Attch1_SOW_SanAndresNWR_3pp.pdf

PDF 924 KB Posted

Attached to
NM SAN ANDRES NWR QRT SIDING Federal contract opportunity
Solicitation number
140FC124Q0022
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document is a Statement of Work (SOW) for the replacement of worn and damaged vinyl siding on a mobile home trailer at the San Andres National Wildlife Refuge in Las Cruces, New Mexico. The work includes removing the existing siding, repairing any underlayment areas, and installing new hardboard siding with trim and paint. The contractor must provide all labor, equipment, and materials necessary to complete the work within 60 days of the notice to proceed. The government will provide a secure storage area for the contractor's equipment and materials. The contract will be a Firm-Fixed-Price award based on best value, considering price and factors such as technical approach and past performance. This is a Total Small Business set-aside with offers from non-small businesses being rejected. The contracting officer, job-site point of contact, and contracting officer's representative are identified, along with their contact information.

View the file

Other files for this federal contract opportunity

Other files attached to NM SAN ANDRES NWR QRT SIDING, newest first.
File Type Posted
Attch2_WD_NM20240003v01-05-2024_DonaAna_5pp.pdf PDF
Attch3_BidSchedule.docx DOCX document
Sol_140FC124Q0022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140FC124Q0022

STATEMENT OF WORK

Replace Siding on Refuge Quarters Mobile Home

Date: 06/10/2024

Background

San Andres National Wildlife Refuge (NWR), located at 5686 Santa Gertrudis Dr., Las Cruces NM 88012, needs to have the vinyl siding on a mobile home trailer removed and replaced with new, updated siding.

The current trailer siding is worn, damaged, and susceptible to future damage from high winds, rain, and other extreme weather conditions. Removing the current siding and replacing it with new siding material will reinforce the trailer and improve its longevity. The trailer serves as refuge housing for visiting staff, interns, seasonals, and other personnel conducting work on the San Andres NWR.

Work to Be Performed/Scope of Work

The work to be performed is to remove existing siding and install new hardboard siding on a mobile home housing unit. The work will be performed at San Andres National Wildlife Refuge located at 5686 Santa Gertrudis Dr., Las Cruces NM 88012. The building requiring the work is an 880 sq. ft 2007 Cavalier Mobile trailer (photos attached). The contractor will provide all labor, equipment, and materials necessary to remove the old vinyl siding and repair any underlayment areas that may exist with similar, new materials. The contractor will install the new siding on the trailer with all the manufacture’s specifications and comply with applicable codes. The siding material will be hardboard siding and trim with a manufacturer’s warranty. All siding will be properly cut, installed, and secure, free of ragged edges. All bordering trim should be primed and painted, and properly reinstalled or replaced, if needed. completion of the work, the contractor will remove all excess and scrap materials from the worksite. The contractor will provide a work schedule and provide 24 hours’ notice to the Contracting Officer prior to mobilization and commencement of work. San Andres National Wildlife Refuge will provide a secure area for storage of the contractor’s equipment and materials. The contractor will provide for the safety of employees engaged in project work in compliance with OSHA regulations, and tailgate safety meetings will be held once before the commencement of work and at least once weekly thereafter.

Storage of materials will be permitted only in areas designated by the San Andres National Wildlife Refuge. The contractor will haul off all project site trash and debris after the project, or as needed, leaving the work area clean ‐ unless it is otherwise authorized by the CO or COR. At the end of construction, the contractor will ensure the area is free of material and/or other debris. All waste materials which may be recycled will be weighed and/or measured before transport to approved recycling sites and measurements will be provided to San Andres National Wildlife Refuge. All unused source materials will be returned to their original cache or storage locations as directed by the CO/COR. All staging areas will be thoroughly cleaned and returned to their original condition. The contractor will comply with all legal load restrictions and tarping/containment requirements in the hauling of materials.

Need: Hardboard siding, trim, paint, and primer.

Contractor Qualification

A qualified contractor will need to remove the old existing vinyl siding on the building, including, underlayment areas, and replace it with new siding to reinforce the trailer against the outdoor elements and improve its longevity by preventing further damage.

POC’s

1. Contracting Officer: Nicole Johnson 571-547-3470 email nicole_c_johnson@fws.gov

2. Job-Site POC: Joe Alvarez 575-323-4439 email: jose_alvarez@fws.gov

3. COR: Kelly Dague 575-315-4721 email: kelly_dague@fws.gov

Period of Performance:

Work to be completed within 60 days from notice to proceed.

Hours of Operation:

Normal duty hours Monday thru Friday 7:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.

Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King Jr. Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).

Photos

Front of trailer (south side)

Front of trailer (south side) Back of trailer (north side)

East side of trailer West side of trailer