Attch 1_PWS_ITC Control Room Upgrade_F2MT1F2054AW01.pdf
PDF 833 KB Posted
- Attached to
- ITC Control Room Upgrade Federal contract opportunity
- Solicitation number
- FA301622Q0084
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch 2_Pricing Worksheet_ITC Control Room Upgrade.pdf | ||
| Solicitation - FA301622Q0084.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
502 CONS/JBKAE
JBSA Lackland, TX
FA301622Q0084
ITC Control Room Upgrade
PERFORMANCE WORK STATEMENT
ITC Control Room Upgrade
2 March 2022
1. BACKGROUND: The Inter-American Air Forces Academy (IAAFA) provides military education and training to military personnel of the Americas and other eligible Partner Nations and requires an upgrade to the visual projection equipment in the IAAFA Training Center (ITC), Building 7356, Joint Base San Antonio (JBSA) Lackland, TX. The control room is the command center and will be utilized frequently for training events, presentations, briefings, and orientations with all 37th Training Wing (TRW) and IAAFA staff as well as many Distinguished Visitors (DVs) and Foreign Military Partner Nations.
2. GENERAL DESCRIPTION: The contractor shall provide management, labor, equipment, tools, materials, delivery, transportation, and incidentals necessary to accomplish the work required within this Performance Work Statement (PWS). The contractor shall, at a minimum, maintain a single point of contact for this effort. The work required includes the following:
a. Replace and relocate production monitors;
b. Replace wireless hand-held microphones with wireless lapel microphones;
c. Add PTZ camera control console, build and install custom table; and
d. Label, organize and place connections in an easy to use format.
3. SCOPE: For this project, the following are required at the IAAFA ITC Auditorium, Building 7356, located at 2441 Carswell Avenue, JBSA Lackland, TX:
a. Equipment: Supply all equipment and installation materials for the modernization and production streamlining of current and new video matrix and audio system.
b. Labor: All labor to include:
(1) Disassembly & Disposal of any equipment that will no longer be used as part of the upgrade. All removed equipment and material, other than items identified by the Requirement Owner or Facility Manager for Air Force disposition, shall be disposed of properly.
(2) Integration of new equipment to be interoperable with existing video matrix and audio system with the control room equipment reconfigured into an organized position.
c. Support/Warranty Services: All equipment and labor shall be covered under a five (5) year warranty.
4. SALIENT CHARACTERISTICS:
a. (2) 43IN COMMERCIAL 4K UHD LED LCD DISPLAY 350;
b. (2) Thinstall TS318T Medium Dual Swing Arm Wall Mount - 18" Extension - Wall mount for LCD /Plasma;
c. (2) HD Pro P/35 - HDMI Premium High Speed Optical Cable 35' – Plenum;
d. (4) Sennheiser SK 300 G4-RC-GW1;
e. (4) Sennheiser MKE 1-EW;
f. (1) Sennheiser MKE 1 Mini clip, black;
g. (1) AV Bridge MatrixMIX Production System;
502 CONS/JBKAE F2MT1F2054AW01
JBSA Lackland, TX ITC Control Room Upgrade
h. (1) PCC Premier and PCC MatrixMIX Rack Ears;
i. (1) TeleTouch 27" USB Touch-Screen Multi-viewer;
j. (10) MicroFlex Pro AV/IT Certified 4K60 18G High Speed HDMI Cable with ProGrip Cool Blue 6ft;
k. (1) 22-1P OAS STR CMP TC Blk Jkt - 100';
l. (1) IPL Pro S6 Six Serial Port IP Link® Pro Control Processor;
m. (1) Custom desk for control room, Control devices and cabling, Hardware and consumables; and
n. Other equipment/solutions may be proposed by the offeror, but must be approved by the Requirement Owner prior to contract award.
5. INSTALLATION REQUIREMENTS: This requirement does not involve Network Operations or Infrastructure Solutions, as none of the equipment being replaced or moved connects or will connect to the Air Force Network.
a. All connections and controls must be located on the production table
b. Audio system should be able to connect to the new mics, and overhead mics on the stage. All mics will be controlled with the remote in front, or back of room.
c. The equipment currently in the audio rack can be moved if needed in order to facilitate installation of new equipment.
d. Cabling should be installed neatly, out of view when possible, and not produce any avoidable safety hazards.
Work will include a one year warranty on parts, labor, and workmanship.
e. Contractor shall provide training to IAAFA staff on use of the equipment. Contractor shall provide all documentation, user guides, operations and administrative manuals to the government. All configuration, coding software, and passwords shall become the property of the Government.
f. The Contractor shall provide preventive maintenance, warranty replacement, firmware upgrades, and replacement of defective equipment for up to one year.
h. Contractor shall provide temporary replacement equipment if original equipment needs to be removed for repair for up to one year.
i. All Outside Plant (OSP) and Inside Plant (ISP) cabling projects installed on JBSA Installations as part of any MILCON, SABER, or other project must meet commercial industry and Telecommunications Systems Cabling Standards.
6. PERFORMANCE LOCATION: Project work is to be performed at IAAFA Training Center (ITC) Building 7356, JBSA Lackland, TX 78236. The area has sufficient parking and accessibility in the surrounding areas. The contractor shall coordinate with the Government representative to gain facility access.
7. HOURS OF OPERATION: The normal hours of operation are 7:30 a.m. through 4:30 p.m., central daylight time (CDT), Monday through Friday, excluding Federal holidays. Project performance is required during normal duty hours. Facility access to work site will be restricted to the above stated hours and days, unless approved otherwise by the Contracting Officer (CO), at no additional cost to the Government.
New Year's Day January 1st Martin Luther King Jr's Birthday 3rd Monday in January President’s Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth June 19th
Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans' Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
8. INSTALLATION ACCESS: Contractor shall coordinate start date, no less than two (2) calendar weeks prior to start of work, with the Government representative(s). Contractor shall repair and/or replace any damaged items, at no additional cost to the Government, and to the satisfaction of the Government representative(s).
9. SITE MAINTENANCE AND CLEAN UP: All shipping and packaging materials shall be removed by the contractor personnel. Contractor shall ensure all leftover wrappings, boxes, paper, and any other related refuse is picked up and properly disposed of off-site on a daily basis. All debris, trash and refuse shall be removed from the site. At completion of project, area shall be left clean and in a final professional appearance. All contractor generated refuse and waste shall be stored in a waste container provided by the contractor and hauled from the project site to a disposal area to be selected by the contractor and shall be located outside the physical boundaries of the installation. Recycle of project and packing materials is required. The contractor shall protect adjacent property, offices and their contents from dust, dirt or other materials. Contractor shall not work or store materials in a manner that would hinder or otherwise block pedestrian circulation to exit corridors and exit doors in the event of an emergency or fire. Storage of materials shall be coordinated with the customer.
10. OCCUPATIONAL SAFETY AND HEALTH. The Contractor shall establish a safety and occupational health program consistent with requirements of the Occupational Safety and Health Administration (OSHA), Title 29 CFR. The Contractor shall also provide Personnel Protective Equipment (PPE) and training consistent with applicable standards. The Contractor shall comply with all national and local fire codes and policies as needed to protect USAF resources (facilities, equipment and USAF personnel). The Contractor shall notify the Government representative(s) of any malfunctioning Government Furnished Equipment (GFE). The Contractor shall immediately report all mishaps involving serious personnel injuries, fatalities, and/or Government property/equipment damage occurring on the job to the responsible Safety Office and the Government representative(s). The Contractor shall fully cooperate with any AF led safety investigation and shall not disturb the mishap scene until proper officials authorize movement.
11. DELIVERY AND STORAGE: In no case is the Government responsible to store product above and beyond the product required to perform this requirement, or to accept direct delivery of freight for the contractor. Entrance to facility will be coordinated through the Government representative(s).
a. The contractor shall be responsible for on-site coordination of all staging and deliveries of their product, to include access to and operation of any equipment needed for unloading and movement of materials or product.
b. Contractor shall be responsible for determination of the appropriate delivery method and handling, based on site conditions to include the existence loading docks and equipment at any given location.
c. Work shall comply with applicable building standards and codes, specifically: National Electrical Code (National Fire Protection Association (NFPA 70) and National Life Safety Code (NFPA 101).
d. The contractor shall be responsible for following all safety and security guidelines within the area in which work is being performed, to include securing any contractor owned tools or equipment, and any on site storage being utilized.
e. The contractor shall maintain accountability and control of any keys and/or passes provided and shall return them to the Government upon completion of work.
f. The contractor shall prevent its personnel from entering any area other than the designated work area to complete the project herein.
g. The contractor shall maintain a means of egress within all designated work areas to comply with fire codes.
12. INSPECTION/ACCEPTANCE: The Government representative(s) shall inspect all work performed by the contractor. The Government representative(s) will document all inspections. Validation between the contractor and the Government representative(s) that all products has been installed according to manufacturer guidelines and customer specifications. A post-installation walkthrough shall be coordinated with the contractor’s authorized representative and Government Inspector/Acceptor.
a. The contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
b. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the CO determines can be accepted separately. The contractor shall notify the Government representative(s), will conduct a final inspection with the contractor, to determine if the project can be accepted or if corrections are required to be completed prior to final acceptance.
c. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
13. RECORDS MANAGEMENT: The contractor shall manage all data created for Government use or legally controlled by the Government, in support of the functional activity or required by AF publication, IAW with the AF Records Management procedures in Air Force Instruction (AFI) 33-322, Air Force Manual (AFMAN) 33-363 and Air Force Instruction (AFI) 33-364 (or their subsequent replacements).
14. SECURITY REQUIREMENTS, CLEARANCE and BADGES:
a. All installation personnel assigned to this requirement shall be a United States citizen, shall have a Local Area Check (LAC) conducted by the contractor and shall identify possible security threats to the installation Security Forces. The contractor shall provide the Government with the names, social security numbers, driver’s license numbers and state of issue, date of birth, and country of birth of personnel performing on this task before they will be allowed on the installation. This information shall be provided at a minimum of 72 hours prior to performance start date in order for the Government representative(s) to coordinate installation access for contract personnel.
Contract personnel not meeting the minimal standards will not be issued an installation pass and will not be allowed access to the installation.
b. Personnel employed by the contractor must get a pass for their privately owned vehicles at the installation Visitor Reception Center, with proof of following:
(1) Liability Insurance
(2) Current License Plates
(3) Current State Inspection Sticker (If required)
(4) Valid State Driver License
(5) A phone number for sponsor on base
c. Vehicles owned by the contractor with the company name permanently printed on them are not required to obtain a pass as long as a current work order is presented at the time of entry. However, current liability insurance, state inspection sticker, and registration is required. The person driving the vehicle must have a valid operator license for the type of vehicle.
d. Upon completion or termination of the contract or expiration of the identification passes, the contractor shall ensure that all base identification passes issued to contractor employees are returned to the issuing office. If a contractor employee has been terminated, the pass will need to be retrieved and returned to Security Forces so that employee does not have base access. If the pass is not retrieved, then SF will need to be notified so base access is not allowed. Upon completion of the contract return all issued installation access passes to the issuing authority.
Failure to comply with these requirements may result in withholding of final payment.
e. The contractor is required to provide identification badges for its employees. All contractor personnel shall wear these badges while on duty on the Government site. Badges are required to identify the individual, company name, and be clearly and distinctly marked as contractor. Size, color, style, etc. are to be mutually agreed upon by contractor and client.
15. APPLICABLE INSTRUCTIONS, PUBLICANTIONS, DIRECTIVES AND GUIDANCE:
NETWORK OPERATIONS AND INFRASTRUCTURE SOLUTIONS (COMPLIANCE)
Standard URL Description
1. AFI 10-701
Operations Security
(OPSEC)
http://static.epublishing.af.
mil/production/1/af_a3_5/p ublication/afi10-701/afi10- 701.pdf
This publication provides guidance for all Air Force personnel (military and civilian) and supporting contractors in implementing, maintaining and executing OPSEC programs. It describes the OPSEC process and discusses integration of OPSEC into Air
2. AFI 33-364
Records Disposition Procedures and Responsibilities http://static.epublishing.af.
mil/production/1/s af_cio_a6/p publication/afi33- 364/afi33-364.pdf
Records Disposition Procedures
3. AFMAN 33-152
User Responsibilities and Guidance for Information Systems http://static.e-publishing.af.mil/productio n/1/s af_cio_a6/p publication/afman33- 152/afman33-152.pdf
This instruction implements Air Force Policy Directive (AFPD) 33-1, Information Resources Management, AFPD 33-2, Information Assurance (IA) Program, and identifies policies and procedures for the use of cyberspace support systems/services and compliance requirements of Secretary of the Air Force, Chief of Warfighting Integration and Chief Information Officer (SAF/CIO A6) managed programs.
These programs ensure availability, interoperability, and maintainability of cyberspace support systems/services in support of Air Force mission readiness and warfighting capabilities. This manual applies to all Air Force military, civilians, contractor personnel under contract by the Department of Defense (DOD), and other individuals or organizations as required by binding agreement or obligation with the Department of the Air Force. This manual applies to the Air National Guard (ANG) and the Air Force Reserve Command (AFRC).
4. AFMAN 33-282
Computer Security
(COMPUSEC)
http://static.e-publishing.af.mil/productio n/1/saf_cio_a6/p publication/afman33- 282/afman33-282.pdf
This AFMAN implements Computer Security in support of AFPD 33-2, Information Assurance Program and AFI 33- 200, IA Management Computer Security (COMPUSEC) is defined within the IA Portion of AFI 33-200.
5. AFPD 33-3
Information Management http://static.e-publishing.af.mil/productio n/1/saf_cio_a6/p publication/afpd33- 3/afpd33-3.pdf
This policy directive establishes Air Force policy for the management of information assets (all forms of data and content), across all AF information sources, as both a strategic resource and corporate asset supporting the warfighter during mission and support operations.
6. AFPD 33-4
Information Technology Governance http://static.e-publishing.af.mil/productio n/1/saf_cio_a6/p publication/afpd33- 4/afpd33-4.pdf
This directive establishes the AF policy for IT Governance to fulfill the AF CIO responsibilities established in federal laws and DoD issuances and the AF IT Governance Executive Board, which will oversee existing IT investment councils, boards, and working groups throughout the IT lifecycle to effectively and efficiently deliver capabilities to users. This directive focuses on aligning IT policy, CIO policy, and capabilities management with doctrine, statutory, and regulatory guidelines that govern accountability and oversight over IT requirements to resource allocation, program development, test, and deployment and operations under the direction and authority of the AF IT Governance Executive Board chaired by the AF CIO.
7. DoDI 8510.01 - DoD Risk Management Framework (RMF) for DoD Information Technology http://www.dtic.mil/whs/di rectives/corres/pd f/851001_2014.pdf
Provides procedural guidance for the reciprocal acceptance of authorization decisions and artifacts within DoD, and between DoD and other federal agencies, for the authorization and connection of information systems (ISs).
Revised from 2007 version on 12 March 2014.
8. DoDI 8500.01 - Cyber Security (CS) http://www.dtic.mil/whs/di rectives/corres/pd f/850001_2014.pdf
The purpose of the Defense Cybersecurity program is to ensure that IT can be used in a way that allows mission owners and operators to have confidence in the confidentiality, integrity, and availability of IT and DoD information, and to make choices based on that confidence
9. DoDI 8551.01 - Ports, Protocols and Services Management http://www.dtic.mil/whs/di rectives/corres/pd f/850001_2014.pdf
10. CJCSI 6211.02D –
Defense Information Systems Network
(DISN)
Responsibilities http://www.dtic.mil/cjcs_d irectives/cdata/un limit/6211_02.pdf
This instruction establishes policy and responsibilities for the connection of information systems (ISs) (e.g., applications, enclaves, or outsourced processes) and unified capabilities (UC) products to the DISN provided transport (including data, voice, and video) and access to information services transmitted over the DISN (including data, voice, video, and cross-domain).
11. DFARS 252.227 -
7013 Rights in Technical Data Non- Commercial Items http://farsite.hill.af.mil/reg html/regs/far2afm cfars/fardfars/dfars/Dfars2 52_227.htm#P6 96_47162
Provides guidelines for rights in technical data on non-commercial items
12. Department of Defense Architecture Framework (DoDAF) Ver2.02 Aug 2010 http://dodcio.defense.gov/ dodaf20.aspx
The Department of Defense Architecture Framework (DoDAF), Version 2.0 is the overarching, comprehensive framework and conceptual model enabling the development of architectures to facilitate the ability of Department of Defense (DoD) managers at all levels to make key decisions more effectively through organized information sharing across the Department, Joint Capability Areas (JCAs), Mission, Component, and Program boundaries. The DoDAF serves as one of the principal pillars supporting the DoD Chief Information Officer (CIO) in his responsibilities for development and maintenance of architectures required under the Clinger-Cohen Act. DoDAF is prescribed for the use and development of Architectural Descriptions in the Department. It also provides extensive guidance on the development of architectures supporting the adoption and execution of Net-centric services within the Department.
13. DFARS 252.227-
7014 Rights in Non-commercial Computer Software http://farsite.hill.af.mil/reg html/regs/far2afmcfars/far dfars/dfars/Dfars252_227.
htm#P6 96_47162
Guidance on rights in technical data and computer software small business innovation research (SBIR) program.
14. DODI 5015.02
DoD Records Management Program http://www.dtic.mil/whs/di rectives/corres/pd f/501502p.pdf
Establishes policy and assigns responsibilities for the management of DoD records in all media, including electronic
Control Room
Screen
ITC Auditorium Building 7356
| PWS_ITC Control Room Upgrade_F2MT1F2054AW01 |
| Bldg 7356 Floor Plan_ITC Project |
| Slide Number 1 |
File details come from the government source that posted it. Updated .