Attch 1 - SOW DRTS Tier 1 CTR Draft.docx

DOCX document 785 KB Posted

Attached to
Digital Range Training Systems (DRTS) Tier 1 Continuous Technology Refresh
Solicitation number
W900KK-23-R-0031
Issued by

About this file

This draft solicitation and statement of work are for a Digital Range Training Systems Tier 1 Continuous Technology Refresh effort to upgrade aging training equipment on several Army ranges. The effort includes replacing information technology and after-action review hardware and software, installing updated DRTS systems software, and ensuring the upgraded systems meet requirements. The U.S. Army Program Executive Office for Simulation, Training, and Instrumentation intends to award a single firm-fixed-price contract with option periods totaling three and a half years. Questions on the draft solicitation are due by March 13, 2023, with proposal submissions due April 30, 2023 and award anticipated by September 22, 2023. The selected contractor will be responsible for planning, procuring, installing, integrating, and testing the technology refresh at multiple installations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW-2022-009

Version: 1.0 9 Nov 2022

DIGITAL RANGE TRAINING SYSTEMS STATEMENT OF WORK

FOR

TIER 1 CONTINUOUS TECH REFRESH EFFORTS

US Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI) 12211 Science Drive Orlando, FL 32826-3276

Prepared By:Concurrence:
Nicole SteibJames Todd
Lead Systems Engineer, PdM LTSChief Engineer, PdM LTS

Prepared By:

Concurrence:

Ruby HancockMatt Brothers
Lead Acquisition LogisticianProduct Support Manager

Submitted By:

Approved By:

Bill BeveridgeMichael Willoughby
Assistant Program Manager, PdM LTSProduct Manager

Live Training Systems (LTS)

Distribution Statement A:

Approved for Public Release, Distribution is Unlimited

Revision History

Date
Version
Author
Section
Revision Description
9 Nov 2022
1.0
DRTS

Team

All
DRTS SOW for Tier 1 CTR

efforts

SOW-2022-

Version:

1.0

Nov iii Table of

Scope1
Background1
Applicable Documents1
Government Directives, Manuals, and Instructions1
Military Specifications, Standards, and Handbooks1
Other Government Documents2
Non-Government Standards and Publications2
Requirements3
DRTS Tier 1 CTR Requirements3
Systems Requirements3
Software Requirements3
Program Management (PM)4
Integrated Product Teams (IPT)4
Post Award Conference4
Program Schedule4
Computer Hardware, Enterprise SW Solutions (CHESS)4
Risk Management4
Engineering5
Systems Engineering5
Product Definition Data (PDD)5
System Integration5
Engineering Change Proposal (ECP)5
Technical Review (TR)5
Test and Verification6
Baseline Test6
In-Plant Test6
Contractor Test (CT)7
Test Readiness Review (TRR)7
System Verification Test (SVT)8
Cybersecurity (CS)8
Antiterrorism (AT) / Operations Security (OPSEC)8
Access and General Protection8
Credentialing9
Security Training9
Army Training Certification Tracking System (ATCTS) Registration for Contractor Employees Who Require Access to Government Information Systems10
Logistics11
Supportability Analysis and Logistics Product Data11
Inventory Support13
Warranty Information13
Physical Configuration Audit (PCA)14
Item Unique Identification (IUID)14
Equipment inventory record for cataloging and Removing Legacy Equipment . 15 Disposal15
Appendix A: DRTS Work Breakdown Structure17
Appendix B: DRTS System Diagram18
Appendix C: DRTS System Diagram CTR Tier Boundary19

1 SCOPE

This Statement of Work (SOW) defines the effort required for the oversight, engineering, and management of the design, integration, installation, verification/testing, training, and logistics associated with the Continuous Technology Refresh (CTR) of DRTS Ranges. This effort will provide a Tier 1 CTR to the Digital Multi-Purpose Range Complexes (DMPRC) at Ft. Stewart (Range Red Cloud Golf), Ft. Riley (Range Douthit Gunnery Complex), and Yakima Training Center (YTC) and the Digital Multi-Purpose Training Ranges (DMPTR) at Ft. Carson (Range 111), Ft. Stewart (Range Red Cloud Foxtrot), and Ft. Bliss (Range 66).

1.1 BACKGROUND

The DRTS program provides CTRs to upgrade/replace aging fielded training equipment on Instrumented Ranges. A Tier 1 CTR upgrades/replaces all DRTS IT hardware, software, network equipment, communication equipment, AAR equipment, all monitors, mouse/keyboard, and operating systems. See Appendix C for a system diagram depicting DRTS Subsystems by Tiers.

2 APPLICABLE DOCUMENTS

In the event of a conflict between documents referenced herein and the contents of this SOW, the contents of this SOW shall be the governing requirement. However, nothing in this SOW supersedes applicable laws and regulations.

2.1 GOVERNMENT DIRECTIVES, MANUALS, AND INSTRUCTIONS

Document Number
Document Title
DOD 8570.01-M
Information Assurance Workforce Improvement

Program

DODD 8570.01
Information Assurance (IA) Training, Certification,

and Workforce Management

DOD 5220.22-M
National Industrial Security Program (NISP)

Table 1: Government Documents

2.2 MILITARY SPECIFICATIONS, STANDARDS, AND HANDBOOKS

The following specifications, standards, instructions, regulations, and handbooks form a part of this document to the extent specified herein.

Document Number
Document Title
AR 530-1
Operations Security (OPSEC)
NIST SP 800-53
National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53: Security and Privacy Controls for Federal Information Systems and

Organizations

AR 25-2
Cybersecurity

SOW-2022-

Version:

1.0

Nov

MIL-STD-40051-2D
Preparation of Digital Technical Information for Page-

Based Technical Manuals

MIL-STD-130N
Identification Marking of US Military Property
AR 750-1
Army Materiel Maintenance Policy

Table 2: Military Specifications, Standards, and Handbooks

2.3 OTHER GOVERNMENT DOCUMENTS

The following other Government documents, drawings, and publications form a part of this specification to the extent specified herein.

Document Number
Document Title
DRTS-SSP
DRTS System Security Plan (SSP)
Army Directive 2014-05
Policy and Implementation Procedures for Common Access Card Credentialling and

Installation Access for Uncleared Contractors

MIL-PRF-32216A
Performance Specification Evaluation of Commercial-Off-The-Shelf (COTS) Manuals and Preparation of Supplemental Data
PRF-PT-768
DRTS Performance Specification
PRF-PT-769
DRTS Video System Suite (VSS) Performance

Specification

Table 3: Other Government Documents

2.4 NON-GOVERNMENT STANDARDS AND PUBLICATIONS

The following documents form a part of this document to the extent specified herein.

Standard Number
Standard Title
GEIA-STD-0007C
Logistics Product Data
GEIA-HB-0007B
Handbook and Guide for Logistics Product Data
TA-HB-0007-1
Logistics Product Data Reports Handbook

Table 4: Non-Government Standards and Publications

Copies of specifications, standards, and drawings may be obtained as directed by the Procuring Contracting Officer (PCO). Copies of the Department of Defense (DOD) Information documents are available at URL: https://www.dtic.mil/whs/directives/.

3 REQUIREMENTS

3.1 DRTS TIER 1 CTR REQUIREMENTS

SYSTEMS REQUIREMENTS

The contractor shall conduct the DRTS Tier 1 CTRs which include the Information Technology (IT) and After-Action Review (AAR) equipment replacement in the Control Tower (CT), Server Room, and AAR building, and the installation of all the latest DRTS systems SW versions. The contractor shall perform all work required to plan, procure, prepare, install, integrate, and verify the CTR to include the removal and accountability of the components being replaced. The contractor shall provide replacement equipment in accordance with (IAW) the latest approved DRTS ATO baseline. The contractor shall notify the Government, within one business day, of any required changes to the ATO baseline and obtain approval through a Configuration Control Board (CCB) prior to implementation of changes. The contractor shall ensure that the removal of the components does not cause damage to the remaining system components/functionality. The contractor shall notify the Government within one business day of any damage noted to existing components or any damage caused by the removal/replacement of upgraded components. The contractor shall integrate and install the CTR hardware and software to achieve a fully functional system IAW the DRTS performance specification (PRF-PT-768), VSS performance specification (PRF- PT-769). The contractor shall integrate with all of the existing systems and subsystems associated with the DRTS ranges. See Appendix B for a system diagram depicting DRTS Subsystems.

RE-STREAMER

The contractor shall reuse and integrate into DRTS the existing Re-Streamer Solution at Yakima Training Center DMPRC.

AUTO-START

The contractor shall reuse and integrate into DRTS the existing Auto-Start solution at each CTR range.

SOFTWARE REQUIREMENTS

The contractor shall obtain SW images required for the CTR from the LT2 portal. The contractor shall procure the Server and Windows OS licenses that match the SW images per the defined baseline. The contractor shall provide one complete system image, after successful completion of System Verification Test (SVT), to both the PEO STRI Integrated Development Environment (IDE) Lab and gaining installation Life Cycle Contractor Support (LCCS).

A001: DI-IPSCD-81442A - Software Version Description

3.2 PROGRAM MANAGEMENT (PM)

The contractor shall provide overall program management and administrative support to ensure the requirements of this SOW are accomplished. The contractor shall identify, monitor, and track key schedule, performance, risk, and supportability metrics on a monthly basis. The contractor shall utilize the metrics and notify the Government if there is any leading indication of impact to the program execution.

A002: DI-MGMT-81928 - Contractor’s Progress and Status Report

INTEGRATED PRODUCT TEAMS (IPT)

The contractor shall conduct bi-weekly IPT meetings to provide program status and address issues. The contractor shall hold the IPT meetings at the contractor’s facility and include a dial-in capability. The contractor shall document action items, coordinate resolutions, and track action items until closure in the monthly management report.

POST AWARD CONFERENCE

The contractor shall host a Post Award Conference at the contractor’s facility, unless a location change is mutually agreed to in advance by both the Government and the contractor, within 15-calendar days after contract award. The contractor shall introduce the key IPT participants, identify points of contact (POCs) and discuss terms, conditions, scope of work, near term schedule and other contract issues.

PROGRAM SCHEDULE

The contractor shall develop and maintain an Integrated Master Schedule (IMS) that shows each task, significant CTR milestones and accomplishments. The contractor shall ensure that the IMS remains current. The contractor shall present the IMS at the Post Award Meeting and all IPTs. The contractor shall include a milestone schedule in the monthly management report that provides key dates for all CTR events, and other major milestones. The contractor shall highlight any changes in the IMS from the previous submission.

COMPUTER HARDWARE, ENTERPRISE SW SOLUTIONS (CHESS)

The contractor shall comply with the Army’s CHESS program. The contractor shall obtain a waiver for any purchase made outside of CHESS contracts. A complete list of CHESS contracts and the on-line waiver process can be found at https://chess.army.mil.

RISK MANAGEMENT

The contractor shall conduct risk management assessments to systematically control the uncertainty in the project’s ability to meet schedule, and performance objectives. The contractor shall ensure that the program interdependencies are highlighted, and the risks are monitored on a bi-weekly basis. The contractor shall address risk management during IPTs, technical review, and at any time the contractor identifies a potential impact to schedule or performance. The contractor shall use their internal risk management tools to perform risk management.

3.3 ENGINEERING

SYSTEMS ENGINEERING

The contractor shall utilize systems engineering techniques to ensure a complete baseline description for each CTR. The systems engineering processes shall consider hardware, firmware, and software in the baseline, and ensure all performance requirements are fulfilled.

PRODUCT DEFINITION DATA (PDD)

The contractor shall update the PDD to depict the final product of the fielded system. The contractor shall provide a PDD that contains the technical description of items for supporting sustainment and logistics.

A003: DI-ADMN-80925A: Revisions to Existing Government Documents: Product Definition Data

SYSTEM INTEGRATION

The contractor shall perform all activities to integrate, assemble and deliver the hardware and software to achieve a fully functional system that performs and operates IAW the DRTS performance specification (PRF-PT-768). The contractor shall conduct a system level requirements review to determine that the total system has been considered. The contractor shall verify the complete integration of the hardware and software of each subsystem and the overall system through the utilization of formalized test procedures.

ENGINEERING CHANGE PROPOSAL (ECP)

The contractor shall identify and document any proposed changes to the established baselines for review by the Government. The contractor shall not implement any changes prior to PCO approval.

In coordination with the Government, the contractor shall hold review on all proposed changes prior to the submittal of the ECP. Review shall include key technical and management team members to avoid topic re-visitation. Minutes shall be included in the monthly management report.

A004: DI-SESS-80639D - Engineering Change Proposal (ECP)

TECHNICAL REVIEW (TR)

The contractor shall host a TR, one for DMPTR CTRs and one for DMPRC CTRs, for the purpose of presenting the proposed HW selection and system design that meets the ATO Baseline. The contractor shall document the results of the review, including any action items. The contractor shall conduct the DMPTR CTR TR within 60-calendar days after contract award. The contractor shall conduct the DMPRC CTR TR within 60- calendar days after option award. During the TR, the contractor shall:

a. Address the CTR schedule to include all CTR milestones.

b. Assess if the proposed HW can meet the performance requirements.

c. Address the baseline test and how results will be determined.

d. Provide a proposed NET training schedule.

e. Provide a proposed test approach detailing each of test events, test tools, and the test cases.

f. Provide a TIR tracking method and approach.

g. Address any impacts to the current Cybersecurity baseline and/or DRTS ATO.

h. Address program risks.

i. Address any system component identified in the ATO baseline that will become obsolete/EOL, EOS, and/or EOS.

A005: DI-MISC-80711A - Scientific and Technical Reports - Technical Review

3.4 TEST AND VERIFICATION

The contractor shall develop a comprehensive test and evaluation strategy by mapping each CTR element to each testing event. The contractor shall document and record any problems/failures that arise during the verification events in Test Incident Reports (TIR). The contractor shall utilize a TIR tracking tool to capture the information for classification and chargeability, trend analysis, and closure. The contractor shall submit a list of all TIRs identified during In-Plant Testing and Contractor Testing to the Government.

BASELINE TEST

Prior to any removal/replacement activities, the contractor shall perform a full system baseline test to identify any non-operational system component that will not be replaced and to benchmark the system’s performance. The contractor shall notify the Government in writing the next business day after the baseline test of any items discovered that has an impact to cost, schedule, or performance. The contractor shall include 14 days in the IMS to account for any impacts due to non-operational equipment. After contractor testing, the contractor shall repeat the baseline test to ensure that the benchmark results are equal to or better than the pre-installation results. The contractor shall present the benchmark results comparison at the Test Readiness Review.

IN-PLANT TEST

The contractor shall conduct in-plant verification tests, utilizing their own facilities, to demonstrate functional capabilities of the CTR elements. The contractor shall assess the adequacy of the system to fulfill the requirements. The contractor shall test the software during in-plant test and provide test incident reports for any SW issues. The contractor shall fully test the software at the range regardless of the in-plant test results. The contractor shall present the in-plant test results during the IPT meeting.

CONTRACTOR TEST (CT)

The contractor shall perform a CT on-site to verify all requirements in preparation for the System Verification Test (SVT). The contractor shall test the complete range functional and performance testing during the CT. If the CT event is a failure, the contractor shall re-plan/re-schedule the CT. The contractor shall identify and request any additional Government resources required for the performance of the CT on-site at least 180 working days prior to the start of testing.

TEST READINESS REVIEW (TRR)

The contractor shall conduct a TRR at least 7 calendar days prior to the SVT event. The contractor shall address and meet the following TRR Entry Criteria:

a. All critical and major TIRs found during In-Plant Testing and CT have been resolved and closed with Government concurrence.

b. Any minor TIRs found during CT have been documented and a resolution for closure has been identified.

c. Identify personnel and required resources to support testing.

d. Provide test results to the following test cases:

1. Manual startup and shutdown of the system test, including all server room device status.

2. Auto-startup and shutdown of the system test, including all server room device status.

3. Clear-Com testing to include SINCGARS radio check.

4. Handheld Target Controller (HTC) testing.

5. SYSCON functionality testing to include target manipulation and fault clearing and Battlefield Effects Simulator II (BES II) Testing.

6. FSE (IPUR control) testing.

7. Complete VSS testing to include all video functionalities as well as field camera presets.

8. System Saturation and Endurance Testing (SET) for ground vehicles (stress test). These stress tests can be performed with the help of testing devices (i.e. audio-video injectors into IPUR).

9. Perform BIT on AWSS equipment/sensors (Only applicable to YTC and Riley.

The contractor shall address and meet the following TRR Exit Criteria:

a. Obtain satisfactory test results from the test cases identified within the entry criteria.

b. Obtain Government approval to proceed.

SYSTEM VERIFICATION TEST (SVT)

The contractor shall provide 15 working days of support to the Government during SVT. The contractor shall support the Government's daily scoring conference in a technical, non-voting role during SVT. The contractor shall provide a minimum of three printed paper copies of the SVT test procedures. If major TIRs are found during the SVT that cannot be corrected on site, the contractor shall correct the TIRs, conduct a regression test of the identified TIRs, and reperform an operational end-to-end system test of the SVT.

A006: DI-ADMN-80925A - Revisions to Existing Government Documents: Test Procedure A007: DI-NDTI-80809B - Test/Inspection Report

3.5 CYBERSECURITY (CS)

The contractor shall:

a. Comply with the existing DRTS Cybersecurity baseline as specified in the latest approved Authority to Operate (ATO), SSP, and relevant Risk Management Framework (RMF) documentation provided as part of the Request for Proposal. The contractor shall seek a waiver with PCO approval if any deviations from the ATO are requested.

b. Integrate CS into their management processes, document any issues that arise during installation, and identify possible solutions.

c. Ensure all CTR components are delivered in a certifiable configuration for a Closed Restricted Network Type IV based on the NIST SP 800-53 MODERATE security protocols.

d. Update RMF package based on CTR specifics to the site implementation including HW/SW lists and CS compliance scans.

e. Ensure that the CS requirements and procedures are met IAW all required DOD and Army regulations per the Confidentiality, Integrity, and Availability levels specified for the system. All CS artifacts shall be stored on the LT2 portal.

f. Scan the system as part of this compliance using the latest DOD approved scanning tools.

g. Provide CS compliance scan results of the hardened system no later than 5-calendar days after the completion of SVT.

A008: DI-ADMN-80925A: Revisions to Existing Government Documents: DOD Risk Management Framework (RMF) Package Deliverables

3.6 ANTITERRORISM (AT) / OPERATIONS SECURITY (OPSEC)

ACCESS AND GENERAL PROTECTION

The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy.

CREDENTIALING

The Common Access Card (CAC) shall be the principal identity credential only for those contractor employees supporting and requiring access to DOD installations, Government leased facilities, buildings, and Government information systems per FAR 52.204-9.

The prime and subcontractor shall coordinate with their Government sponsor and complete DD Form 1172-2 in order to obtain a CAC. The prime and subcontractor employee shall be issued a CAC only if duties involve one of the following:

a. Require both physical access to a DOD facility and access, via logon, to DOD networks on-site or remotely;

b. Remote access, via logon, to a DOD network using DOD-approved remote access procedures; or

c. Physical access to multiple DOD facilities or multiple non-DOD federally controlled facilities on behalf of the DOD on a recurring basis for a period of 6 months or more.

The prime and subcontractor employees shall have an adjudicated Tier 1 or higher investigation in accordance with Army Directive 2014-05. The contractor shall ensure that all employees clearly display the prescribed identification at all times while they are working within Government facilities and performing official duties in execution of contract requirements. The contractor shall account for all forms of Government- provided identification credentials issued to contractor (or their employees including subcontractor employees in connection with performance) under the contract. The contractor shall return such identification credentials to the issuing agency at the earliest of any of the circumstances listed below, unless otherwise determined by the Government. The contractor shall return all identification credentials when:

a. No longer needed for contract performance.

b. Completion of contractor employee’s employment.

c. Contract completion or termination.

SECURITY TRAINING

OPSEC AWARENESS TRAINING

Per AR 530-1 Operations Security, the contractor employees shall complete Level I OPSEC Awareness training. The contractor shall ensure that all employees have been OPSEC trained or are OPSEC trained at the beginning of the contract. The contractor shall ensure new employees are trained within 30-calendar days of their start date on this contract and annually thereafter. OPSEC Awareness training information and materials are available at https://www.cdse.edu/catalog/elearning/GS130.html.

INSIDER THREAT TRAINING

The contractor and their subcontractors shall designate in writing a US citizen as the Insider Threat program official per paragraph 1-202 of DOD 5220.22-M with change 2. All contractors shall comply with Insider Threat Training requirements per paragraph 3- 103 of DOD 5220.22-M with change 2. Insider threat program information and materials are available at https://www.cdse.edu/catalog/elearning/INT101.html.

CONTROLLED UNCLASSIFIED INFORMATION TRAINING

The contractor shall have only those employees who handle CUI take annual CUI Training required for all DOD and Industrial personnel with access to controlled unclassified information. The contractor shall ensure that all employees have been CUI trained or are CUI trained at the beginning of the contract. The contractor shall ensure new employees complete this training 30-calendar days from start day of the contract. This training is available at https://securityawareness.usalearning.gov/cui/index.html.

UNAUTHORIZED DISCLOSURE OF CLASSIFIED INFORMATION FOR DOD AND INDUSTRY

The contractor employees working on this contract with security clearances shall complete the annual Unauthorized Disclosure of Classified Information for DOD and Industry Training. The contractor shall ensure that all employees have been trained or are trained at the beginning of the contract. The contractor shall ensure new employees complete this training 30-calendar days from start day of the contract. This training is available at https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf.

IWATCH TRAINING

The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer or PCO). The contractor shall complete training within 90-calendar days of contract award and within 30-calendar days of new employees commencing performance on this contract.

ARMY TRAINING CERTIFICATION TRACKING SYSTEM (ATCTS) REGISTRATION FOR CONTRACTOR EMPLOYEES WHO REQUIRE ACCESS TO GOVERNMENT INFORMATION SYSTEMS All contractor employees with access to a Government info system shall be registered in the ATCTS at commencement of services, and must successfully complete the DOD Information Assurance Awareness training prior to access to the Government IS and then annually thereafter.

CYBERSECURITY/INFORMATION TECHNOLOGY (IT) TRAINING

All contractor employees and associated subcontractor employees shall complete the DOD CS awareness training before issuance of network access and annually thereafter. All contractor employees working CS/IT functions shall comply with DOD and Army training requirements in DODD 8570.01, DOD 8570.01-M, and AR 25-2 within 6-months of employment. CS/IT training can be accomplished at https://cs.signal.army.mil.

CYBERSECURITY/IT CERTIFICATION

Per DOD 8570.01-M, and AR 25-2, the contractor employees and associated subcontractor employees supporting CS/IT functions shall complete the baseline certification upon contract award.

3.7 LOGISTICS

The contractor shall conduct engineering analyses to establish quantitative and qualitative supportability design guidelines. The contractor shall coordinate with existing LCCS contractor using associate contractor agreement, develop initial fielding plans for the system and verify that the maintenance actions and support structure are aligned with the maintenance concept per AR 750-1 consisting of two levels: field and sustainment. The contractor shall utilize the latest version of GEIA-STD-0007C, GEIA- HB-0007B, TA-HB-0007-1 and MIL-STD-40051-2D.

SUPPORTABILITY ANALYSIS AND LOGISTICS PRODUCT DATA

The contractor shall conduct an updated repair level analysis, develop diagnostics, preventative maintenance and repair procedures, conduct facilities analyses, refine hardware and software maintenance and support concepts, and identify support resource requirements including spares and support equipment for any equipment as part of the CTR.

The contractor shall utilize the current version of MIL-STD-40051-2D when updating existing Operator User Manual (OUM), System Maintenance Manual (SMM) and existing training documentation and procedures. The contractor shall update the existing documentation to incorporate information on enhancements/modifications to the delivered equipment.

OPERATOR USER MANUAL (OUM)

The contractor shall update the existing OUM to account for design changes on any new enhancements/modifications as part of the CTR. The contractor shall identify and document operational tasks and specific operator level preventive maintenance checks, inspections, lubrication, adjustment and operator level repair and replacement tasks.

The contractor shall identify all required spare parts, consumables, tools, the test/support equipment with the operator tasks.

C001: DI-ADMN-80925A - Revisions to Existing Government Documents: Operator User Manual

SYSTEM MAINTENANCE MANUAL (SMM)

The contractor shall update the existing SMM to account for design changes on any new enhancements/modifications. The contractor shall ensure the SMM provides detailed installation/removal procedures, fault isolation, LRUs removal and replacement procedures, firmware update procedures, preventive/scheduled maintenance and unscheduled/corrective maintenance procedures, calibration, and proper use of test equipment for training system. The contractor shall verify work packages required for operation of the hardware with the OUM.

C002: DI-ADMN-80925A - Revisions to Existing Government Documents: System Maintenance Manual

COTS MANUALS

The contractor shall deliver COTS technical publication for all commercial equipment provided as part of the CTR efforts. The contractor shall deliver COTS documentation in electronic media or scanned into indexed electronic media (i.e. portable document format) for delivery to the Government. The contractor shall ensure the COTS manuals are sufficient to support the operation and maintenance of all COTS components per MIL-PRF-32216A. The contractor shall review the COTS documentation and identify deficiencies or deviations in the manuals. If the COTS document is not sufficient to support the operation and maintenance and the contractor is unable to retrieve the required data from the vendor, the contractor shall develop supplementary data for the inclusion in the main text of the Technical Manual ensuring that all required data for the COTS item is presented.

C003: DI-TMSS-80527D - Commercial Off-the-Shelf (COTS) Manuals and Associated Supplemental Data

LOGISTICS PRODUCT DATA SUMMARIES

The contractor shall update the existing LPDS with all new data associated with the CTR. The contractor shall update the LPDS while using GEIA-STD-0007C as a guide and capture the following information:

a. Maintenance Allocation Chart (used in the SMM)

b. Recommended Spare Part List (required in the SMM)

c. Consolidated Periodic Maintenance Plan (required by SMM)

d. LORA (embedded in Logistics Support Study)

e. Support and Test Equipment (required for SMM)

f. Packaging, Handling, Storage, and Transportation (required for SMM, reported in Logistics Review)

g. Bill of Materials (BOM)

h. Warranty Information (contractor format acceptable)

i. Army Enterprise Systems Integration Program (AESIP) Mass Create Process List- Manufacturing Part-Number (MAN-P) (PEO STRI-unique) (inventoried items only)

j. Material Component List (MCL) (Use Component List Template) (inventoried items only)

A009: DI-ADMN-80925A - Revisions to Existing Government Documents: Logistics Product Data Summaries

NEW EQUIPMENT TRAINING MATERIAL

The contractor shall update the existing new equipment training material to account for any design changes associated with the CTR. The contractor shall ensure the training material includes a complete training support package that integrates training products, materials, and other pertinent information necessary to train the system.

A010: DI-ADMN-80925A - Revisions to Existing Government Documents: Training Materials

SPECIAL TOOLS AND TEST EQUIPMENT

The contractor shall update the special tools and test equipment list to account for any changes introduced as a result of the CTR. The contractor shall update the special tools and test equipment list in all supporting documents (OUM, SMM, and training support package.)

PARTS MANAGEMENT PLAN

The contractor shall manage obsolescence over the entire period of the contract. The contractor shall be responsible for locating part replacement, vendor interface and engineering efforts. The contractor shall identify vendors designing, building, testing, and distributing critical components and where this work occurs. The contractor shall include company name, address, Commercial and Government Entity (CAGE) code and a supplied item description. The contractor shall maintain a list of all components/parts proposed as part of the baseline and shall brief any changes in obsolescence status of these components/parts at the IPT meetings. The contractor shall ensure that all components’ parts statuses are updated once a month. The contractor shall track that status of any component in the monthly management report until replacement components/parts are identified.

INVENTORY SUPPORT

The contractor shall assist with a joint inspection and physical inventory of the system, spares, tools, and test equipment upgraded as part of the CTR, in conjunction with the Government during SVT. The contractor shall utilize the Configuration Audit Plan (CAP) when conducting the on-site property inventory. The contractor shall sign a hardcopy of the CAP inventory to ensure all required items were delivered and a baseline established, upon completion of the inventory.

A011: DI-SESS-81646B - Configuration Audit Plan

WARRANTY INFORMATION

The contractor shall establish a one-year warranty period for all systems provided as part of the CTR. The contractor shall consider the following while developing the warranties:

a. The acceptance of a warranty does not waive the Government’s rights under the “Inspection” clause, neither does it limit the Government’s rights regarding the other terms and conditions of future contracts.

b. Acceptance dates will act as the start date for warranty coverage.

c. Contractor is responsible for all shipping and packaging cost for all items covered under warranty.

d. The contractor shall provide warranty information to the Government, so the Government has a holistic understanding of future procurement cost.

PHYSICAL CONFIGURATION AUDIT (PCA)

The contractor shall:

a. Perform a PCA, in conjunction with the Government, to verify the system HW and technical documentation for completeness and accuracy.

b. Examine the updated physical configuration of the system and verify that the components correspond to the build-to product baseline documentation.

c. Perform an inspection, in conjunction with the Government, of the complete system inventory and spares components.

d. Affix a Government property sticker in a prominent location.

e. Provide verification of serial numbers and Item Unique Identifications (IUIDs).

f. Mark all items requiring an Item Unique Identification (IUID) marking, with an IUID label that is constructed of a material designed to last the life of the item/system in its intended environment and operation.

g. Verify, in conjunction with the Government, the “as-built” drawings to include complete system level drawings of all equipment, wiring, network topology, and system architecture.

h. Perform a final review, in conjunction with the Government, of the system level OUM and SMMs.

ITEM UNIQUE IDENTIFICATION (IUID)

The contractor shall determine items requiring IUID IAW MIL-STD-130N. The contractor shall include embedded subassemblies, components, parts, and identify the IUID to be used for each item. The contractor shall provide IUID, or a DOD recognized unique identification equivalent, for all identified items delivered. Enter all IUID data into the DOD IUID database at: (http://dodprocurementtoolbox.com/site-pages/overview- iuid-registry). The IUID marking design for each item shall be both machine readable and human readable IAW MIL-STD-130N. All IUID markings shall be constructed of material designed to last the life of the system within its intended environment. All markings shall be easily accessible for viewing/inventory once installed.

A012: DI-MGMT-81858 - Unique Identification (IUID) Marking and Verification Report

EQUIPMENT INVENTORY RECORD FOR CATALOGING AND REMOVING LEGACY EQUIPMENT

The contractor shall support the documentation and inventory of all delivered equipment to the government. The contractor shall provide a list of all part numbers and needed information to catalog delivered equipment to the government.

a. Identify and provide an Equipment Inventory Record (EIR) that will be removed, at the TR.

b. Include the following data elements are required:

1) Nomenclature (complete item description)

2) Make and model number

3) Unique Item Identification Number (if applicable)

4) Original Part number issued by manufacturer

5) Manufacturer CAGE code.

6) Quantity.

7) Unit of issue.

8) Unit price.

9) Location from where equipment was removed

For property not managed in the gaining installation Accountable Property System of Record (APSR), the contractor shall coordinate, process, and develop the necessary paperwork to turn the removed HW over to the installation property disposal Defense Logistics Agency (DLA) Disposition Service. The contractor shall coordinate with the Government for a location or staging area for the removed HW. The contractor shall place the HW in the staging area agreed to by the Government.

The contractor shall assemble the HW in a manner to facilitate validating the inventory list with the corresponding removed HW components during the inventory effort prior to GAT. The contractor shall protect the removed HW from the potential environmental/ meteorological damage. The contractor and Government representative shall conduct an inventory of all HW removed and validate the inventory list. After inventory validation, the contractor shall support the transfer of the removed HW for DLA disposition.

The contractor shall remove the Blue Force Tracker as part of the CTR effort.

A013: DI-ILSS-81251 - Equipment Inventory Records

DISPOSAL

The Government and contractor shall coordinate with the Defense Logistics Agency Disposition Services to perform the necessary actions for turn-in equipment IAW Government regulations. The contractor shall identify and categorize property to be turned in into three categories: usable property, scrap property, and hazardous property.

The contractor shall coordinate with the Government on the documentation to be included with the turn-in in addition to the DD Form 1348-1A. This form is available online through www.dla.mil/dispositionservices/DDSR/Turnin. The document may be completed online using the Electronic Turn-In Documents (ETID) system.

Prior to turning in property, the contractor shall provide a minimum of three copies of each DD Form 1348-1A. One copy shall be delivered to the Government and two copies attached to the property. The contractor shall:

a. Include all certifications and physically attach to the property.

b. Palletize, shrink wrap, and band equipment IAW local DLA SOP.

c. Coordinate transportation of all disposed equipment with the local DLA.

d. Remove and properly dispose of all packaging materials, debris, trash, and excess materials generated as a result of equipment installation and disposition.

The contractor shall follow the local DLA disposition services for sensitive items procedures required for disposing of the Blue Force Tracker as part of the CTR effort.

APPENDIX A: DRTS WORK BREAKDOWN STRUCTURE

APPENDIX B: DRTS SYSTEM DIAGRAM

APPENDIX C: DRTS SYSTEM DIAGRAM CTR TIER BOUNDARY

image73.png image74.png image75.png image76.png image77.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png image34.png image35.png image36.png image37.png image38.png image39.png image40.png image41.png image42.png image43.png image44.png image45.png image46.png image47.png image48.png image49.png image50.png image1.png image51.png image52.png image53.png image54.png image55.png image56.png image57.png image58.png image59.png image60.png image61.png image62.png image63.png image64.png image65.png image66.png image67.png image68.png image69.png image70.png image71.png image72.png

File details come from the government source that posted it. Updated .