This document outlines requirements for two inert items and related data deliverables required under a federal contract. The contract requires the delivery of 1377-01-393-4792ES Actuator and 1377-01-654-5421ES Manifold to the Department of the Air Force Materiel Command for use on C-17 aircraft. Key deliverables include engineering change proposals, notices of revision, requests for variance, acceptance test plans, inspection reports and failure analysis reports. Submission deadlines and approval processes are provided for each deliverable. The document also specifies packaging, marking and shipment notification requirements.

View the file

Other files

File Type Posted
FA8213-22-R-3017.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

AIRMUNITION SPECIFICATION

DATE: 12 AUG 2021

FD2020-22-50024

NSN: 1377-01-393-4792ES

1377-01-654-5421ES

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with Attached REPSHIP.

2. Department of Defense Identification Code (DODIC): SQ29, N/A

3. Items shall be marked using accepted practices for marking (reference MIL-STD-130N for guidance). Minimum item marking shall include Government/Manufacturer Part Number, Lot Number (reference MIL-STD-1168C), and Serial Number if applicable.

4. Serial numbers are required for each item, and should be listed individually in the remarks of a Lot Ammunition Data Card, when ADCs are required.

5. The vendor shall serialize items sequentially for this (each) part number. Do not repeat serial numbers unless approved by the government. Serial numbers shall be a minimum of 4 digits.

6. Items are Inert.

7. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For

Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.

Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:

COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639E) NORs – CDRL (DI-SESS-80642E) RFVs – CDRL (DI-SESS-80640E)

Distribution Statement: B, Reason: Administrative or operational (ref. DoDI 5230.24)

8. The contractor shall provide the Lot Acceptance Test Plan (LATP/ATP) for this item(s) in accordance with the contractual data requirements. No changes to previously approved government Acceptance Test Plans shall be made without prior government approval. The Lot Acceptance Test Plan provided must be approved by HAFB engineering at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

9. Lot Acceptance Test Requirements are: in accordance with latest government-approved ATP.

Contractor

10. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF

CDRL: (DI-NDTI-80809B)

11. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization: AFLCMC/EBHJ Organization E-mail: Matthew.tanner.7@us.af.mil

12. In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255B)

13. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.

MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA:

14. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment #5, Clause ES7034)

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

1377013934792ES*

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Engineering Change Proposal (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80639E

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHJ

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

Draft

Final

Reg Repro

16. REMARKS

BLK 4: : Follow format requirements listed under paragraph 2 of Data Item Description. Data deliverable contents of Engineering Change Proposal shall contain all information required by DD Form 1692.

BLK 7: The Letter of Transmittal shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data. The Letter of Transmittal shall be used only for this data item; do not combine other data item submittals with this requirement.

BLK 8: Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation. Notification of approval of the proposed engineering change shall be by signed contract modification.

BLK 9: DISTRIBUTION STATEMENT B. Distribution authorized to U.S.

Government agencies only, (Administrative/Operational Use) (Date of Contract Award). Other requests for this document shall be referred to AFLCMC/EBHJ.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979(Title 50, U.S.C, App 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE - Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLK 14: Submit reports electronically via e-mail in Microsoft Office or PDF format to the following e-mail recipients listed below. Refer to contract for e-mail address of the Government Contracting Officer

(AFLCMC/EBHKB).

robert.morgan.27@us.af.mil (AFLCMC/EBHEC)

*1377016545421ES.

FOB DESTINATION

EBH 21-167-002

Terry McCurdy, AFLCMC/EBHEC, 586-0535

AFLCMC/EBHJ 1 1 0

AFLCMC/EBHEC 1 1 0

AFLCMC/EBHKA 1 1 0

DCMA/QAR 1 1 0

DCMA/ACO 1 1 0

15. TOTAL 5 5 0

G. PREPARED BY

mccurdy.terry.d.1075978215

H. DATE

2021/06/16

I. APPROVED BY

hargrove.eric.v.1167016843

J. DATE

2021/06/17

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE GROUP

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A002

Notice of Revision (NOR)

DI-SESS-80642E

BLK 4: Follow format requirements listed under paragraph 2 of Data Item Description. Data deliverable contents of Notice of Revision shall contain all information required by DD Form 1695.

BLK 8: Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation. Notification of approval of the proposed notice of revision shall be by signed contract modification (AFLCMC/EBHKB).

2751, et seq.) or the Export Administration Act of 1979(Title 50, U.S.C, App 2401 et seq.), as amended. Violations of these export accordance with provisions of DoD Directive 5230.25.

BLK 14: Submit reports electronically via email in Microsoft Office or PDF format to the e-mail recipients listed below. Refer to contract for email address of the Government Contracting Officer

AFLCMC/EBHEC 1 1 0

AFLCMC/EBHKB 1 1 0

15. TOTAL 5 5 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A003

Request for Variance (RFV)

DI-SESS-80640E

BLK 4: Follow format requirements listed under paragraph 2 of Data Item Description. Data deliverable contents of Request for Variance shall contain all information required by DD Form 1694.

submittal of data. The Letter of Transmittal shall be used only for

BLK 8: Government Engineer will perform review of the RFV. Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation. Notification of approval shall be signed contract modification (AFLCMC/EBHKB).

2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App 2401 et seq.), as amended. Violations of these export accordance with provisions of DoD Directive 5230.25.

BLK 14: Submit reports electronically via e-mail in Microsoft Office or PDF format to the following e-mail recipients listed below. Refer to contract for e-mail address of the Government Contracting Officer

AFLCMC/EBHTC 1 1 0

15. TOTAL 4 4 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

TDP TM OTHER QCIC

A004

Acceptance Test Plan

DI-QCIC-80553A

DD

BLK16

BLK 4: Contractor format required.

BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:

https://wawf.eb.mil. The electronic receiving report shall be used only for this data item, do not combine other data item submittals with this requirement.

BLK 8: Comments/approval/disapproval will be submitted within 30 working days of receipt by AFLCMC/EBHJ.

restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directives 5230.25.

BLK 10,11, 12, 13: The contractor shall provide a Acceptance Test Plan after contract award and at least 90 days prior to Lot Acceptance Testing allowing for 30 day approval time. No changes to previously approved government Acceptance Test Plans shall be made without prior notification of AFLCMC/EBHJ. Engineering approval in accordance with Airmunitions Specification.

BLK 14: Report shall be in Microsoft Office or PDF format. Submit through WAWF, DoDAAC, FA8213 .

WAWF 0 1 0

DoDAAC, FA8213

15. TOTAL 0 1 0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

TDP TM OTHER NDTI

A005

Test/Inspection Report

Lot Acceptance Test

DI-NDTI-80809B

DD

BLK 16

BLK 4: Contractor format is acceptable.

BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:

https://wawf.eb.mil. The electronic receiving report shall be used only for that data item; do not combine other data item submittals with this requirement.

Government agencies only (Administrative/Operational Use) (Date of

2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export accordance with provisions of DoD Directives 5230.25.

BLK 10,12,13: Submit within 30 calendar days after completion of each Lot Acceptance Test.

BLK 14: Report shall be in Microsoft Office software or PDF format.

Submit through WAWF, DoDAAC, FA8213.

WAWF 1 0 1

DoDAAC, FA8213

15. TOTAL 1 0 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A006

Failure Summary and Analysis Report

DI-SESS-80255B

BLK 16

BLK 4: Contractor's format required for both the Preliminary and Final report.

submittal of data. The Letter of Transmittal shall be used only for

BLK 8: Comments/approval/disapproval will be submitted within 30 calendar days after receipt by AFLCMC/EBHJ.

restricted by the Arms Export Control Act (Title 22, U.S.C., Sec.

2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C, App. 2401 et seq.), as amended. Violations of these export accordance with provisions of DoD Directives 5230.25.

BLK 10, 12, 13: Submit within 7 calendar days of each failure.

Final with 15 calendar days after receipt of AFLCMC/EBHJ comments.

BLK 14: Report shall be in Microsoft Office or PDF format. Submit via e-mail to cognizant Hill AFB Contracting Officer.

Contr. Officer 0 1 0

Hill AFB, UT

15. TOTAL 0 1 0

ITEM DESCRIPTION

NSN

1377013934792ES

CAGE

06331

REFERENCE NUMBER

824463-2

NOUN

ACTUATOR,EXPLOSIVE,

END ITEM

C-17

TCTO NUMBER TO NUMBER

11A-1-10

CRITICALITY CODE

F

DEMILITARIZATION CODE

D

SECURITY CODE

MDC

WZ1

ES CODE

WQ

REMARKS

INITIATOR

NAME

RICHARD.G.WETZ

ORGANIZATION / OFFICE SYMBOL

AFLCMC / EBHJ

DSN PHONE

775-4851

COMMERCIAL PHONE

801-775-4851

ITEM DESCRIPTION DATA

LENGTH ( IN )

6.0000

WIDTH ( IN )

2.0000

HEIGHT ( IN )

2.0000

WEIGHT ( LB )

0.5000

OTHER DIMENSIONS

ITEM MATERIAL

Metal body with interal o-rings

ITEM FUNCTION

Gas pressure from an external cartridge provides a mechanical means to postion to the floatation device.

SAFETY CRITICAL SCREW

THREADED COMPONENT

ESD CEMS SENSITIVE DATA

STATEMENT OF HELIUM CONTENT (%) 0 PRECIOUS METAL INDICATOR CODE

GFM REQUIRED GFE REQUIRED GFP REQUIRED

JEWEL BEARING JEWEL BEARING RELATED

LEGACY ITEM DESCRIPTION

CYLINDRICAL, STAINLESS STEEL DEVICEMEASURING 2.3 IN DIAM BY 22 IN LONG. HAS A THREADED CAP ON EACH END. ONE END

CAP HAS A .75 INCH PORT TO RECEIVE A GAS PRESSURE CARTRIDGE.

Page 1 of 1ITEM DESCRIPTION Version 1Generated by PRPS using Jasper Reports on 12 Aug 2021

ITEM DESCRIPTION

NSN

1377016545421ES

CAGE

06331

REFERENCE NUMBER

825698-1

NOUN

MANIFOLD,SMDC,4PORT

END ITEM

C-17A

TCTO NUMBER TO NUMBER

11A-1-10

CRITICALITY CODE

F

DEMILITARIZATION CODE

D

SECURITY CODE

MDC

WZ1

ES CODE

WQ

REMARKS

INITIATOR

NAME

KENNETH.G.MCCORMICK

ORGANIZATION / OFFICE SYMBOL

AFLCMC / EBHJ

DSN PHONE

586-2327

COMMERCIAL PHONE

801-586-2327

ITEM DESCRIPTION DATA

LENGTH ( IN )

1.6800

WIDTH ( IN )

1.6180

HEIGHT ( IN )

0.8100

WEIGHT ( LB )

0.1250

OTHER DIMENSIONS

ITEM MATERIAL

Machined Aluminum Alloy

ITEM FUNCTION

Four port junction for SMDC detonation transfer.

SAFETY CRITICAL SCREW

THREADED COMPONENT

ESD CEMS SENSITIVE DATA

STATEMENT OF HELIUM CONTENT (%) 0 PRECIOUS METAL INDICATOR CODE

GFM REQUIRED GFE REQUIRED GFP REQUIRED

JEWEL BEARING JEWEL BEARING RELATED

LEGACY ITEM DESCRIPTION

Page 1 of 1ITEM DESCRIPTION Version 1Generated by PRPS using Jasper Reports on 12 Aug 2021

Item Description_1377013934792

Item Description_1377016545421

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 22-50024

Date Contract Awarded:

Final Delivery Date FDD:

Program Name: C-17

DODIC: SQ29, N/A

undefined: V undefined_2: V undefined_3: V undefined_4: V undefined_5: V undefined_6: N undefined_7:

undefined_8:

undefined_9:

undefined_10:

undefined_11:

undefined_12:

Text19: PSEMC

Text20: 06331

Text21:

Text22:

Text23:

Text24: 1.Inspection

Text25: 2. Leak Test

Text26: 3. X-Ray/N-Ray

Text27: 4. Preparation for Shipment

Text28: 5. Shippers (DD250, DD1149, Reports)

Text29: 6. Additional Requirements

Text30:

Text31:

Text32:

Text33:

Text34:

Text35:

Text36: 1. Visually verify.

2. Verify gross/fine leak checks are performed per ATP requirements.

3. If items are X-rayed/N-rayed, ensure film labeling is correct and radiographic film is readable / well-defined. DCMA is not required to interpret film.

4. Ensure Paperwork is correct.

5. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M).

6. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2021-05-26T11:36:34-0600

TANNER.MATTHEW.W.1379435919

Text46: 2021-05-26

Text49:

Type name_1:

Type name_4:

Part Number:

Noun: 824463-2, 825698-1

REPSHIP Data Requirements for Individual Shipments of Hazardous Material (HAZMAT) and Inert Component Parts - Continental United States (CONUS) to CONUS, CONUS to Overseas or From All

Overseas Locations FROM: Shipping Activity To: Domestic Customer or Transshipping Activity Clearance Authority (Ocean) or Customer Service

Branch (CSB) (Air) or CONUS Sea Terminal

INFO: GACP TRANSPORTATION, HILL AFB UT - (AFLCMC / EBHMB)

email: ooalc.gacp.transportation@us.af.mil or FAX (801) 777-1089.

INFO: Sponsoring Service Accountable Supply Activity Ultimate Consignee/ Final Destination

SUBJ: Report of Shipment (REPSHIP)

1. Shipment Date written as a three-digit day of the year (Julian)

2. Estimated Time of Arrival (ETA) written as a three-digit day of the year (Julian) (Observe Standard Transit

Time (STT), if CONUS Truck Shipment and no Required Delivery Date (RDD) identified)

3. Required Delivery Date (RDD) or Delivery Date (DD), if specified

4. Carrier

5. Bill of Lading (BL) Number (Notes 1, 2, 3, 4)

6. Military Traffic Expediting-Greater Security (MTX-GS) Service Number (Notes 1, 2, 3)

7. Air Release Number (Notes 1, 2, 3) or for Surface Shipments, Export Traffic Release (ETR) Number and

Vessel Name and/or Voyage Document Number

8. Shipment (Cargo) Name (Example: Bombs)

9. Container and Seal Number (if applicable):

a. Container Transportation Control Number (TCN)

b. Total Weight of Contents

c. Rounds, Pieces, Weight, Cube, Condition code, and Lot Numbers (Note 4)

10. Security Risk Category (SRC), (E.G., Security Risk Category I, II, III, IV, Unclassified, Confidential, Secret, None)

11. Controlled Item Inventory Code (CIIC)

12. Total Net Explosive Weight (NEW)

13. Hazard Classification (s)

14. Department of Defense Identification Code / Navy Ammunition Logistic Code (DODIC/NALC). (Note 4).

15. Name, address, and phone number of person responsible for information contained in REPSHIP

NOTES:

1. When the conveyance contains more than one shipment unit, repeat the data elements in separately lettered paragraphs for each shipment unit.

2. Cargo for more than one vessel or flight, but shipped to Port of Embarkation (POE) in a single conveyance, is included in a single REPSHIP. When cargo for a single vessel is moved to the Seaport of Embarkation (SPOE) in more than one conveyance, repeat all the data elements as above in separate numbered paragraphs for each conveyance or REPSHIP.

3. A separate REPSHIP is used for each mode of shipment to the POE.

4. Lot number, DODIC and NALC are not mandatory fields. If available, they may be provided in the electronic

RESHIP or in the template above. If a CBL is used, the lot number and ammunition condition code should be included in the remarks section. Weapons must be identified on the CBL by each serial number contained within the shipment.

5. DODIC and NALC are codes used specifically for logistic administration and control of ammunition.

Attachment 1 mailto:ooalc.gacp.transportation@us.af.mil

1. Shipment Date written as a three-digit day of the year (Julian)

2. Estimated Time of Arrival (ETA) written as a three-digit day of the year (Julian) (Observe Standard Transit Time (STT), if CONUS Truck Shipment and no Required Delivery Date (RDD) identified)

3. Required Delivery Date (RDD) or Delivery Date (DD), if specified

4. Carrier

5. Bill of Lading (BL) Number (Notes 1, 2, 3, 4)

6. Military Traffic Expediting-Greater Security (MTX-GS) Service Number (Notes 1, 2, 3)

7. Air Release Number (Notes 1, 2, 3) or for Surface Shipments, Export Traffic Release (ETR) Number and Vessel Name and/or Voyage Document Number ...

8. Shipment (Cargo) Name (Example: Bombs)

9. Container and Seal Number (if applicable):

a. Container Transportation Control Number (TCN)

b. Total Weight of Contents

c. Rounds, Pieces, Weight, Cube, Condition code, and Lot Numbers (Note 4)

10. Security Risk Category (SRC), (E.G., Security Risk Category I, II, III, IV, Unclassified, Confidential, Secret, None)

11. Controlled Item Inventory Code (CIIC)

12. Total Net Explosive Weight (NEW)

13. Hazard Classification (s)

15. Name, address, and phone number of person responsible for information contained in REPSHIP

NOTES:

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(ES7034)

Existing Packaging Statement of Work January 2019

SPECIAL PACKAGING INSTRUCTIONS RETRIEVAL & EXCHANGE SYSTEM (SPIRES)

Contractors may request the use of SPIRES website to view item packaging requirements or search for Special Packaging Instruction drawings via the following website: https://spires.wpafb.af.mil/

REUSABLE CONTAINERS

The contractor shall safeguard all received reusable shipping containers that meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets. The contractor shall dispose of and replace unserviceable containers with new containers that meet requirements of the AFMC Form 158. Contact the Administering Contracting Office (ACO) for disposition and replacement when Long Life Reusable Containers (LLRC) are received in an unserviceable condition.

REPORTING DISCREPANCIES

The contractor shall use Web Supply Discrepancy Report (WebSDR) to submit/reply to a Supply Discrepancy Report (SDR), when improperly packed assets are received/shipped in other than the contracted packaging requirements (coded data or Special Packaging Instructions (SPI) drawings) from Department of Defense (DoD) components or contractor activities. The contractor shall request a WebSDR account via the following website: https://www.transactionservices.dla.mil/daashome/homepage.asp (See Defense Logistics Management (DLMS) 4000.25-M, Volume 2, Supply Standard and Procedures, Chapter 17, Supply Discrepancy Reporting)

Exceptions when no damage has occurred are as follows:

- Items packaged before the current SPI date.

- An alternate pack may be used, provided the prime Air Force Sustainment Complex, Packaging Office at the Air Logistics Complex (ALC) approves and issues a waiver and deviation number, which would be annotated on the exterior container on the lower right hand portion of the identification side of the container.

- In accordance with Technical Order (TO) 00-85B-3, How to Package Air Force Spares, the contractor may substitute the next larger size fast pack, of the type I or type II to ship transportation priorities 1 and 2 shipments as long as there is no decrease in any of the container dimensions without the requirement of a waiver deviation. TO 00-85B-3, para 4.2 can be accessed via the website:

- https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082416-00-85B-3.pdf

ASSIST Documents for Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions The contractor shall use the ASSIST website to access specification, standards, data item descriptions documents listed in this contract solicitation:

FAR 52-211-2 Availability of Specifications, Standards, and Data Item Descriptions listed in the Acquisition Streamlining and Standardization Information System https://quicksearch.dla.mil/ https://spires.wpafb.af.mil/ https://www.transactionservices.dla.mil/daashome/homepage.asp https://www.tinker.af.mil/Portals/106/Documents/Technical%20Orders/AFD-082416-00-85B-3.pdf https://quicksearch.dla.mil/#/

Existing Packaging Statement Of Work (Cont)

AFSC

406 SCMS/GULAA

Attn: ROBERT (BOBBY) TOMAC

DSN: 777-4454

COMM: 801-777-4454

E-mail: ROBERT.TOMAC@US.AF.MIL

APPLICABLE GOVERNMENT PACKAGING DOCUMENTS

NOTE: UTILIZE THE MOST RECENT REVISION

DLMS 4000.25, Defense Logistics Management Systems, Volume 2, Change 10, Supply Standards and Procedures, Chapter 17, Supply Discrepancy Reporting

TO 00-85B-3 How to Package Air Force Spares

Exceptions when no damage has occurred are as follows:

ASSIST Documents for Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions

Existing Packaging Statement Of Work (Cont)

File details come from the government source that posted it. Updated .