This document is a Construction Cost Estimate Breakdown for PNQS 18-9959, which is a solicitation to replace elevators in Buildings 841, 889, and 1143 at Maxwell Air Force Base and Gunter Annex. The estimate provides detailed line items and costs for the elevator replacement work, including divisions for conveying equipment, fire suppression, plumbing, and electrical/fire system/communications. The total proposed contract price is $0.00. The solicitation is being issued by the Department of the Air Force Air Education and Training Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
IGEMaxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPLACE ELEVATORS - PRIME CONTRACTOR$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
PNQS 18-9959B841 MAXWELL AFB

B889 GUNTER ANNEX

B1143 GUNTER ANNEX

UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYdManhoursAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
1.0Project ManagerMH$0.00$0.00
2.0SuperintendentMH$0.00$0.00
3.0pickupEA$0.00$0.00
4.0Toolswk$0.00$0.00$0.00
5.0Daily cleanupMH$0.00$0.00
6.0Elevator, B841 at Maxwell AFBEA$0.00$0.00$0.00
7.0Elevator, B889 at GunterEA$0.00$0.00
8.0Elevator, B1143 at GunterEA$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
9.0TOTAL$0.00$0.00$0.00$0.00
10.0$0.00$0.00$0.00
11.0Material Costs$0.00$0.00
12.0Tax on Materials10%$0.00$0.00
13.0TOTAL MATERIAL COST$0.00$0.00
14.0$0.00$0.00$0.00
15.0Labor Cost$0.00$0.00
16.0Insurance & Tax on Labor44%$0.00$0.00
17.0TOTAL LABOR COST$0.00$0.00
18.0$0.00$0.00$0.00
19.0Total Other Direct Costs$0.00$0.00$0.00
20.0Total Material, Labor, Tax & Insurance$0.00$0.00
21.0
22.0TOTAL DIRECT COSTS$0.00$0.00$0.00
23.0$0.00$0.00$0.00
24.0Overhead12%$0.00$0.00$0.00
25.0Subtotal$0.00$0.00$0.00$0.00
26.0Profit10%$0.00$0.00$0.00
27.0Sub Total$0.00$0.00
28.0
29.0Bonds2.5%$0.00$0.00
30.0TOTAL$0.00$0.00$0.00
I acknowledge the above cost estimate has been estimated to the best of my ability and means.

B841 CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
IGEMaxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPLACE ELEVATOR - B841$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
PNQS 18-9959B841 MAXWELL AFB
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYdManhoursAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
1.0DIVISION 14 (CONVEYING EQUIPMENT)
2.0
3.0Hydraulic Elevator, 2 stopsEA
4.0
5.0Elevator sub OH&PLot
6.0
7.0DIVISION 21 (FIRE SUPPRESSION)$0.00$0.00
8.0$0.00$0.00
9.0Sprinkler subcontractorLot$0.00$0.00
10.0$0.00$0.00
11.0DIVISION 22 (PLUMBING)$0.00
12.0$0.00
13.0Remove piping and pumpLot
14.0Install 0.5 hp 115V submersible pumpLot$0.00
15.0Install piping and fittingsLot
16.0plumber OH&P$0.00
17.0$0.00
18.0DIVISION 26 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS)$0.00
19.0$0.00
20.0Electrical Team LeaderLot
21.0Fire alarm subcontractorLot$0.00
22.0Remove 20A breaker, single phaseEA$0.00
23.020A breaker, one phaseEA$0.00$0.00
24.0Connect 115V accessory terminals at elevatorEA$0.00$0.00
25.0Remove 100A breaker, 3-phaseEA$0.00$0.00
26.0100A breaker, 3-phaseEA$0.00$0.00
27.0Connect terminals, hydraulic pump motor, 3-phaseEA$0.00$0.00
28.0Remove existing 3-phase power wiringLOT$0.00$0.00
29.0#4 wireLF$0.00$0.00
30.00.75" conduit IMTLF$0.00$0.00
31.00.75" conduit fittingsEA$0.00$0.00
32.01.5" flex conduitLF$0.00$0.00
33.0EA$0.00$0.00
34.0Electrical sub OH&PLot$0.00$0.00
35.0$0.00$0.00$0.00
36.0TOTAL$0.00$0.00$0.00$0.00
37.0$0.00$0.00$0.00
38.0Material Costs$0.00$0.00
39.0Tax on Materials$0.00$0.00
40.0TOTAL MATERIAL COST$0.00$0.00
41.0$0.00$0.00$0.00
42.0Labor Cost$0.00$0.00
43.0Insurance & Tax on Labor$0.00$0.00
44.0TOTAL LABOR COST$0.00$0.00
45.0$0.00$0.00$0.00
46.0Total Other Direct Costs$0.00$0.00$0.00
47.0Total Material, Labor, Tax & Insurance$0.00$0.00
48.0
49.0TOTAL DIRECT COSTS$0.00$0.00$0.00
50.0$0.00$0.00$0.00
51.0Overhead$0.00$0.00$0.00
52.0Subtotal$0.00$0.00$0.00$0.00
53.0Profit$0.00$0.00$0.00
54.0Sub Total$0.00$0.00
55.0
56.0Bonds$0.00$0.00
57.0TOTAL$0.00$0.00$0.00

B889 CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
IGEMaxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPLACE ELEVATOR - B889$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
PNQS 18-9959B889 GUNTER ANNEX
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYdManhoursAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
1.0DIVISION 14 (CONVEYING EQUIPMENT)
2.0
3.0Hydraulic Elevator, 2 stopsEA
4.0
5.0Elevator sub OH&PLot
6.0
7.0DIVISION 21 (FIRE SUPPRESSION)
8.0
9.0Sprinkler subcontractorLot
10.0
11.0DIVISION 22 (PLUMBING)
12.0
13.0Remove piping and pumpLot
14.0Install 0.5 hp 115V submersible pumpLot
15.0Install piping and fittingsLot
16.0plumber OH&P
17.0
18.0DIVISION 26 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS)
19.0
20.0Electrical Team LeaderLot
21.0Fire alarm subcontractorLot
22.0Remove 20A breaker, single phaseEA
23.020A breaker, one phaseEA
24.0Connect 115V accessory terminals at elevatorEA
25.0Remove 125A breaker, 3-phaseEA
26.0125A breaker, 3-phaseEA
27.0Connect terminals, hydraulic pump motor, 3-phaseEA
28.0Remove existing 3-phase power wiringLOT
29.0#4 wireLF
30.0#8 wireLF
31.00.75" conduit IMTLF
32.00.75" conduit fittingsEA
33.0LF
34.01.5" fittingsEA
35.0Electrical sub OH&PLot
36.0$0.00$0.00$0.00
37.0TOTAL$0.00$0.00$0.00$0.00
38.0$0.00$0.00$0.00
39.0Material Costs$0.00$0.00
40.0Tax on Materials$0.00$0.00
41.0TOTAL MATERIAL COST$0.00$0.00
42.0$0.00$0.00$0.00
43.0Labor Cost$0.00$0.00
44.0Insurance & Tax on Labor$0.00$0.00
45.0TOTAL LABOR COST$0.00$0.00
46.0$0.00$0.00$0.00
47.0Total Other Direct Costs$0.00$0.00$0.00
48.0Total Material, Labor, Tax & Insurance$0.00$0.00
49.0
50.0TOTAL DIRECT COSTS$0.00$0.00$0.00
51.0$0.00$0.00$0.00
52.0Overhead$0.00$0.00$0.00
53.0Subtotal$0.00$0.00$0.00$0.00
54.0Profit$0.00$0.00$0.00
55.0Sub Total$0.00$0.00
56.0
57.0Bonds$0.00$0.00
58.0TOTAL$0.00$0.00$0.00

B1143 CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
IGEMaxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPLACE ELEVATOR - B1143$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
PNQS 18-9959

B1143 GUNTER ANNEX

UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYManhoursAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
1.0DIVISION 14 (CONVEYING EQUIPMENT)
2.0
3.0Hydraulic Elevator, 3 stopsEA
4.0Elevator sub OH&PLot
5.0
6.0DIVISION 21 (FIRE SUPPRESSION)
7.0
8.0Sprinkler subcontractorLot
9.0
10.0DIVISION 22 (PLUMBING)
11.0
12.0Remove piping and pumpLot
13.0Install 0.5 hp 115V submersible pumpLot
14.0Install piping and fittingsLot
15.0plumber OH&P
16.0$0.00$0.00$0.00
17.0DIVISION 26 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS)$0.00$0.00$0.00
18.0$0.00$0.00$0.00
19.0Electrical Team LeaderLot
20.0Fire alarm subcontractorLot
21.0Remove 20A breaker, single phaseEA
22.020A breaker, one phaseEA
23.0Connect 115V accessory terminals at elevatorEA
24.0Connect terminals, hydraulic pump motor, 3-phaseEA
25.0Remove existing 3-phase power wiringLOT
26.0Remove 40A breakerEA
27.040A breakerEA
28.0#12 WireLF
29.0#8 wireLF
30.00.75" conduit IMTLF
31.00.75" conduit fittingsEA
32.01.5" flex conduitLF
33.0EA
34.0Electrical sub OH&P
35.0
36.0TOTAL$0.00$0.00$0.00$0.00
37.0$0.00$0.00$0.00
38.0Material Costs$0.00$0.00
39.0Tax on Materials$0.00$0.00
40.0TOTAL MATERIAL COST$0.00$0.00
41.0$0.00$0.00$0.00
42.0Labor Cost$0.00$0.00
43.0Insurance & Tax on Labor$0.00$0.00
44.0TOTAL LABOR COST$0.00$0.00
45.0$0.00$0.00$0.00
46.0Total Other Direct Costs$0.00$0.00$0.00
47.0Total Material, Labor, Tax & Insurance$0.00$0.00
48.0
49.0TOTAL DIRECT COSTS$0.00$0.00$0.00
50.0$0.00$0.00$0.00
51.0Overhead$0.00$0.00$0.00
52.0Subtotal$0.00$0.00$0.00$0.00
53.0Profit$0.00$0.00$0.00
54.0Sub Total$0.00$0.00
55.0
56.0Bonds$0.00$0.00
57.0TOTAL$0.00$0.00$0.00