This document contains an attachment to a federal solicitation for a science and technology protection initial risk review. The attachment provides reference information for Air Force Research Laboratory's science and technology protection program. It outlines the process for conducting personnel risk assessments and initial institution program reviews for selectable proposals that are selected for funding. These reviews include examining documentation such as senior personnel profiles and security program questionnaires submitted by offerors. The purpose is to identify any potential risks and ensure appropriate measures are in place to protect science and technology information. The related federal grant opportunity is a solicitation from the Air Force Materiel Command Research Laboratory seeking proposals for a project called Lab-to-Orbit: Accelerating the Development and Testing of Materials for Low Earth Orbit. Proposals would fall under the federal grant program called the Air Force Defense Research Sciences Program.
S&T Protection Initial Risk Review
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_updated 18 Dec.xlsx | XLSX spreadsheet | |
| Q&A.xlsx | XLSX spreadsheet | |
| Q&A_updated 13 Dec.xlsx | XLSX spreadsheet | |
| University Day_Virtual.pdf.pdf | ||
| University Day_Virtual.pdf.pdf | ||
| Attch 7_Data Assertion Table.pdf | ||
| Attch 6_Technical Background.pdf | ||
| Attch 5_Statement of Objectives.pdf | ||
| Attch 4_Base Support List.pdf | ||
| Attch 3_Assistance Instrument Certifications.pdf | ||
| Attch 2_Model Contract.pdf | ||
| Attch 1_Supp Instructions for Assistance Props.pdf | ||
| FOA_FA8650-24-S-5210_rev1.pdf | ||
| FOA_FA8650-24-S-5210.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8650-24-S-5210
Attachment 8
CUI – SOURCE SELECTION INFORMATION
SEE FAR 2.101 & FAR 3.104
*This attachment is provided as reference to AFRL’s Science and Technology (S&T) Protection Initial Risk Review. See AFRLI 61-113 for further explanation. No action is required by the offeror.
S&T PROTECTION INITIAL RISK REVIEW
In accordance with (IAW) Air Force Research Laboratory Instruction (AFRLI) 61-113, “Science and Technology (S&T) Protection for the Air Force Research Laboratory”, Section 3.4, a S&T Protection Initial Risk Review was conducted only for those proposals categorized as Selectable and selected for funding and negotiations. The risk review consisted of a personnel risk assessment and initial institution S&T protection program review, as documented below.
The Offeror’s proposal was categorized as Selectable AND selected for funding and negotiations IAW the procedures outlined in the solicitation under which this proposal was submitted.
Response: Choose an item.
IAW AFRLI 61-113, the Offeror submitted as part of their proposal a completed initial Standard Form (SF) 424, Research and Related Senior/Key Person Profile (Expanded) Form, for all senior/key personnel proposed, and documentation of a security program plan to include, at a minimum, a completed Security Program Questionnaire.
Response: Choose an item.
IAW AFRLI 61-113 Sections 3.4.2 and 3.4.3, the Government reviewed the Offeror’s submitted S&T protection documentation and performed a S&T Protection Initial Risk Review, consisting of: 1) a Personnel Risk Assessment, in which the Government reviewed non-government research key/senior performers identified by the Offeror on the initial SF 424 for workload conflicts and conflicts of interest; and 2) an Initial Institution S&T Protection Program Review, in which the Government reviewed the Offeror’s security program information including, at a minimum, a completed Security Program Questionnaire to identify any potential risks and ensure appropriate measures are in place to protect S&T information.
Response: Choose an item.
As a result of the S&T Protection Initial Risk Review conducted, are there any identified risks, issues, or additional information/fact-finding necessary as it pertains to the Offeror’s S&T protection proposal documentation?
Response: Choose an item.