Attatchment 1-KATMAI BAY (WTGB 140) DD FQ4 JBT 21ER0_BLANK.xls
XLS spreadsheet 63 KB Posted
- Attached to
- USCGC KATMAI BAY (WTGB 101) DD FY21
- Solicitation number
- 70Z085-21-Q-P30B5600
About this file
This document includes a pricing schedule and cost estimate template for drydock repairs of the USCGC KATMAI BAY, a 140-foot Bay Class icebreaking tug homeported in Sault Sainte Marie, Michigan. The schedule lists over 50 items of work required including hull inspection and preservation, tank cleaning, machinery overhaul, deck and interior repairs, and drydocking. Pricing is provided for inspection, cleaning and preservation tasks, overhauls, component replacements and repairs. The cost estimate template includes sections for labor hours by trade, material and subcontracted work costs, general and administrative expenses, profit and labor rates by area. The solicitation seeks bids from contractors to furnish all necessary labor, materials and services to perform the drydock repairs in accordance with the specification for the USCGC KATMAI BAY drydock availability in fiscal year 2021. The contracting agency is the Department of Homeland Security United States Coast Guard.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC KATMAI BAY (WTGB-140) DRYDOCK AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect | JOB | 1 | $0.00 | |
| D-002 | U/W Body, Preserve (100%) | JOB | 1 | $0.00 | |
| O-003 | Hull Plating Freeboard, Preserve – Partial | JOB | 1 | $0.00 | |
| D-004 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | $0.00 | |
| D-005 | Bubbler Channels, Inspect | JOB | 1 | $0.00 | |
| D-006 | Chain Locker(s), Clean and Inspect | JOB | 1 | $0.00 | |
| D-007 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect | JOB | 1 | $0.00 | |
| D-008 | Voids (Non-Accessible), Leak Test | JOB | 1 | $0.00 | |
| D-009 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | 1 | $0.00 | |
| D-010 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0.00 | |
| D-011 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | $0.00 | |
| D-012 | Tanks (Ballast), Clean and Inspect | JOB | 1 | $0.00 | |
| D-013 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | 1 | $0.00 | |
| D-014 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | JOB | 1 | $0.00 | |
| D-015 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-016 | Propulsion Shaft Bearings (External), Check Clearances | JOB | 1 | $0.00 | |
| D-017 | Stern Tube Bearing Staves, Renew | JOB | 1 | $0.00 | |
| D-018 | Propeller , Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| O-019 | Propeller, Minor Repairs and Reconditioning, Perform | JOB | 1 | $0.00 | |
| D-020 | Heat Exchangers; Clean, Inspect And Hydro | JOB | 1 | $0.00 | |
| D-021 | Circuit Breakers (60 Hz), Inspect and Test | JOB | 1 | $0.00 | |
| D-022 | Fathometer Transducer, Renew | JOB | 1 | $0.00 | |
| D-023 | Engine Room Ventilation Fans, Overhaul | JOB | 1 | $0.00 | |
| D-024 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | $0.00 | |
| D-025 | Rudder Assembly, Remove, Inspect And Reinstall | JOB | 1 | $0.00 | |
| D-026 | Rudder(s), Preserve (“100%”) | JOB | 1 | $0.00 | |
| D-027 | Rudder Stock Bearings Clearances, Check | JOB | 1 | $0.00 | |
| O-028 | Rudder Stock Bearings (Upper And Lower), Renew | JOB | 1 | $0.00 | |
| D-029 | Rudder Stock, Rebuild | JOB | 1 | $0.00 | |
| D-030 | Anchor Chain(s) and Ground Tackle, Inspect and Repair | JOB | 1 | $0.00 | |
| D-031 | Anchor(s), Preserve | JOB | $0.00 | ||
| D-032 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| O-033 | Tanks (Ballast), Preserve “Partial” | JOB | 1 | $0.00 | |
| O-034 | Chain Lockers, Preserve – Partial | JOB | 1 | $0.00 | |
| O-035 | Tanks, Dirty Oil and Waste, Preserve, Partial, | JOB | 1 | $0.00 | |
| O-036 | Accessible Void(s), Preserve, Partial, | JOB | 1 | $0.00 | |
| O-037 | Tanks (MP Fuel Service), Preserve “Partial” | JOB | 1 | $0.00 | |
| O-038 | Tanks (MP Fuel Storage and Overflow), Preserve “Partial” | JOB | 1 | $0.00 | |
| D-039 | Tanks (Potable Water), Preserve, Partial, | JOB | 1 | $0.00 | |
| D-040 | Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) | JOB | 1 | $0.00 | |
| D-041 | Cathodic Protection, Zinc Anodes, Renew, | JOB | 1 | $0.00 | |
| D-042 | Drydock | JOB | 1 | $0.00 | |
| D-043 | Temporary Services, Provide - Tender | JOB | 1 | $0.00 | |
| D-044 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-045 | Auxillary Machinery Space II, Aft, Preserve | JOB | 1 | $0.00 | |
| D-046 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | $0.00 | |
| D-047 | Fan Room, Preserve | JOB | 1 | $0.00 | |
| D-048 | Voids (Accessible), Clean and Inspect | JOB | 1 | $0.00 | |
| D-049 | Stack Space and Uptake, Preserve | JOB | 1 | $0.00 | |
| D-050 | Sounding Tube, Renew | JOB | 1 | $0.00 | |
| D-051 | WTGB Magnetic Compass Replacement | JOB | 1 | $0.00 | |
| D-052 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| O-053 | Tanks (Grey Water Holding), Preserve “Partial” | JOB | 1 | $0.00 | |
| O-054 | Tanks, Dirty Oil and Waste, Preserve, 100% | JOB | 1 | $0.00 | |
| D-055 | Steering Actuator Overhaul | JOB | 1 | $0.00 | |
| D-056 | Windows, Renew and/or Repair | JOB | 1 | ||
| D-057 | Forward Frames, Repair | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 0 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $500.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(10/23/2020) Draft-1 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .