Attch 4. Gen #2 Burner Tune-up SOW.pdf
PDF 31 KB Posted
- Attached to
- Heat Plant Generator Tune-Up
- Solicitation number
- FA4626-23-Q-0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBO_Generator Tuneup.pdf | ||
| Attch 3. Wage Determination 15-5391.pdf | ||
| Attch 1. Bid Schedule Generator Tuneup.xlsx | XLSX spreadsheet | |
| Attch 2. Installation Perimeter Access Control.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Generator #2 Burner Tune-Up
1.1 GENERAL REQUIREMENTS
Provide all items, articles, materials, operations, or methods listed, mentioned or scheduled on the drawings and/or as specified herein, including all labor, materials, equipment, and incidentals necessary and required for completion of the scope of this project.
1.2 UTILITIES
All reasonable quantities of utilities will be made available from existing utilities to the Contractor without charge. Any temporary connection or lines that may be required will be installed, maintained, and removed by the Contractor at his own expense and in such a manner satisfactory to the Contracting Officer. Removal of such connections or lines will be accomplished prior to final acceptance of the construction. The Contractor shall provide any necessary portable power.
1.3 SAFETY
The Contractor shall comply with all existing Occupational Safety and Health Act (OSHA) standards of safety at all times in the performance of this contract. Hazards to the safe use of the premises due to the Contractor's work and/or equipment shall be suitably marked at all times.
Pedestrian and vehicle traffic ways shall be kept clear and unobstructed.
1.4 CONTRACTOR VEHICLES AND EQUIPMENT
The Contractor shall provide all vehicles and equipment necessary to accomplish the contract work. Power equipment shall be equipped with safety and noise limiting devices. The equipment shall be in a safe and efficient operating condition. The Contractor shall not park vehicles in the project area during non-working hours. A designated parking area for vehicles and equipment will be provided. Vehicles will not be allowed on lawns or sidewalks without prior written approval.
All equipment will be clearly marked with the Company name.
Truckload Limits: The following load limits shall apply to all contractor-operated equipment on this project:
April I to June I 350 #/inch width of tire
All Other Times 400 #/inch width of tire
1.5 CONTINUED USE OF FACILITIES:
Building, structures, facilities, and utilities will continue in use by the Government during this contract. The Contractor shall notify Contracting when a no-work condition will occur for more than one day by the Contractor or sub-contractors (except weekends and federal holidays).
1 .6 CONSTRUCTION NEAR UTILITY SYSTEMS
All contractors shall be responsible for processing their own Work Clearance Request (AF Form
I 03), commonly known as a "Digging Permit," and coordinating with Government inspectors as required. It is also the sole responsibility of the Contractor to make all requests for locates and marking by the private sector. Note that private companies supply numerous utilities and services on Malmstrom Air Force Base. AF Form 103 does not address coordination with private companies. Requests for locates by private firms shall be performed by the contractor in accordance with State of Montana and Federal regulations. The Contractor is responsible for obtaining all coordination signatures for the permit. The approved permit shall be valid for a period not to exceed 90 calendar days. TO THE MAXIMUM EXTENT POSSIBLE, ELIM
INATE PERMANENT MARKINGS ON PAVEMENT AND CURBS. The contractor shall be responsible for maintaining all utility markings. Location marks shall be removed after 14 calendar days if not used. All markings shall be accomplished with water-based chalk (Aervoe
Pacific Inc. 1-800-227-0196 or equal). No paints will be used. Detailed permit procedures and guidelines shall be provided to the contractor during the Pre-performance Conference. Digging within three feet of buried communications cables, environmental monitoring wells, electrical cables, irrigation systems, and gas lines shall be performed by hand digging until the utility is exposed. The Project Inspector shall be notified three days prior to digging within a three-foot area near this utility. A representative from communications (Telco) must be present during excavation of Communications Cables. The cable piping routes must be marked prior to excavation in the area. The Contractor shall be held responsible for any damage to a marked or identified utility by excavation procedures. Once the utility is exposed, mechanical excavation may be used if there is no chance of damage occurring to the cable or piping system. The contractor is responsible for marking all excavations he will do, three (3) work days prior to needing existing utilities marked by the government.
1 .7 WORK SCHEDULE
Working hours for the Contractor will normally be between the hours of 7:45 a.m. and 4:15 p.m.
excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The
Contractor must notify the Contracting Officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces when the Contracting
Officer determines that they are reasonably available. If such force is reasonably available, the
Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the adjustments to the contract price may be made periodically as directed by the Contracting Officer.
1.8 ANTI-TERRORISM (AT) AWARENESS TRAINING
In accordance with DoDI O-2000.16v1_AFI 10-245-O, Antiterrorism (AT) Program
Implementation, ensure Level I - AT Awareness Training is completed by all contractors within 30 days of requiring access, and annually thereafter. The training will be provided by the government. The objective of the training is to provide personnel with requisite knowledge necessary to remain vigilant and enable employment of AT tactics, techniques, and procedures.
1.9 FORCE PROTECTION
Contractor personnel are required to abide by all real world Force Protection Condition
(FPCON) measures, random anti-terrorism measures (RAMs), shelter-in-place orders, evacuations and lock-down notices as directed. Examples include mandatory badge or ID checks, facility single points-of-entry and searches of hand carried items.
2.0 GENERATOR #2 TUBE INSPECTION PROJECT
2.1 SUMMARY OF WORK:
The contractor shall provide all labor, equipment and materials to tune #2 Generator natural gas burner flame off of the target wall of the combustion chamber. Burner will be tuned to manufacturer recommendations of combustion efficiency, carbon monoxide and nitrogen oxide limits. All work shall be performed by a Natcom (Clever Brooks) certified technician. Contractor shall provide a final combustion analysis report when all work is complete. Contractor shall provide all documentation and inspections required by State and Federal requirements.
2.2 GENERATOR BURNER SPECIFICATIONS:
Mfg: Natcom (Clever Brooks)
Mfg #: P-60-G-22-1017
Serial #: N20388
Project #: 20388
2.3 EXECUTION:
2.3.1 Tune burner to reduce distance of burner flame
2.3.2 Tune burner to meet manufacturer recommendations of combustion efficiency, carbon monoxide and nitrogen oxide emission limits
3.0 PERIOD OF PERFORMANCE
3.1 All work has to be performed during plant operation time frame between Oct- May
3.2 The contractor shall have all required work and tests completed no later than 30 calendar days from the issuance of the Notice to Proceed.