Attch 1 - 22 SOPS T1 to Ethernet Migration PWS.pdf

PDF 120 KB Posted

Attached to
22 SOPS T1 to Ethernet Migration Federal contract opportunity
Solicitation number
FA521525Q0024
Issued by
Department of the Air Force Pacific Air Forces

About this file

This Performance Work Statement (PWS) details the requirements for migrating the Ka'ena Point Space Force Station's (KPSFS) Indo-Pacific Partners (IP2) Land Mobile Radio (LMR) backhaul network from T1 to Ethernet infrastructure. The project aims to modernize the network by transitioning to a Layer 3 Ethernet system, ensuring compliance with Department of Defense and Defense Information Systems Agency (DISA) mandates for serial obsolescence by June 20, 2025.

The scope of work includes comprehensive equipment provisioning, installation, network configuration, and integration tasks. Key requirements involve installing ethernet switches, fiber patches, and associated equipment, configuring routers and switches to meet LMR Backhaul and DISA standards, and conducting extensive testing. The contractor must provide a one-year warranty, deliver detailed documentation, and meet specific performance standards including bandwidth metrics (100Mbps core to remote, 10Mbps site to core), jitter specifications, and cybersecurity requirements. The performance period is from June 20, 2025 to August 20, 2025, with the work to be completed at the Kaʻena Point Space Force Station in Hawaiʻi.

View the file

Other files for this federal contract opportunity

Other files attached to 22 SOPS T1 to Ethernet Migration, newest first.
File Type Posted
Sole Source Justification T1 Redacted.pdf PDF
Attch 2 - FAR Provisions and Clauses.pdf PDF
COMBO Request for Quotation (RFQ).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) for Kaʻena Point Space Force Station (KPSFS)

IP2LMR T1 to Ethernet Migration.

1.0 Introduction

This Performance Work Statement (PWS) defines the requirements for migrating the

KPSFS Indo-Pacific Partners (IP2) Land Mobile Radio (LMR) backhaul network from T1 to

Ethernet, ensuring compliance with the Department of Defense and Defense Information

Systems Agency (DISA) mandate for serial obsolesce by 20 June 2025. This migration modernizes the LMR backhaul to the P25 System Core, improving reliability, security, and ensuring seamless integration.

2.0 Objective

The objective is to transition KPSFS's LMR backhaul network to a Layer 3 Ethernet infrastructure, meeting DoD and DISA requirements and ensuring compatibility with the

P25 System Core.

3.0 Scope of Work

The Contractor shall provide all design, labor, materials, equipment, and supervision necessary to complete the following tasks.

3.1 Equipment Provisioning and Installation:

• Provide and install ethernet switches, fiber patches, and associated mounting equipment, modules, SFP, and power cabling (TAA Compliant) between DISA node and existing LMR equipment.

• Provide fiber conversion if required.

3.2 Network Configuration and Integration:

• Configure routers and switches according to LMR Backhaul design standards and DISA requirements for Layer 3 Ethernet.

• Uninstall and remove existing equipment, as required.

3.3 Testing and Documentation:

• The contractor shall identify and provide approved industry and OEM procedures that outline, sequence, and indicate qualifications for system acceptance, such as 24-hour burn-in, etc. The test procedures will be provided to the Government for review and approval prior to the beginning of any testing. The testing will ensure the system is fully functional, meets the intended use per this PWS and is installed by any required OEM

Military Unique Deployment Guides (MUDG) to provide military unique features. Military unique features, to include Muli-Level Precedence and

Preemption, shall be incorporated into the test procedures. The approved test procedures will be used as a final completion checklist at the date of the installation. Contractor shall provide an Installation Test Acceptance

Plan

• Conduct comprehensive testing with DISA and LMR Cores, and Ethernet certification testing. Provide "as-installed" documentation. As installed documentation refers to documents that explain the capabilities of computer software or provide instructions for using the software. It includes owner's manuals, user's manuals, installation instructions, and operating instructions. Tailored documentation, such as an Installation

Guide and a Deployment Guide, is crucial for supporting users and deployment teams.

3.4 Warranty and Sustainment: Provide a one-year warranty and enhanced support services.

4.0 Deliverables

• Installed and configured equipment data sheets

• Test results and as-installed documentation

• Updated topology diagrams

5.0 Performance Standards

• Network compliant with DoD and DISA requirements (8005.1), including specified performance metrics for bandwidth (100Mbps core to remote, 10Mbps site to core), jitter (10ms point-to-point, 6.7ms meshed), dropped packets

(<0.01%), and latency (<374ms call setup time).

• MPLS and dynamic routing protocols configured as specified by DISA.

• Three-layer QoS scheme implemented and validated.

• Cybersecurity requirements are met, including STIG compliance and protocol encryption.

• All backhaul devices are monitored through UEM.

6.0 Period of Performance

• June 20, 2025 to August 20, 2025

7.0 Place of Performance

• Kaʻena Point Space Force Station, Hawaiʻi

8.0 Government-Furnished Equipment/Information

• Rack space, site preparation, network connectivity (fiber), storage, DISA Layer 3

MPLS circuit, circuit information.

9.0 Security Requirements

• Compliance with all applicable security requirements guides for the Department of Defense information technology systems.

10.0 Acceptance Criteria

• Successful completion of testing and validation procedures demonstrating compliance with all LMR PMO, Motorola and LMR managers requirements.

File details come from the government source that posted it. Updated .