ATTCH1_SOR_ABAV-10SEP25.pdf

PDF 195 KB Posted

Attached to
Aircrew Body Armor Vest System
Solicitation number
F2XTB95132AW01
Issued by

About this file

This Statement of Requirements details the procurement of an Aircrew Body Armor Vest (ABAV) System for the Air Force, specifically for the MH-139A program. The comprehensive requirement includes multiple vest components in various sizes, such as plate carriers (SAPI/ESAPI cut), tactical aid to flotation elements, padded ballistic inserts, adaptive cummerbunds, pouches, tubes, shoulder sleeve sets, and compressed air canisters. The equipment is specified in OCP/Tan 499 color with flame-resistant (FR) materials, and sizes range from XS to XL to accommodate different aircrew body types. The total quantity ranges from 5 to 50 units per item, with delivery to a single-story building at Maxwell Air Force Base in Alabama. The document emphasizes that all items must be brand new, and the contractor must provide standard manufacturer warranties at no additional cost to the government.

View the file

Other files

File Type Posted
ATTCH2_ClausesandProvisions-11SEP25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Requirements Aircrew Body Armor Vest (ABAV) System

1.0 PURPOSE. PROVIDE AIRCREW WITH A SURVIVAL VEST EQUIPMENT SYSTEM THAT

IS CAPABLE OF CARRYING BALLISTIC PLATES, WEAPONS, AMMUNITION, AND

MANDATED SURVIVAL EQUIPMENT REQUIRED FOR AIRCREW SURVIVAL IN CASE OF

AN EMERGENCY LANDING.

2.0 DESCRIPTION OF ITEMS. THE FOLLOWING ITEMS ARE REQUIRED FOR

PERFORMANCE UNDER THIS CONTRACT: THE BRAND NAME ITEM BEING

REQUESTED IS THE ONE SELECTED BY AIR FORCE GLOBAL STRIKE COMMAND

(AFGSC- THE LEAD MAJCOM FOR THE MH-139A PROGRAM). AIR FORCE RESERVE

COMMAND (AFRC) FOLLOWS LEAD MAJCOM GUIDANCE ON THESE MATTERS,

REQUIRING THE PURCHASE OF THIS BRAND NAME AIRCREW BALLISTIC SURVIVAL

VEST SYSTEM.

2.1 AIRCREW BODY ARMOR VEST SYSTEM: AIR FORCE MANDATED SURVIVAL

EQUIPMENT COMPOSED OF MULTIPLE INDIVIDUAL ITEMS MADE SPECIFICALLY

FOR THIS SURVIVAL VEST SYSTEM. ITEMS LISTED BELOW:

Item Number Description of Services Quantity 0001 500-90-00190-5179F-02

USAF Global Strike, Plate Carrier, SAPI/ESAPI Cut, FR OCP/Tan, Small

5 ea

0002 500-90-00190-5179F-03 USAF Global Strike, Plate Carrier, SAPI/ESAPI Cut, FR OCP/Tan, Medium

10 ea

0003 500-90-00190-5179F-04 USAF Global Strike, Plate Carrier, SAPI/ESAPI Cut, FR OCP/Tan, Large

15 ea

0004 500-90-00190-5179F-05 USAF Global Strike, Plate Carrier, SAPI/ESAPI Cut, FR OCP/Tan, XL

5 ea

0005 500-17-60403-000-02 Tactical Aid to Flotation, SAPI, Small

20 ea

0006 500-17-60403-000-03 Tactical Aid to Flotation, SAPI, Medium

20 ea

0007 500-17-60403-000-04 Tactical Aid to Flotation, SAPI, Large

20 ea

0008 500-17-60403-000-05 Tactical Aid to Flotation, SAPI, XL

20 ea

0009 500-17-60405-000-02 Padded Ballistic Insert, Overlap, Small

20 ST-2

0010 500-17-60405-000-03 Padded Ballistic Insert, Overlap, Medium

20 ST-2

0011 500-17-60405-000-04 Padded Ballistic Insert, Overlap, Large

20 ST-2

0012 500-17-60405-000-05 Padded Ballistic Insert, Overlap, XL

20 ST-2

0013 500-17-60405-000-01 Padded Ballistic Insert, Overlap, XS

10 ST-2

0014 300-10-00886-5179F-00 EBIS Pocket, P200, 6/9, OCP/Tan 499, FR Materials

30 ea

300-15-00479-5179F-02 Adaptive Cummerbund, Sectional, Flotation Element "CTAF-38", 6/12, FR, Tubes, OCP/Tan 499, Small

10 ea

0016 300-15-00479-5179F-03 Adaptive Cummerbund, Sectional, Flotation Element "CTAF-38", 6/12, FR, Tubes, OCP/Tan 499, Medium

10 ea

0017 300-15-00479-5179F-04 Adaptive Cummerbund, Sectional, Flotation Element "CTAF-38", 6/12, FR, Tubes, OCP/Tan 499, Large

10 ea

0018 300-15-00479-5179F-05 Adaptive Cummerbund, Sectional, Flotation Element "CTAF-38", 6/12, FR, Tubes, OCP/Tan 499, XL

10 ea

0019 300-10-00415-5179F-00 Tourniquet Pouch, Vertical 6/9, Horizontal Belt- Mount, OCP/Tan 499

30 ea

0020 300-10-00915-5179F-00 Pistol Shingle, Single Mag

20 ea

0021 HW-T010-02.000-011

Tubes, 2" Female Split Bar w/ Lanyard, Acetal, Tan

25 ea

0022 HW-T009-02.000-011

Tubes, 2" Male, Split Bar, Acetal, Tan 499

25 ea

0023 HW-T010-04.000-011

Tubes, 4" Female Split Bar w/ Lanyard, Acetal, Tan

25 ea

0024 HW-T009-04.000-011

Tubes, 4" Male, Split Bar, Acetal, Tan 499

25 ea

0025 300-15-01032-5179F-02 Full Length, ABAV, Shoulder Sleeve set, OCP/Tan 499, Small

20 ea

0026 300-15-01032-5179F-52 Full Length, ABAV, Shoulder Sleeve set, OCP/Tan 499, M/L

20 ea

0027 300-15-01171-5179F-01 Adaptive Cummerbund, Sectional, Modular Element, 6/12, FR, Tubes, OCP/Tan 499, XS

10 ea

0028 300-15-01171-5179F-02 Adaptive Cummerbund, Sectional, Modular Element, 6/12, FR, Tubes, OCP/Tan 499, Small

20 ea

0029 300-15-01171-5179F-03 Adaptive Cummerbund, Sectional, Modular Element, 6/12, FR, Tubes, OCP/Tan 499, Medium

20 ea

0030 300-15-01171-5179F-04 Adaptive Cummerbund, Sectional, Modular Element, 6/12, FR, Tubes, OCP/Tan 499, Large

20 ea

0031 300-15-01171-5179F-05 Adaptive Cummerbund, Sectional, Modular Element, 6/12, FR, Tubes, OCP/Tan 499, XL

20 ea

0032 300-10-00464-5179F-00 General Purpose Pocket, Medium, 6/9, OCP/Tan 499 Trims

20 ea

0033 300-10-00463-5179F-00 General Purpose Pocket, Small, 6/9, FR OCP

20 ea

MC-C002-00.000-000

CO2 38 g, 3/8" Thread Compressed Air Canister

50 ea

3.0 DELIVERY REQUIREMENTS: SINGLE STORY BUILDING AT MAXWELL AFB, AL

4.0 INSTALLATION REQUIREMENTS: NONE

5.0 TRAINING REQUIREMENTS: NONE

6.0 STANDARD WARRANTY: The contractor shall provide any Original Equipment Manufacturer (OEM) standard commercial warranty applicable to the products being purchased at no additional cost to the Government.

6.1 Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, CDs and DVDs and other documentation on all equipment.

6.2 Prior to project acceptance, the contractor shall provide written procedures, points of contact within company, and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty equipment.

7.0 GENERAL INFORMATION: ITEMS MUST BE BRAND NEW. REFURBISHED ITEMS ARE

NOT AUTHORIZED.

File details come from the government source that posted it. Updated .