Attachments.pdf
PDF 5 MB Posted
- Solicitation number
- W912WJ25Q0060
About this file
These are detailed mowing area maps for the West Thompson Dam facility, prepared by the U.S. Army Corps of Engineers for 2025 grounds maintenance. The document outlines five distinct mowing zones (Areas A, B, C, E, G, H, K, and L) with specific maintenance frequencies and acreage requirements: approximately 4.6 acres to be mowed weekly and 15.3 acres to be mowed every other week. The maps include precise geographic locations, noting specific areas like the Recreation Road, Park Office, Dam Area, Overlook Shelter, and Utility Garages, with annotations for special conditions such as steep slopes and areas requiring grass clipping removal. Key locations are marked along Reardon Road, West Thompson Road, and around various dam infrastructure, with each area color-coded to indicate mowing frequency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ25Q0060-0001.pdf | ||
| Solicitation W912WJ25Q0060.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WEST THOMPSON DAM U.S. ARMY CORPS OF ENGINEERS
BUILDING STRONG ® ®
OVERVIEW OF MOWING AREAS
2025 MOWING AREAS
WEST THOMPSON DAM
FEBRUARY 2025
Ch urc hS t
Re ard on Ro ad
Figure 5
Ra ve ne lle
Ro ad
West Thomps on Rd
Figure 2
Figure 3
Weekly Every Other Week
FIGURE 1
Figure 4
AREA FREQUENCY ACRES
A Once Weekly 0.8 B Once Weekly 0.3 C Once Weekly 2.1 E Once Weekly 1.4
Total Once Weekly 4.6 NOTE: AREA D is not included in this contract.
AREA FREQUENCY ACRES
G Every Other Week 3.2 H Every Other Week 0.8 K Every Other Week 3.5 L Every Other Week 7.8
I - NOT INCLUED IN CONTRACT
J - NOT INCLUED IN CONTRACT
N - NOT INCLUED IN CONTRACT
U - NOT INCLUED IN CONTRACT
TOTAL -Every Other Week 15.3
Reardon Road Dike
Area H
Recr eat ion Area Road
Ar ea
C
Ar ea
C Re ard on
R d
Remove grass clippings from this
0.34 acre section of Area C
Area E
WEST THOMPSON DAM U.S. ARMY CORPS OF ENGINEERS
BUILDING STRONG ® ®
FIGURE 2
2025 MOWING AREAS
RECREATION ROAD AND DIKE
WEST THOMPSON DAM
FEBRUARY 2025
Every Other Week Weekly
Remove Clippings
Area Type Acres C Weekly 2.1 E Weekly 1.4 H Every Other Week 0.8
FIGURE 3
2025 MOWING AREAS
PARK OFFICE
WEST THOMPSON DAM
FEBRUARY 2025
Weekly Every Other Week
Park Office
Area K
Area B Barn
Area B
SEE FIGURE 4
Area B
Re ard on Ro ad
Area B
Area K
Area K
Area Type Acres B Weekly 0.3 K Every Other Week 3.5
Area K
FIGURE 4
2025 MOWING AREAS
DAM AREA
WEST THOMPSON DAM
FEBRUARY 2025
Every Other Week
Re ar do nR oa d
Area L
West Thompson Road
Significant Areas of Trimming
SEE FIGURE 3
Area Type Acres L Every Other Week 7.8
NOTE: Significant trimming along dam rock edge and shoreline.
FIGURE 5
FEBRUARY 2025
Weekly Every Other Week
Area G
Area A
Ov erl oo k S he lte r R oa d
West Thompson Road
Utility Garages
Area A
2025 MOWING AREAS
OVERLOOK SHELTER &
UTILITY GARAGES
WEST THOMPSON DAM
Overlook Shelter
Area Type Acres A Weekly 0.8 G Every Other Week 3.2 U Every Other Week 0.7
STEEP SLOPE
NOTE: STEEP SLOPE
File details come from the government source that posted it. Updated .