Attch 1 - 2024-05-28_SOW_GH_roof.pdf
PDF 204 KB Posted
- Attached to
- Greenhouse Roof and Endwall Replacement
- Solicitation number
- 12905B24Q0168
About this file
This document appears to be a Statement of Work (SOW) for the "Greenhouse Roof and Endwall Replacement" project at the USDA Agricultural Research Service National Clonal Germplasm Repository in Riverside, CA.
The SOW outlines the requirements for the contractor to provide professional services to remove the existing greenhouse roof panels and endwalls and replace them with 8mm twinwall polycarbonate. The contractor must coordinate with repository personnel to avoid exposure of the trees during the project, which may involve completing the work one chamber at a time. The contractor is also responsible for site cleanup, providing O&M manuals, training, start-up and commissioning, and providing a 1-year warranty on the work.
The related federal contract opportunity solicitation number is 12905B24Q0168. An organized site visit is scheduled for August 12, 2024 at 10:00AM Pacific Time. Proposals are due by the contractor, and the work must be inspected and approved by USDA-APHIS prior to final payment. The work is to be performed at the USDA Agricultural Research Service National Clonal Germplasm Repository in Riverside, CA.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Greenhouse Roof and Endwall
Replacement
USDA Agricultural Research Service National Clonal Germplasm Repository, 1060 Martin Luther King Blvd., Riverside, CA. 925
June XX, 2024
1. Project Title: “Greenhouse Roof and Endwall Replacement”
2. Government Points of Contact
a. CONTRACTING OFFICER (CO):
Michael Hassett
USDA, ARS
Tel. No: 510-292-5186 Email: Michael.hassett@usda.gov
b. RESEARCH PROGRAM REPRESENTATIVES (RPR):
Dr. Robert Krueger
Riverside, CA 92507 Phone: (951) 827-6980 Email: todd.skaggs@usda.gov
c. ADMINISTRATIVE OFFICER (AO):
Nancy E. Knap Riverside, CA 92507 Phone: (951) 369-4813 Email: nancy.knap@usda.gov
d. AREA SAFETY AND HEALTH MANAGER Ken Cushman, Safety and Health Manager Albany, California 94710 Email: ken.cushman@ars.usda.gov Phone: (510) 559-6002
e. ENGINEERING PROJECT MANAGER (EPM)
Peter Lane Albany, CA 94710 Email: peter.lane@usda.gov
f. LOCATION MONITOR Dr. Robert Krueger Riverside, CA 92507 Email: Robert.krueger@usda.gov Phone: 951-827-6980
3. Location: The site of work is located at the Agricultural Research Service National Clonal Germplasm Repository, 1060 Martin Luther King Blvd., Riverside, CA. 92507.
4. Site Visit:
5. Program Need and Justification:
mailto:nancy.knap@usda.gov mailto:ken.cushman@ars.usda.gov mailto:peter.lane@usda.gov mailto:Robert.krueger@usda.gov
The Repository must maintain clean source trees in an APHIS-approved protective structures.
One protective structure is a greenhouse designed, manufactured, and installed by Conley Manufacturing and Sales, Montclair, California. The roof of this structure has begun to deteriorate, particularly the areas near the attachment points to the frame. Therefore, to maintain structural integrity and insect exclusion, the roof must be replaced. Replacement with twin wall poly carbonate will increase durability and decrease temperature fluctuations.
6. Scope of Service: The contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein.
The Contractor shall provide services for the following tasks marked by an “X”.
[X] Provide a technical and cost proposal to complete the project as per project requirements.
[X] Provide and install all material to complete the project as per project requirements.
7. Background/Project Requirements:
Greenhouse:
The existing protective structure is a greenhouse that was designed, manufactured, and installed by Conley Manufacturing and Sales, Montclair, CA. The greenhouse is a steel-frame structure with a width (E-W) of 36 ft, a length (N-S) of 168 ft, and a height at the gable of 15 ft.
All structural components are galvanized steel. The greenhouse is divided into four sections of (from south to north) 60 ft X 36 ft, 24 ft X 36 ft, 24 ft X 36 ft, and 60 ft X 36 ft, designated GHA, GHB, GHC, and GHD, respectively. Vestibules of approximately 8 ft X 8 ft are located at the southern and northern walls.
8. Description of work:
Greenhouse Roof and Endwall Replacement
• Coordinate with Repository personnel in order to avoid exposure of trees during project. This may involve emptying each chamber and doing the job one chamber at a time.
• Remove existing roof panels and replace with 8 mm twinwall polycarbonate.
• Remove existing south and north endwalls and replace with 8 mm twinwall polycarbonate.
• Twinwall polycarbonate panels shall be installed as per manufacturer’s instructions and recommendations.
• Clean up work area as needed, recycling as much material as possible.
• The Government shall retain excess material at its discretion.
• Installation must be inspected and approved by USDA-APHIS before final payment. Inspection will be arranged by Repository personnel. Provide at least 1-week prior notice to arrange an APHIS inspection, for timely inspection.
• Invoices can be approved upon completion of inspection and acceptance by USDA-APHIS inspector.
9. References & Standards: All construction shall comply with ARS Facilities Design
Standards (ARS Manual 242.1, 5-01-12), ARS Energy, Water, and Sustainability Policy (ARS Policy & Procedures 134.2, 11-12-13), ARS Energy, Water, and Sustainability Policy Bulletin (ARS Policy & Procedures Bulletin 15-134.2), governing Building Codes, and all applicable local, regional, State, and Federal regulations. Where one or more Codes or regulations conflict, the more stringent shall apply.
10. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. Special authority may be required for remediation and disposal of ACM, Contractor shall confirm this and obtain this authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
11. Existing Installations/Demolition:
a) Contractor shall modify existing installations as needed to accommodate the new installation. Where applicable contractor shall coordinate demolition or modification of existing installations with the Owner. All disturbances of existing systems shall be thoroughly coordinated with the Owner to prevent disconnecting equipment that may potentially jeopardize in-progress research.
b) The Owner reserves the right to retain any equipment or materials removed as part of this scope of work. The Contractor shall coordinate any equipment or materials to be retained with the Owner prior to starting demolition operations. The Contractor shall legally dispose all equipment or material removed that will not be retained.
c) The contractor shall divert project waste to recycle where practical. The Contractor shall track and document the amount of waste diverted to recycle. The contractor shall submit diversion documentation as part of closeout. If no waste is diverted to recycle, the contractor shall submit a letter stating so and why diversion was not practical.
12. Submittals:
a) Contractor shall provide other relevant illustrations, standard schedules, mix designs, electrical layout and plan, performance charts, instructions, brochures, diagrams, manufacturer descriptive literature, catalog data, etc. applicable to proposed material install.
b) Contractor shall provide a site-specific Safety Plan and an Asbestos Abatement/Management Plan designed to protect the workers and occupants of the buildings during all phases of construction.
c) The descriptive literature shall be annotated/highlighted to show its conformance with contract requirements.
d) Submittals are required for all building materials and equipment and will be stamped and/or signed by the general contractor prior to submission to the Government.
e) Contractor is responsible for any costs incurred for equipment ordered without prior approval
13. Quality Control: The work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor.
14. Temporary Facilities:
a) Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.
b) If wash-down facilities are constructed for abatement activities, Contractor shall dispose wastewater in accordance with State and local regulations.
c) Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the Location Monitor three working days prior to the need
15. Site Cleanup: The construction site shall be kept clean and free of debris at all times.
Clearance air and surface samples shall be taken to verify complete remediation of ACM. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.
16. O&M Manuals
a) O&M manuals shall be submitted upon completion and acceptance of the project.
17. Training/Start-up/Commissioning:
a) Contractor is responsible for start-up, testing, and commissioning of all installed systems.
b) Contractor shall provide user training to cover all safe operation and preventative maintenance actions/frequencies/schedules of equipment included in this solicitation.
18. Final Inspection: The Contractor shall notify the Contracting Officer and Owner in writing
10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time. COR and contractor shall compile a “punch list” prior to final acceptance of the installation and submit completed warranty documentation to manufacturer.
19. Warranty: In addition to any other warranties set out elsewhere in this contract, the
Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
20. Notification and Compliance: The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.
21. Latent Defects: The Warranty specified herein shall not limit the Government’s rights with respect to latent defects, gross mistake, or fraud.
22. Acceptance: Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and excepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment. All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer's certificate. Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor
END
| 2. Government Points of Contact |
| 5. Program Need and Justification: |
| 11. Existing Installations/Demolition: |
| 12. Submittals: |
| 14. Temporary Facilities: |
| 16. O&M Manuals |
| 17. Training/Start-up/Commissioning: |
File details come from the government source that posted it. Updated .