ATTCH 03 PNQS25-5418 Blank AF3052rev.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- FA3300-26-R-0016-0002
About this file
This is a blank Construction Cost Estimate Breakdown form (AF Form 3052) for a federal construction contract. The form is a pricing template established for Project Number PNQS 25-5418, titled "Repair Electrical Systems Airfield," to be performed at Maxwell Air Force Base in Alabama. The work location is identified as the Airfield, with a contract address of 400 Cannon Street, Maxwell AFB, AL. The form lists specific repair work items including 39 Airfield Runway/Taxi Light Fixture Repairs (EA), 8 Airfield PAPI Light Repairs (EA), 1 Airfield Sign (EA), and 412 Circuit Tags (EA), along with a Superintendent labor category.
The form is structured to capture material and equipment costs, labor rates, and other direct costs across 16 construction divisions, with calculations for tax on materials (10%), labor insurance and tax (10%), overhead (10%), profit (10%), and bonds (2.5%). All cost fields are currently blank, as this is a template. The document requires contractor signature and government coordinator signature for certification. This pricing template was submitted in connection with Amendment 0002 to Solicitation FA3300-26-R-0016, issued by the Department of the Air Force Air Education and Training Command, with a revised proposal due date of Wednesday, April 15, 2026, at 12:00 p.m. CDT.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||
| Contractor: | ||
| DATE | ADDRESS |
400 Cannon Street Maxwell Air Force Base Alabama
| 4/13/26 | 400 Cannon Sreet, Maxwell AFB, AL | ||
| CONTRACT FOR (Work to be performed) | |||
| PROPOSED TOTAL CONTRACT PRICE |
| PNQS 25-5418 Repair Electrical Systems | $0.00 | |
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION |
| Maxwell AFB | PNQS 25-5418 | Airfield | |||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER DIRECT | ||||
| COSTS | LINE TOTAL | ||||||||
| UNIT | TOTAL | AVERAGE | |||||||
| RATE | TOTAL | ||||||||
| DIVISION 1 (General Requirements) | |||||||||
| Superintendent | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| ERROR:#VALUE! | AirField Runway/Taxi Light Fixture Repairs | EA | 39 | ||||||
| ERROR:#VALUE! | AirField PAPI Light Repairs | EA | 8 | ||||||
| ERROR:#VALUE! | AirField Signs | EA | 1 | ||||||
| ERROR:#VALUE! | Circuit Tags | EA | 412 | ||||||
| DIVISION 2 (Site Work) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 3 (CONCRETE | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 4 (MASONRY) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 5 (METAL) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 6 (WOOD AND PLASTICS) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 7 (THERM. /MOIST PROT) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 8 (DOORS AND WINDOWS) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 9 (FINISHES) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 11 (EQUIPMENT) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 12 (FURNISHINGS) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 13 (SPECIAL CONSTRUCTION) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 15 (MECHANICAL) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 15 (MECHANICAL) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| DIVISION 16 (ELEC/.FIRE SYSTEM/COMM. | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 |
| Material Costs | $0.00 | |
| Tax on Materials | 10% | $0.00 |
| TOTAL MATERIAL COST | $0.00 |
| Labor Cost | $0.00 | |
| Insurance & Tax on Labor | 10% | $0.00 |
| TOTAL LABOR COST | $0.00 |
| Total Other Direct Costs | $0.00 |
| Total Material, Labor, Tax & Insurance | $0.00 |
| TOTAL DIRECT COSTS | $0.00 |
| Overhead | 10% | $0.00 |
| Subtotal | $0.00 | |
| Profit | 10% | $0.00 |
| Sub Total | $0.00 | |
| Bonds | 2.5% | $0.00 |
| TOTAL | $0.00 |
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
Signature: Gov't Coord Signature:
File details come from the government source that posted it. Updated .