Attachments.pdf

PDF 5 MB Posted

Attached to
Grounds Maintenance Services, West Thompson Lake, N. Grosvenordale, CT
Solicitation number
W912WJ25Q0060
Issued by

About this file

These are detailed mowing area maps for the West Thompson Dam facility, prepared by the U.S. Army Corps of Engineers for 2025 grounds maintenance. The document outlines five distinct mowing zones (Areas A, B, C, E, G, H, K, and L) with specific maintenance frequencies and acreage requirements: approximately 4.6 acres to be mowed weekly and 15.3 acres to be mowed every other week. The maps include precise geographic locations, noting specific areas like the Recreation Road, Park Office, Dam Area, Overlook Shelter, and Utility Garages, with annotations for special conditions such as steep slopes and areas requiring grass clipping removal. Key locations are marked along Reardon Road, West Thompson Road, and around various dam infrastructure, with each area color-coded to indicate mowing frequency.

View the file

Other files

File Type Posted
Amendment W912WJ25Q0060-0001.pdf PDF
Solicitation W912WJ25Q0060.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEST THOMPSON DAM U.S. ARMY CORPS OF ENGINEERS

BUILDING STRONG ® ®

OVERVIEW OF MOWING AREAS

2025 MOWING AREAS

WEST THOMPSON DAM

FEBRUARY 2025

Ch urc hS t

Re ard on Ro ad

Figure 5

Ra ve ne lle

Ro ad

West Thomps on Rd

Figure 2

Figure 3

Weekly Every Other Week

FIGURE 1

Figure 4

AREA FREQUENCY ACRES

A Once Weekly 0.8 B Once Weekly 0.3 C Once Weekly 2.1 E Once Weekly 1.4

Total Once Weekly 4.6 NOTE: AREA D is not included in this contract.

AREA FREQUENCY ACRES

G Every Other Week 3.2 H Every Other Week 0.8 K Every Other Week 3.5 L Every Other Week 7.8

I - NOT INCLUED IN CONTRACT

J - NOT INCLUED IN CONTRACT

N - NOT INCLUED IN CONTRACT

U - NOT INCLUED IN CONTRACT

TOTAL -Every Other Week 15.3

Reardon Road Dike

Area H

Recr eat ion Area Road

Ar ea

C

Ar ea

C Re ard on

R d

Remove grass clippings from this

0.34 acre section of Area C

Area E

WEST THOMPSON DAM U.S. ARMY CORPS OF ENGINEERS

BUILDING STRONG ® ®

FIGURE 2

2025 MOWING AREAS

RECREATION ROAD AND DIKE

WEST THOMPSON DAM

FEBRUARY 2025

Every Other Week Weekly

Remove Clippings

Area Type Acres C Weekly 2.1 E Weekly 1.4 H Every Other Week 0.8

FIGURE 3

2025 MOWING AREAS

PARK OFFICE

WEST THOMPSON DAM

FEBRUARY 2025

Weekly Every Other Week

Park Office

Area K

Area B Barn

Area B

SEE FIGURE 4

Area B

Re ard on Ro ad

Area B

Area K

Area K

Area Type Acres B Weekly 0.3 K Every Other Week 3.5

Area K

FIGURE 4

2025 MOWING AREAS

DAM AREA

WEST THOMPSON DAM

FEBRUARY 2025

Every Other Week

Re ar do nR oa d

Area L

West Thompson Road

Significant Areas of Trimming

SEE FIGURE 3

Area Type Acres L Every Other Week 7.8

NOTE: Significant trimming along dam rock edge and shoreline.

FIGURE 5

FEBRUARY 2025

Weekly Every Other Week

Area G

Area A

Ov erl oo k S he lte r R oa d

West Thompson Road

Utility Garages

Area A

2025 MOWING AREAS

OVERLOOK SHELTER &

UTILITY GARAGES

WEST THOMPSON DAM

Overlook Shelter

Area Type Acres A Weekly 0.8 G Every Other Week 3.2 U Every Other Week 0.7

STEEP SLOPE

NOTE: STEEP SLOPE

File details come from the government source that posted it. Updated .