This draft solicitation is for the expansion and renovation of Building 27 at a Veterans Affairs medical center to add additional MRI capacity. The solicitation number and contractor response date are not yet available because this is a draft that will be updated and posted on SAM.gov at a later date via an amendment. However, the scheduled site visit for potential offerors will still take place on February 15, 2024 from 6:00 to 7:30 PM Pacific Standard Time as indicated in the draft provision FAR 52.236-27. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
LOCATION ON CAMPUS
PRINCIPAL IN CHARGE: Blue Trident, LLC Emmanuel (Manny) Bautista, PE*, F.SAME-----------(206) 972-0645 PROJECT MANAGER: SCBC Engineering, PLLC Brian Moll, PE, SE -------------------------------------------(206) 351-2217 ARCHITECT: Blue Trident, LLC Lauri Strauss, AIA, LEED AP BD&C---------------------(907) 317-5040 STRUCTURAL ENGINEER: SCBC Engineering, PLLC Brian Moll, PE, SE -------------------------------------------(206) 351-2217 MECHANICAL ENGINEER: Notkin P2S, inc Peter Eberle, PE-----------------------------------------------(206) 267-6940 ELECTRICAL ENGINEER: SAZAN Group Kelly Anderson, PE-------------------------------------------(206) 576-7168 MEDICAL DESIGN ARCHITECT: ZGA Architects & Planners Lowell Alseth, AIA---------------------------------------------(208) 345-8872 INTERIOR DESIGNER: Mackenzie Kim Doyle, NCIDQ, IIDA------------------------------------(206) 582-2571 CIVIL ENGINEER S&B Christ Consulting, LLC Daniel Kelley, PE----------------------------------------------(702) 513-0285 LANDSCAPE ARCHITECT Osborn Pacific Group Inc Linda Osborn---------------------------------------------------(206) 356-7000 COST ESTIMATOR: ProDims Dennis Teschlog ----------------------------------------------(206) 395-9738
PROJECT TEAM
PROJECT
WORK AREA
BUILDING FOOTPRINT
BLDG 1
BLDG 27
N
BLDG 7
Pr oj ec t N um be r
Sheet Number
Pr oj ec t T itl e
Lo ca tio n
Issue Date:
Approved Drawn
Dr aw in g
Ti tle
Phase:
AR
CH
IT
EC
T/
EN
GI
NE
ER
O
F
RE
CO
RD
A/ E:
Seal
321 4 5 6 7 8
A/E Proj. No.
MA
NN
-G
RA
ND
ST
AF
F
VA
M ed ica l C en ter
N
. A ss em bl y, Sp ok an e, W
A
EN
GI
NE
ER
IN
G
PR
OJ
EC
TS
VA
MC
M
AI
N
OF
FI
CE
PH
ON
E:
9)
4-
FA
X:
9)
4-
Sheet OF
B lu e Tr id en t, LL
C
N
E E sp er io ne
L N
B ai nb ri dg e
Is la nd , W
A
PR
O
JE
C
T M
G R
: B ri an E
. M ol l P E
,S E
Ph
.7
.9
F
E
D
C
B
A
F
E
D
C
B
A
321 4 5 6 7 8 C
:\U se rs \la ur i\O ne D riv e\ d2 L-
Pr oj ec ts
\2
7-
1_
Sp ok an e
VA
M C
B
_1
M R
I\0 4-
D
ES
IG
N
\R
EV
IT
\2
7-
1_
-S
PK
N
B
M R
I A R
C H
.rv t
G101
CO
VE
R S
HE
ET
RE
NO
VA
TE
B
UI
LD
IN
G #2
7 T O
AD
D
NE
W
M
RI
A
SS
EM
BL
Y
ST
, S
PO
KA
NE
, W A
8-
CS
I-0
9/20/2023
LA
lms
ISSUED FOR CONSTRUCTION
21-0011
DRAWING INDEX
# SHEET
NAME SHEET DESCRIPTION
1 G101 COVER SHEET
2 G102 PHASES 1-2 PLAN
3 G103 PHASES 3-4 PLAN
4 G104 CODE PLAN
5 CR101 REMOVAL PLAN
6 C101 SITE PLAN
7 C102 GRADING PLAN
8 C103 GEOMETRIC CONTROL
9 C104 LINE AND POINT TABLES
10 CD501 CIVIL DETAILS
11 CD502 CIVIL DETAILS
12 LI100 LANDSCAPE IRRIGATION PLAN
13 LI200 LANDSCAPE IRRIGATION DETAILS
14 LP100 LANDSCAPE PLANTING PLAN
15 LP200 LANDSCAPE PLANTING DETAILS
16 S001 GENERAL NOTES
17 S100 LOWER FLOOR AND FOUNDATION PLAN
18 S101 MAIN FLOOR FOUNDATION/FRAMING PLAN
19 S102 ROOF FRAMING PLAN
20 S200 BRACE FRAME ELEVATIONS
21 S501 CONCRETE DETAILS
22 S502 CONCRETE DETAILS
23 S503 CONCRETE DETAILS
24 S521 STEEL DETAILS
25 S522 STEEL DETAILS
26 S523 STEEL DETAILS
27 S524 STEEL DETAILS
28 AS100 ARCH. SITE PLAN
29 AD101 MRI DEMO FLOOR PLAN
30 AD102 MRI DEMO CEILING PLAN
31 A101 FLOOR PLAN
32 A110 ENLARGED PATIENT AREA
33 A111 ENLARGED OFFICE AREA
34 A112 ENLARGED MRI ROOM
35 A113 ENLARGED ADDITION
36 A114 ENLG WALKWAY TO B7
37 A120 REFL CEILING PLAN
38 A130 ROOF PLAN
39 A200 EXTERIOR ELEVATIONS
40 A300 BUILDING SECTIONS
41 A301 BUILDING SECTIONS
42 A302 BUILDING SECTIONS
43 A401 WALL SECTIONS
44 A402 WALL SECTIONS
RENOVATE
BUILDING 27 TO
ADD NEW MRI
DEPARTMENT OF VETERANS AFFAIRS
VA MEDICAL CENTER SPOKANE
PROJECT # 668-CSI-008
KEY PLAN
ISSUED FOR CONSTRUCTION
DRAWING INDEX
# SHEET
NAME SHEET DESCRIPTION
45 A403 WALL SECTIONS
46 A410 WALL SECTION DETAILS
47 A600 DOOR SCHEDULE
48 A601 WINDOW SCHEDULE
49 A602 EQUIPMENT SCHEDULE
50 A603 SIGN SCHEDULE AND DETAILS
51 A810 INTERIOR ELEVATIONS
52 A811 INTERIOR ELEVATIONS
53 A812 INTERIOR ELEVATIONS
54 A813 INTERIOR ELEVATIONS
55 A814 INTERIOR ELEVATIONS
56 A815 INTERIOR ELEVATIONS
57 A816 INTERIOR ELEVATIONS
58 A817 INTERIOR ELEVATIONS
59 A818 INTERIOR ELEVATIONS
60 A819 INTERIOR ELEVATIONS
61 A900 ROOF DETAILS
62 A901 MISC DETAILS
63 I101 FINISH PLAN
64 FXD101 FIRE SPRINKLER DEMO
65 FX101 FIRE SPRINKLER PLAN
66 FA001 COVER PAGE
67 FAD101 FIRE ALARM DEMO PLAN
68 FA101 FIRE ALARM PLAN
69 P001 PLUMBING LEGEND AND SHEET INDEX
70 PD101 1ST FLR PLUMBING DEMO PLAN WEST
71 P100 BASEMENT FLOOR PLAN
72 P101 1ST FLR PLUMBING PLAN EAST
73 P102 1ST FLR PLUMBING PLAN WEST
74 P601 PLUMBING SCHEDULES
75 M001 LEGEND AND SHEET INDEX
76 M002 1ST FLOOR ZONING PLAN
77 MD101 1ST FLOOR DEMO PLAN
78 M101 1ST FLOOR PLAN EAST
79 M102 1ST FLOOR PLAN WEST
80 MP101 1ST FLOOR PIPING PLAN EAST
81 MP102 1ST FLOOR PIPING PLAN WEST
82 M120 ROOF PLAN
83 M501 DETAILS
84 M502 DETAILS
85 M503 DETAILS
86 M504 DETAILS
87 M505 DETAILS
88 M601 SCHEDULES
DRAWING INDEX
# SHEET
NAME SHEET DESCRIPTION
89 M602 SCHEDULES
90 M603 SCHEDULES
91 M801 CONTROL DIAGRAMS
92 M802 CONTROL DIAGRAMS
93 M803 CONTROL DIAGRAMS
94 EG001 COVER PAGE
95 ESD101 ELECTRICAL SITE PLAN DEMOLITION
96 ELD101 LIGHTING DEMO PLAN
97 EPD101 POWER DEMO PLAN
98 EPD601 BLDG 1 ONE-LINE DIAGRAM DEMO
99 EPD602 BUILDING 27 ONE-LINE DIAGRAM DEMO
100 E101 LIGHTING SCHEDULES
101 E102 EQUIPMENT SCHEDULES
102 ES101 ELECTRICAL SITE PLAN
103 EL101 LIGHTING SYSTEM PLAN
104 EL102 NORMAL SYSTEM LIGHTING LEVEL
CALCULATIONS
105 EL103 EMERGENCY SYSTEM LIGHTING LEVEL
106 EP101 POWER PLAN
107 EP102 POWER ROOF PLAN
108 EP103 MRI
109 EP104 MRI
110 EP501 DETAILS
111 EP502 DETAILS
112 EP601 BLDG 1 ONE-LINE DIAGRAM
113 EP602 BLDG 27 ONE LINE DIAGRAM
114 EP701 PANEL SCHEDULES
115 TN001 COVER PAGE
116 TND101 SYSTEMS DEMO PLAN
117 TN101 SYSTEMS PLAN
118 TN102 SYSTEMS BASEMENT PLAN
119 TN501 DETAILS
120 RF0.0 COVER
121 RF1.0 FOUNDATION PLAN
122 RF1.1 CEILING SUPPORT LAYOUT
123 RF1.2 FLOOR PLAN
124 RF1.3 PARENT WALL FRAMING
125 RF2.0 ELEVATIONS
126 RF2.1 ELEVATIONS
127 RF3.0 DETAILS
128 RF3.1 DETAILS
129 RF3.2 SEISMIC DETAILS
130 RF3.3 SEISMIC DETAILS
131 RF4.0 EVO AIR DOOR OUTSWING
No
Da te
Re vis io n De sc rip tio n
TEMP IV ROOM -
PHASE I AND II
TEMP PATIENT
WAITING AREA IN
CORR.
TEMP ONMI
CELL LOCATION
COVER RELITE FROM
INSIDE ROOM
DO NOT BLOCK DOOR
TO BE USED AS EXIT.
PATIENT FLOW
INSTALL NEW EXIT DOOR AT PHASE I
J
H G FKL
PHASE I - THE GOAL OF PHASE I IS TO MOVE THE
PATIENTS OUT OF THE IV PREP ROOM AND PREPARE THE
SOACES EAST OF GRID 10 FOR THE NEW CONSTRUCTION
IN THAT AREA. THIS WILL INCLUDE CREATING A
TEMPORARY IV PREP ROOM AND CONSTRUCTING A
TEMPORARY ICRA RATED PARTITIONS ALONG GRID 10
PHASE II - THE GOAL OF PHASE II IS TO BUILD OUT THE NEW
ADDITION COMPLETE, REMODEL THE EXISTING SPACE EAST
OF GRID 10 FOR FUTURE TEMPORAY USE BY PATIENTS AND
STAFF. THIA WILL PREPARE THE NEW MRI AND RELATED
CONTROL ROOM FOR USE BY PATIENTS WHILE OTHER
PORTIONS OF THE BUILDING ARE RENOVATED.
PHASE III - THE GOAL OF PHASE III IS TO RELOCATE THE
PATIENTS AND STAFF INTO THE NEW ADDITION AND
RENOVATED PORTION OF THE BUILDING EAST OF GRID 10,
WHILE THE PATIENT AREA WEST OF GRID 9 IS RENOVATED.
THE IV PREP, CHANGING ROOMS AND STAFF TOILET WILL BE
USED BY BOTH PATIENTS AND STAFF DURING THIS PHASE.
PHASE IV - THE GOAL OF PHASE IV IS TO MOVE THE
PATIENTS AND STAFF INTO THEIR NEW PERMANEMT
AREAS AND COMMPLETE THE FINISH WORK IN THE
HOLDING ROOM AND ADJACENT STAFF OFFICES.
TEMPORARY WALLS CONSTRUCTED BETWEEN
PHASES II AND III (COULD ALSO BE A NEW
PERMANENT WALL OR AN EXISTING PERMANENT
WALL USED AS TEMPORAY PARTITION)
TEMPORAY WALLS CONSTRUCTED BETWEEN
PHASES I AND II (COULD ALSO BE A NEW
PERMANENT WALL OR AN EXISTING PERMANENT
WALL USED AS TEMPORAY PARTITION)
PHASING LEGEND
PHASE I: THE GOAL OF PHASE I IS TO RELOCATE BUIDING OPERATIONS FROM THE EAST END OF THE
BUILDING INTO OTHER AREAS AND PREPARE THAT AREA TO CONSTRUCT THE NEW ADDITION.
1. SUBMIT CONSTRUCTION SCHEDULE, PHASING PLAN, WORK PLAN, HEALTH AND SAFETY
PLAN, AND SHOP DRAWINGS FOR TEMP. PARTITIONS, MATERIALS, AND FINISHES.
2. WORK TO BE DONE IN OFF HOURS TO ELIMINATE DISRUPTION OF MRI OPERATIONS.
3. MAKE MODIFICATIONS NECESSARY TO TEMPORARILY RELOCATE THE IV ROOM TO THE
EXISTING PATIENT WAITING ROOM.
A. MOVE CHAIRS INTO EXISTING CORRIDOR TO CREATE NEW PATIENT WAITING AREA
IN ALCOVE.
B. COVER RELIGHT WINDOW FROM WAITING ROOM TO CORRIDOR.
C. DO NOT BLOCK DOOR BETWEEN CORRIDOR AND WAITING ROOM AS THIS WILL BE
AN EMERGENCY EXIT.
D. MOVE 3 OMNI CELLS TO WAITING ROOM.
E. PROVIDE TEMPORARY MED GAS, NURSE CALL, & CODE BLUE SYSTEMS IN NEW
TEMPORARY IV ROOM.
4. REMOVE EXISTING ENTRY DOORS TO HOLDING ROOM AND PORTION OF THE PARTITIONS.
5. CONSTRUCT NEW WALL IN CORRIDOR 1 AND REINSTALL DOORS (100A), INCLUDING ALL
HARDWARE AND ELECTRONICS. PATIENTS WILL TEMPORARILY ENTER THE MRI SPACE
THROUGH THIS DOUBLE DOOR FROM THE EAST END OF THE CORRIDOR.
6. REMOVE WINDOW IN CORRIDOR TO INSTALL NEW EXIT DOOR (100B). SAWCUT PORTION OF
WALL BELOW SILL; INSTALL NEW DOOR AND FRAME; PROVIDE NEW CONCRETE LANDING
OUTSIDE OF DOOR.
7. INSTALL AIR CURTAIN OVER NEW EXIST DOOR (100B)
8. SUBMIT FOR REVIEW/ACCEPTANCE ELECTRICAL EQUIPMENT AND PADMOUNT
TRANSFORMER; ORDER LONG-LEAD ITEMS.
9. ENGAGE LOCATING SERVICES TO IDENTIFY UNDERGROUND UTILITIES IN THE PROJECT
AREA.
10. SHORE UP EXISTING PADMOUNT TRANSFORMER IN PREPRATION OF ADJACENT
EXCAVATIONS – HAND EXCAVATE TO EXPOSE, SUPPORT, AND PROTECT MRI SERVICE
ENTRANCE CONDUCTORS DURING CONSTRUCTION.
11. PREPARE PLAN FOR MAINTAINING AMBULANCE ACCESS TO HOSPITAL DURING
UNDERGROUND INSTALLATIONS – SUBMIT PLAN TO COR FOR REVIEW/APPROVAL.
12. INSTALL UNDERGROUND UTILITY VAULT IN THE AREA SOUTH OF THE ELECTRICAL ROOM TO
FACILITATE INSTALLATION OF SERVICE ENTRANCE CONDUCTORS FROM THE
TRANSFORMER SECONDARIES TO THE NEW SWITCHBOARD.
13. IDENTIFY DUCT STUB UP LOCATIONS FOR THE PRIMARY AND SECONDARY COMPARTMENTS
OF THE NEW PADMOUNT TRANSFORMER.
14. EXCAVATE AND INSTALL UNDERGROUND DUCTBANKS IN COORDINATION WITH
UNDERGROUND UTILITIES/SITE CONDITIONS, AND WORK OF OTHER TRADES.
15. STUB UP DUCTS AT EXISTING TRANSFORMER SECONDARY COMPARTMENT.
16. STUB UP DUCTS AT NEW PRIMARY COMPARTMENT FOR THE MEDIUM-VOLTAGE FEEDER.
TERMINATE SERVICE ENTRANCE DUCTS AT THE UTILITY VAULT NEAR THE ELECTRICAL
ROOM.
17. SEAL OPEN ENDS OF DUCTS WITH DUCT SEAL PUTTY.
18. BACKFILL/COMPACT EXCAVATIONS. PREPARE GRADE FOR TRANSFORMER PAD
INSTALLATION.
19. REMOVE/RELOCATE ELECTRICAL LIGHTING, DEVICES, AND EQUIPMENT AS REQUIRED TO
SUPPORT THE WORK OF PHASE I.
PHASE II: (GL-10 TO GL-12; GL-J TO GL-F) THE GOAL OF PHASE II IS TO CONSTRUCT THE ADDITION IN ITS
ENTIRETY AND GET THE NEW MRI SCANNER UP AND RUNNING, AND TO PROVIDE FUNCTIONAL
TEMPORARY SPACE TO MOVE THE PATIENT OPERATIONS INTO WHILE THE EXISTING PATIENT AREA IS
RENOVATED.
1. REMOVE SLIDING DOOR TO THE EXIT VESTIBULE. INFILL WALL WITH TEMPORARY PARTITION
WALL.
2. REMOVE DOUBLE DOORS TO IV ROOM AND INFILL WITH TEMP. PARTITION WALL, REMOVE
RELITE INTO CORRIDOR AND INFILL WITH TEMP. PARTITION WALL, REMOVE PARTITION
WALL, INCLUDING DOOR AND FRAME TO PATIENT TOILET ROOM.
3. REMOVE ALL TOILET ACCESSORIES, PLUMBING FIXTURES AND TRIM, AND LIGHTING
FIXTURES FROM EXISTING PATIENT TOILET ROOM. REMOVE TOILET ROOM SIDE OF CHASE
WALL. REMOVE GYPSUM BOARD CEILING.
4. DEMOLISH EXISTING PLUMBING FIXTURES AND ASSOCIATED DOMESTIC WATER AND VENT
PIPING. DEMOLISH EXHAUST GRILLE AND ASSOCIATED DUCTWORK.
5. REMOVE HAC CLOSET WALLS SEPARATING TOILET ROOM; REMOVE BUILT IN CASEWORK,
FLOORING AND CEILINGS FROM BOTH THE TOILET ROOM AND HAC ROOM.
6. DEMOLISH EXISTING MEDICAL GAS AREA ALARM PANEL. INSTALL NEW 6 ALARM MEDICAL
GAS AREA ALARM PANEL. COORDINATE ALARM OUTAGE WITH VA PRIOR TO REMOVAL OF
EXISTING AREA ALARM PANEL.
7. REMOVE ACOUSTICAL CEILING AND SUSPENSION SYSTEM FROM EXISTING IV PREP ROOM.
8. CAREFULLY REMOVE AND SALVAGE STAINLESS STEEL CASEWORK FROM IV PREP ROOM. A
PORTION OF THESE WILL BE REINSTALLED IN THE NEW TRAINING ROOM.
9. DEMOLISH ALL MEDICAL GAS AND DOMESTIC WATER PIPING SERVING IV PREP ROOM.
DEMOLISH EXISTING STAINLESS-STEEL SINK IN IV PREP ROOM. REMOVE AND SALVAGE
EXISTING MEDICAL GAS OUTLETS.
10. REMOVE EXTERIOR CANOPY AND RELATED STRUCTURAL COLUMNS AND FRAMING.
SALVAGE PATIENT LIFT AND TURN OVER TO THE VA.
11. REMOVE EXTERIOR SLIDING DOOR FROM EXISTING EXTERIOR WALL UNDER CANOPY.
12. CONSTRUCT NEW MRI ADDITION, COMPLETE, EXCEPT, DO NOT INSTALL WALLS TO
SEPARATE TRAINING ROOM, SOILED UTILITY, AND STORAGE ROOM. FINISH THIS SPACE TO
READY IT FOR USE AS THE IV REP ROOM DURING PHASE III.
13. COORDINATE EARTHWORK WITH THE EXISTING MRI SCHEDULE AND THE VA. WORK SHALL
BE DONE OFF HOURS AS THE VIBRATION FROM EXCAVATION AND COMPACTION WILL
AFFECT THE MRI.
14. INSTALL NEW HVAC SYSTEMS, I.E. DUCTWORK, GRILLES, AND VAV BOXES) IN MRI ADDITION.
15. INSTALL PLUMBING PIPING AND FIXTURES IN MRI ADDITION.
16. INSTALL MEDICAL GAS PIPING AND OUTLETS IN MRI ADDITION.
17. INSTALL NEW ROOFTOP UNIT, EXHAUST FAN, AND QUENCH VENT.
18. INSTALL CHW PIPING BETWEEN VENDOR PROVIDED AC UNIT IN EQUIPMENT ROOM AND
VENDOR PROVIDED ROOFTOP CHILLER.
19. PROVIDE TEMPORARY CONNECTIONS TO SUPPLY GRILLES IN TRAINING ROOM,
EQUIPMENT/STORAGE, AND CORRIDOR 4 FROM EXISTING VAV BOXES IN PHASE 3 AREA
20. RELOCATE EXISTING ELECTRICAL PANELS, EQUIPMENT, ETC. IN EXISTING EQUIPMENT
ROOM
21. CUT NEW OPENING BETWEEN EXISTING AND NEW EQUIPMENT ROOMS.
22. CONSTRUCT NEW OFFICES, CONTROL ROOM, STAFF TOILET, HAC CLOSET AND CORRIDOR
EAST OF GRID 10.
23. AFTER HOURS RELOCATE AND REVISE EXISTING DUCTWORK ABOVE FORMER IV PREP
ROOM. COORDINATE OUTAGE WITH VA PRIOR TO START OF WORK.
24. INSTALL NEW HVAC AND PLUMBING IN OFFICES, CONTROL ROOM, LOCKERS, STAFF TOILET, AND HAC/QT.
25. PROVIDE TEMPORARY CONNECTIONS TO SUPPLY DIFFUSERS IN LOCKERS, AND HAC/QT.
26. PERFORM TAB AND COMMISSIONING OF ALL HVAC SYSTEMS AND MEDICAL GASES SERVING
NEW MRI.
27. REMOVE/RELOCATE ELECTRICAL LIGHTING, DEVICES, AND EQUIPMENT AS REQUIRED TO
SUPPORT THE WORK OF PHASE II.
28. COORDINATE WITH FOUNDATION/FLOOR SLAB CONSTRUCTION TO STUB SERVICE
ENTRANCE CONDUITS FROM THE SWITCHBOARD LOCATION IN THE ELECTRICAL ROOM TO
THE UTILITY VAULT SOUTH OF THE ELECTRICAL ROOM.
29. POSITION NEW TRANSFORMER PAD OVER DUCT STUB UPS.
30. SET NEW TRANSFORMER ON CONCRETE PAD; ANCHOR IN PLACE.
31. INSTALL MEDIUM-VOLTAGE FEEDERS FROM PADMOUNT SWITCHES S-NORMAL AND S-
EMERGENCY TO THE PRIMARY COMPARTMENT OF THE NEW TRANSFORMER; TERMINATE
FEEDERS USING 15KV LOAD-BREAK ELBOWS.
32. PERFORM ACCEPTANCE TESTS ON MEDIUM-VOLTAGE FEEDER CONDUCTORS AND
TERMINATIONS; SUBMIT TEST RESULTS TO THE COR FOR REVIEW/ACCEPTANCE.
33. INSTALL NEW SWITCHBOARD.
34. STUB FEEDER CONDUITS FROM THE NEW SWITCHBOARD TO LOCATIONS CONVENIENT TO
INTERCEPTING/REFEEDING THE EXISTING MRI DISTRIBUTION PANELS.
35. INSTALL SERVICE ENTRANCE CONDUCTORS FROM NEW TRANSFORMER SECONDARY TO
ONE END OF THE DOUBLE-ENDED SWITCHBOARD; PERFORM CABLE TESTS; TERMINATE
CONDUCTORS.
36. INSTALL PANELBOARDS AND FEEDERS IN THE ELECTRICAL ROOM. PERFORM ACCAPTANCE
TESTS; SUBMIT TEST RESULTS TO THE COR FOR REVIEW/ACCEPTANCE.
37. ENERGIZE NEW SWITCHBOARD.
38. SCHEDULE TRANSITIONING OF THE EXISTING MRI DISTRIBUTION FEEDERS TO THE NEW
SWITCHBOARD.
39. SUBSEQUENT TO CUTOVER OF EXISTING MRI FEEDERS, CLOSE THE NEW SWITCHBOARD
TIE BREAKERS TO ENERGIZE THE PANELBOARDS.
40. DEENERGIZE THE EXISTING PADMOUNT TRANSFORMER; DISCONNECT AND REMOVE
EXISTING SERVICE CONDUCTORS.
41. INSTALL NEW SERVICE CONDUCTORS FROM EXISTING TRANSFORMER SECONDARY TO NEW
SWITCHBOARD. TEST AND TERMINATE CONDUCTORS. MAIN CIRCUIT BREAKER SHALL
REMAIN OPEN AT THIS STEP.
42. REENERGIZE EXISTING PADMOUNT TRANSFORMER.
43. SCHEDULE BRIEF POWER INTERRUPTION; OPEN THE NEW SWITCHBOARD TIE BREAKERS
AND CLOSE THE MAIN CIRCUIT BREAKER.
PHASING NOTES
1. THE ENTIRE AREA MUST REMIAN OPERATIONAL DURING THE
ENTIRE DEMOLITION AND CONSTRUCTION PERIOD.
2. CONTRACTOR SHALL PREPARE AND SUBMIT A FULL PHASING
PLAN INCLUDING NARRATIVES AND PLANS TO DESCRIBE FULLY
THE WORK PLANNED FOR EACH PHASE.
3. PACS, PA, WiFi, TELEMETRY, CAMERAS, NURSE CALL, T-MOBILE
ANTENNA, & CODE BLUE SYSTEMS MUST REMAIN OPERATIONAL
THROUGHOUT PROJECT.
PROPOSED PHASING PLAN
Pr oj ec t N um be r
Sheet Number
Pr oj ec t T itl e
Lo ca tio n
Issue Date:
Approved Drawn
Dr aw in g
Ti tle
Phase:
AR
CH
IT
EC
T/
EN
GI
NE
ER
O
F
RE
CO
RD
A/ E:
Seal
321 4 5 6 7 8
A/E Proj. No.
MA
NN
-G
RA
ND
ST
AF
F
VA
M ed ica l C en ter
N
. A ss em bl y, Sp ok an e, W
A
EN
GI
NE
ER
IN
G
PR
OJ
EC
TS
VA
MC
M
AI
N
OF
E:
9)
4-
FA
X:
9)
4-
Sheet OF
B lu e Tr id en t, LL
C
N
E E sp er io ne
L N
B ai nb ri dg e
Is la nd , W
A
PR
O
JE
C
T M
G R
: B ri an E
. M ol l P E
,S E
Ph
.7
.9
F
E
D
C
B
A
F
E
D
C
B
A
321 4 5 6 7 8 C
:\U se rs \la ur i\O ne D riv e\ d2 L-
Pr oj ec ts
\2
7-
1_
Sp ok an e
VA
M C
B
_1
M R
I\0 4-
D
ES
IG
N
\R
EV
IT
\2
7-
1_
-S
PK
N
B
M R
I A R
C H
.rv t
G102
PH
AS
ES
1-
2 P
LA
N
RE
NO
VA
TE
B
UI
LD
IN
G #2
7 T O
AD
D
NE
W
M
RI
A
SS
EM
BL
Y
ST
, S
PO
KA
NE
, W A
8-
CS
I-0
9/20/2023 la
LMS
ISSUED FOR CONSTRUCTION
21-0011
SCALE: 1/8" = 1'-0"F5 BLDG 27 MRI SUITE PHASING PLAN - DEMOLITION N
No
Da te
Re vis io n De sc rip
PHASE I - THE GOAL OF PHASE I IS TO MOVE THE
PATIENTS OUT OF THE IV PREP ROOM AND PREPARE THE
SOACES EAST OF GRID 10 FOR THE NEW CONSTRUCTION
IN THAT AREA. THIS WILL INCLUDE CREATING A
TEMPORARY IV PREP ROOM AND CONSTRUCTING A
TEMPORARY ICRA RATED PARTITIONS ALONG GRID 10
PHASE II - THE GOAL OF PHASE II IS TO BUILD OUT THE NEW
ADDITION COMPLETE, REMODEL THE EXISTING SPACE EAST
OF GRID 10 FOR FUTURE TEMPORAY USE BY PATIENTS AND
STAFF. THIA WILL PREPARE THE NEW MRI AND RELATED
CONTROL ROOM FOR USE BY PATIENTS WHILE OTHER
PORTIONS OF THE BUILDING ARE RENOVATED.
PHASE III - THE GOAL OF PHASE III IS TO RELOCATE THE
PATIENTS AND STAFF INTO THE NEW ADDITION AND
RENOVATED PORTION OF THE BUILDING EAST OF GRID 10,
WHILE THE PATIENT AREA WEST OF GRID 9 IS RENOVATED.
THE IV PREP, CHANGING ROOMS AND STAFF TOILET WILL BE
USED BY BOTH PATIENTS AND STAFF DURING THIS PHASE.
PHASE IV - THE GOAL OF PHASE IV IS TO MOVE THE
PATIENTS AND STAFF INTO THEIR NEW PERMANEMT
AREAS AND COMMPLETE THE FINISH WORK IN THE
HOLDING ROOM AND ADJACENT STAFF OFFICES.
TEMPORARY WALLS CONSTRUCTED BETWEEN
PHASES II AND III (COULD ALSO BE A NEW
PERMANENT WALL OR AN EXISTING PERMANENT
WALL USED AS TEMPORAY PARTITION)
TEMPORAY WALLS CONSTRUCTED BETWEEN
PHASES I AND II (COULD ALSO BE A NEW
PERMANENT WALL OR AN EXISTING PERMANENT
WALL USED AS TEMPORAY PARTITION)
PHASING LEGEND
PHASE III: (GL- 6 – GL-9, GL-J – GL-F) THE GOAL OF PHASE III IS TO RENOVATE THE EXISTING PATIENT AREA TO PROVIDE THE PERMANENT PROGRAMMED FUNCTIONS, AND ALLOW PATIENT OPERATIONS TO
MOVE BACK INTO THE SPACE.
1. DURING PHASE 3, THE NEWLY CONSTRUCTED PORTION OF THE BUILDING WILL BE USED
FOR PATIENTS. THE LOCKER ROOM AND HAC CLOSETS WILL SERVE AS CHANGING ROOMS.
THE CONSTRUCTED PORTION OF THE RADIOLOGISTS OFFICE WILL SERVE AS THE PATIENT
WAITING AREA. THE EAST SIDE OF THE EXISTING RECEPTION AREA WILL REMAIN
OPERATIONAL AS A RECEPTION AREA. THE COMPLETED PORTION OF THE SPACE BETWEEN
GRIDS E AND G AND GRIDS 11 - 13 WILL SERVE AS THE IV PREP AREA. THE NEW STAFF
TOILET WILL SERV BOTH PATIENTS AND STAFF DURING PHASE III.
2. DURING OFF HOURS, REMOVE PORTION OF EXISTING WALL AND TEMPORARY PARTITION
WALL ON GRID 10.
3. PROVIDE TEMPORARY MED GAS, NURSE CALL, & CODE BLUE SYSTEMS IN NEW TEMPORARY
I.V. ROOM
4. PROVIDE TEMP NURSE CALL IN PATIENT/STAFF TOILET & TEMP CHANGING ROOMS
5. CONSTRUCT A TEMPORARY PARTITION WALL DOWN CORRIDOR 1 TO CLOSE OFF THE SUITE
BETWEEN GRID 7 TO GRID 9. CORRIDOR SHALL NOT BE NARROWER THAN 7-0” CLEAR.
6. REMOVE DOORS TO EXISTING CONTROL ROOM. CONSTRUCT WALL TO NEW CONTROL
ROOM AND REINSTALL DOORS 130A INCLUDING ALL HARDWARE AND ELECTRONICS.
7. CONSTRUCT TEMPORARY PARTITION WALL ON GRID 9; CONSTRUCT PERMANENT WALL
ALONG GRID 9 TO DIVIDE EXISTING RECEPTION AREA, MAKING IT SMALLER. REMOVE ALL
BUILT-IN CASEWORK IN THE EXISTING RECEPTION AREA. THE ANGLED WALL NORTH AND
EAST OF THE ROOM ARE TO REMAIN THROUGH PHASE 3. MOVEABLE FURNITURE WILL BE
PLACED IN THE TEMPORARY RECEPTION SPACE.
8. RENOVATE MRI PATIENT SUITE, COMPLETE.
9. RENOVATE HVAC, PLUMBING, AND MEDICAL GAS SYSTEMS IN MRI PATIENT SUITE.
10. INSTALL NEW ROOFTOP EXHAUST FAN FOR CHANGING ROOMS.
11. AFTER HOURS REMOVE TEMPORARY CONNECTIONS TO SUPPLY DIFFUSERS AND MAKE
FINAL CONNECTIONS FROM VAV BOXES INSTALLED IN PHASE 2 TO SUPPLY DIFFUSERS.
12. REMOVE/RELOCATE ELECTRICAL LIGHTING, DEVICES, AND EQUIPMENT AS REQUIRED TO
SUPPORT THE WORK OF PHASE III.
13. DISCONNECT AND REMOVE THE LIFE SAFETY AND CRITICAL BRANCH PANELBOARDS
14. INTERCEPT THE LIFE SAFETY AND CRITICAL BRANCH FEEDERS AND EXTEND TO THE NEW
LIFE SAFETY AND CRITICAL BRANCH PANELBOARDS IN THE NEW ELECTRICAL ROOM.
15. INSTALL NEW LIGHTING, DEVICES, AND EQUIPMENT PER THE DRAWINGS.
16. PERFORM ACCEPTANCE AND RECEPTACLE TESTS. SUBMIT TEST RESULTS TO COR FOR
REVIEW/ACCEPTANCE.
PHASING NOTESPROPOSED PHASING PLAN
PHASE IV: (GL-9 TO GL-10; GL-J TO GL-F) THE GOAL OF PHASE IV IS TO COMPLETE THE FINISHES AND CLEAN THE LAST FEW AREAS TO HAVE A FULLY FUNCTIONING MRI SUITE WITH BOTH SCANNERS
OPERATIONS.
1. DURING PHASE IV, THE NEWLY RENOVATED PORTION OF THE BUILDING WILL BE OPENED UP
FOR FULL USE BY PATIENTS AND STAFF.
2. DURING OFF HOURS, REMOVE THE TEMPORARY PARTITIONS IN THE CORRIDOR AND ALONG
GRID 9.
3. REMOVE THE ANGLED WALL AROUND THE RECEPTION AREA.
4. CONSTRUCT THE WALLS TO COMPLETE THE 2 OFFICES AND HOLDING ROOMS.
5. CONSTRUCT THE WALLS AND INSTALL DOORS TO CREATE THE TRAINING ROOM,
EQUIPMENT STORAGE ROOM, AND SOILED UTILITY ROOMS, COMPLETE.
6. INSTALL FLOOR, WALL, AND CEILING FINISHES IN THESE SPACES DURING OFF HOURS.
ENSURE THE SPACE IS SECURE FOR PATIENT MOVEMENT DURING OPERATING HOURS.
7. CUT OPENING AND CONSTRUCT KNOCK OUT PANEL AT EXISTING MRI EAST WALL. (THIS CAN
BE DONE ANYTIME ONCE NEW MRI IS FULLY CERTIFIED AND OPERATIONAL.) VERIFY WITH
SIEMENS AND VA WHETHER THE VIBRATIONS FROM THE SAWCUTTING AND DRILLING FOR
EPOXY ANCHORS WILL AFFECT THE NEW MRI. OFF HOURS MAY BE REQUIRED FOR SOME OF
THIS WORK.
8. PROVIDE FULL TAB AND CX OF PHASE 2 HVAC WORK NOT PERFORMED IN PHASE 2 AND OF
ALL PHASE 3 HVAC WORK.
9. CLEAN PANELBOARDS AND ELECTRICAL EQUIPMENT TO REMOVE DUST AND
CONSTRUCTION DEBRIS.
10. PERFORM ACCEPTANCE TESTS AND RECEPTACLE TESTS AS SPECIFIED. SUBMIT TEST
RESULTS TO COR FOR REVIEW/ACCEPTANCE.
1. THE ENTIRE AREA MUST REMIAN OPERATIONAL DURING THE
ENTIRE DEMOLITION AND CONSTRUCTION PERIOD.
2. CONTRACTOR SHALL PREPARE AND SUBMIT A FULL PHASING
PLAN INCLUDING NARRATIVES AND PLANS TO DESCRIBE FULLY
THE WORK PLANNED FOR EACH PHASE.
3. PACS, PA, WiFi, TELEMETRY, CAMERAS, NURSE CALL, T-MOBILE
ANTENNA, & CODE BLUE SYSTEMS MUST REMAIN OPERATIONAL
THROUGHOUT PROJECT.
TEMP RECEPTION
PHASE III
TEMP WAITING
PHASE III
TEMP
CHANGE
ROOM
PH. III
TEMP CHG
RM PH.III
PNT &
STAFF
TOILET
PH.III
TEMP IV
PREP PH III
PATIENT
FLOW PH III
DO NOT INSTALL WALLS, DOORS, OR
FINISHES DURING DURING PHASE II,
AS THIS WILL BE USED FOR IV PREP
DURING PHASE III.
J
H G F EKL
D
Pr oj ec t N um be r
Sheet Number
Pr oj ec t T itl e
Lo ca tio n
Issue Date:
Approved Drawn
Dr aw in g
Ti tle
Phase:
AR
CH
IT
EC
T/
EN
GI
NE
ER
O
F
RE
CO
RD
A/ E:
Seal
321 4 5 6 7 8
A/E Proj. No.
MA
NN
-G
RA
ND
ST
AF
F
VA
M ed ica l C en ter
N
. A ss em bl y, Sp ok an e, W
A
EN
GI
NE
ER
IN
G
PR
OJ
EC
TS
VA
MC
M
AI
N
OF
E:
9)
4-
FA
X:
9)
4-
Sheet OF
B lu e Tr id en t, LL
C
N
E E sp er io ne
L N
B ai nb ri dg e
Is la nd , W
A
PR
O
JE
C
T M
G R
: B ri an E
. M ol l P E
,S E
Ph
.7
.9
F
E
D
C
B
A
F
E
D
C
B
A
321 4 5 6 7 8 C
:\U se rs \la ur i\O ne D riv e\ d2 L-
Pr oj ec ts
\2
7-
1_
Sp ok an e
VA
M C
B
_1
M R
I\0 4-
D
ES
IG
N
\R
EV
IT
\2
7-
1_
-S
PK
N
B
M R
I A R
C H
.rv t
G103
PH
AS
ES
3-
4 P
LA
N
RE
NO
VA
TE
B
UI
LD
IN
G #2
7 T O
AD
D
NE
W
M
RI
A
SS
EM
BL
Y
ST
, S
PO
KA
NE
, W A
8-
CS
I-0
9/20/2023
LA
lms
ISSUED FOR CONSTRUCTION
21-0011
SCALE: 1/8" = 1'-0"F4 BLDG 27 MRI SUITE PHASING PLAN - NEW CONSTRUCTION N
No
Da te
Re vis io n De sc rip
T
T
T
T
T
T
T
T
T
DN
PROJECT
WORK AREA
BUILDING FOOTPRINT
BLDG 1
BLDG 27
N
BLDG 7
SMOKE LIMITING
CORRIDORS, NON RATED
1-HR WALL, 45-MINUTE
OPENINGS REQ'D
2-HR SHAFT ENCLOSURE
OR 2-HR FIRE BARRIER/
SMOKE BARRIER WALL; 90
MINUTES OPENINGS REQ'D
EXISTING AREA TO REMAIN
LIFE/SAFETY LEGEND
EXIT FROM BUILDING OR
SPACE - A NUMBER
INDICATES THE
CALCULATED
ACCUMULATED LOAD AT
THAT ROOM OR BUILDING
EXIT - ARROW INDICATES
DIRECTION
EXIT ROUTE
FE/FEC
1-HR WALL, 20-MINUTE
OPENINGS REQ'D
EXIT
STAIR
FROM
BSMT
MRI
ENTRY
B27
EXIT
CORR 1
1C1-27
WAITING
174CORR 2
1C2-27
WTNG ALCV
RECEPTION
OFFICE
TOILET
CH2
175B
LINEN
CH3
175C
CH1
175A
IV PREP
HOLDING
EXG CONTROL
185A
EXG MRI
EXG EQPT
MRI SPRVSR
OFFICE
CORR. 4
1C4-27
RADIOLOGIST
OFFICE
LKR
STAFF TLT
SOILED UTIL
EQPT/STOR
HAC/QT
CONTROL ROOM
182A
NEW EQPT
188 MRI
TRAINING CONF
EXG CLO
187A
ASDU
171A
MED PREP
CFS 60 DIAM
CORR. 5
1C5-27
CFS 'T'
CORR. 3
1C3-27
VEST
B7 FIN
FLOOR
1905.6
ELECT
189 72'
65'14'
33'
28'
50'
32'
40'
6'
J
H G F EKL
D
FEC
Legend
ZONE 1
ZONE 2
ZONE 3
ZONE 4
Pr oj ec t N um be r
Sheet Number
Pr oj ec t T itl e
Lo ca tio n
Issue Date:
Approved Drawn
Dr aw in g
Ti tle
Phase:
AR
CH
IT
EC
T/
EN
GI
NE
ER
O
F
RE
CO
RD
A/ E:
Seal
321 4 5 6 7 8
A/E Proj. No.
MA
NN
-G
RA
ND
ST
AF
F
VA
M ed ica l C en ter
N
. A ss em bl y, Sp ok an e, W
A
EN
GI
NE
ER
IN
G
PR
OJ
EC
TS
VA
MC
M
AI
N
OF
E:
9)
4-
FA
X:
9)
4-
Sheet OF
B lu e Tr id en t, LL
C
N
E E sp er io ne
L N
B ai nb ri dg e
Is la nd , W
A
PR
O
JE
C
T M
G R
: B ri an E
. M ol l P E
,S E
Ph
.7
.9
F
E
D
C
B
A
F
E
D
C
B
A
321 4 5 6 7 8 C
:\U se rs \la ur i\O ne D riv e\ d2 L-
Pr oj ec ts
\2
7-
1_
Sp ok an e
VA
M C
B
_1
M R
I\0 4-
D
ES
IG
N
\R
EV
IT
\2
7-
1_
-S
PK
N
B
M R
I A R
C H
.rv t
G104
CO
DE
PL
AN
RE
NO
VA
TE
B
UI
LD
IN
G #2
7 T O
AD
D
NE
W
M
RI
A
SS
EM
BL
Y
ST
, S
PO
KA
NE
, W A
8-
CS
I-0
9/20/2023
LA
lms
ISSUED FOR CONSTRUCTION
21-0011
SCALE: 1" = 100'-0"
KEY PLAN
SCALE: 1/8" = 1'-0"F4 BLDG 27 MRI SUITE CODE PLAN
SCALE: 3/32" = 1'-0"F1 BLDG 27 MRI SUITE ZONE PLAN
OCCUPANCY CALCULATIONS
RM
NUM ROOM NAME
NET
AREA
OCC
FACT
OC
CS
1C1-27 CORR 1 238 SF 0.0
1C2-27 CORR 2 201 SF 0.0
1C3-27 CORR. 3 72 SF
1C4-27 CORR. 4 88 SF
1C5-27 CORR. 5 33 SF
135B MRI CLO 10 SF 300.0 1
170 OFFICE 97 SF 100.0 1
171 IV PREP 160 SF 100.0 2
171A ASDU 55 SF 100.0 1
172 RECEPTION 132 SF 100.0 2
173 WTNG ALCV 23 SF 50.0 1
174 WAITING 139 SF 100.0 2
175A CH1 27 SF 50.0 1
175B CH2 29 SF 50.0 1
175C CH3 40 SF 50.0 1
176 O2 11 SF 300.0 1
177 LINEN 64 SF 300.0 1
178 TOILET 63 SF
180 HOLDING 322 SF 100.0 4
181 MRI SPRVSR OFFICE 96 SF 100.0 1
182 VEST 60 SF
182A CONTROL ROOM 332 SF 100.0 4
184 MRI 587 SF 100.0 6
185 MED PREP 83 SF 100.0 1
185A EXG CONTROL 265 SF 100.0 3
186 EXG EQPT 182 SF 300.0 1
187 EXG MRI 405 SF 100.0 5
187A EXG CLO 16 SF 300.0 1
188 NEW EQPT 205 SF 300.0 1
189 ELECT 126 SF 300.0 1
190 RADIOLOGIST OFFICE 156 SF 100.0 2
191 HAC/QT 65 SF 300.0 1
192 LKR 32 SF 100.0 1
193 STAFF TLT 57 SF
194 SOILED UTIL 57 SF 300.0 1
195 TRAINING CONF 142 SF 40.0 4
196 EQPT/STOR 103 SF 300.0 1
No
Da te
Re vis io n De sc rip
W V
W V
W V
W V
W V
W V
H
Y D
H
Y D
W V
WV
W V
W V
W V
W V
W V
W V
H
Y D
H
Y D
W V
WV
BUILDING 27
FFE: (1908.6)
BUILDING 7
FFE: (1905.7)
EX SEWER MH
EX STORM MH
EX ELEC VAULTS
EX IRR VAULTS
EX WATER VALVE
EX HYDRANT
EX HYDRANT
EX LIGHT
EX WATER VALVE
EX SIDEWALK
EX PIV AND
VALVE
P
4 4 P
P P
P
P
P
P
P
P
2 2
2 2
P
EX CANOPYP
6 6
EX ELEC
HANDHOLE 6
EX CANOPYP
EX FDC AND PIV P
EX SIGNP
EX SIGNP
EX WATER P
EX WATER PEX WATER P
EX WATER P
EX ELEC P
EX ELEC P
EX ELEC P
EX SEWER P
3 SIGN "A"
3 SIGN "B"
3 SIGN "C"
3 SIGN "D"
EX ELEC
VAULTP
LIMITS OF DEMOLITION
LIMITS OF DEMOLITION
LIMITS OF DEMOLITION
LIMITS OF DEMOLITION
LIMITS OF DEMOLITION
EX WATER VALVES P
LIMITS OF DEMOLITION
EX WATER7
REMOVE SIDEWALK TO
NEAREST CONSTRUCTION JOINT2
3SIGN "E"
EX IRR VAULT P
CURB AND
GUTTER ONLY
W V
D
Y H
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
H Y
D
H
Y
D
W V
W V
W
VW
V
W V
WV
W V
D
Y H
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
H Y
D
H
Y
D
W V
W V
W
VW
V
W V
WV
Pr oj ec t N um be r
Sheet Number
Pr oj ec t T itl e
Lo ca tio n
Issue Date:
Approved Drawn
Dr aw in g
Ti tle
Phase:
AR
CH
IT
EC
T/
EN
GI
NE
ER
O
F
RE
CO
RD
A/ E:
Seal
321 4 5 6 7 8
A/E's Proj. No.
MA
NN
-G
RA
ND
ST
AF
F
VA
M ed ica l C en ter
N
. A ss em bl y, Sp ok an e, W
A
EN
GI
NE
ER
IN
G
PR
OJ
EC
TS
VA
MC
M
AI
N
OF
FI
CE
PH
ON
E:
9)
4-
FA
X:
9)
4-
B lu e Tr id en t, LL
C
N
E E sp er io ne
L N
B ai nb ri dg e
Is la nd , W
A
PR
O
JE
C
T M
G R
: B ri an E
. M ol l P E
,S E
Ph
.7
.9
Ex pa nd an d R en ov ate
B ldg fo r A dd itio na l M
RI
Ma nn
-G ra nd sta ff V A
Me dic al Ce nte r, Sp ok an e, W A
8-
CS
I-0
DFK
DEG
21-0011
B& S&B CHRIST CONSULTING, LLCS
CCCC
OPS RESEARCH, A/E & ENVIRONMENTAL SERVICES
9555 HILLWOOD DRIVE, SUITE 160
LAS VEGAS, NV 89134
OFFICE (702) 202-6004
PRO
FE
SS
IO
NA
L ENGI NEER- STATE
OF
NEVADA
NO. 021134
DANIEL
CIVIL
KELLEY
Exp. 06-30-25
OF 131
CR101
RE
MO
VA
L P
LA
N
DEMOLITION/REMOVAL NOTES
PROTECT IN PLACE
REMOVE EXISTING AC PAVEMENT
REMOVE EXISTING SIDEWALK, CURB & GUTTER
REMOVE EXISTING SIGNS. SEE SIGNAGE TABLE BELOW AND SHEET C102 FOR
RELOCATION.
SAWCUT EXISTING CONCRETE/AC PAVEMENT
NOT USED.
REMOVE EXISTING BOLLARD LIGHTING. SEE ELECTRICAL SITE PLAN DEMO
(ESD101)
EX WATER LINE TO BE REROUTED. SEE SITE PLAN FOR DETAILS AND
PHASING.
RELOCATE DOOR ACCESS POST. SEE ELECTRICAL SHEETS.
P
SIGNAGE
SIGN "A" "AMBULANCE ENTRANCE" - TO BE RELOCATED
SIGN "B" "NO PARKING" - SALVAGE AND RETURN TO VA
SIGN "C" "DO NOT ENTER" - SALVAGE AND RETURN TO VA
SIGN "D" "OUTPATIENT CLINIC/MAIN ENTRANCE/URGENT CARE" - SALVAGE AND
RETURN TO VA
SIGN "E" "NO PARKING" - TO BE RELOCATED
PR
O
JEC
T
LO
C
ATIO
N
BLD
G
BLD
G
BENCHMARK
GPS 32291-72
A FOUND RIVET WSDOT BRASS DISK IN THE SOUTHWESTERLY
SIDEWALK OF DRISCALL BLVD. APPROXIMATELY 220 FEET SOUTHEAST
OF THE INTERSECTION OF N ASSEMBLY STREET.
ELEVATION (METERS) = 578.242 (NAVD 88)
ELEVATION (FEET) = 1,897.116 (NAVD 88)
BASIS OF BEARINGS
NORTH 02°23'00" WEST BETWEEN A FOUND ALUMINUM CAP AT THE SE
QUARTER SECTION 34 AT INTERSECTION OF N ASSEMBLY STREET AND
E WELLESLEY AVENUE, AND A FOUND ALUMINUM CAP AT THE EAST
QUARTER SECTION 34 INN ASSEMBLY STREET BETWEEN W ROMAN
AVENUE AND W SANSON AVENUE, DETERMINED BY GPS METHODS,
WASHINGTON STATE PLANE COORDINATES, NORTH ZONE, NAD83.
DEMOLITION NOTES:
1. EXISTING UTILITIES SHOWN ARE FROM BEST AVAILABLE
INFORMATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY LOCATIONS AND ELEVATIONS OF ALL UTILITIES
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. IF
CONFLICTS ARE ENCOUNTERED, THE CONTRACTOR IS TO NOTIFY
THE COR AND PROJECT ENGINEER IMMEDIATELY.
2. UNLESS OTHERWISE INDICATED, ALL SURFACE FEATURES AND
UTILITY INFRASTRUCTURE TO BE PROTECTED IN PLACE.
3. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO
EXISTING FEATURES, STRUCTURES, OR UTILITIES TO REMAIN.
CONTRACTOR SHALL MATCH OR EXCEED CURRENT CONDITION
OF THOSE FEATURES OR UTILITIES TO REMAIN.
4. CONTRACTOR SHALL MAINTAIN THE SITE FREE OF TRASH AND
DEBRIS. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL
OF TRASH AND DEBRIS DAILY. NO TRASH OR DEBRIS SHALL BE
DISPOSED OF ONSITE.
5. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO
PROTECT ROOT SYSTEMS OF SHRUBS, PLANTS, AND TREES TO
REMAIN.
ISSUED FOR CONSTRUCTION
09/20/2023
D
Y H
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
H Y
D
H
Y
D
W V
W V
W
VW
V
W V
WV
W V
W V
W V
W V
W V
W V
H
Y D
H
Y D
W V
WV
EX SSMH
5 EX PIV
AND FDC
5EX IRRIGATION
VALVES
P
EX SEWER MH
P EX FIRE
HYDRANT
MATCH
EX CURB
RAMP
DOWN
10' TRANSITION
ZERO-FACE TO
"L" CURB
' T
R
AN
SI
TI
O N
ZE
R
O -F
AC
E
TO
"L
" C U
R B
5 EX COMM
VAULTS
5EX WATER
VALVE5EX HYDRANT
5EX STORM
DRAIN MANHOLE
PEX LIGHT
P EX SIGN
EX PIV
AND FDC
5EX WATER
VALVE
50-FT
STANDOFF
NEW MRI 3-GAUSS LINE
25-FT OFFET
BUILDING 27
FFE: (1908.6)
BUILDING 7
FFE: (1905.7)
7 SIGN "C"
7 SIGN "A"
PLACE CURB SO
THAT SDMH LID
CAN BE REMOVED
6.3'
SW
HANDRAILS
FOR ADA
RAMPS SEE
ARCH SHEET
5EX WATER
VALVES
6 TYP
4' M
AX
4'MAX
7 SIGN "E"
5 EX IRRIGATION
VALVE
4'
TYP
15 TYP
15 TYP
P
NEW MRI
3-GAUSS LINE
5.25'
EX MRI
3-GAUSS LINE
(10' x 15')
EX MRI MAGNET MOVING
SENSITIVITY LINE
(15.5' x 24.6')
19EX GRATE
AND VALVE
RAMPDOWN
17 NEW HYDRAULIC
PUMPING UNIT
NEW ELEC
MANHOLE
17 EX
TRANFORMER
17EX ELEC
DUCT
17NEW ELEC
DUCT
17EX ELEC
17 NEW INDUCTION
LOOP
17NEW INDUCTION
LOOP
P
17 NEW TRANFORMER
SEE DTL 7, SHT CD501 FOR
TRANSFORMER SLAB
17NEW ELEC
DUCT
EX COMM VAULT
REMOVED AS PART OF
VA PROJECT 668-21-111
17 NEW
ELEC
17NEW
ELEC
17NEW
ELEC
PEX SIGN
R
AM
P D
O W
N
P
HANDRAILS
FOR ADA
RAMPS SEE
ARCH SHEET
6.3'
SW
ENCASE THE COLUMN
WITH 3-INCHES OF
CONCRETE TO 1-INCH
ABOVE FINISHED GRADE
HANDRAILS
FOR ADA
RAMPS SEE
ARCH SHEET
5.
0'
SW
MATCH
EX SW MATCH
EX SW
5.0
SW
MATCH
EX SW
MATCH
EX SW MATCH
EX SW
ST
EP
S
8" CONC RETAINING WALL,
SEE ARCH.
Pr oj ec t N um be r
Sheet Number
Pr oj ec t T itl e
Lo ca tio n
Issue Date:
Approved Drawn
Dr aw in g
Ti tle
Phase:
AR
CH
IT
EC
T/
EN
GI
NE
ER
O
F
RE
CO
RD
A/ E:
Seal
321 4 5 6 7 8
A/E's Proj. No.
MA
NN
-G
RA
ND
ST
AF
F
VA
M ed ica l C en ter
N
. A ss em bl y, Sp ok an e, W
A
EN
GI
NE
ER
IN
G
PR
OJ
EC
TS
VA
MC
M
AI
N
OF
FI
CE
PH
ON
E:
9)
4-
FA
X:
9)
4-
B lu e Tr id en t, LL
C
N
E E sp er io ne
L N
B ai nb ri dg e
Is la nd , W
A
PR
O
JE
C
T M
G R
: B ri an E
. M ol l P E
,S E
Ph
.7
.9
Ex pa nd an d R en ov ate
B ldg fo r A dd itio na l M
RI
Ma nn
-G ra nd sta ff V A
Me dic al Ce nte r, Sp ok an e, W A
8-
CS
I-0
DFK
DEG
21-0011
B& S&B CHRIST CONSULTING, LLCS
CCCC
OPS RESEARCH, A/E & ENVIRONMENTAL SERVICES
9555 HILLWOOD DRIVE, SUITE 160
LAS VEGAS, NV 89134
OFFICE (702) 202-6004
PRO
FE
SS
IO
NA
L ENGI NEER- STATE
OF
NEVADA
NO. 021134
DANIEL
CIVIL
KELLEY
Exp. 06-30-25
OF 131
C101
SIT
E P
LA
N
PR
O
JEC
T
LO
C
ATIO
N
BLD
G
BLD
G
SITE NOTES
PROTECT IN PLACE
INSTALL "L" CURB PER DTL 1, SHT CD501
INSTALL ZERO-FACE CURB PER DTL 1, SHT CD501
TRANSITION FROM ZERO-FACE TO "L" CURB
INSTALL SIDEWALK PER DTL 3, SHT CD501
ADJUST TO BE FLUSH WITH FINISHED GRADE.
HYDRAULIC BOLLARDS AT 4-FT SPACING, SEE ELECTRICAL SHEETS
INSTALL SIGN PER DTL 6, SHT CD501
INSTALL CURB ACCESS RAMP PER DTL 2, SHT CD501
INSTALL INLINE 6" GATE VALVE (TEMPORARY). PER THRUST BLOCK DTL 4, SHT
CD502 SEE WATER LINE NOTE.
INSTALL WET TAP PER DTL 2 SHT CD502. SEE WATER LINE NOTE.
INSTALL NEW 6" C900 PVC WATER LINE PER DTL 3, SHT CD502. SEE WATER
LINE NOTE.
CUT AND CAP WATER WITH THRUST BLOCK PER DTL 1, SHT CD502. SEE
WATER LINE NOTE.
INSTALL CROSSWALK PER DTL 5, SHT CD501
INSTALL LANDSCAPE CURB PER DTL 1, SHT CD501
3.5' TALL BY 8' LONG CONCRETE BARRIER With REFLECTIVE TAPE
(ASTM-D-4061)
INSTALL AC PAVEMENT PER DTL 4, SHT CD501
ELECTRICAL INFRASTRUCTURE, SEE ELECTRICAL SHEETS
INSTALL CONCRETE SIDEWALK PER DTL 7, SHT CD501
ADJUST TO BE FLUSH WITH FINISHED GRADE. REPLACE GRATE WITH
ADA/PEDESTRIAN PROOF 18"X24" "TWS" LOCKING FRAME AND GRATE
(OLYMPIC FOUNDRY PART NO. SM50TWS D/T, OR APPROVED EQUAL)
INSTALL CONCRETE FILLED BOLLARD PER DTL 5, SHT CD502
P
SIGNAGE
SIGN "A" "AMBULANCE ENTRANCE"
SIGN "C" "DO NOT ENTER"
SIGN "E" "NO PARKING"
WATER LINE NOTE:
AVAILABLE RECORDS INDICATE THE EXISTING WATER LINE IS 6-INCHES.
CONTRACTOR TO FIELD VERIFY PIPE DIAMETER AND MATERIAL. NEW WATER LINE,
FITTINGS, AND VALVES TO MATCH EXISTING WATER LINE DIAMETER. PROVIDE
APPROPRIATE COUPLINGS AT NEW AND EXISTING PIPE CONNECTIONS.
PRIOR TO ANY UTILITY OUTAGES, CONTRACTOR SHALL COORDINATE WITH
CONTRACTING OFFICER. CLEARANCE IS REQUIRED PRIOR TO START OF
DEMOLITION. CONTRACTOR SHALL SUBMIT WRITTEN NOTIFICATION NOT LESS THAN
28 CALENDAR DAYS IN ADVANCE OF EACH INTERRUPTION. NO SINGLE UTILITY
OUTAGE SHALL EXCEED FOUR (4) HOURS AT A TIME OR MORE THAN ONCE IN A
2-WEEK PERIOD UNLESS APPROVED IN WRITING BY THE CONTRACTING OFFICER.
CONSTRUCTION TO BE PERFORMED IN THE FOLLOWING ORDER:
1. INSTALL IN-LINE (TEMPORARY) GATE VALVES IN OPEN POSITION.
2. WET TAP EXISTING LINE FOR NEW CONNECTION AND CONSTRUCT NEW
WATER LINE.
3. ONCE NEW WATER LINE AND APPURTENANCES HAVE BEEN TESTED AND
ACCEPTED, REROUTE WATER TO NEW LINE AND CLOSE IN-LINE (TEMPORARY)
GATE VALVES.
4. ABANDON IN-LINE (TEMPORARY) VALVES IN THE CLOSED POSITION. REMOVE
THE TOP 24-INCHES OF THE VALVE BOX AND THEN FILL THE BOTTOM OF THE
BOX WITH A MINIMUM OF 8-INCHES OF SAND OR TYPE-II AGGREGATE BASE.
THE REMAINING PORTION OF THE VALVE BOX SHALL BE FILLED WITH
CONCRETE. CUT AND CAP THE ABANDONED LINE WITHIN 1-FT OF THE
ABANDONED VALVE.
BENCHMARK
GPS 32291-72
A FOUND RIVET WSDOT BRASS DISK IN THE SOUTHWESTERLY SIDEWALK OF
DRISCALL BLVD. APPROXIMATELY 220 FEET SOUTHEAST OF THE INTERSECTION OF
N ASSEMBLY STREET.
ELEVATION (METERS) = 578.242 (NAVD 88)
ELEVATION (FEET) = 1,897.116 (NAVD 88)
BASIS OF BEARINGS
NORTH 02°23'00" WEST BETWEEN A FOUND ALUMINUM CAP AT THE SE QUARTER
SECTION 34 AT INTERSECTION OF N ASSEMBLY STREET AND E WELLESLEY
AVENUE, AND A FOUND ALUMINUM CAP AT THE EAST QUARTER SECTION 34 INN
ASSEMBLY STREET BETWEEN W ROMAN AVENUE AND W SANSON AVENUE,
DETERMINED BY GPS METHODS, WASHINGTON STATE PLANE COORDINATES,
NORTH ZONE, NAD83. 09/20/2023
ISSUED FOR CONSTRUCTION
(1905)
(1906)
(1907)
(1908)
(1
4)
(1905)
(1
5)
(1
6)
(1
7)
(1906)
(1907)
(1
8)
(1905)
(1
7)
(1908)
(1909)
(1907)
(1906)
(1906)
(1
7)
(1905)
BASEMENT
EG: (1896.7)
FREEDOM WAY
50-FT
STANDOFF
3-GAUSS LINE
25-FT OFFET
SW:1908.08
MATCH EX
SW:1908.21
MATCH EX
TC:1908.28
MATCH EX
TC:1908.12
MATCH EX
TRANSITION TO
ZERO-FACE CURB
MAINTAIN FLOWLINE
TRANSITION TO
ZERO-FACE CURB
10' TRANSITION
ZERO-FACE TO
"L" CURB
' T
R
AN
SI
TI
O N
ZE
R
O -F
AC
E
TO
"L
" C U
R B
BUILDING 27
FFE: (1908.6)
BUILDING 7
FFE: (1905.7)
3-GAUSS LINE
2% M
AX
EXISTING STORM
DRAIN GRATE.
PROTECT IN PLACE
AC:1907.91
MATCH EX
AC:1907.74
MATCH EX
AC:1905.62
MATCH EX
AC:1907.02
MATCH EX
AC:1907.10
MATCH EX
AC:1906.84
MATCH EX
AC:1906.75
MATCH EX
AC:1905.49
MATCH EX
TC:1907.15
MATCH EX
TC:1907.12
MATCH EX
SW:1907.31
MATCH EX
SW:1907.35
MATCH EX
W V
W V
W V
W V
W V
W V
H
Y D
H
Y D
W V
WV
MAINTAIN
FLOWLINE
(1907)
(1908)
(1
4)
(1908)
SW:1908.59
MATCH EX
SW:1908.61
MATCH EX
ZERO-FACE CURB
5.25'
EX MRI
3-GAUSS LINE
(10' x 15')
EX MRI MAGNET MOVING
SENSITIVITY LINE
(15.5' x 24.6')
SW:1908.59
MATCH EX
SW:1908.55
MATCH EX
SW:MATCH EX
SW:MATCH EX
SW:1908.75
MATCH EXSW:1908.73
MATCH EX
TRANSFORMER SLAB
PER DTL 7, SHT CD501
SW:1905.69
STEP:1908.55
SW:1908.55
-4 .9
-5.0%
-2 .9
SW:1907.00
TC:1906.73
SW:1906.22
SW:1906.31
SW:1905.30
SW:1905.20
TC:1906.19
SW:1905.69
SW:1908.55
SW:1908.03
SW:1908.11
MATCH EX
SW:1908.13
MATCH EX
SW:1908.20SW:1908.50
SW:1908.22
SW:1905.43
SW:1904.80
MATCH EX
SW:1904.70
MATCH EX
RAMP DOWN
R
AM
P D
O W
N
SW:1904.34
MATCH EX
SW:1903.93
MATCH EX
TC:1908.30
SW:1908.17
SW:1908.43
SW:1908.30SW:1908.16
SW:1908.37
MATCH EX
SW:1908.57
MATCH EX
SW:1908.34
SW:1908.19 TC:1908.20SW:1907.99
MATCH EX
SW:1908.02
MATCH EX
SW:1908.06
FG: 1908.60
SW:1907.60
AC:1903.44
MATCH EX
TC:1903.82
MATCH EX
AC:1906.71
MATCH EX
TC:1907.15
MATCH EX
SW:1908.04
TC:1906.12
SW:1905.62
SW:1905.00
SW:1905.10
SW:1905.20
SW:1906.96
MATCH EX
-6.0%
TC:1906.12
SW:1905.62
SW:1905.60
MATCH EX
SW:1905.44
MATCH EX
SW:1908.50
1908 1908
1905.00
RAMP DOWN
SW:1907.00
MATCH EX
SW:1908.55
STEP:1906.80
STEP:1907.40
STEP:1908.00
SW:1908.37
MATCH EX
SW:1908.33
MATCH EX
BUILDING 4
BUILDING 7
MEMORIAL CIRCLE
FREEDOM WAY
W V
D
Y H
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
H Y
D
H
Y
D
W V
W V
W
VW
V
W V
WV
Pr oj ec t N um be r
Sheet Number
Pr oj ec t T itl e
Lo ca tio n
Issue Date:
Approved Drawn
Dr aw in g
Ti tle
Phase:
AR
CH
IT
EC
T/
EN
GI
NE
ER
O
F
RE
CO
RD
A/ E:
Seal
321 4 5 6 7 8
A/E's Proj. No.
MA
NN
-G
RA
ND
ST
AF
F
VA
M ed ica l C en ter
N
. A ss em bl y, Sp ok an e, W
A
EN
GI
NE
ER
IN
G
PR
OJ
EC
TS
VA
MC
M
AI
N
OF
FI
CE
PH
ON
E:
9)
4-
FA
X:
9)
4-
B lu e Tr id en t, LL
C
N
E E sp er io ne
L N
B ai nb ri dg e
Is la nd , W
A
PR
O
JE
C
T M
G R
: B ri an E
. M ol l P E
,S E
Ph
.7
.9
Ex pa nd an d R en ov ate
B ldg fo r A dd itio na l M
RI
Ma nn
-G ra nd sta ff V A
Me dic al Ce nte r, Sp ok an e, W A
8-
CS
I-0
DFK
DEG
21-0011
B& S&B CHRIST CONSULTING, LLCS
CCCC
OPS RESEARCH, A/E & ENVIRONMENTAL SERVICES
9555 HILLWOOD DRIVE, SUITE 160
LAS VEGAS, NV 89134
OFFICE (702) 202-6004
PRO
FE
SS
IO
NA
L ENGI NEER- STATE
OF
NEVADA
NO. 021134
DANIEL
CIVIL
KELLEY
Exp. 06-30-25
OF 131
BENCHMARK
GPS 32291-72
A FOUND RIVET WSDOT BRASS DISK IN THE SOUTHWESTERLY
SIDEWALK OF DRISCALL BLVD. APPROXIMATELY 220 FEET SOUTHEAST
OF THE INTERSECTION OF N ASSEMBLY STREET.
ELEVATION (METERS) = 578.242 (NAVD 88)
ELEVATION (FEET) = 1,897.116 (NAVD 88)
BASIS OF BEARINGS
NORTH 02°23'00" WEST BETWEEN A FOUND ALUMINUM CAP AT THE SE
QUARTER SECTION 34 AT INTERSECTION OF N ASSEMBLY STREET AND
E WELLESLEY AVENUE, AND A FOUND ALUMINUM CAP AT THE EAST
QUARTER SECTION 34 INN ASSEMBLY STREET BETWEEN W ROMAN
AVENUE AND W SANSON AVENUE, DETERMINED BY GPS METHODS,
WASHINGTON STATE PLANE COORDINATES, NORTH ZONE, NAD83.
PR
O
JEC
T
LO
C
ATIO
N
BLD
G
BLD
G
GRADING NOTES:
1. EXISTING UTILITIES SHOWN ARE FROM BEST AVAILABLE
INFORMATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY LOCATIONS AND ELEVATIONS OF ALL UTILITIES
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. IF
CONFLICTS ARE ENCOUNTERED, THE CONTRACTOR IS TO NOTIFY
THE COR AND PROJECT ENGINEER IMMEDIATELY.
2. UNLESS OTHERWISE INDICATED, ALL SURFACE FEATURES AND
UTILITY INFRASTRUCTURE TO BE PROTECTED IN PLACE.
3. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO
EXISTING FEATURES, STRUCTURES, OR UTILITIES TO REMAIN.
CONTRACTOR SHALL MATCH OR EXCEED CURRENT CONDITION
OF THOSE FEATURES OR UTILITIES TO REMAIN.
4. CONTRACTOR SHALL MAINTAIN THE SITE FREE OF TRASH AND
DEBRIS. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL
OF TRASH AND DEBRIS DAILY. NO TRASH OR DEBRIS SHALL BE
DISPOSED OF ONSITE.
5. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO
PROTECT ROOT SYSTEMS OF SHRUBS, PLANTS, AND TREES TO
REMAIN.
6. FOR UTILITY STRUCTURE ADJUSTMENTS IN CONCRETE OR AC
PAVEMENT, SET RIM FLUSH WITH FG.
7. FOR UTILITY STRUCTURES WITHIN LANDSCAPING, REFER TO
LANDSCAPE PLANS FOR RIM ELEVATIONS.
8. WHERE LANDSCAPING IS ADJACENT TO NEW AND EXISTING
BUILDINGS, SLOPE AT 5% FOR 10-FT AWAY FROM BUILDING
C102
GR
AD
IN
G
PL
AN
09/20/2023
W V
W V
W V
W V
W V
H
Y D
H
Y D
W V
WV
10' TRANSITION
ZERO-FACE TO
"L" CURB
' T
R
AN
SI
TI
O N
ZE
R
O -F
AC
E
TO
"L
" C U
R B
P1
P2 P3 P4
P5
P6P7 P8
P10 P11
P12
P13
P14 P15
P16
P17
P18
P19
P20 P21
P22
P23
P24
P25
P26 P27 P28 P29
P30 P31
P32P33
P34
P35
P36
P37 P38
P39
P40
P41
P42
P43
P44
P45
P46
P47
P48
P49
P50
P5
P52
P53
P54
P55
P56
P57
P58
P59 P60
P61 P62
P63
P64
P65 P66
P67
P68 P69
P70 P71
P72 P73
P74
P75
P76 P77
P79
P81
P82
P83
P84P85
P86
P87
P88
P89
P90
P91
P92
P93
P94
P95
P96
P97
P98
P99
P101
P102
P103
P104
P105
P106
P107
P108
P109
P110
P111
P112
P113 P114
P115 P116
P117 P118
P119
P122
P123
L83
L82
L81
L80
L79
L78
L77
L76
L75
L74
L73
P126
P127
R
AM
P D
O W
N
RAMP
DOWN
BUILDING 27
FFE: (1908.6)
BUILDING 7
FFE: (1905.7)
4' M
AX
4'MAX
4'
TYP
RAMP
DOWN
P128 P129
P130
P131 P132
P133
P134
P135
P136
EX MRI
3-GAUSS LINE
(10' x 15')
EX MRI MAGNET MOVING
SENSITIVITY LINE
(15.5' x 24.6')
3-GAUSS LINE
25-FT OFFET3-GAUSS LINE
P137
P139
P140
P141
P142
W V
D
Y H
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
W V
H Y
D
H
Y
D
W V
W V
W
VW
V
W V
WV
BUILDING 4
MEMORIAL CIRCLE
Pr oj ec t N um be r
Sheet Number
Pr oj ec t T itl e
Lo ca tio n
Issue Date:
Approved Drawn
Dr aw in g
Ti tle
Phase:
AR
CH
IT
EC
T/
EN
GI
NE
ER
O
F
RE
CO
RD
A/ E:
Seal
321 4 5 6 7 8
A/E's Proj. No.
MA
NN
-G
RA
ND
ST
AF
F
VA
M ed ica l C en ter
N
. A ss em bl y, Sp ok an e, W
A
EN
GI
NE
ER
IN
G
PR
OJ
EC
TS
VA
MC
M
AI
N
OF
FI
CE
PH
ON
E:
9)
4-
FA
X:
9)
4-
B lu e Tr id en t, LL
C
N
E E sp er io ne
L N
B ai nb ri dg e
Is la nd , W
A
PR
O
JE
C
T M
G R
: B ri an E
. M ol l P E
,S E
Ph
.7
.9
Ex pa nd an d R en ov ate
B ldg fo r A dd itio na l M
RI
Ma nn
-G ra nd sta ff V A
Me dic al Ce nte r, Sp ok an e, W A
8-
CS
I-0
DFK
DEG
21-0011
B& S&B CHRIST CONSULTING, LLCS
CCCC
OPS RESEARCH, A/E & ENVIRONMENTAL SERVICES
9555 HILLWOOD DRIVE, SUITE 160
LAS VEGAS, NV 89134
OFFICE (702) 202-6004
PRO
FE
SS
IO
NA
L ENGI NEER- STATE
OF
NEVADA
NO. 021134
DANIEL
CIVIL
KELLEY
Exp. 06-30-25
OF 131
C103
GE
OM
ET
RI
C
CO
NT
RO
L
BENCHMARK
GPS 32291-72
A FOUND RIVET WSDOT BRASS DISK IN THE SOUTHWESTERLY
SIDEWALK OF DRISCALL BLVD. APPROXIMATELY 220 FEET SOUTHEAST
OF THE INTERSECTION OF N ASSEMBLY STREET.
ELEVATION (METERS) = 578.242 (NAVD 88)
ELEVATION (FEET) = 1,897.116 (NAVD 88)
BASIS OF BEARINGS
NORTH 02°23'00" WEST BETWEEN A FOUND ALUMINUM CAP AT THE SE
QUARTER SECTION 34 AT INTERSECTION OF N ASSEMBLY STREET AND
E WELLESLEY AVENUE, AND A FOUND ALUMINUM CAP AT THE EAST
QUARTER SECTION 34 INN ASSEMBLY STREET BETWEEN W ROMAN
AVENUE AND W SANSON AVENUE, DETERMINED BY GPS METHODS,
WASHINGTON STATE PLANE COORDINATES, NORTH ZONE, NAD83.
PR
O
JEC
T
LO
C
ATIO
N
BLD
G
BLD
G
09/20/2023
LINE TABLE
LINE #
L73
L74
L75
L76
L77
L78
L79
L80
L81
L82
L83
LENGTH
27.89'
4.96'
8.99'
1.31'
62.59'
22.55'
12.33'
37.92'
26.58'
0.29'
3.38'
DIRECTION
S87° 22' 48.00"W
S2° 40' 27.26"E
N87° 36' 43.89"E
S2° 24' 49.87"E
S87° 20' 47.82"W
N2° 37' 12.00"W
S87° 22' 48.00"W
N2° 37' 12.00"W
N87° 22' 48.00"E
S2° 37' 12.00"E
N87° 24' 44.53"E
POINT TABLE
POINT #
NORTHING
274317.76
274318.07
274320.06
274320.04
274328.03
274327.78
274319.79
274319.76
274329.24
274335.23
274329.94
274335.63
274344.30
274342.29
274342.17
274341.92
274341.86
274341.52
274351.06
274380.34
274389.22
274394.61
274409.03
274416.97
274425.85
EASTING
2466556.62
2466563.12
2466563.03
2466562.53
2466562.16
2466556.67
2466557.03
2466556.53
2466588.09
2466587.82
2466597.14
2466596.81
2466574.70
2466574.82
2466569.31
2466563.25
2466561.53
2466553.25
2466542.89
2466541.55
2466546.15
2466554.57
2466577.09
2466589.50
2466594.10
DESCRIPTION
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
GUTTER
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
BC
POINT TABLE
POINT #
NORTHING
274509.33
274512.15
274530.04
274531.63
274533.32
274530.13
274425.94
274415.28
274392.93
274387.53
274380.43
274351.15
274343.52
274343.92
274344.68
274319.60
274314.40
274315.28
274320.48
274323.80
274325.22
274329.51
274346.05
274345.31
274333.78
EASTING
2466590.27
2466590.14
2466589.32
2466586.25
2466585.17
2466591.32
2466596.10
2466590.58
2466555.65
2466547.23
2466543.55
2466544.89
2466553.18
2466563.17
2466584.73
2466586.51
2466586.88
2466599.34
2466598.97
2466645.95
2466636.99
2466630.11
2466619.84
2466600.26
2466561.90
DESCRIPTION
BC
BC
BC
BC
GUTTER
GUTTER
GUTTER
GUTTER
GUTTER
GUTTER
GUTTER
GUTTER
GUTTER
GUTTER
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
SW
POINT TABLE
POINT #
NORTHING
274333.51
274333.55
274333.20
274335.75
274345.36
274344.83
274358.45
274358.93
274380.00
274379.28
274385.29
274386.08
274394.69
274412.79
274515.18
274518.49
274464.60
274470.60
274491.62
274495.26
274470.36
274470.27
274469.88
274469.61
274495.96
EASTING
2466556.90
2466555.61
2466548.12
2466548.03
2466537.58
2466526.16
2466525.41
2466536.02
2466535.06
2466518.93
2466518.66
2466535.91
2466542.64
2466570.91
2466566.46
2466571.55
2466521.48
2466521.26
2466531.51
2466528.01
2466516.02
2466514.02
2466505.69
2466500.20
2466491.71
DESCRIPTION
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
POINT TABLE
POINT #
NORTHING
274489.50
274464.26
274463.58
274471.57
274467.92
274470.80
274465.00
274461.92
274460.67
274489.33
274489.01
274495.35
274495.81
274496.27
274496.53
274489.85
274490.17
274501.79
274496.90
274469.85
274489.87
274490.14
274464.95
274325.53
274325.69
EASTING
2466492.04
2466514.29
2466499.98
2466464.32
2466464.49
2466447.98
2466448.23
2466464.76
2466464.82
2466488.61
2466482.44
2466478.38
2466488.31
2466498.24
2466504.26
2466498.53
2466504.53
2466522.22
2466526.00
2466505.19
2466499.09
2466504.09
2466450.64
2466597.77
2466601.77
DESCRIPTION
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
SW
BC
BC
BC
GUTTER
GUTTER
BOLLARD
BOLLARD
POINT TABLE
POINT #
NORTHING
274325.85
274326.01
274326.17
274326.33
274326.49
274326.65
274326.81
274403.95
274404.10
274403.81
274405.03
274442.91
274442.34
274464.87
274461.04
274456.08
274455.07
274463.88
274469.58
274335.59
274334.59
274335.55
274334.75
274321.31
274317.71
EASTING
2466605.77
2466609.76
2466613.76
2466617.76
2466621.75
2466625.75
2466629.75
2466512.43
2466515.81
2466515.82
2466542.37
2466540.64
2466528.32
2466527.29
2466473.81
2466474.04
2466451.07
2466505.97
2466499.70
2466611.37
2466611.41
2466610.37
2466590.40
2466590.94
2466594.50
DESCRIPTION
BOLLARD
BOLLARD
BOLLARD
BOLLARD
BOLLARD
BOLLARD
BOLLARD
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
STEP
STEP
WTR CONNECT
WV
WV
90° WTR
45° WTR
WV
POINT TABLE
POINT #
NORTHING
274317.70
274317.00
274401.51
274384.19
274384.47
274384.76
274378.67
274377.99
EASTING
2466595.92
2466595.20
2466535.42
2466464.95
2466470.96
2466505.06
2466505.38
2466486.70
DESCRIPTION
WV
WTR CONNECT
ELEC VAULT
SW
SW
SW
SW
ELEC XFMR
Pr oj ec t N um be r
Sheet Number
Pr oj ec t T itl e
Lo ca tio n
Issue Date:
Approved Drawn
Dr aw in g
Ti tle
Phase:
AR
CH
IT
EC
T/
EN
GI
NE
ER
O
F
RE
CO
RD
A/ E:
Seal
321 4 5 6 7 8
A/E's Proj. No.
MA
NN
-G
RA
ND
ST
AF
F
VA
M ed ica l C en ter
N
. A ss em bl y, Sp ok an e, W
A
EN
GI
NE
ER
IN
G
PR
OJ
EC
TS
VA
MC
M
AI
N
OF
FI
CE
PH
ON
E:
9)
4-
FA
X:
9)
4-
B lu e Tr id en t, LL
C
N
E E sp er io ne
L N
B ai nb ri dg e
Is la nd , W
A
PR
O
JE
C
T M
G R
: B ri an E
. M ol l P E
,S E
Ph
.7
.9
Ex pa nd an d R en ov ate
B ldg fo r A dd itio na l M
RI
Ma nn
-G ra nd sta ff V A
Me dic al Ce nte r, Sp ok an e, W A
8-
CS
I-0
DFK
DEG
21-0011
B& S&B CHRIST CONSULTING, LLCS
CCCC
OPS RESEARCH, A/E & ENVIRONMENTAL SERVICES
9555 HILLWOOD DRIVE, SUITE 160
LAS VEGAS, NV 89134
OFFICE (702) 202-6004
PRO
FE
SS
IO
NA
L ENGI NEER- STATE
OF
NEVADA
NO. 021134
DANIEL
CIVIL
KELLEY
Exp. 06-30-25
OF 131
C104
LIN
E A
ND
PO
IN
T T
AB
LE
S
BENCHMARK
GPS 32291-72
A FOUND RIVET WSDOT BRASS DISK IN THE SOUTHWESTERLY
SIDEWALK OF DRISCALL BLVD. APPROXIMATELY 220 FEET SOUTHEAST
OF THE INTERSECTION OF N ASSEMBLY STREET.
ELEVATION (METERS) = 578.242 (NAVD 88)
ELEVATION (FEET) = 1,897.116 (NAVD 88)
BASIS OF BEARINGS
NORTH 02°23'00" WEST BETWEEN A FOUND ALUMINUM CAP AT THE SE
QUARTER SECTION 34 AT INTERSECTION OF N ASSEMBLY STREET AND
E WELLESLEY AVENUE, AND A FOUND ALUMINUM CAP AT THE EAST
QUARTER SECTION 34 INN ASSEMBLY STREET BETWEEN W ROMAN
AVENUE AND W SANSON AVENUE, DETERMINED BY GPS METHODS,
WASHINGTON STATE PLANE COORDINATES, NORTH ZONE, NAD83.
09/20/2023
ASPHALT PAVEMENT DETAIL
CD501
NTS
9"
3"
BASE COURSE
WSDOT 9-03.9(3)
1-1/4" CRUSHED AGGREGATE
COMPACT TO 95% (ASTM D1557)
EX SUBGRADE
COMPACT TO 95%
(ASTM D1557)
STYLE 1
NOTES:
1. ALL FOOTINGS MUST MEET WIDTH AND DEPTH REQUIREMENTS TO ACCOMMODATE HEIGHT
AND SIZE OF SIGN, SOIL CONDITIONS, WIND LOADS AND WINTER GROUND FREEZING.
2. FOR IN LANDSCAPED AREAS, USE STYLE 1 PERMANENT INSTALLATION.
3. SIGNS INSTALLED IN GRASS CAN HAVE THE RAISED CONCRETE COLLARS EXTENDED TO
COVER THE AREA BETWEEN POSTS.
4. FOR PAVED AREAS CORE DRILL ONLY. USE STYLE 2 PERMANENT INSTALLATION.
STYLE 2
IN LANDSCAPED AREAS, FOOTING SHALL BE
BOXED SO AS TO EXTEND 3 1/2" ABOVE
GRADE WITH 2" BEVEL. REPLACE
SURROUNDING LANDSCAPING TO ORIGINAL
CONDITION.
2"
MIN CONCRETE PIER FOOTING 1'-6" DIA. X
2'-6" DEEP
APPLY PROTECTIVE COATING TO
ALUMINUM POST IN CONCRETE TO
PREVENT CORROSION
75 MM - 100 MM (3"-4") DRAIN
ROCK
IN SIDEWALK AREAS, CORE DRILL OR SAW
CUT PIER HOLE, FILL FLUSH AND MATCH
MATERIAL, COLOR AND FINISH ON TOP
SURFACE OF CONCRETE PIER.
SIGN POST
1/
2"
MIN CONCRETE PIER FOOTING 1'-6" DIA. X 2'-6"
DEEP
APPLY PROTECTIVE COATING
TO ALUMINUM POST IN
CONCRETE TO PREVENT
CORROSION
3"-4" DRAIN ROCK
SIGN POST
SIGN FOOTING INSTALLATION
CD501
NTS
6-1/2"
5-1/2" 1" R
1"
2% 6"
3/8"-1/2"R
FACE OF
CURB
3" 6"
1" 6" 24"
NOTES:
1. CONCRETE SHALL BE 4500 PSI MIN.
2. CURBS ADJACENT TO PAVEMENT OR SIDEWALK TO HAVE
EXPANSION AND/OR CONTROL JOINTS TO MATCH EXISTING
PATTERNS.
3. EXPANSION JOINTS TO BE PROVIDED AT THE BEGINNING AND END
OF CURB RETURNS, ALL CHANGES IN DIRECTION, COLD JOINTS
WITH EXISTING CURB, DRAINAGE STRUCTURES, AND DRIVEWAYS.
4. CONTROL JOINTS TO BE PLACED AT 15' MAXIMUM SPACING. SEE
WSDOT STD. DETAIL F30.10-04.
5. CRUSHED SURFACING BASE COURSE SHALL BE TO SUBGRADE OF
STREET SECTION OR MIN. 3" THICK, WHICHEVER IS GREATER, AND
SHALL EXTEND 6" BEHIND BACK OF CURB. THE SUBGRADE AND
CRUSHED SURFACING MATERIALS SHALL BE COMPACTED TO 95%
MAX DRY DENSITY.
6. CURB TO BE BRUSH FINISHED, WHEN POURING NEW CURBS
ADJACENT TO EXISTING, ALL EXISTING EDGES SHALL BE SAWCUT.
7. CONTINUOUS NO. 4 BAR REQUIRED IN NOSE OF MEDIAN ONLY
CONCRETE CURBS
CD501
NTS
CONCRETE "L" AND ZERO-FACE CURB
NOTES:
1. CONCRETE SHALL BE 4500 PSI MIN.
2. FINISH SHALL BE MEDIUM BROOM PERPENDICULAR TO PEDESTRIAN TRAFFIC
UNLESS OTHERWISE DIRECTED.
3. THE SUBGRADE AND CRUSHED SURFACING MATERIALS SHALL BE COMPACTED TO
95% OF MAX. DRY DENSITY.
4. SEE WSDOT STD. DETAIL F30.10-04 FOR CONCRETE JOINTS.
5. OBSTRUCTIONS (IE UTILITY POLES, SIGN SUPPORTS, TREES, FIRE HYDRANTS,
MAILBOXES, ETC.) SHALL NOT REDUCE SIDEWALK WIDTH AND MINIMUM
PEDESTRIAN ACCESSIBLE ROUTE TO LESS THAN 5 FEET.
6. GRATINGS ACCESS COVERS, JUNCTION BOXES, CABLE VAULTS, PULL BOXES, AND
OTHER APPURTENANCES WITHIN THE SIDEWALK MUST HAVE SLIP RESISTANCE
SURFACE, BE FLUSH WITH THE SURFACE, AND MATCH GRADE OF THE SIDEWALK.
7. WHERE SIDEWALK DIMENSIONS DO NOT MATCH THOSE SHOWN ABOVE,
CONTRACTOR SHALL SUBMIT A JOINT PLAN FOR LAYOUT FOLLOWING ACI
GUIDELINES.
5'-6'
5'-6'5'-6'5'-6'
NEW SIDEWALK
5' MIN.
15'-18' MAX
5' -0
" M
IN
CONCRETE SIDEWALK
CD501
NTS
JOINT SPACING:
SURFACE JOINTS - 5' MIN.
CONTROL JOINTS - 15' MIN.
EXPANSION JOINT AT,
STRUCTURES, OBSTRUCTIONS,
DRIVEWAYS OR AS DIRECTED
BY THE INSPECTOR.
CURB
OR
CURB &
GUTTER
* 1.5% OR FLATTER RECOMMENDED
FOR DESIGN/FORMWORK (2% MAX)
CONCRETE
SIDEWALK SUBGRADE
COMPACTED
TO 95%
MIN 2" OF
CSTC OR
CSBC
3/8"-1/2" R
(TYP)
CEMENT
CONCRETE
SIDEWALK
SUBGRADE
COMPACTED TO 95%
MIN 2" OF
CSTC OR CSBC
4" M
IN
CONTROL
JOINT
CONTROL
JOINT
CONTROL
JOINT
CONTROL
JOINTCONTROL
JOINT
CONTROL
JOINT
ZE
R
O -F
AC
E
C U
R B:
"L " C
U R
B:
2"
CURB ACCESS RAMP
CD501
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .