This document is a Construction Cost Estimate Breakdown for PNQS 18-9959, which is a solicitation to replace elevators in Buildings 841, 889, and 1143 at Maxwell Air Force Base and Gunter Annex. The estimate provides detailed line items and costs for the elevator replacement work, including divisions for conveying equipment, fire suppression, plumbing, and electrical/fire system/communications. The total proposed contract price is $0.00. The solicitation is being issued by the Department of the Air Force Air Education and Training Command.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | |
| IGE | Maxwell Air Force Base Alabama | |||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||
| REPLACE ELEVATORS - PRIME CONTRACTOR | $0.00 | |||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||
| PNQS 18-9959 | B841 MAXWELL AFB |
B889 GUNTER ANNEX
B1143 GUNTER ANNEX
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | d | Manhours | AVERAGE | DIRECT | LINE | ||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| DIVISION 1 (General Requirements) | ||||||||||
| 1.0 | Project Manager | MH | $0.00 | $0.00 | ||||||
| 2.0 | Superintendent | MH | $0.00 | $0.00 | ||||||
| 3.0 | pickup | EA | $0.00 | $0.00 | ||||||
| 4.0 | Tools | wk | $0.00 | $0.00 | $0.00 | |||||
| 5.0 | Daily cleanup | MH | $0.00 | $0.00 | ||||||
| 6.0 | Elevator, B841 at Maxwell AFB | EA | $0.00 | $0.00 | $0.00 | |||||
| 7.0 | Elevator, B889 at Gunter | EA | $0.00 | $0.00 | ||||||
| 8.0 | Elevator, B1143 at Gunter | EA | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| 9.0 | TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 10.0 | $0.00 | $0.00 | $0.00 | |||||||
| 11.0 | Material Costs | $0.00 | $0.00 | |||||||
| 12.0 | Tax on Materials | 10% | $0.00 | $0.00 | ||||||
| 13.0 | TOTAL MATERIAL COST | $0.00 | $0.00 | |||||||
| 14.0 | $0.00 | $0.00 | $0.00 | |||||||
| 15.0 | Labor Cost | $0.00 | $0.00 | |||||||
| 16.0 | Insurance & Tax on Labor | 44% | $0.00 | $0.00 | ||||||
| 17.0 | TOTAL LABOR COST | $0.00 | $0.00 | |||||||
| 18.0 | $0.00 | $0.00 | $0.00 | |||||||
| 19.0 | Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||||||
| 20.0 | Total Material, Labor, Tax & Insurance | $0.00 | $0.00 | |||||||
| 21.0 | ||||||||||
| 22.0 | TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||||||
| 23.0 | $0.00 | $0.00 | $0.00 | |||||||
| 24.0 | Overhead | 12% | $0.00 | $0.00 | $0.00 | |||||
| 25.0 | Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 26.0 | Profit | 10% | $0.00 | $0.00 | $0.00 | |||||
| 27.0 | Sub Total | $0.00 | $0.00 | |||||||
| 28.0 | ||||||||||
| 29.0 | Bonds | 2.5% | $0.00 | $0.00 | ||||||
| 30.0 | TOTAL | $0.00 | $0.00 | $0.00 | ||||||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
B841 CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | |
| IGE | Maxwell Air Force Base Alabama | |||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||
| REPLACE ELEVATOR - B841 | $0.00 | |||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||
| PNQS 18-9959 | B841 MAXWELL AFB |
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | d | Manhours | AVERAGE | DIRECT | LINE | ||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| 1.0 | DIVISION 14 (CONVEYING EQUIPMENT) | |||||||||
| 2.0 | ||||||||||
| 3.0 | Hydraulic Elevator, 2 stops | EA | ||||||||
| 4.0 | ||||||||||
| 5.0 | Elevator sub OH&P | Lot | ||||||||
| 6.0 | ||||||||||
| 7.0 | DIVISION 21 (FIRE SUPPRESSION) | $0.00 | $0.00 | |||||||
| 8.0 | $0.00 | $0.00 | ||||||||
| 9.0 | Sprinkler subcontractor | Lot | $0.00 | $0.00 | ||||||
| 10.0 | $0.00 | $0.00 | ||||||||
| 11.0 | DIVISION 22 (PLUMBING) | $0.00 | ||||||||
| 12.0 | $0.00 | |||||||||
| 13.0 | Remove piping and pump | Lot | ||||||||
| 14.0 | Install 0.5 hp 115V submersible pump | Lot | $0.00 | |||||||
| 15.0 | Install piping and fittings | Lot | ||||||||
| 16.0 | plumber OH&P | $0.00 | ||||||||
| 17.0 | $0.00 | |||||||||
| 18.0 | DIVISION 26 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | ||||||||
| 19.0 | $0.00 | |||||||||
| 20.0 | Electrical Team Leader | Lot | ||||||||
| 21.0 | Fire alarm subcontractor | Lot | $0.00 | |||||||
| 22.0 | Remove 20A breaker, single phase | EA | $0.00 | |||||||
| 23.0 | 20A breaker, one phase | EA | $0.00 | $0.00 | ||||||
| 24.0 | Connect 115V accessory terminals at elevator | EA | $0.00 | $0.00 | ||||||
| 25.0 | Remove 100A breaker, 3-phase | EA | $0.00 | $0.00 | ||||||
| 26.0 | 100A breaker, 3-phase | EA | $0.00 | $0.00 | ||||||
| 27.0 | Connect terminals, hydraulic pump motor, 3-phase | EA | $0.00 | $0.00 | ||||||
| 28.0 | Remove existing 3-phase power wiring | LOT | $0.00 | $0.00 | ||||||
| 29.0 | #4 wire | LF | $0.00 | $0.00 | ||||||
| 30.0 | 0.75" conduit IMT | LF | $0.00 | $0.00 | ||||||
| 31.0 | 0.75" conduit fittings | EA | $0.00 | $0.00 | ||||||
| 32.0 | 1.5" flex conduit | LF | $0.00 | $0.00 | ||||||
| 33.0 | EA | $0.00 | $0.00 | |||||||
| 34.0 | Electrical sub OH&P | Lot | $0.00 | $0.00 | ||||||
| 35.0 | $0.00 | $0.00 | $0.00 | |||||||
| 36.0 | TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 37.0 | $0.00 | $0.00 | $0.00 | |||||||
| 38.0 | Material Costs | $0.00 | $0.00 | |||||||
| 39.0 | Tax on Materials | $0.00 | $0.00 | |||||||
| 40.0 | TOTAL MATERIAL COST | $0.00 | $0.00 | |||||||
| 41.0 | $0.00 | $0.00 | $0.00 | |||||||
| 42.0 | Labor Cost | $0.00 | $0.00 | |||||||
| 43.0 | Insurance & Tax on Labor | $0.00 | $0.00 | |||||||
| 44.0 | TOTAL LABOR COST | $0.00 | $0.00 | |||||||
| 45.0 | $0.00 | $0.00 | $0.00 | |||||||
| 46.0 | Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||||||
| 47.0 | Total Material, Labor, Tax & Insurance | $0.00 | $0.00 | |||||||
| 48.0 | ||||||||||
| 49.0 | TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||||||
| 50.0 | $0.00 | $0.00 | $0.00 | |||||||
| 51.0 | Overhead | $0.00 | $0.00 | $0.00 | ||||||
| 52.0 | Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 53.0 | Profit | $0.00 | $0.00 | $0.00 | ||||||
| 54.0 | Sub Total | $0.00 | $0.00 | |||||||
| 55.0 | ||||||||||
| 56.0 | Bonds | $0.00 | $0.00 | |||||||
| 57.0 | TOTAL | $0.00 | $0.00 | $0.00 |
B889 CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | |
| IGE | Maxwell Air Force Base Alabama | |||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||
| REPLACE ELEVATOR - B889 | $0.00 | |||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||
| PNQS 18-9959 | B889 GUNTER ANNEX |
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | d | Manhours | AVERAGE | DIRECT | LINE | ||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| 1.0 | DIVISION 14 (CONVEYING EQUIPMENT) | |||||||||
| 2.0 | ||||||||||
| 3.0 | Hydraulic Elevator, 2 stops | EA | ||||||||
| 4.0 | ||||||||||
| 5.0 | Elevator sub OH&P | Lot | ||||||||
| 6.0 | ||||||||||
| 7.0 | DIVISION 21 (FIRE SUPPRESSION) | |||||||||
| 8.0 | ||||||||||
| 9.0 | Sprinkler subcontractor | Lot | ||||||||
| 10.0 | ||||||||||
| 11.0 | DIVISION 22 (PLUMBING) | |||||||||
| 12.0 | ||||||||||
| 13.0 | Remove piping and pump | Lot | ||||||||
| 14.0 | Install 0.5 hp 115V submersible pump | Lot | ||||||||
| 15.0 | Install piping and fittings | Lot | ||||||||
| 16.0 | plumber OH&P | |||||||||
| 17.0 | ||||||||||
| 18.0 | DIVISION 26 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | |||||||||
| 19.0 | ||||||||||
| 20.0 | Electrical Team Leader | Lot | ||||||||
| 21.0 | Fire alarm subcontractor | Lot | ||||||||
| 22.0 | Remove 20A breaker, single phase | EA | ||||||||
| 23.0 | 20A breaker, one phase | EA | ||||||||
| 24.0 | Connect 115V accessory terminals at elevator | EA | ||||||||
| 25.0 | Remove 125A breaker, 3-phase | EA | ||||||||
| 26.0 | 125A breaker, 3-phase | EA | ||||||||
| 27.0 | Connect terminals, hydraulic pump motor, 3-phase | EA | ||||||||
| 28.0 | Remove existing 3-phase power wiring | LOT | ||||||||
| 29.0 | #4 wire | LF | ||||||||
| 30.0 | #8 wire | LF | ||||||||
| 31.0 | 0.75" conduit IMT | LF | ||||||||
| 32.0 | 0.75" conduit fittings | EA | ||||||||
| 33.0 | LF | |||||||||
| 34.0 | 1.5" fittings | EA | ||||||||
| 35.0 | Electrical sub OH&P | Lot | ||||||||
| 36.0 | $0.00 | $0.00 | $0.00 | |||||||
| 37.0 | TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 38.0 | $0.00 | $0.00 | $0.00 | |||||||
| 39.0 | Material Costs | $0.00 | $0.00 | |||||||
| 40.0 | Tax on Materials | $0.00 | $0.00 | |||||||
| 41.0 | TOTAL MATERIAL COST | $0.00 | $0.00 | |||||||
| 42.0 | $0.00 | $0.00 | $0.00 | |||||||
| 43.0 | Labor Cost | $0.00 | $0.00 | |||||||
| 44.0 | Insurance & Tax on Labor | $0.00 | $0.00 | |||||||
| 45.0 | TOTAL LABOR COST | $0.00 | $0.00 | |||||||
| 46.0 | $0.00 | $0.00 | $0.00 | |||||||
| 47.0 | Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||||||
| 48.0 | Total Material, Labor, Tax & Insurance | $0.00 | $0.00 | |||||||
| 49.0 | ||||||||||
| 50.0 | TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||||||
| 51.0 | $0.00 | $0.00 | $0.00 | |||||||
| 52.0 | Overhead | $0.00 | $0.00 | $0.00 | ||||||
| 53.0 | Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 54.0 | Profit | $0.00 | $0.00 | $0.00 | ||||||
| 55.0 | Sub Total | $0.00 | $0.00 | |||||||
| 56.0 | ||||||||||
| 57.0 | Bonds | $0.00 | $0.00 | |||||||
| 58.0 | TOTAL | $0.00 | $0.00 | $0.00 |
B1143 CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | |
| IGE | Maxwell Air Force Base Alabama | |||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||
| REPLACE ELEVATOR - B1143 | $0.00 | |||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||
| PNQS 18-9959 |
B1143 GUNTER ANNEX
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | Manhours | AVERAGE | DIRECT | LINE | |||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| 1.0 | DIVISION 14 (CONVEYING EQUIPMENT) | |||||||||
| 2.0 | ||||||||||
| 3.0 | Hydraulic Elevator, 3 stops | EA | ||||||||
| 4.0 | Elevator sub OH&P | Lot | ||||||||
| 5.0 | ||||||||||
| 6.0 | DIVISION 21 (FIRE SUPPRESSION) | |||||||||
| 7.0 | ||||||||||
| 8.0 | Sprinkler subcontractor | Lot | ||||||||
| 9.0 | ||||||||||
| 10.0 | DIVISION 22 (PLUMBING) | |||||||||
| 11.0 | ||||||||||
| 12.0 | Remove piping and pump | Lot | ||||||||
| 13.0 | Install 0.5 hp 115V submersible pump | Lot | ||||||||
| 14.0 | Install piping and fittings | Lot | ||||||||
| 15.0 | plumber OH&P | |||||||||
| 16.0 | $0.00 | $0.00 | $0.00 | |||||||
| 17.0 | DIVISION 26 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | $0.00 | $0.00 | ||||||
| 18.0 | $0.00 | $0.00 | $0.00 | |||||||
| 19.0 | Electrical Team Leader | Lot | ||||||||
| 20.0 | Fire alarm subcontractor | Lot | ||||||||
| 21.0 | Remove 20A breaker, single phase | EA | ||||||||
| 22.0 | 20A breaker, one phase | EA | ||||||||
| 23.0 | Connect 115V accessory terminals at elevator | EA | ||||||||
| 24.0 | Connect terminals, hydraulic pump motor, 3-phase | EA | ||||||||
| 25.0 | Remove existing 3-phase power wiring | LOT | ||||||||
| 26.0 | Remove 40A breaker | EA | ||||||||
| 27.0 | 40A breaker | EA | ||||||||
| 28.0 | #12 Wire | LF | ||||||||
| 29.0 | #8 wire | LF | ||||||||
| 30.0 | 0.75" conduit IMT | LF | ||||||||
| 31.0 | 0.75" conduit fittings | EA | ||||||||
| 32.0 | 1.5" flex conduit | LF | ||||||||
| 33.0 | EA | |||||||||
| 34.0 | Electrical sub OH&P | |||||||||
| 35.0 | ||||||||||
| 36.0 | TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 37.0 | $0.00 | $0.00 | $0.00 | |||||||
| 38.0 | Material Costs | $0.00 | $0.00 | |||||||
| 39.0 | Tax on Materials | $0.00 | $0.00 | |||||||
| 40.0 | TOTAL MATERIAL COST | $0.00 | $0.00 | |||||||
| 41.0 | $0.00 | $0.00 | $0.00 | |||||||
| 42.0 | Labor Cost | $0.00 | $0.00 | |||||||
| 43.0 | Insurance & Tax on Labor | $0.00 | $0.00 | |||||||
| 44.0 | TOTAL LABOR COST | $0.00 | $0.00 | |||||||
| 45.0 | $0.00 | $0.00 | $0.00 | |||||||
| 46.0 | Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||||||
| 47.0 | Total Material, Labor, Tax & Insurance | $0.00 | $0.00 | |||||||
| 48.0 | ||||||||||
| 49.0 | TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||||||
| 50.0 | $0.00 | $0.00 | $0.00 | |||||||
| 51.0 | Overhead | $0.00 | $0.00 | $0.00 | ||||||
| 52.0 | Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 53.0 | Profit | $0.00 | $0.00 | $0.00 | ||||||
| 54.0 | Sub Total | $0.00 | $0.00 | |||||||
| 55.0 | ||||||||||
| 56.0 | Bonds | $0.00 | $0.00 | |||||||
| 57.0 | TOTAL | $0.00 | $0.00 | $0.00 |