Attch 2 - Technical Specifications.pdf
PDF 1 MB Posted
- Attached to
- Repair Pavement and Striping AFRL and DFAS
- Solicitation number
- FA875126Q0010
About this file
This is a Technical Specifications document for pavement and striping maintenance and repair work at the Air Force Research Laboratory (AFRL) Rome Research Site in Rome, New York, issued by AFRL/RIOC for Project Number ULDF260410, dated 29 May 2026.
The scope of work encompasses maintenance and repair of pavement and striping throughout the AFRL Rome Research Site, including approximately 2-inch and 4-inch cold-mill asphalt repair patches distributed across the facility, installation of new concrete sidewalk sections, installation of a catch basin on the west perimeter road, and application of parking space delineation and pavement markings. The work is organized into divisions covering general requirements, demolition, concrete work, specialties (traffic signage), earthwork, exterior improvements (paving fabric interlayer, base courses, hot-mix asphalt, Portland cement concrete pavement, curbs/gutters/sidewalks, and pavement markings), and utilities (storm drainage). Standard working hours are 0700-1600 Monday through Friday, excluding federal holidays, with non-standard hour work requiring advance notification and justification. The document mandates compliance with all federal, Air Force, and New York State safety, health, and environmental regulations, including OSHA standards and the Air Force Occupational Safety and Health Standards. Contractors must submit excavation permits (Air Force Form 103) prior to excavation, obtain security clearance through AFRL/RIOF including background checks, and comply with strict hazardous materials handling and reporting requirements through the Environmental Office (RIOCV). Green procurement requirements mandate compliance with EPA Comprehensive Procurement Guidelines and submission of Green Procurement Program statements or Recovered Material Determination Forms. Extensive submittal requirements include shop drawings for formwork, concrete mix designs, material certifications, test reports, safety plans, and equipment specifications. Materials must meet specified ASTM standards for concrete, reinforcement, aggregates, admixtures, and curing compounds, with preference for recycled content products and low-VOC curing materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
FOR
RRS PAVEMENT AND STRIPING
PREPARED BY AFRL/RIOC
AIR FORCE RESEARCH LABORATORY
ROME RESEARCH SITE ROME, NEW
YORK
PROJECT NR: ULDF260410 DATED: 29 MAY 2026
TABLE OF CONTENTS
DIVISION
DIVISION 01 GENERAL REQUIREMENTS
01 00 00 SUMMARY OF WORK
01 11 00 ABBREVIATIONS AND SYMBOLS
01 35 29 SAFETY, FIRE PROTECTION AND HEALTH
01 50 01 ENVIRONMENTAL PROTECTION
DIVISION 02 DEMOLITION
02 41 00 DEMOLITION
DIVISION 03 CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 10 SPECIALTIES
10 14 53 TRAFFIC SIGNAGE
DIVISION 31 EARTHWORK
31 00 00 SITE GRADING
31 22 00 GRADING
31 25 13 EROSION CONTROL
DIVISION 32 EXTERIOR IMPROVEMENTS
32 01 17.62 PAVING FABRIC INTERLAYER
32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES
32 16 19 CONRETE CURBS, GUTTERS, AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
DIVISION 33 UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
DIVISION 1
GENERAL REQUIREMENTS
1. GENERAL INFORMATION:
1.1. Title: Maintain and Repair Paving and Striping AFRL & DFAS
1.2. Project No.: ULDF260410
1.3. Scope: These standards apply to all new construction, demolition, modification, repair and maintenance for all site pavements including associated site infrastructure.
1.4. Project Description:
1.4.1 Location: Air Force Research Laboratory – Rome Research Site
1.4.2 Performance of services; The work area consists of numerous 2” & 4” coldmill asphalt repair patches located throughout the entire RRS as well as the installation of various new concrete sidewalk sections. Additionally, the installation of a new catch basin on the west perimeter road. After all site work is completed, delineated parking spaces as well as pavement markings are to be laid as identified.
1.4.3 Green Procurement Requirements: The Contractor shall comply with the United States Environmental Protection Agency Comprehensive Procurement Guidelines (CPG).
1.4.3.1 The EPA's list of designated products grouped into 8 categories and the accompanying recycled-content recommendations listed below:
http://www.epa.gov/cpg/products.htm
1. Construction Products
2. Landscaping Products
3. Non-paper Office Products
4. Paper and Paper Products
5. Park and Recreation Products
6. Transportation Products
7. Vehicular Products
8. Miscellaneous Products
1.4.4 The contractor is required to complete a Green Procurement Program (GPP) Statement or the Recovered
Material Determination Form (RMDF) prior to beginning construction. The contractor submits the completed form to Contracting, who will then forward the completed form to Civil Engineering for concurrence and filing.
1.4.5 As required on an order-by-order basis, the contractor shall estimate the amount of recycled material that was used in the project and provide the estimate as an official submittal to Contracting. The contractor shall also provide certification. The certification must be in the form of a label on the product or a statement verified by the vendor and attached to the proposal documents. Measurement of recovered material content should be made in accordance with standard industry practice. The certification on multi-component or multi-material products must verify the percentage of post-consumer waste and recycled material contained in the major constituents of the product.
2.0 WORKING HOURS: The regular hours of work on the Rome Research Site are from 0700 to 1600 hours, Monday through Friday, excluding Federal holidays. The government may restrict access to work sites to these hours and days.
The contractor shall consider all other hours non- regular time and use the appropriate unit prices for tasks performed during those hours. In the technical/cost proposal submitted for each delivery order, the contractor shall clearly identify those items of work scheduled for accomplishment during non-standard time and include justification for the request. The contractor shall notify the CO at least 48 hours in advance of any work performed during non-regular hours that requires inspection during accomplishment or that prevents inspection of previous work after accomplishment.
2.1 Legal Holidays:
The Rome Research Site recognizes the following legal holidays:
New Year’s Day 1 January Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth Day 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
3.0 SECURITY REQUIREMENTS
3.1. The work to be done on this project is located in and around area’s that are under the scrutiny of the Department of Defense Police assigned to the AFRL Information Directorate. To gain access to the area(s) to examine the work to be done for job estimation purposes; arrangements must be made through the Contracting Office. Contractor personnel will be escorted into the area(s) for the purpose of project estimation.
3.2. When it has been determined which Contractor will accomplish the project a Visit Request from the company, preferably on Company letterhead, will be necessary prior to initial work commencement. The Visit Request form needs to be signed by the Company President or Director of Human Resources. The Visit Request form will also be used as the Entry Authority List. The Contractor will supply the Visit Request to Security (AFRL/RIOF) through the Contracting Office. The Visit Request can be done via RRS Form 31 Request for Visit Authorization Form, AFMC Form 97 (found on the AFRL web page, (https://rlweb.area52.afnoapps.usaf.mil/#) or a simple Company Letterhead letter identifying all personnel who will be employed during the work. The request will contain a full name to include a middle initial (Frank A. Dude), date of birth (14 Dec 1953), state of driver’s license issuance and place of birth (Austin, Texas). This information will be used to do a Local Files Check. This check will provide Driver’s License Info, Wants & Warrants and Protection Orders and will also provide information on Illegal Immigration and suspected terrorist affiliations. The Local Files Check will also be accomplished prior to work commencing. If the individual is not a US Citizen they will not be allowed within the complex or facilities. If, the individual is not a US Citizen but has a Green Card, Form I-551 or has the I-551 stamp on their passport, Security will need to see either one. There will be no foreign national workers allowed on the Rome Research Site. For work at DFAS, and additional Form SF 85 must be submitted for each contractor working in the facility.
3.3 Provide the Company’s phone number and a Project Leaders or Supervisor/Foremen cell-phone number is necessary for the Law Enforcement Desk Sergeant.
3.4 All facilities are entered using a magnetic media entry badge. Any personnel such as Supervisor/Foremen or Project Leaders who may need building access for meetings etc.., during contract period, can acquire a Local Contractor Entry Badge through the Division/Branch with oversight of the work. This will be accomplished with the AFRL/RI Form 110 (Unescorted Visitor Badge). The Security Visitation Office is located in the lobby of Bldg 3, West Wing. This badge will be worn at all times within the facility. These badges will be returned to the Contracting Officer’s Technical Representative upon completion of the final inspection and Acceptance of Work. Any badges lost during the period of work will be reported to Security as soon as possible.
3.5 Access to the AFRL/RI Complex is controlled by a Main Gate on Brooks Rd, located just west of the Otis & Brooks intersection. Identification for the contractor to enter with a vehicle will be an access list supported by the electronic badge issued. All commercial vehicles entering the gate will be searched. One-time deliveries can be escorted from the gate to delivery point by project personnel.
3.6 All commercial vehicles are searched prior to entry into the AFRL/RI Complex. Vehicle operators will be aware of the vehicle search pull-off area prior to approaching the Main Gate. A search of the vehicle will be conducted prior to its entry. All vehicles not needed for delivery of equipment or tools will be parked in the visitor parking area unless cleared through Security. There are No vehicles allowed within 25 meters (80 ft.) of the AFRL/RI facilities.
3.7 All personnel should be aware that AFRL/RI is Property of the United States Air Force. All personnel will follow all posted signage.
3.8 Contractor personnel will be notified by AFRL/RI Police of any emergencies which would require an evacuation or work stoppage, such as an increase in the Force Protection Condition.
3.9 Building/Room Keys: If the contractor needs access to area(s) that are locked (i.e. mechanical rooms, janitor’s closet, etc.), a request for entry of at least 2 working days prior to the need for access will be submitted to AFRL/RIOC construction representative. The area(s) will be provided on a daily basis. The area(s) will be locked down at the end of the day’s work.
3.10 Dumpsters: Per UFC 04-010-02, all construction dumpsters shall be located no less than 25 meters from any facility, unless otherwise approved by AFRL/RI Security. All dumpster locations will be reviewed and evaluated on a case by case basis.
3.11 The 24 hour Desk Sgt. can be reached at 330-2961.
4.0 SAFETY: The Contractor is responsible for compliance with all Federal, Air Force, and State safety and health regulations and is subject to Air Force safety, OSHA inspections, and conformance to Section 01 35 29 of this SOW, Safety, Fire Protection and Health while working at the Rome Research Site
5.0 EXCAVATION PERMITS: The contractor shall obtain excavation permits (Air Force Form 103) prior to any excavation. The Contracting Officer or his designated representative shall assist the contractor in obtaining the excavation permits. The contractor shall provide drawings and details showing exact location and description of the type of excavation to be accomplished. Should any one of the coordination points indicate an additional underground utility or structure over and above those shown on the contract drawing either by sketch on the contractor's drawing by field pointing or by flagging, the contractor shall be responsible for protection of each of the items indicated. Should damage occur to any of the items indicated by the contractor, contract drawings or coordinating agency to the permit, the contractor shall be responsible for prompt repair of the damage to return the item to its original workable condition.
6.0 UTILITIES AND INTERRUPTION OF UTILITIES OR BUILDING SYSTEMS:
6.1. Any required utility interruption that affects AFRL RRS building operations shall be scheduled for off-hour switch-over unless otherwise directed in the contract documents. See the paragraph WORKING HOURS for AFRL normal operating hours and Federal Holidays.
6.2. Submit written request to AFRL and Contracting Officer’s Representative (COR) fourteen (14) days prior to all utility cutovers and interruptions to include but not necessarily be limited to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and natural gas. The request shall give the following information:
6.2.2. Location of shut-off.
6.2.3. Services and areas affected.
6.2.4. Hour, date, and duration of shut-off.
6.3. Submit a written method of procedure to the COR for approval.
6.4. Do not proceed: Services shall not be interrupted until receipt of approval of the proposed hours and date from the COR. If utility services are damaged by the contractor, the contractor shall restore them within 24 hours.
6.5. Execute all work in a thoughtful, organized, expeditious fashion to minimize downtime.
6.6. Provide piping connections with public and/or site utilities providers (water supply, sanitary drainage, storm drainage, steam, steam condensate, heating hot water, chilled water, condenser water, heat pump loop water, natural gas, propane gas, fuel oil, and air distribution connections) in accordance with the sizes and locations shown on the drawings in strict compliance with the rules and regulations set forth by the local Authority Having Jurisdiction (AHJ) and the utility provider complete with test and final connections, with provisions for shut-off, isolation, and adapters as required.
6.7. Connections causing interruption of service shall be performed off-hours employing “premium time” labor as applicable. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
6.8. Disruptions to life safety systems (fire alarm/fire suppression systems) shall be restored to functional status at the end of each work day. For an exemption to the requirements of this paragraph, submit a written request to the COR for approval.
6.9. AFRL will pay all public utility charges related to permanent service.
7.0 SUBMITTALS: Submittals will be required on materials used under each proposal. Each submittal shall include information as described in the technical specifications or as shown on the drawings. Submittals will accompany the contractor’s proposal on each project. All submittals shall include a Material Approval Submittal AF3000 cover sheet. Once an item of material or equipment has been approved, the contractor will not be required to resubmit with the following exception: If, at any time during the duration of this contract, the contractor desires to change materials from those originally approved, his new materials shall be resubmitted to and approved by the Contracting Officer prior to incorporation into the project.
8.0 SCHEDULING WORK:
8.1 Before any of the work is initiated under an individual delivery order, the Contractor shall confer with the Contracting Officer or his representative(s) and agree on a sequence of procedures; means of access to premises and buildings; space for storage of materials and equipment; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; the location of partitions.
8.2 Delivery of materials and equipment shall be made with a minimum interference to Government operations and personnel.
8.3 The work shall, so far as practicable, be done in definite sections or divisions and confined to limited areas which shall be completed before work in other sections or divisions is begun.
9.0 CONTRACTOR STORAGE: A suitable outside storage area for each delivery order shall be provided to the contractor by the Contracting Officer. Security shall be the responsibility of the contractor. The contractor shall keep the storage area neat, orderly and clear of all debris. The contractor shall not allow trash or other debris to scattered from his area by wind or other means.
10.0 INSPECTION: Inspection of work by the Government will normally be accomplished along with the work as it progresses. At the discretion of the Contracting Officer, inspection may be directed at the completion of various phases of the work prior to initiation of any further work. The Contractor shall notify the Contracting Officer's Technical Representative that a phase will be complete at least 3 days in advance of the completion of each phase to be inspected.
-- End of Section --
SECTION 01 00 00
SUMMARY OF WORK
1.0 GENERAL:
1.1 Location: Air Force Research Laboratory – Rome Research Site
1.2 Description: The work area consists of numerous 2” & 4” coldmill asphalt repair patches located throughout the entire RRS as well as the installation of various new concrete sidewalk sections. Additionally, the installation of a new catch basin on the west perimeter road. After all site work is completed, delineated parking spaces as well as pavement markings are to be laid as identified.
2.0 PRODUCTS:
2.1 Submittal Requirements: Reproducible Shop drawings, manufacturer’s data, dated certifications and test reports, and samples constitute the project submittals. All submittals shall have an AF Form 3000 attached.
3.0 EXECUTION:
3.1 Safety Requirements: It shall be the responsibility of the contractor to initiate and maintain such programs as to comply with the provisions of the Air Force Occupational Safety and Health Standards. These programs shall include the education and training of employees and subcontractors' personnel in the recognition, avoidance and prevention of unsafe conditions. See Section 01 35 29 for further instructions.
3.2 Disposal of Materials: AFRL/RI shall have right of first refusal over all scrap metal generated; the Environmental Office shall provide appropriately sized containers to collect the material. Unless designated as salvageable, all waste materials generated by any work under this contract shall be handled, transported, stored and disposed of off Government property by the contractor at the end of each day’s work. Such materials shall be disposed of in accordance with applicable federal, state or local laws, ordinance or regulations. Spoils from excavation for marker bases may be spread evenly around the work area, but at no time will piles of soil be allowed in the work area.
Coordination with the Environmental and Occupational Health office (EOH) is required before the generation and disposal of any Resource Conservation and Recovery Act (RCRA) (http://www.access.gpo.gov/uscode/title42/chapter82_.html ) hazardous wastes.
3.2.1 Lead: The Contractor is responsible for ensuring surfaces coated with lead paint are properly remediated and disposed of IAW EPA protocols. Lead contaminated waste exceeding RCRA toxicity thresholds must be disposed IAW with Air Force, EPA, and NYSDEC regulations, and disposal must be coordinated with the Environmental office. Under no circumstances shall a contractor sign a hazardous waste manifest on behalf of
AFRL/RI.
3.2.2 Universal Wastes: The contractor is responsible for ensuring that Universal Wastes (batteries, light bulbs, mercury-containing equipment/thermostats) is collected and disposed of IAW with EPA and NYSDEC regulations. The Environmental Office will provide appropriate containers to collect Universal Waste. The Contractor is responsible for disposing of Universal Wastes generated during projects. Disposal must be coordinated with the Environmental Office; under no circumstances shall a contactor sign a Universal Waste manifest on behalf of
AFRL/RI.
3.3 Fire Protection: The contractor shall be responsible for furnishing adequate and proper fire protection for all phases of the contract work. USACE Engineering Manual (EM), EM-385- 1-1 and NFPA 241 shall be adhered to throughout the duration of the construction contract.
3.4 Reference Standards and Publications: The standards and publications listed in each section of these specifications form part of these specifications to the extent referenced. The contractor shall conform with the provision of the dated issue of the listed standard or publication.
3.5 Clean-up: The contractor shall at all times, keep the construction area, including storage areas used by him, free from accumulation of waste materials or rubbish. Prior to completion of the work each day, remove from the construction site all waste materials or rubbish. Upon completion of the construction, the contractor shall leave the work premises in a clean, neat condition.
3.6 Pollution Control/Hazardous Substances: The contractor shall report any spill of oil or hazardous material to the EOH Office and to take every reasonable precaution to prevent the spillage of oil or other hazardous substances. The Contractor will perform all work consistent with the requirements of all Federal, State and Local laws, rules and regulations pertaining to pollution control. Additionally, Contractors using HAZMAT on this installation must comply with the procedures outlined in the Hazardous Materials Management Plan (HMMP), (see below). Any clarification of these procedures can be provided by the EOH Office.
4.0 HAZARDOUS MATERIALS MANAGEMENT
Pertaining to Contractor Usage For the purposes of this contract, the “HMMP Team” and the “HAZMART” are the Environmental Office.
HAZMAT Determination and Authorization Procedures for Contractors
AFI 32-7086 Hazardous Materials Management:
4.1 If a contract is reasonably expected to require a contractor to bring or to use HAZMAT on an installation, the requiring activity working with the Contracting Office shall include the following contract requirements to ensure that contractor materials can be evaluated for authorization and tracking under the
HMMP.
4.2 Federal Acquisition Regulation (FAR) Clause 52.223-3, Hazardous Material Identification and Material Safety Data.
4.3 FAR Clause 52.223-5, Pollution Prevention and Right-to-Know Information.
4.4 FAR Clause 52.223-19, Compliance with Environmental Management Systems.
4.5 AFFARS Clause 5352.223-9001, Health and Safety on Government Installations.
4.6 FAR Clause 52.223-7, Notice of Radioactive Materials.
4.7 The locally developed HAZMAT tracking and reporting tasks necessary to ensure contractor compliance with this AFI. All HAZMAT brought onto an installation for use shall be authorized via the process described in this section.
The Environmental office has developed these local procedures to ensure that the HAZMAT monitoring process does not impede time-critical mission-essential materiel requests.
4.8 IAW FAR Clause 52.223-3, each Contractor must provide the Contracting Office (CO) with a list of proposed Hazardous Materials (HAZMAT) that it plans to use on the installation during the performance of the contract (includes any sub-contractor HAZMAT). IAW AFI 32-7086, contractors must obtain Air Force authorization prior to using HAZMAT on an Air Force installation, and must report usage data to the Environmental Office (RIOCV). This includes fuels used to run generators and other construction/maintenance equipment.
4.8.1 Contractors shall submit through the CO to RIOCV, Safety Data Sheets (formerly known as Material Safety Data Sheets or MSDS’s), for all potentially hazardous materials/products that will be brought on to the installation.
4.8.2 RIOCV will review all potentially hazardous materials and identify the materials deemed as HAZMAT that require tracking. RIOCV may remove any materials from consideration for use by the Contractor that contain ingredients prohibited buy the AF or other regulatory agency.
4.8.3 RIOCV will communicate to the Contracting Officer Representative the list of HAZMAT that will require AF- EESOH-MIS tracking. Those materials will require the completion of one Contractor HAZMAT Product Request Form (PRF) per HAZMAT by the Contractor. RIOCV will provide the Hazardous Material Form to the Contractor and can assist the Contractor with this documentation if requested.
4.8.4 RIOCV will complete their portion on the Contractor PRF and load all information from the forms into the AF-EESOH-MIS data system. The Contractor will also retain a copy of their Contractor HAZMAT PRF for the duration of the specified project.
4.8.5 If the contractor needs to bring a material on the installation that was not included in the original HAZMAT listing, the contractor must first notify the CO and then obtain prior authorization, if RIOCV determines the material to be a HAZMAT.
4.8.6 The Contractor will submit a Contractor Material Usage Data Sheet provided by RIOCV to the CO once a month for contracts over 60 days. For contracts less than 60 days, a Material Usage Data Sheet will be submitted by the Contractor to CO at the completion of the contract.
4.8.7 The CO will provide a copy of the Usage Data Sheet to RIOCV.
4.8.8 Any HAZMAT brought on site for the contract and not used in its entirety will be removed from the installation by the Contractor. If HAZMAT can be used in another contract at this installation, please contact RIOCV for assistance.
4.8.9 RIOCV is ready to assist the CO and Contractor in any way to simplify and expedite this reporting and tracking procedure. Please contact RIOCV (330-2098) with any questions.
SECTION 01 11 01
ABBREVIATIONS AND SYMBOLS
1.0
MEASURE
DISTANCE
DESCRIPTION
MM
IN
CM
FT
M
LF
VLF
YD
CLF
MLF
MI
Millimeter Inch Centimeter Foot Meter Linear Foot Vertical Linear Feet Yard 100 Linear Feet 1000 Linear Feet Mile (Statute)
2.0 AREA
CM2
Square Centimeter
SI
M2
SF
HEC
SY
KM2
CSF
CSY
ACR
MI2
Square Inch Square Meter Square Foot Hectare Square Yard Square Kilometer 100 Square Feet 100 Square Yards Acre Square Mile
3.0 VOLUME
CC
Cubic Centimeter
CI
M3
CF
CY
BF
MBF
Cubic Inch Cubic Meters Cubic Feet Cubic Yard Board Feet 1000 Board Feet
4.0 FLOW
CCS
Cubic Centimeter/Sec
CFM
CMM
MCF
Cubic Ft/Minute Cubic Meter/Minute 1000 Cubic Ft/Minute
5.0 Liquid
MEASURE
DESCRIPTION
LIT
GAL
Liter Gallon (US)
6.0 Weight
G
Gram
OZ
KG
LB
MT
TON
Ounce Kilogram Pound Metric Ton Ton (Short)
7.0 Miscellaneous
BBL Barrel EA Each FLR Floor LAN Lane LS Lump Sum OPN Opening PCT Percent PR Pair RSR Riser SEA Seat SET Set SQ Square (Roofing) LD Load
SECTION 01 35 29
SAFETY, FIRE PROTECTION AND HEALTH SPECIFICATION
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements.
1. Comply with all safety and health requirements necessary for the protection of personnel, facilities and equipment including, but not limited to, the Occupational Safety and Health Administration (OSHA) standards, while performing this contract at the Air Force Research Laboratory (AFRL), Rome Research Site (RRS), Rome NY. It is the contractor’s sole responsibility to make certain that all safety requirements are met.
2. Maintain a written safety program for compliance with the applicable OSHA standards, and make said program available for review by the Government upon request by the Contracting Officer.
3. In the event of a mishap, or a “near miss”, during the performance of this contract at AFRL RRS, notify the Contracting Officer or the DET 4 Safety Office in an expeditious manner. Written notification shall be provided to the Contracting Officer (who will forward a copy to the DET 4 Safety Office) within 72 hours and shall include the following information (Air Force Form 978 Supervisors Mishap Report may be used):
a. Contract, Contract number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Detailed narrative of accident/incident (events leading to accident/incident, answer who, what, when, where, and how)
d. Cause of accident/incident (if known)
e. Type of injuries resulting from the accident/incident and estimated cost of accident/incident (material and labor to replace/repair)
f. Nomenclature of equipment involved in accident/incident
g. Personnel involved in accident/incident
h. Corrective Actions (taken or proposed)
i. Other pertinent information
4. AFRL RRS uses a Safety and Health Management System to implement and manage its safety programs. A SHMS is a systematic approach to managing safety and health activities by integrating occupational safety and health programs, policies, and objectives into organizational policies and procedures. Simply stated, a SHMS is a set of safety and health program components that interact in an organized way. An effective SHMS consists of five critical elements that apply safety and health management practices of employers who have been successful in protecting the safety and health of their employees. All contractors are required to familiarize themselves with the requirements of a SHMS. An example of a SHMS is OSHA’s Voluntary Protection Program (VPP). Detailed information on VPP is available at the OSHA website at http://www.osha.gov/dcsp/vpp/index.html. On-site contractors are required to attend a Local Conditions Course as part of in-processing at AFRL RRS.
SECTION II - SAFETY PLAN ELEMENTS
The contractor prepared Safety Plan shall clearly define procedures, personnel qualifications, facilities, required equipment, and other attributes necessary to fulfill the following elements. Each attribute shall meet or exceed the referenced benchmarks.
ELEMENT REQUIRED REFERENCED BENCHMARK
THE US AIR FORCE MISHAP PREVENTION
PROGRAM
AFI 91-202 w/ AFMC Sup1
AIR FORCE OCCUPATIONAL SAFETY, FIRE, AND
HEALTH STANDARDS
AFMAN 91-203
CIVIL ENGINEERING AFMAN 91-203 Chapter 25
WELDING, CUTTING, AND BRAZING AFMAN 91-203 Chapter 27, NFPA 410, NFPA 51B
INTERIOR SPRAY FINISHING AFMAN 91-203 Chapter 28
CONFINED SPACES AFMAN 91-203 Chapter 23
HYDROCARBON FUELS-- GENERAL AFMAN 91-203 Chapter 18
COMMUNICATIONS CABLE, ANTENNA AND
COMMUNICATIONS-ELECTRONIC(C-E) SYSTEMS
AFMAN 91-203 Chapter 30
DATA PROCESSING FACILITIES AFMAN 91-203
GENERAL INDUSTRIAL OPERATIONS 29 CFR 1910 Subpart A
MATERIALS HANDLING AND STORAGE
EQUIPMENT
AFMAN 91-203 Chapter 12
AGRICULTURAL TRACTORS AND IMPLEMENT
ATTACHMENTS
AFMAN 91-203 Chapter 10
THE US AIR FORCE TRAFFIC SAFETY PROGRAM AFI 91-207
HAZARD COMMUNICATION (HAZCOM)
PROGRAM
AFI 90-821
Electronic/Electrostatic Discharge Sensitive (ESD) Components
MIL HDBK 263, T.O. 00-25-234
FACILITY FIRE PROTECTION NAS 3306, AFI 32-2001, NFPA 13, 70, 72,
NFPA 409, 410
GROUNDING AND BONDING T.O. 00-25-172
NOTE: Anyone working on SAFETY should be familiar with Risk Management (RM) processes. Further information on RM is contained in AFI 90-802, Risk Management (RM) Program, AFPAM 90-803, Risk Management (RM) Guidelines and Tools.
SECTION 01 50 01
ENVIRONMENTAL PROTECTION
PART I - GENERAL
1.1 SCOPE: The work covered by this section consists of furnishing all labor, materials and equipment and performing all work required for the prevention of environmental pollution during, and as the result of, construction operations under this contract except for those measures set forth in other Technical Provisions of these specifications. For the purpose of this specification, environmental pollution is defined as the presence of chemical, physical, or biological elements or agents which adversely affect human life; affect other species of importance to man or degrade the ability of the environment for aesthetic and recreational purposes. The control of environmental pollution requires consideration of air, water and land, and involves noise, solid waste-management and management of radiant energy and radioactive materials, as well as other pollutants.
1.2 APPLICABLE REGULATIONS: In order to prevent, and to provide for abatement and control of, any environmental pollution arising from the construction activities of the contractor in the performance of this contract, the contractor shall comply with all applicable Federal, State and local laws, and regulations concerning environmental pollution control and abatement.
1.3 NOTIFICATION: The Contracting Officer will notify the contractor in writing of any noncompliance with the foregoing provisions and the action to be taken. The contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the contractor, shall be deemed sufficient for the purpose.
1.4 IMPLEMENTATION: Prior to commencement of the work, the contractor will meet with representatives of the Contracting Officer to develop mutual understandings relative to compliance with this provision and administration of the environmental pollution control program.
1.5 REPORTING OF HAZARDOUS MATERIALS BY CIVILIAN CONTRACTORS: IAW FAR Clause 52.223- 3, each Contractor must provide the Contracting Office (CO) with a list of proposed Hazardous Materials (HAZMAT) that it plans to use on the installation during the performance of the contract. IAW AFI 32-7086, contractors must obtain Air Force authorization prior to using HAZMAT on an Air Force installation, and must report usage data to the Environmental Office (RIOCV). This includes fuels used to run generators and other construction/maintenance equipment.
1. Contractors shall submit through the CO to RIOCV, Safety Data Sheets (formerly known as Material Safety Data
Sheets or MSDS’s), for all potentially hazardous materials/products that will be brought on to the installation.
2. RIOCV will review all potentially hazardous materials and identify the materials deemed as HAZMAT that require tracking. RIOCV may remove any materials from consideration for use by the Contractor that contain ingredients prohibited buy the AF or other regulatory agency.
3. RIOCV will communicate to the Contracting Officer Representative the list of HAZMAT that will require AF-
EESOH-MIS tracking. Those materials will require the completion of one Contractor HAZMAT Product Request Form (PRF) per HAZMAT by the Contractor. RIOCV will provide the Hazardous Material Form to the Contractor and can assist the Contractor with this documentation if requested.
4. RIOCV will complete their portion on the Contractor PRF and load all information from the forms into the AF-
EESOH-MIS data system. The Contractor will also retain a copy of their Contractor HAZMAT PRF for the duration of the specified project.
5. If the contractor needs to bring a material on the installation that was not included in the original HAZMAT listing, the contractor must first notify the CO and then obtain prior authorization, if RIOCV determines the material to be a HAZMAT.
6. The Contractor will submit a Contractor Material Usage Data Sheet provided by RIOCV to the CO once a month for contracts over 60 days. For contracts less than 60 days, a Material Usage Data Sheet will be submitted by the Contractor to CO at the completion of the contract.
7. The CO will provide a copy of the Usage Data Sheet to RIOCV.
8. Any HAZMAT brought on site for the contract and not used in its entirety will be removed from the installation by the Contractor. If HAZMAT can be used in another contract at this installation, please contact RIOCV for assistance.
9. RIOCV is ready to assist the CO and Contractor in any way to simplify and expedite this reporting and tracking procedure. Please contact RIOCV (330-2098) with any questions.
DIVISION 2
SECTION 02 41 00
DEMOLITION
1.0 DESCRIPTION OF WORK: This specification covers the dismantling, salvage, demolition, and disposal of designated structures, utilities, and/or materials as directed by the Contracting Officer.
2.0 PRODUCTS: (This section not Used).
3.0 EXECUTION:
3.1 Submittals: Procedures proposed for the accomplishment of a1l demolition and salvage work, including a detailed description of the methods and equipment to be used for each operation and the scheduled sequence of operations, shall be submitted to the Contracting Officer for approval. Operations which involve interruption of utility services or the handling of toxic or hazardous materials shall be scheduled and approved by the Contracting Officer or designated representative at least 48 hours prior to the start of such operations. Weight tickets for all waste disposal generated during a project must be provided to the Environmental Office.
3.2 Clearances and Permits: Obtain as required from local authorities.
3.3 Salvage: Title to all materials and equipment to be demolished is vested in the Government. All recyclable metals shall be considered salvageable. The Environmental Office shall provide appropriately sized containers to collect salvageable scrap metal. Unsalvageable materials shall be disposed of as directed by the Contracting Officer. Materials and equipment for Government salvage or reuse shall be carefully removed and delivered to a storage site designated by the Contracting Officer or designated representative.
3.4 Protection of Existing Work: All necessary precautions shall be taken to ensure against damage to existing work that is to remain in place or is to remain the property of the Government. Damaged areas shall be repaired or replaced with new products to match existing surrounding surfaces. Shoring, bracing, and supports shall be provided as required and structural elements shall not be overloaded Care shall be taken to prevent unscheduled interruptions to any utility service.
3.5 Protection from Weather: The interior of buildings and all materials and equipment shall be protected from the weather at all times.
3.6 Dust and Dirt Control: Dust and dirt resulting from demolition operations shall be controlled with temporary barriers and enclosures to prevent spread into occupied portions of buildings and to avoid creation of a nuisance to the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding, and pollution.
3.7 Burning: Burning at the project site for the disposal of refuse and debris will not be permitted.
3.8 Explosives: The use of explosives will not be permitted.
3.9 Hazardous Materials: Extreme care and caution shall be exercised at all times when handling toxic or hazardous materials in order to prevent harm to personnel and property and to prevent environmental contamination.
Federal, state, and local regulations governing handling, transportation, and disposal of such materials shall be rigidly adhered to. Potentially hazardous wastes must be sampled to determine if EPA or NYSDEC hazardous waste thresholds are met. The Environmental Office must be notified when hazardous waste is generated; hazardous waste shall be disposed of IAW with Air Force, EPA, and NYSDEC regulations. Disposal must be coordinated with the Environmental office.
Under no circumstances shall a contractor sign a hazardous waste manifest on behalf of AFRL/RI.
3.10 Utilities: Temporary interruptions, disconnections, and relocation of existing utilities and removal of abandoned utility services shall be as directed by the Contracting Officer.
3.11 Cleanup: Debris and rubbish shall not be allowed to accumulate in buildings or on site. Local regulations regarding hauling and disposal shall be followed.
DIVISION 3
SECTION 03 30 00
CAST-IN-PLACE
CONCRETE
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION
OFFICIALS (AASHTO)
AASHTO M 182 (2005; R 2009) Standard Specification for Burlap Cloth Made from Jute or Kenaf and Cotton Mats
AASHTO M 322M/M 322 (2010) Standard Specification for Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI/MCP-1 (2011) Manual of Concrete Practice Part 1
ACI/MCP-2 (2011) Manual of Concrete Practice Part 2
ACI/MCP-3 (2011) Manual of Concrete Practice Part 3
ACI/MCP-4 (2011) Manual of Concrete Practice Part 4
AMERICAN HARDBOARD ASSOCIATION (AHA)
AHA A135.4 (1995; R 2004) Basic Hardboard
AMERICAN WELDING SOCIETY (AWS)
AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2009) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A185/A185M (2007) Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete
ASTM A496/A496M (2007) Standard Specification for Steel
Wire, Deformed, for Concrete Reinforcement
ASTM A497/A497M (2007) Standard Specification for Steel Welded Wire Reinforcement, Deformed, for Concrete
ASTM A53/A53M (2010) Standard Specification for Pipe, Steel, Black and Hot- Dipped, Zinc-Coated, Welded and Seamless
ASTM A615/A615M (2009b) Standard Specification for Deformed and Plain Carbon- Steel Bars for Concrete Reinforcement
ASTM A706/A706M (2009b) Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement
ASTM A767/A767M (2009) Standard Specification for Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement
ASTM A775/A775M (2007b) Standard Specification for Epoxy-Coated Steel Reinforcing Bars
ASTM A780/A780M (2009) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A82/A82M (2007) Standard Specification for Steel Wire, Plain, for Concrete Reinforcement
ASTM A934/A934M (2007) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars
ASTM A996/A996M (2009b) Standard Specification for Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement
ASTM C1017/C1017M (2007) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete
ASTM C1107/C1107M (2011) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1116/C1116M (2010a) Standard Specification for Fiber-Reinforced Concrete
ASTM C1240 (2011) Standard Specification for Silica Fume Used in Cementitious Mixtures
ASTM C1260 (2007) Standard Test Method for Potential Alkali Reactivity of Aggregates
(Mortar-Bar Method)
ASTM C143/C143M (2010a) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150/C150M (2011) Standard Specification for Portland Cement
ASTM C156 (2011) Standard Test Method for Water Retention by Concrete Curing Materials
ASTM C1567 (2011) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C171 (2007) Standard Specification for Sheet Materials for Curing Concrete
ASTM C172/C172M (2010) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C173/C173M (2010b) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method
ASTM C192/C192M (2007) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory
ASTM C231/C231M (2010) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C233/C233M (2011) Standard Test Method for Air-Entraining Admixtures for Concrete
ASTM C260/C260M (2010a) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C295/C295M (2011) Petrographic Examination of Aggregates for Concrete
ASTM C309 (2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C31/C31M (2010) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C311 (2011a) Sampling and Testing Fly Ash or Natural Pozzolans for Use as a Mineral Admixture in Portland-Cement Concrete
ASTM C33/C33M (2011a) Standard Specification for Concrete Aggregates
ASTM C330/C330M (2009) Standard Specification for Lightweight Aggregates for Structural Concrete
ASTM C39/C39M (2011) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C42/C42M (2011) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C494/C494M (2011) Standard Specification for Chemical Admixtures for Concrete
ASTM C567 (2005a) Determining Density of Structural Lightweight Concrete
ASTM C595/C595M (2011) Standard Specification for Blended Hydraulic Cements
ASTM C618 (2008a) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C881/C881M (2010) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete
ASTM C920 (2011) Standard Specification for Elastomeric Joint Sealants
ASTM C932 (2006) Standard Specification for Surface-Applied Bonding Compounds for Exterior Plastering
ASTM C94/C94M (2011b) Standard Specification for Ready-Mixed Concrete
ASTM C989 (2010) Standard Specification for Slag Cement for Use in Concrete and Mortars
ASTM C990 (2009) Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants
ASTM C990M (2009) Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants (Metric)
ASTM D1557 (2009) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D1751 (2004; R 2008) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)
ASTM D1752 (2004a; R 2008) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion
ASTM D2628 (1991; R 2011) StandardSpecification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete Pavements
ASTM D5759 (1995; R 2005) Characterizationof Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses
ASTM D6690 (2007) Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements
ASTM D7116 (2005) Standard Specification forJoint Sealants, Hot Applied, Jet Fuel Resistant Types, for Portland Cement Concrete Pavement
ASTM E1155 (1996; R 2008) Standard TestMethod for Determining Floor Flatness and Floor Levelness Numbers
ASTM E1745 (2011) Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs
ASTM E329 (2011b) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2009; 28th Ed) Manual of Standard Practice
FOREST STEWARDSHIP COUNCIL (FSC)
FSC STD 01 001 (2000) Principles and Criteria for Forest Stewardship
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-07, Structural Plywood
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 572 (1974) Corps of Engineers Specifications for Polyvinylchloride Waterstops
U.S. DEPARTMENT OF COMMERCE (DOC)
DOC/NIST PS1 (1995) Construction and Industrial Plywood with Typical APA Trademarks
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS SS-S-200 (Rev E; Am 1; Notice 1) Sealant, Joint, Two-Component, Jet-Blast- Resistant, Cold-Applied, for Portland Cement Concrete Pavement
FS UU-B-790 (Rev A; Am 1; Notice 1) Building Paper, Vegetable Fiber: (Kraft, Waterproofed, Water Repellent and Fire Resistant)
1.2 DEFINITIONS
a. "Cementitious material" as used herein must include all portland cement, pozzolan, fly ash, ground granulated blast-furnace slag, and silica fume.
b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.
c. "Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.
d. "Workability (or consistence)" is the ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work (vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious content and age (level of hydration).
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are[for Contractor Quality Control approval. for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Fabrication Drawings for concrete formwork must be submitted by the Contractor in accordance with paragraph entitled, "Shop Drawings," of this section, to include the following:
Formwork Column Forms Wall Forms Floor Forms Ceiling Forms
Special Construction
Reinforcing steel; G
Reproductions of contract drawings are unacceptable.
Provide erection drawings for concrete Formwork that show placement of reinforcement and accessories, with reference to the contract drawings.
Submit documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in project.
Vapor retarder and Vapor barrier
Epoxy bonding compound
Synthetic reinforcing fibers
Waterstops
Wood Forms
Biodegradable Form Release Agent
Submit documentation indicating type of biobased material in product and biobased content. Indicate relative dollar value of biobased content products to total dollar value of products included in project. SD-04 Samples
Slab finish sample
Submit the following samples:
Three samples of each type waterstop, 300 mm 1/2 inch long. Dumbbell Type Rubber
Polyvinylchloride (PVC)
SD-05 Design Data
Concrete mix design; G
Thirty days minimum prior to concrete placement, submit a mix design for each strength and type of concrete. Submit a complete list of materials including type; brand; source and amount of cement, fly ash, pozzolans, silica fume, ground slag polypropylene fibers, and admixtures; and applicable reference specifications. Provide mix proportion data using at least three different water-cement ratios for each type of mixture, which produce a range of strength encompassing those required for each class and type of concrete required. If source material changes, resubmit mix proportion data using revised source material. Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mix design is used when more than one mix design is submitted. Submit additional data regarding concrete aggregates if the source of aggregate changes. Submit copies of the fly ash, silica fume, polypropylene fibers and pozzolan test results, in addition. The approval of fly ash, silica fume, and pozzolan , and polypropylene fibers test results must be within 6 months of submittal date. Obtain acknowledgement of receipt prior to concrete placement.
Calculations
SD-06 Test Reports
Concrete mix design;
G Fly ash
Pozzolan round granulated blast-furnace slag
Aggregates
Fiber-reinforced concrete
Tolerance report
Compressive strength tests
Unit weight of structural lightweight concrete
Ion concentration
Air Content
Slump
Air Entrainment
SD-07 Certificates
Curing concrete elements
Pumping concrete
Silica fume manufacturer's representative
Finishing plan
Form removal schedule
Biodegradable Form Release Agent
VOC Content for form release agents, curing compounds,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .