This Performance Work Statement (PWS) details the procurement of network switches for the 87th Communications Squadron (87 CS) at Joint Base McGuire-Dix-Lakehurst to support the Air Force Information Network (AFIN). The contractor is required to equip and furnish 14 network switches across multiple buildings, including specific Cisco equipment such as 4x Catalyst 9600 6-slot switches, 20x Catalyst 9500 48-port switches, and various associated transceivers, cables, and licensing. The primary objectives are to support the life cycle of the AFIN, update network hardware and software, and increase network reliability and sustainability.

Key contractor responsibilities include complying with the Privacy Act, reporting any project delays, and providing a report with serial numbers of the switches. The equipment must be delivered to 2320 Radin Avenue, McGuire AFB, NJ within 60 days after contract award. Additionally, the contractor must ensure the new equipment meets Department of Defense information assurance requirements, including compliance with specific DoD directives and instructions related to network and information security. No specific training is required for the installed switches, but the contractor must provide all product manuals, guides, and an IP address table with topology for the installed equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

87 CS AFIN Core Node Switches

1. General The 87 CS Operations Flight (SCO) mission is to manage and maintain the Air Force Information Network (AFIN) and supporting cyber transport devices. This Performance Work Statement (PWS) addresses the need to proccure/purchase Cisco switches for various facilities.

2. Scope of Work The contractor will be required to Equip and Furnish (E&F) 14 network switches for multiple buildings (Hanger 1, 120, 2217, 1730, 2401, 1901, 1738, 2906, 1907A, 3369, 5656, 5321, 5418, 5940).

3. Objectives

• Supports life cycle support for Joint Base McGuire-Dix-

Lakehurst AFIN.

• Updates current hardware and software versions for end point network equipment.

• Increases reliability and sustainability of the base network.

4. Contractor Responsibilities The selected contractor shall:

a. Comply with the Privacy Act of 1974, and shall comply with all applicable safeguarding and handling requirements associated with Privacy Act information

b. Inform the POC and the Contracting Specialist/Officer in writing of any Contractor or Government caused Project delays.

c. Provide a report that includes serial numbers of each switches.

5. Deliverables Contractor shall document serial number of new switche and shall provide to 87 CS/FUOPS. All information will be delivered electronically in an email or an attachment like excel or adobe. NOTE: Please reference 7. Information Assurance Requirements.

6. Equipment Requirements

• C9606R-48Y24C-BN-A TAA (Catalyst 9600 6-slot, 1xSup, 2xLC, 3x2KW AC, DNA-A LIC) x4

• CAB-CONSOLE-RJ45 (Console Cable 6ft with RJ45 and DB9F) x4

• C9600-SUP-1/2 (Cisco Catalyst 9600 Series Redundant Supervisor 1 Module) x4

• C9600-DNA-A-3Y (Cisco Catalyst 9600 EDNA Advantage 3 Year License) x4

• C9500-48Y4C-A TAA (Catalyst 9500 48-port x 1/10/25G + 4-port 40/100G, Advantage) x20

• C9K-PWR-650WAC-R/2 (650W AC Config 4 Power Supply front to back cooling) x20

• C9500-DNA-A-3Y (Cisco Catalyst 9500 DNA Advantage 3 Year License) x20

• QSFP-100G-ZR4-S= (100GBASE QSFP Transceiver, 80KM reach over SMF, Duplex LC) x4

• QSFP-100G-CU1M= (100GBASE-CR4 Passive Copper Cable, 1m) x24

• QSFP-100G-LR4-S= (100GBASE LR4 QSFP Transceiver, LC, 10km over SMF) x28

• SFP-10G-LR-S= (10GBASE-LR SFP Module, Enterprise-Class) x80

• C9600-LC-48YL++= TAA (Cisco Catalyst 9600 Series 48-Port 25GE/10GE/1GE TAA) x1

7. Information Assurance Requirements:

The contractor shall provide, at completion, all product manuals, guides, and an IP address table with topology for the installed equipment.

TRAINING: No training should be required for the installed switches. If training is required, coordination will be done through the 87 CS/FUOPS.

Information Assurance System Requirements

The new equipment shall provide the additional features to support the IA requirements:

o Include and support all IA activities necessary to meet DoD and Air Force IA requirements.

Information Assurance References

The new system shall comply with the following DoD policy documents or latest versions (https://public.cyber.mil/stigs/) provides the latest version of the following DoD documents and STIGs):

o DoD Directive 5000.1, The Defense Acquisition System (ref (a), (j), and (k)).

o Department of Defense Directive (DoDD 8500.1, Information Assurance (IA).

o Department of Defense Instruction (DoDI 8500.2, Information Assurance (IA) Implementation.

o 10 U.S.C. Section 2224, Defense Information Assurance Program.

o Office of Management and Budget Circular A-130, Appendix III, Management of Federal Information Resources.

o AFI 33-202V1, Network and Computer Security.

o Network Infrastructure STIG.

8. Delivery o All Equipment shall be delivered to 2320 Radin

Avenue, McGuire AFB, NJ 08641 within 60 Days after Contract Award.o