Cowlitz Street. The scope of work includes excavation, grading, cement concrete curb and gutter installation, cement concrete sidewalk construction, storm drainage improvements, minor asphalt paving, channelization, traffic control measures, and other related work items necessary to complete the improvements in compliance with ADA standards.
The specifications document establishes the technical requirements, materials standards, construction methods, and quality assurance procedures that contractors must follow to complete the project. These specifications ensure consistency with applicable codes, regulations, and industry standards while maintaining the quality and durability of the sidewalk improvements. No pricing information, set-asides, incumbent contractor details, or specific contract term provisions are detailed within this specifications file, as it functions as a technical guide for bidders preparing proposals for the construction work.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF TOLEDO
LEWIS COUNTY WASHINGTON
CONTRACT PROVISIONS
for
AUGUSTUS STREET AND
SOUTH 4TH STREET SIDEWALKS
TIB PROJECT NO. P-W-965(P08)-1
G&O #26428
NOVEMBER 2026
LEWIS COUNTY WASHINGTON
for
AUGUSTUS STREET AND
SOUTH 4TH STREET SIDEWALKS
G&O #26428
NOVEMBER 2026
CB-1
CALL FOR BIDS
AUGUSTUS STREET AND SOUTH 4TH STREET SIDEWALKS
Sealed Proposals will be received by the undersigned at the City of Toledo, 130 North
Second Street, Toledo, Washington 98591, up to 2:00 p.m.; local time on Thursday, December 10, 2026, for furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct the Augustus Street and South 4th Street Sidewalks.
This contract provides for the construction of new ADA compliant sidewalk along the northerly side of Augustus Street from South 5th Street approximately 550 feet easterly to
South 3rd Street and on the easterly side of South 4th Street from Augustus Street approximately 200 feet northerly to Cowlitz Street. Improvements include, but are not limited to, excavation, grading, cement concrete curb and gutter, cement concrete sidewalk, storm drainage improvements, minor asphalt paving, channelization, traffic control and other related work items.
The Work shall be substantially complete within 25 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City
Hall, Toledo, Washington.
The Proposals will be publicly opened and read aloud shortly after the time and date stated above. Proposals are to be submitted only on the form provided with the Bid
Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the “City of Toledo” and in an amount of not less than five percent (5%) of the total Proposal amount.
Bid Documents for this project are available free-of-charge at the following website:
https://gobids.grayandosborne.com. Bidders are encouraged to register in order to receive automatic email notification of future addenda and to be placed on the Bidders
List. For assistance, please call (206) 284-0860. Contract questions shall be directed only to the office of the Project Engineer.
Financing of the Project has been provided by City of Toledo, Washington and the
Washington State Transportation Improvement Board. The City of Toledo expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal.
(Signed) RACHEL CAMPBELL
CITY CLERK/TREASURER
https://gobids.grayandosborne.com/
TC-1
CONTRACT PROVISIONS
TABLE OF CONTENTS
AUGUST STREET AND SOUTH 4TH STREET SIDEWALKS
PAGE NO.
CALL FOR BIDS
PART 1. BID DOCUMENTS
BIDDER’S CHECKLIST ........................................................................... BC-1 PROPOSAL ......................................................................................... P-1 – P-7 PROPOSAL BOND .................................................................................... PB-1
PART 2. AGREEMENT AND BONDS
AGREEMENT .................................................................................... A-1 – A-3 PERFORMANCE BOND .............................................................................. B-1 PUBLIC WORKS PAYMENT BOND ......................................................... B-2
PART 3. SPECIAL PROVISIONS
DIVISION 1 – GENERAL REQUIREMENTS .............................. 1-1 TO 1-67
DIVISION 2 – TEMPORARY FEATURES .................................... 2-1 TO 2-5
DIVISION 3 – EARTHWORK ...................................................... 3-1 TO 3-11
DIVISION 4 – AGGREGATES AND BASES ............................................ 4-1
DIVISION 5 – SURFACE TREATMENTS AND
PAVEMENTS ........................................................ 5-1 TO 5-33
DIVISION 7 – DRAINAGE STRUCTURES, STORM SEWERS,
SANITARY SEWERS, WATER MAINS, AND
CONDUITS .............................................................. 7-1 TO 7-9
DIVISION 8 – MISCELLANEOUS CONSTRUCTION ............... 8-1 TO 8-14
DIVISION 9 – MATERIALS ....................................................................... 9-1
PART 4. WAGE RATES
PART 5. APPENDIX
Appendix A – Supplemental Bidder Responsibility Criteria Appendix B – Property Release
PART 1
BID DOCUMENTS
BC-1
BIDDER’S CHECKLIST
1. REQUIRED FORMS
The Bidder shall submit the following forms, which must be executed in full and submitted with the Proposal.
a. Proposal (including Statement of Bidder’s Qualifications) (Pages P-1 - P-7)
b. Bid Deposit or Proposal Bond (PB-1)
2. SUPPLEMENTAL BIDDER CRITERIA
The Apparent two lowest bidders shall submit to the Contracting Agency the completed
Supplemental Bidder Criteria forms in the Appendix by noon of the second business day following the bid submittal deadline.
3. AGREEMENT FORMS
The following forms (a., b., and c.) are to be executed and the Certificates of Insurance (d.
and e.) are to be provided after the Contract is awarded and prior to Contract execution.
a. Agreement (Pages A-1 - A-3)
b. Performance Bond (Page B-1)
c. Public Works Payment Bond (Page B-2)
d. Certificate of Insurance
e. Certificate of Builders Risk Insurance (when required)
P-1
PROPOSAL
City of Toledo
130 North Second Street
Toledo, Washington 98591
The undersigned has examined the Work site(s), local conditions, the Contract, and all applicable laws and regulations covering the Work. The following unit and lump sum prices are tendered as an offer to perform the Work in accordance with all of the requirements set forth in the Contract and all applicable laws and regulations.
As required by the Contract, a postal money order, certified check, cashier’s check or Proposal bond made payable to the Owner is attached hereto. If this Proposal is accepted and the undersigned fail(s) or refuse(s) to enter into a contract and furnish the required performance bond, labor and material payment bond, special guarantee bonds (if required), required insurance and all other required documentation, the undersigned will forfeit to the Owner an amount equal to five percent of the Proposal amount.
After the date and hour set for submitting the Proposals, no bidder may withdraw its Proposal, unless the Award of the contract is delayed for a period exceeding 60 consecutive calendar days.
The undersigned agrees that in the event it is Awarded the contract for the Work, it shall employ only Contractors and Subcontractors that are duly licensed by the State of Washington and remain so at all times they are in any way involved with the Work.
The undersigned agrees that the Owner reserves the right to reject any or all Proposals and to waive any minor irregularities and informalities in any Proposal.
The undersigned agrees that the Owner will Award the Contract to the lowest responsible, responsive bidder whose Proposal is in the best interest of the Owner.
PROPOSAL - Continued
P-2
NO. ITEM QUANTITY UNIT PRICE AMOUNT
1. Minor Change (1-04.4) 1 CALC $1,000.00 $1,000.00
2. Survey (1-05.4) 1 LS $____________ $___________
3. SPCC Plan (1-07.15(1)) 1 LS $____________ $___________
4. Mobilization, Cleanup and
Demobilization (2-01.5)
LS
5. Project Temporary Traffic
Control (2-04.5)
1 LS $____________ $___________
6. Clearing and Grubbing (3-01.5) 1 LS $____________ $___________
7. Removal of Structure and
Obstruction (3-02.5)
8. Excavation, Embankment and
Grading, Incl. Haul (3-03.5)
9. Locate Existing Utilities (3-07.5) 1 LS $____________ $___________
10. Crushed Surfacing Top Course
(4-05.5)
300 TN $____________ $___________
11. HMA Cl. 1/2" PG 58H-22
(5-04.5)
95 TN $____________ $___________
12. DI Storm Sewer Pipe, 6 In.
Diam. (Incl. Bedding) (7-04.5)
LF
13. DI Storm Sewer Pipe, 8 In.
14. DI Storm Sewer Pipe, 12 In.
15. CPEP Storm Sewer Pipe, 12 In.
16. Catch Basin, Type 1 (7-05.5) 4 EA $____________ $___________
17. Catch Basin, Type 1L (7-05.5) 1 EA $____________ $___________
18. Concrete Inlet (7-05.5) 4 EA $____________ $___________
P-3
19. Area Drain (7-05.5) 1 EA $____________ $___________
20. Adjust Catch Basin (7-05.5) 1 EA $____________ $___________
21. Adjust Catch Basin and Furnish
Rectangular Frame and Solid Lid
(7-05.5)
EA
22. Trench Excavation Safety
Systems (7-08.5)
23. Bank Run Gravel for Trench
Backfill (7-08.5)
TN
24. Adjust Valve Box (7-12.5) 1 EA $____________ $___________
25. Erosion Control and Water
Pollution Prevention (8-01.5)
26. Seeding, Fertilizing and
Mulching (8-02.5)
SY
27. Topsoil, Type A (8-02.5) 20 CY $____________ $___________
28. Cement Conc. Traffic Curb and
Gutter (8-04.5)
29. Cement Conc. Pedestrian Curb
(8-04.5)
80 LF $____________ $___________
30. Cement Concrete Driveway
Entrance (8-06.5)
SY
31. Cement Conc. Sidewalk (8-14.5) 460 SY $____________ $___________
32. Detectable Warning Surface
(Cast-in-Place) (8-14.5)
SF
33. Permanent Signing (8-21.5) 1 LS $____________ $___________
34. Paint Line (8-22.5) 460 LF $____________ $___________
35. Plastic Stop Line (8-22.5) 35 LF $____________ $___________
P-4
36. Plastic Crosswalk Line (8-22.5) 130 SF $____________ $___________
Subtotal: .................................................................................................$_____________________
Washington State Sales Tax (0% Per W.S. Revenue Rule No. 171): .....$ 0.00
TOTAL CONSTRUCTION COST: ......................................................$_____________________
Note: A bid must be received on all items.
P-5
STATEMENT OF BIDDER'S QUALIFICATIONS
Name of Firm:
Address:
Telephone No. Fax No.
Contact Person for this Project:
E-mail:
Number of years the Contractor has been engaged in the construction business under the present firm name, as indicated above:
WORK TO BE COMPLETED BY BIDDER
List the Work and the dollar amount thereof that the Bidder will complete with its forces, if awarded the contract.
Work to be Performed Dollar Amount
P-6
ADDENDA RECEIVED
Addendum No. Date Received Name of Recipient
NOTE: Bidder shall acknowledge receipt of all addenda. Bidder is responsible for verifying the actual number of addenda issued prior to submitting a Proposal.
Subject to any extensions of the Contract Time granted under the Contract, the undersigned agrees to substantially complete the Work required under this Contract within 25 working days
(the Substantial Completion Date) and to physically complete the Work required under this contract within 30 working days (the Physical Completion Date) from when Contract Time begins.
The undersigned has reviewed and fully understands the provisions in the Contract regarding liquidated damages and agrees that liquidated damages shall be $1,500.00 per day for each and every working day beyond the Contract Time allowed for substantial completion until the
Substantial Completion Date is achieved and $1,500.00 for each and every working day required beyond the Contract Time for physical completion until the Physical Completion Date is achieved.
The undersigned is, and will remain in, full compliance with all Washington State administrative agency requirements including, but not limited to registration requirements of Washington State
Department of Labor & Industries for contractors, including but not limited to requirements for bond, proof of insurance and annual registration fee. The undersigned's Washington State:
Dept. of Labor and Industries Workman's Compensation Account No. is ___________________;
Dept. of Licensing Contractor's Registration No. is ______________________________;
Unified Business Identifier Number is ________________________________;
Excise Tax Registration Number is ______________________________; and
Employment Security Account Number is _____________________________.
The undersigned has reviewed all insurance requirements contained in the Contract and has verified the availability of and the undersigned’s eligibility for all required insurance. The undersigned verifies that the cost for all required insurance, has been included in this Proposal.
In relation to claims related in whole or in part to workplace injuries to employees, the undersigned waives any immunity granted under the State Industrial Insurance Law, RCW Title
51. This waiver has been specially negotiated by the parties, which is acknowledged by the undersigned in signing this Proposal.
P-7
By signing the proposal, the undersigned declares, under penalty of perjury under the laws of the
United States and the State of Washington, that the following statements are true and correct:
1. That the undersigned person(s) or entity(ies) has(have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this Proposal is submitted.
2. Certification of Compliance with Wage Payment Statutes: The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date November 24, 2026, that the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52
RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.
The undersigned agrees that the Owner is authorized to obtain information from all references included herein.
Sincerely, Sign Name Date
By:
Print Name, Title Location Executed (City, State or County)
Print Company Name
Amount of Proposal deposit: $ Check No. , or Proposal bond in the amount of $
, issued through
Name of Bank/Bonding Company located at
Mailing Address
Telephone Number of Bank/Bonding Company
PB-1
PROPOSAL BOND
KNOW ALL MEN BY THESE PRESENTS, That we of as principal, and the a corporation duly organized under the laws of the state of , and authorized to do business in the State of
Washington, as surety, are held and firmly bound unto the CITY OF TOLEDO in the full and penal sum of five percent of the total amount of the bid proposal of said principal for the work hereinafter described, for the payment of which, well and truly to be made, we bind our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents.
The condition of this bond is such, that whereas the principal herein is herewith submitting their sealed proposal for the following construction project, to wit:
said bid and proposal, by reference thereto, being made a part hereof.
NOW, THEREFORE, If the said proposal bid by said principal be accepted, and the contract be awarded to said principal, and if said principal shall duly make and enter into and execute said Contract and shall furnish bond as required by the CITY OF TOLEDO within a period of 10 days from and after said award, exclusive of the day of such award, then this obligation shall be null and void, otherwise it shall remain and be in full force and effect.
IN TESTIMONY WHEREOF, The principal and surety have caused these presents to be signed and sealed this day of , __________.
(Principal)
(Surety)
(Attorney-in-fact)
PART 2
AGREEMENT AND BONDS
A-1
AGREEMENT
THIS AGREEMENT is entered into by and between the CITY OF TOLEDO
(hereinafter called the Owner) and __________________________________________
(hereinafter called the Contractor).
The Owner and the Contractor agree as follows:
ARTICLE 1. WORK.
[Include description of all schedules, alternate or additive items awarded]
ARTICLE 2. CONTRACT TIME.
The Contractor shall substantially complete the Work required by the Contract within
________ working days (the Substantial Completion Date) and physically complete the
Work within _____working days (the Physical Completion Date).
ARTICLE 3. LIQUIDATED DAMAGES.
The Owner and the Contractor recognize that time is of the essence and that the Owner will suffer financial loss if the Work is not completed within the time, plus any extensions thereof, allowed in accordance with the Contract. They also recognize the inconvenience, expense, and difficulties involved in a legal proceeding to prove the actual loss suffered by the Owner if the Work is not completed within the time allowed in the Contract. Accordingly, the Owner and the Contractor agree that as liquidated damages for delay, and not as a penalty, the Contractor shall pay the Owner
($_____________) per day for each working day beyond the Substantial Completion
Date until the Contractor achieves substantial completion of the Work and
($____________) per day for each working day beyond the Physical Completion Date until the Contractor achieves physical completion of the Work.
ARTICLE 4. CONTRACT PRICE.
The Owner shall pay the Contractor the amount(s) set forth in the Proposal (in United
States dollars) for completion of the Work in accordance with the Contract.
AGREEMENT – Continued
A-2
ARTICLE 5. CONTRACT.
The Contract, which comprises the entire agreement between the Owner and the
Contractor concerning the Work, consists of the following:
• This Agreement;
• The Contractor’s Proposal including the bid, bid schedule(s), information required of bidder, Proposal bond, and all required certificates and affidavits;
• The Performance Bond and the Public Works Payment Bond;
• The Contract Provisions;
• The Plans (or drawings) consisting of __________ sheets, as listed in the index on sheet ________ of the Plans;
• Addenda numbers ________, inclusive; and
• Change Orders issued after the effective date of this Agreement.
There are no Contract Documents other than those listed in this Article 5. The Contract may be amended only in writing by Change Order as provided in the Contract.
ARTICLE 6. MISCELLANEOUS.
For purpose of indemnifying and defending any work place injury claims by employees of the Contractor and Subcontractors, the Contractor waives any immunity granted under the State Industrial Insurance Law, RCW Title 51. This waiver has been specifically negotiated between the parties and is hereby acknowledged by the Contractor.
________________________(Contractor’s initials)
The Contractor shall not assign any rights under or interests in the Contract, including but not limited to rights to payment, without the prior written consent of the Owner. Unless specifically stated in a written consent to an assignment, no assignment will release or discharge the Contractor-assignor from any duty or responsibility under the Contract.
The Contract is binding upon the Owner and the Contractor, and their respective partners, successors, assigns and legal representatives.
AGREEMENT – Continued
A-3
IN WITNESS WHEREOF, Owner and Contractor have caused this Agreement to be executed the day and year indicated below.
CITY OF TOLEDO CONTRACTOR
License No.
By By
Date Title
Attest
Name and Address for giving notices (print)
DOT Form 272-002A
12/2019 B-1
PUBLIC WORKS PERFORMANCE BOND
to CITY OF TOLEDO, WA
Bond No. _____________
The CITY OF TOLEDO, Washington, (City) has awarded to __________________________ (Principal), a contract for the construction of the project designated as Augustus Street and South 4th Street Sidewalks in Toledo, Washington
(Contract), and said Principal is required under the terms of that Contract to furnish a bond for performance of all obligations under the Contract.
The Principal, and ___________________________________ (Surety), a corporation organized under the laws of the
State of ___________________ and licensed to do business in the State of Washington as surety and named in the current list of “Surety Companies Acceptable in Federal Bonds” as published in the Federal Register by the Audit
Staff Bureau of Accounts, U.S. Treasury Dept., are jointly and severally held and firmly bound to the City, in the sum of _______________________________________________ US Dollars ($________________ amount to include sales tax) Total Contract Amount, subject to the provisions herein.
This statutory performance bond shall become null and void, if and when the Principal, its heirs, executors, administrators, successors, or assigns shall well and faithfully perform all of the Principal’s obligations under the
Contract and fulfill all the terms and conditions of all duly authorized modifications, additions, and changes to said
Contract that may hereafter be made, at the time and in the manner therein specified; and if such performance obligations have not been fulfilled, this bond shall remain in full force and effect.
The Surety agrees to indemnify, defend, and protect the City against any claim of direct or indirect loss resulting from the failure of the Principal, its heirs, executors, administrators, successors, or assigns (or any of the employees, subcontractors, or lower tier subcontractors of the Principal) to faithfully perform the Contract.
The Surety for value received agrees that no change, extension of time, alteration or addition to the terms of the
Contract, the specifications accompanying the Contract, or to the work to be performed under the Contract shall in any way affect its obligation on this bond, and waives notice of any change, extension of time, alteration or addition to the terms of the Contract or the work performed. The Surety agrees that modifications and changes to the terms and conditions of the Contract that increase the total amount to be paid the Principal shall automatically increase the obligation of the Surety on this bond and notice to Surety is not required for such increased obligation.
This bond may be executed in two (2) original counterparts, and shall be signed by the parties’ duly authorized officers.
This bond will only be accepted if it is accompanied by a fully executed and original power of attorney for the officer executing on behalf of the surety.
The Surety agrees to be bound by the laws of the state of Washington and subjected to the jurisdiction of the state of
Washington.
PRINCIPAL SURETY
Principal Signature Date Surety Signature Date
Printed Name Printed Name
Title Title
Local office/agent of Surety Company:
Name _____________________________________ Telephone _________________________________
Address _________________________________________________________________________________
DOT Form 272-003A EF
12/2019 B-2
PUBLIC WORKS PAYMENT BOND
to CITY OF TOLEDO, WA
Bond No. _____________
The CITY OF TOLEDO, Washington, (City or County) has awarded to __________________________ (Principal), a contract for the construction of the project designated as Augustus Street and South 4th Street Sidewalks in Toledo, Washington (Contract), and said Principal is required under the terms of that Contract to furnish a payment bond in accord with Title 39.08 Revised Code of Washington (RCW) and (where applicable) 60.28 RCW.
The Principal, and ___________________________________ (Surety), a corporation organized under the laws of the
State of ___________________ and licensed to do business in the State of Washington as surety and named in the current list of “Surety Companies Acceptable in Federal Bonds” as published in the Federal Register by the Audit
Staff Bureau of Accounts, U.S. Treasury Dept., are jointly and severally held and firmly bound to the City, in the sum of _______________________________________________ US Dollars ($________________ amount to include sales tax) Total Contract Amount, subject to the provisions herein.
This statutory payment bond shall become null and void, if and when the Principal, its heirs, executors, administrators, successors, or assigns shall pay all persons in accordance with RCW Titles 60.28, 39.08, and 39.12 including all workers, laborers, mechanics, subcontractors, lower tier subcontractors, and material suppliers, and all persons who shall supply such contractor or subcontractor with provisions and supplies for the carrying on of such work, and all taxes incurred on said Contract under Title 50 and 51 RCW and all taxes imposed on the Principal under Title 82
RCW; and if such payment obligations have not been fulfilled, this bond shall remain in full force and effect.
The Surety agrees to indemnify, defend, and protect the City against any claim of direct or indirect loss resulting from the failure of the Principal, its heirs, executors, administrators, successors, or assigns, (or the subcontractors or lower tier subcontractors of the Principal) to pay all laborers, mechanics, subcontractors, lower tier subcontractors materialpersons, and all persons who shall supply such contractor or subcontractors with provisions and supplies for the carrying on of such work.
The Surety for value received agrees that no change, extension of time, alteration or addition to the terms of the
Contract, the specifications accompanying the Contract, or to the work to be performed under the Contract shall in any way affect its obligation on this bond, except as provided herein, and waives notice of any change, extension of time, alteration or addition to the terms of the Contract or the work performed. The Surety agrees that modifications and changes to the terms and conditions of the Contract that increase the total amount to be paid the Principal shall automatically increase the obligation of the Surety on this bond and notice to Surety is not required for such increased obligation.
This bond may be executed in two (2) original counterparts, and shall be signed by the parties’ duly authorized officers.
This bond will only be accepted if it is accompanied by a fully executed and original power of attorney for the officer executing on behalf of the surety.
The Surety agrees to be bound by the laws of the state of Washington and subjected to the jurisdiction of the state of
Washington.
PRINCIPAL SURETY
Principal Signature Date Surety Signature Date
Printed Name Printed Name
Title Title
Local office/agent of Surety Company:
Name _____________________________________ Telephone _________________________________
Address _________________________________________________________________________________
PART 3
SPECIAL PROVISIONS
Augustus Street and South 4th Street Sidewalks G&O #26428
INTRODUCTION TO THE SPECIAL PROVISIONS 1
(January 4, 2024 APWA GSP, Option A) 3
The work on this project shall be accomplished in accordance with the Standard 5
Specifications for Road, Bridge and Municipal Construction, 2026 edition, as 6 issued by the Washington State Department of Transportation (WSDOT) and the 7
American Public Works Association (APWA), Washington State Chapter (hereafter 8
“Standard Specifications”). The Standard Specifications, as modified or 9 supplemented by these Special Provisions, all of which are made a part of the 10
Contract Documents, shall govern all of the Work. 11
These Special Provisions are made up of both General Special Provisions (GSPs) 13 from various sources, which may have project-specific fill-ins; and project-specific 14
Special Provisions. Each Provision either supplements, modifies, or replaces the 15 comparable Standard Specification, or is a new Provision. The deletion, 16 amendment, alteration, or addition to any subsection or portion of the Standard 17
Specifications is meant to pertain only to that particular portion of the section, and 18 in no way should it be interpreted that the balance of the section does not apply. 19
The GSPs are labeled under the headers of each GSP, with the effective date of 21 the GSP and its source. For example: 22
(March 8, 2013 APWA GSP) 24
(April 1, 2013 WSDOTGSP) 25
(May 1, 2013 G&O GSP) Agency Special Provision 26
Project specific special provisions are labeled without a date as such: 29
(******) 31
Also incorporated into the Contract Documents by reference are: 33
• Manual on Uniform Traffic Control Devices for Streets and Highways, 35 currently adopted edition, with Washington State modifications, if any 36
• Standard Plans for Road, Bridge and Municipal Construction, 37
WSDOT Manual M21-01, current edition 38
Contractor shall obtain copies of these publications, at Contractor’s own expense. 40
DIVISION 1
GENERAL REQUIREMENTS
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-1
DIVISION 1 1
GENERAL REQUIREMENTS 3
DESCRIPTION OF WORK 5
(March 13, 1995 WSDOT GSP) 6
This Contract provides for the construction of new ADA compliant sidewalk along 7 the northerly side of Augustus Street from South 5th Street approximately 550 feet 8 easterly to South 3rd Street and on the easterly side of South 4th Street from 9
Augustus Street approximately 200 feet northerly to Cowlitz Street. Improvements 10 include, but are not limited to, excavation, grading, cement concrete curb and 11 gutter, cement concrete sidewalk, storm drainage improvements, minor asphalt 12 paving, channelization, traffic control, and other related work items all in 13 accordance with the attached Contract Plans, these Special Provisions and the 14
Standard Specifications. 15
1-01 DEFINITIONS AND TERMS 17
1-01.3 Definitions 19
(February 7, 2022 G&O GSP) 20
Delete the definition of “Bid Documents,” “Completion Dates,” “Contract” and 22
“Contracting Agency.” 23
This Section is supplemented with the following: 25
All references in the Standard Specifications and WSDOT General Special 27
Provisions to the terms “Department of Transportation,” “Washington State 28
Transportation Commission,” “Commission,” “Secretary of Transportation,” 29
“Secretary,” “Headquarters,” and “State Treasurer” shall be revised to read 30
“Contracting Agency.” 31
All references to the terms “State” or “state” shall be revised to read 33
“Contracting Agency” unless the reference is to an administrative agency of 34 the State of Washington, a State statute or regulation, or the context 35 reasonably indicates otherwise. 36
All references to “State Materials Laboratory” shall be revised to read 38
“Contracting Agency designated location.” 39
All references to “final contract voucher certification” shall be interpreted to 41 mean the Contracting Agency form(s) by which final payment is authorized, 42 and final completion and acceptance granted. 43
SPECIAL PROVISIONS - Continued
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-2
Additive 1
A supplemental unit of work or group of bid items, identified separately in 2 the Proposal, which may, at the discretion of the Contracting Agency, be 3 awarded in addition to the base bid. 4
Alternate 6
One of two or more units of work or groups of bid items, identified separately 7 in the Proposal, from which the Contracting Agency may make a choice 8 between different methods or material of construction for performing the 9 same work. 10
Bid Documents 12
The component parts of the proposed Contract which may include, but are 13 not limited to, the Proposal form, the proposed Contract Provisions, the 14 proposed Contract Plans, Addenda, and Subsurface Boring Logs (if any). 15
Business Day 17
A business day is any day from Monday through Friday, except holidays as 18 listed in Section 1-08.5. 19
Contract 21
The written agreement between the Contracting Agency and the Contractor. 22
It describes, among other things: 23
1. What work will be done, and by when; 25
2. Who provides labor and materials; and 26
3. How Contractor will be paid. 27
The Contract includes the Contract (Agreement) form, bidder’s completed 29
Proposal Form, all required certificates and affidavits, performance and 30 payment bonds, Standard Specifications for Road, Bridge and Municipal 31
Construction, Contract Provisions, Contract Plans, Standard Plans, 32 addenda and change orders. 33
Contract Bond 35
The definition in the Standard Specifications for “Contract Bond” applies to 36 whatever bond form(s) are required by the Contract Documents, which may 37 be a combination of a Payment Bond and a Performance Bond. 38
Contract Documents 40
See definition for “Contract.” 41
Contract Time 43
The period of time established by the terms and conditions of the contract 44 within which the Work must be completed. 45
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-3
Contracting Agency (Owner) 2
Agency of Government that is responsible for the execution and 3 administration of the Contract. 4
Dates 6
Bid Opening Date 8
The date on which the Contracting Agency publicly opens and reads 9 the bids. 10
Award Date 12
The date of the formal decision of the Contracting Agency to accept 13 the lowest responsible and responsive bidder for the Work. 14
Contract Execution Date 16
The date when both the Contractor and the Contracting Agency have 17 signed the Agreement, binding themselves to the Contract. 18
Notice to Proceed Date 20
The date stated in the Notice to Proceed on which the Contract time 21 begins. 22
Substantial Completion Date 24
The day the Engineer determines the Contracting Agency has full and 25 unrestricted use and benefit of the facilities, both from the operational 26 and safety standpoint, any remaining traffic disruptions will be rare 27 and brief, and only minor incidental work, replacement of temporary 28 substitute facilities, plant establishment periods or correction or repair 29 remains for the Physical Completion of the total Contract. 30
Physical Completion Date 32
The day all of the Work is physically completed on the project. The 33
Engineer has received from the Contractor record drawings, operation 34 and maintenance manuals, manufacturers’ affidavits, and software 35 and programming. 36
Completion Date 38
The day all the Work specified in the Contract is completed and all the 39 obligations of the Contractor under the Contract are fulfilled by the 40
Contractor. All documentation required by the Contract and required 41 by law must be furnished by the Contractor before establishment of 42 this date. 43
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-4
Final Acceptance Date 1
The date on which the Contracting Agency accepts the Work as 2 complete. 3
Notice of Award 5
The written notice from the Contracting Agency to the successful bidder 6 signifying the Contracting Agency’s acceptance of the Bid Proposal. 7
Notice to Proceed 9
The written notice from the Contracting Agency or Engineer to the 10
Contractor authorizing and directing the Contractor to proceed with the 11
Work and establishing the date on which the Contract time begins. 12
Traffic 14
Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, 15 wheelchairs, and equestrian traffic. 16
1-02 BID PROCEDURES AND CONDITIONS 18
1-02.1 Prequalification of Bidders 20
Delete this Section and replace it with the following: 22
1-02.1 Qualifications of Bidder 24
(February 17, 2026 APWA GSP Option A) 25
Before award of a public works contract, a Bidder must meet at least the 27 minimum qualifications of RCW 39.04.350(1) to be considered a 28 responsible bidder and qualified to be awarded a public works project. 29
1-02.1(1) Supplemental Qualifications Criteria 31
(April 6, 2018 G&O GSP) 32
In addition, the Contracting Agency has established Contracting Agency-specific 34 and/or project-specific supplemental criteria, in accordance with RCW 35
39.04.350(3), for determining Bidder responsibility, including the basis for 36 evaluation and the deadline for appealing a determination that a Bidder is not 37 responsible. These criteria are contained in Section 1-02.14. 38
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-5
1-02.2 Plans and Specifications 1
(June 27, 2011 G&O GSP) 2
Delete this Section and replace it with the following: 4
Information as to where Bid Documents can be obtained or reviewed is 6 contained in the Call for Bids (Advertisement for Bids) for the Work. 7
After Award of the Contract, Plans and Contract Provisions will be issued to 9 the Contractor at as stated below: 10
To Prime Contractor No. of Sets Basis of Distribution 12
Contract Provisions 2 Furnished automatically 14
Reduced Plans (11" x 17") 2 Furnished automatically 16
Additional Plans and other Contract Provisions may be purchased by the 18
Contractor. 19
1-02.4 Examination of Plans, Specifications, and Site of Work 21
1-02.4(1) General 23
(December 30, 2022 APWA GSP Option A) 24
The first sentence of the ninth paragraph, beginning with “Prospective Bidder 26 desiring…”, is revised to read: 27
Prospective Bidders desiring an explanation or interpretation of the Bid 29
Documents, shall request the explanation or interpretation in writing soon 30 enough to allow a written reply to reach all prospective Bidders before the 31 submission of their Bids. 32
(January 26, 2024 G&O GSP) 34
This Section is supplemented with the following: 35
Bidders shall review the entire Contract to ensure that the completeness of 37 their Proposal includes all items of Work regardless of where shown in the 38
Contract. Bidders are cautioned that alternate sources of information 39
(copies of the Contract obtained from third parties) are not necessarily an 40 accurate or complete representation of the Contract. Bidders shall use such 41 information at their own risk. 42
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-6
1-02.4(2) Subsurface Information 1
(February 7, 2022 G&O GSP) 2
Delete this Section and replace it with the following: 4
If the Contracting Agency has made a subsurface investigation of the site 6 of the proposed Work, the boring log data and soil sample test data 7 accumulated by the Contracting Agency will be made available for 8 inspection by the Bidders. However, the Contracting Agency makes no 9 representation or warranty, expressed or implied, that: 10
a. The Bidders’ interpretations from the boring logs may be 12 correct; 13
b. Moisture conditions and indicated water tables will not vary 15 from those found at the time the borings were made; 16
c. The ground at the location of the borings has not been 18 physically disturbed or altered after the boring was made; and 19
d. Conditions below the surface of the ground are consistent 21 throughout the site with the information made available 22 hereunder, or that conditions to be encountered on the site 23 are uniform or consistent with geological conditions usually 24 encountered in the area. 25
The Contracting Agency makes no representations, guarantees, or 27 warranties as to the condition, materials, or proportions of the materials 28 between the specific borings, regardless of any subsurface information the 29
Contracting Agency may make available to the prospective Bidders. 30
Bidders are solely responsible for making the necessary investigations to 31 support and/or verify any conclusions or assumptions used in preparation 32 of their bids. 33
Any subsurface investigations and analysis were carried out for design 35 purposes only. Contractor may not rely upon or make any claim against 36
Contracting Agency, Engineer, or any of their subconsultants, with respect 37 to: 38
1. The completeness of such reports for Contractor’s purposes, 40 including, but not limited to, any aspects of the means, methods, 41 techniques, sequences, and procedures of construction to be 42 employed by Contractor, and safety precautions and programs 43 incident thereto; or 44
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-7
2. Other conclusions, interpretations, opinions, representations, and 1 information contained in such reports; or 2
3. Any Contractor interpretation of or conclusion drawn from any 4
“technical data” or any such other data, conclusions, interpretations, 5 opinions or information. 6
The availability of subsurface information from the Contracting Agency shall 8 not relieve the Bidder or the Contractor from any risks or of any duty to make 9 examinations and investigations as required by Section 1-02.4(1) or any 10 other responsibility under the Contract or as may be required by law. 11
1-02.5 Proposal Forms 13
(March 9, 2026 G&O GSP) 14
Delete this Section and replace it with the following: 16
Proposals shall be submitted on the Proposal Form, which is included with 18 the Contract. All Proposals shall be completed, signed and dated. 19
The Proposal Form will identify the project and its location and describe the 21
Work. It will also list estimated quantities, units of measurement, the items 22 of work, and the materials to be furnished at the lump sum and/or unit bid 23 prices. The Bidder shall complete spaces on the Proposal Form that call for, 24 but are not limited to, unit prices; extensions; summations; the total bid 25 amount; signatures; date; and, where applicable, retail sales taxes and 26 acknowledgment of addenda; the bidder’s name, address, telephone 27 number, and signature; a State of Washington Contractor’s Registration 28
Number; and a Business License Number, if applicable. Bids shall be in 29 legible figures (not words) written in ink or typed and expressed in U.S. 30 dollars. Required certifications are included as part of the Proposal Form. 31
The Contracting Agency reserves the right to arrange the proposal forms 33 with alternates and additives, if such be to the advantage of the Contracting 34
Agency. The Bidder shall bid on all alternates and additives set forth in the 35
Proposal form unless otherwise specified. 36
1-02.6 Preparation of Proposal 38
(March 9, 2026 G&O GSP) 39
The first sentence of the second paragraph is revised to read as follows: 41
All prices shall be in legible figures (not words) written in ink or typed, and 43 expressed in U.S. dollars. 44
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-8
Supplement the second paragraph with the following: 2
4. If a minimum bid amount has been established for any item, the unit 4 or lump sum price must equal or exceed the minimum amount stated. 5
Delete the last two paragraphs, and replace it with the following: 7
The Bidder shall certify compliance with the Contractor Certification Wage 9
Law. The certification is included in the Proposal form. 10
The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in 12 any manner. 13
A bid by a corporation shall be executed in the corporate name, by the 15 president or a vice president (or other corporate officer accompanied by 16 evidence of authority to sign). 17
A bid by a partnership shall be executed in the partnership name, and 19 signed by a partner. 20
A bid by a joint venture shall be executed in the joint venture name and 22 signed by a member of the joint venture. 23
All Proposals submitted shall, on their face, remain valid for a period of 60 25 days following the date of Bid opening. In the event of a conflict in this 26 duration, which may appear elsewhere in the Contract Provisions, the 27 longest duration shall apply. 28
(November 20, 2023, WSDOT GSP) 30
The fourth and fifth paragraphs of this Section are deleted. 31
1-02.7 Bid Deposit 33
(March 9, 2026 G&O GSP) 34
Supplemented this Section with the following: 36
Bid bonds shall contain the following: 38
1. Contracting Agency-assigned number for the project; 40
2. The name of the project; 42
3. The name of the Contracting Agency, named as the obligee; 44
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-9
4. The amount of the bid bond stated either as a dollar figure or 1 as a percentage which represents five percent of the 2 maximum bid amount that could be awarded; 3
5. The signature of the bidder’s officer empowered to sign official 5 statements. The signature of the person authorized to submit 6 the Proposal should agree with the signature on the bond, and 7 the title of the person must accompany the said signature; 8
6. The signature of the surety’s officer empowered to sign the 10 bond, and the power of attorney. 11
The Bidder must use the bond form included in the Contract. 13
If so stated in the Contract Provisions, cash will not be accepted for a bid 15 deposit. 16
1-02.9 Delivery of Proposal 18
(March 9, 2026 G&O GSP) 19
Delete this section in its entirety and replace with the following: 21
The Proposal, bid deposit, and all other certificates, forms or other 23 documents required by any Contract Provisions to be executed and 24 delivered with said Proposal shall be submitted, in a sealed package, 25 addressed to the Contracting Agency, and plainly marked “Proposal for 26
______________ (insert name of project as shown on the Proposal) to be 27 opened on the ______ day of ____________, 20___,” (said day, month and 28 year to be used as shown in the published Call for Bids). 29
The Contracting Agency will not consider any Bid Proposal or any 31 supplement to a Bid Proposal that is received after the time specified in the 32
Call for Bids for receipt of Bid Proposals, or received in a location other than 33 that specified for receipt of Bid Proposal. Emailed or faxed Proposals or 34 supplement to a Proposal are not acceptable. 35
If an emergency or unanticipated event interrupts normal work processes 37 of the Contracting Agency so that Proposals cannot be received at the office 38 designated for receipt of bids as specified in Section 1-02.12 the time 39 specified for receipt of the Proposal will be deemed to be extended to the 40 same time of day specified in the solicitation on the first work day on which 41 the normal work processes of the Contracting Agency resume. 42
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-10
Supplemental bid information submitted after the Proposal submittal but 1 within 48 hours of the time and date the Proposal is due, shall be submitted 2 as follows: 3
1. Email to the following e-mail address: bsourwine@g-o.com 5
All other information required to be submitted with the Bid Proposal must be 7 submitted with the Bid Proposal itself, at the time stated in the Call for Bids. 8
1-02.10 Withdrawing, Revising, or Supplementary Proposal 10
(March 9, 2026 G&O GSP) 11
Delete this Section and replace it with the following: 13
After submitting a physical Bid Proposal to the Contracting Agency, the 15
Bidder may withdraw, revise, or supplement it if: 16
1. The Bidder submits a written request signed by an authorized person 18 and physically delivers it to the place designated for receipt of Bid 19
Proposals, and 20
2. The Contracting Agency receives the request before the time set for 22 receipt of Bid Proposals, and 23
3. The revised or supplemented Bid Proposal (if any) is received by the 25
Contracting Agency before the time set for receipt of Bid Proposals. 26
If the Bidder’s request to withdraw, revise, or supplement its Bid Proposal is 28 received before the time set for receipt of Bid Proposals, the Contracting 29
Agency will return the unopened Proposal package to the Bidder. The 30
Bidder must then submit the revised or supplemented package in its 31 entirety. If the Bidder does not submit a revised or supplemented package, 32 then its bid shall be considered withdrawn. 33
Late revised or supplemented Bid Proposals or late withdrawal requests will 35 be date recorded by the Contracting Agency and returned unopened. 36
Mailed, emailed, or faxed requests to withdraw, revise, or supplement a Bid 37
Proposal are not acceptable. 38
1-02.11 Combination and Multiple Proposals 40
(June 16, 2006 G&O GSP) 41
Delete this Section in its entirety. 43 mailto:bsourwine@g-o.com
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-11
1-02.13 Irregular Proposals 1
(November 21, 2025 APWA GSP) 2
Delete this section and replace it with the following: 4
1. A Proposal will be considered irregular and will be rejected if: 6
a. The Bidder is not prequalified when so required; 8
b. The Bidder adds provisions reserving the right to reject or 10 accept the Award, or enter into the Contract; 11
c. A price per unit cannot be updated to the new gsp determined 13 from the Bid Proposal; 14
d. The Proposal form is not properly executed; 16
e. The Bidder fails to submit or properly complete a 18 subcontractor list, if applicable, as required in Section 1-02.6; 19
f. The Bidder fails to submit the Bidder Questionnaire, if 21 applicable as required by Section 1-02.6, or if the 22 documentation that is submitted fails to meet the 23 requirements of the Special Provisions; or 24
g. The Bid Proposal does not constitute a definite and 26 unqualified offer to meet the material terms of the Bid 27 invitation. 28
2. A Proposal may be considered irregular and may be rejected if: 30
a. The Proposal does not include a unit price for every Bid item; 32
b. Any of the unit prices are excessively unbalanced (either 34 above or below the amount of a reasonable Bid) to the 35 potential detriment of the Contracting Agency; 36
c. The authorized Proposal Form furnished by the Contracting 38
Agency is not used or is altered; 39
d. The completed Proposal form contains unauthorized 41 additions, deletions, alternate Bids, or conditions; 42
e. Receipt of Addenda is not acknowledged; 44
Augustus Street and South 4th Street Sidewalks
G&O #26428 1-12
f. A member of a joint venture or partnership and the joint 1 venture or partnership submit Proposals for the same project 2
(in such an instance, both Bids may be rejected); or 3
g. If Proposal form entries are not made in ink. 5
1-02.14 Disqualification of Bidders 7
(March 1, 2023 G&O GSP) 8
Delete this section and replace it with the following: 10
A Bidder will be deemed not responsible if the Bidder does not meet the 12 mandatory bidder responsibility criteria in RCW 39.04.350(1), as amended; 13 or does not meet Supplemental Criteria 1 through 9 in this Section: 14
The Contracting Agency will verify that the Bidder meets the mandatory 16 bidder responsibility criteria in RCW 39.04.350(1), and Supplemental 17
Criteria 1. Evidence that the Bidder meets Supplemental Criteria 2 through 18
9 shall be provided by the Bidder as stated later in this Section. 19
1. Federal Debarment 21
A. Criterion: The Bidder shall not currently be debarred or 23 suspended by the Federal government. 24
B. Documentation: The Bidder shall not be listed as having an 26
“active exclusion” on the U.S. government’s “System for 27
Award Management” database (www.sam.gov). 28
2. Delinquent State Taxes 30
A. Criterion: The Bidder shall not owe delinquent taxes to the 32
Washington State Department of Revenue without a payment 33 plan approved by the Department of Revenue. 34
B. Documentation: The Bidder shall, if and when required as 36 detailed below, sign a statement (on a form to be provided by 37 the Contracting Agency) that the Bidder does not owe 38 delinquent taxes to the Department of Revenue.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .